Loading...
HomeMy WebLinkAboutH_2024_Annual ReportAnnual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 1 Revised 02/14/2025 INSTRUCTIONS Each Planning Commission/Board must approve an Annual Report for the reporting calendar year 2024 (January 1, 2024 - December 31, 2024, as required under §1-207(b) of the Land Use Article. In addition, the Annual Report shall be filed with the local legislative body and the Maryland Department of Planning (MDP), via email to david.dahlstrom@maryland.gov and cc: to mdp.planreview@maryland.gov. Hardcopy will no longer be accepted. A jurisdiction may use the attached template form, or any of the previous Annual Report forms. The Land Use Article requirements have not changed for calendar year 2024, however, the templates have been modified to address the new reporting requirements for local jurisdictions with at least 150,000 residents. These changes are generally limited to Section V, Part A, and the new Section V, Part B, to address the provisions of HB131 and Land Use Article §7–105. Section I- New Residential Permits, and Section II- Amendments and Growth-Related Changes, are required by all local jurisdictions. Section III- Development Capacity Analysis, is required every three years. Section IV- Locally Funded Agriculture Preservation, is required for counties only. Section V – Measures and Indicators, is required for jurisdictions reporting more than 50 new residential permits in Section I. If new permit data is not available, MDP will accept new occupancy data, provided the jurisdiction describes this deviation in its submission. Section B is new for CY2024 and applies only to a local jurisdiction with at least 150,000 residents. Section VI- Adequate Public Facility Ordinances, is required every two years for jurisdictions with adopted Adequate Public Facility Ordinances (APFOs). Jurisdictions may delete this Section from their report if they have not adopted an APFO. Section VII – Planning Survey Questions is optional. Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 2 Revised 02/14/2025 Section I: New Residential Permits Issued (Inside and Outside the PFA) (§1-208(c)(1)(i) and (c)(3)(ii)) (A) In Table 1, New Residential Permits Issued (Inside and Outside the PFA) below, enter the number of new residential building permits issued in calendar year (2024). Enter 0 if no new residential building permits were issued in 2024. Table 1: New Residential Permits Issued Inside and Outside the Priority Funding Area (PFA) Residential – Calendar Year 2024 PFA Non - PFA Total New Residential Permits Issued 121 61 182 Note: If new residential permit data is not available or tracked, jurisdictions are encouraged to begin a process to track the number of new residential permits approved. MDP will accept new residential occupancy permits as a substitute for new residential permits, provided that the jurisdiction represents the data as new occupancy permits, rather than new residential permits, in this template or other reporting form submitted to MDP. Similarly, if permitting data that specifies within and without of the PFA is not available, and the jurisdiction submits data related to a locally defined growth area, instead of PFAs, then the jurisdiction should consider a future process to track permits within the PFA. MDP will accept permit or occupancy data specific to a locally defined growth area, provided that the jurisdiction represents the data as such in this template or other reporting form submitted to MDP, rather than as PFA. Section II: Amendments and Growth Related Changes In Development Patterns (§1-207(c)(1) through (c)(4)) Note: Growth related changes in development patterns are changes in land use, zoning, transportation capacity improvements, new subdivisions, new schools or school additions, or changes to water and sewer service areas. (A) Were any new comprehensive plan or plan elements adopted? If yes, briefly summarize what was adopted. Y N No new comprehensive plan or plan elements were formally adopted during 2024. The second draft of the 2040 Washington County Comprehensive Plan was released for ninety (90) day public comment in July 2024. Staff reviewed comments and revised the document. The Washington County Planning Commission held a public hearing in January 2025 and further revised the Plan before recommending approval of the Plan to the Board of County Commissioners. The BOCC public hearing is scheduled for June 3, 2025. (B) Were there any amendments to zoning regulations or zoning map? If yes, briefly summarize each amendment, include an updated zoning map, and/or GIS shapefile, if available. Y N Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 3 Revised 02/14/2025 RZ-23-006 • Piecemeal application – Zoning Ordinance map amendment to create a Rural Business floating zone over 2.0 acres, located on the south side of Reidtown Road, west of Marsh Pike. The property, located at 19815 Reidtown Road, will be used for an Auto Body Repair Shop. The underlying zoning is Rural Village. RZ-23-007 • Piecemeal application – Zoning Ordinance map amendment to create a Historic Preservation District overlay on part of a parcel located on the east side of Smithsburg Pike. The request is for 2.46 acres, located at 13215 Smithsburg Pike. The underlying zoning is Agricultural Rural. RZ-23-008 • Piecemeal application – Zoning Ordinance map amendment to rezone two parcels located on the east side of South Artizan Street, south of Kenilworth Avenue from Highway Interchange to Rural Transition. The properties, located at 429 and 431 South Artizan Street, are 0.47 and 0.27 acres in size, respectively, and will be used for residential purposes. RZ-24-001 • Text application - Zoning Ordinance text amendment to Section 23.4 pertaining to removing high-density warehouses from the list of uses exempt from height limitations. RZ-24-002 • Piecemeal application – Zoning Ordinance map amendment to create a Rural Business floating zone over 6.82 acres (of the 50.28-acre parcel), located on a private lane on the north side of National Pike, east of Saint Paul Road. The property, located at 12635 Flying Duck Lane, will be used for a wood planner shop, agricultural equipment rental, produce sales, woodstove sales and cemetery monument sales. The underlying zoning is Agricultural Rural. RZ-24-003 • Text application - Zoning Ordinance text amendment to Sections 3, 7A, 8, 9, 10, 11, 12, 13, 14, 19C & 28A to address the State legalization of adult-use cannabis and where the dispensaries, processing facilities and growing facilities can be located. Case Number RZ-23-006 Ralph E & Leah A Martin (Map) 19815 Reidtown Road 2.0 A(R) RB (AR) 2/13/2024 RZ-23-007 Jeffrey & Laura Unsworth (Map) 13215 Smithsburg Pike 2.46 A(R) A(R) HP 1/9/2024 RZ-23-008 Williamsport Storage Bins, Inc. 429/431 S. Artizan Street 0.74 HI RT 3/12/2024 RZ-24-001 Washington County Planning Commission (Text)Section 23.4 (Warehouse height limitations) n/a n/a n/a 5/7/2024 RZ-24-002 John Halteman 12635 Flying Duck Lane 6.82 A(R) RB (AR) 11/19/2024 RZ-24-003 Washington County Planning Commission (Text) Sections 3, 7A, 8, 9, 10, 11, 12, 13, 14, 19C & 28A (Cannabis)n/a n/a n/a 10/15/2024 Name Location Total Acres From Zone To Zone Decision Date Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 4 Revised 02/14/2025 (C) Were there growth-related changes, including land use, annexations, zoning ordinance changes, new schools, changes in water or sewer service areas, municipal annexations that changed municipal or unincorporated area boundaries? If yes, describe or attach a map of the changes and/or GIS shapefile, and describe how they are consistent with internal, state, or adjoining jurisdiction plans. Y N Hagerstown Annexation: A-2024-01 • The ’55 West Oak Ridge’ annexation is located along the south side of West Oak Ridge Drive, east of Downsville Pike, consists of 74.14 acres, and was effective on 5/17/2024. County Zoning was Highway Interchange; new City Zoning is Industrial – Mixed Use. Hagerstown Annexation: A-2024-003 • The ’45 West Oak Ridge’ annexation is located along the south side of West Oak Ridge Drive, east of Downsville Pike, consists of 52.0 acres, and was effective on 8/23/2024. County Zoning was Highway Interchange, new City Zoning is Industrial - Mixed Use. Hagerstown Annexation: A-2024-004 • The ‘Heavens Heights Homes’ annexation is located along the north side of Southern Boulevard, east of Villa Ridge Drive, consists of 12.08 acres, and was effective on 7/12/2024. County Zoning was Residential Suburban, new City Zoning is Residential – Moderate Density. WS-24-001 • Property owner request to change both Water and Sewer designations on a 24.11-acre piece of property located in the southeast quadrant of MD-340 and Keep Tryst Road. A seven (7) lot subdivision is planned for the parcel with current designation W-3/S-3. The request is to change the designation to W-1/S-1. Administrative Amendment due to mapping error was effective 6/10/2024. WS-24-002 • Property owner request to change the Sewer designation on five (5) parcels (8.95 acres) located in the northeast quadrant of MD-64 and MD-77. A multi-lot subdivision is planned for the area with current sewer designation S-5. The request is to change the sewer designation to S-3. Administrative Amendment due to mapping error was effective 7/23/2024. WS-24-003 • Property owner request to change both Water and Sewer designations on a 9.73-acre piece of property located at 15919 Spielman Road. Commercial development is planned for the parcel with current designation W-5/S-5. The request is to change the designation to W-3/S- 3. Administrative Amendment due to mapping error was effective 11/5/2024. WS-24-004 • Property owner request to change both Water and Sewer designations on a 99.24-acre piece of property located at 16545 Cargo Drive. Industrial development is planned for the parcel with current designation W-5/S-5. The request is to change the designation to W-3/S-3. Administrative Amendment due to mapping error was effective 11/5/2024. Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 5 Revised 02/14/2025 (D) If yes to municipal annexations, have copies of each adopted resolution been submitted to: Georgeanne Carter, Legislative Counsel Municipal Resolution Reposition Department of Legislative Services, 90 State Circle, Annapolis MD, 21401-1991? Y N (E) Did your jurisdiction identify and/or implement recommendations, related to the following general planning topics, to improve the local planning and/or development process? Please select all that apply. Y N  Green Infrastructure  Zoning Reform  Climate Change  Affordable/Workforce Housing  Equity  Resilience  Water/Air Quality  Water/Sewer Capacity  Brownfield Remediation  Revitalization and Infill  Bike/Ped Planning  Commercial Redevelopment  Sustainable Growth  Placemaking  Aging Population  Sensitive Area Preservation  Expedited Review for Preferred Projects Please describe any other planning improvements identified or implemented in 2024. (F) Have all Planning (Commission/Board) and Board of Appeals members completed the Maryland Planning Commissioners Association (MPCA) training course? Y N Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 6 Revised 02/14/2025 Section III: Development Capacity Analysis (DCA)(§1-208(c)(1)(iii)) Note: MDP provides technical assistance to local governments in completing development capacity analyses. Please contact your MDP regional planner for more information. (A) Has an updated DCA been submitted with your annual report or to MDP within the last three years? Y N 1. If no, explain why not, such as, no substantial growth changes. The County’s development capacity analysis continues to be analyzed as part of the draft of Washington County’s 2040 Comprehensive Plan which is scheduled for a Washington County Board of County Commissioners public hearing on June 3, 2025. Once the 2040 Comprehensive Plan is adopted, a DCA will be submitted with that year’s annual report. 2. If yes, when was the last DCA submitted? Identify month and year: Note: A DCA is not due if a comprehensive plan was updated in the past three years (2021-2024). MDP recommends that jurisdictions share DCAs with local school boards. Was the DCA shared with the local school board facilities planner? Y N (B) Using the most current DCA available, provide the following data on capacity inside and outside the PFA in Table 2, Residential Development Capacity (Inside and Outside the PFA): Table 2: Residential Development Capacity (Inside and Outside the PFA) Parcels & Lots w/ Residential Capacity PFA Non – PFA Total Residentially Zoned Acres w/ Capacity Residential Parcel & Lots w/Capacity Residential Capacity (Units) Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 7 Revised 02/14/2025 Section IV: (Locally) Funded Agricultural Land Preservation & Local Land Use Goal (Counties Only) (§1-208(C)(1)(iv and v) (A) How many acres were preserved using local agricultural land preservation funding? Enter 0 if no land was preserved using local funds. Enter the value of local program funds, if available. Table 3: Locally Funded Agricultural Land Preservation* Local Preservation Program Type Acres Value ($) MALPF Easements (6) 929.95 $4,545,507 Rural Legacy Easements (5) 544.13 $2,093,352 MARBIDCO (3) 501.02 $1,366,657 Total 1,975.10 $8,005,516 *State funded agricultural land preservation acres and values are not required to be reported as state funding is documented. (B) What is the county’s established local land use percentage goal? This percentage should include land uses within PFAs, not including PFA comment areas Washington County does not have a percentage goal for land preservation efforts. We have had a long-established acreage goal of 50,000 acres. (C) What is the timeframe for achieving the local land use percentage goal? 20-30 Years. (D) Has there been any progress in achieving the local land use percentage goal? Yes, more than 41,000 acres of land has been permanently preserved across all programs since the start of the County’s participation in agricultural land preservation over 40 years ago. (E) What are the resources necessary (e.g. legislative actions (programs incentives), functional planning, and capital funding) for infrastructure inside the PFAs? Additional growth-related funding for water and sewer infrastructure projects, transportation facilities, workforce housing, business development and neighborhood revitalization would advance local needs within the community. Streamlining regulations that have similar goals but require dedicated infrastructure to accomplish required mandates (i.e., programs that address water quality) would also be beneficial. Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 8 Revised 02/14/2025 (F) What are the resources necessary (e.g. legislative actions (program incentives and zoning changes), preservation planning, and easement funding) for land preservation outside the PFAs? a. Promote the Agricultural Preservation program(s) as a method to incentivize farmers to preserve their land until funds become available for permanent easements. b. Seek out permanent funding sources that can sustain agricultural easements and development rights acquisition. c. Place an emphasis on preserving large contiguous blocks of permanent farmland in excess of 1,000 acres by factoring this variable more heavily in the priority ranking system. d. Implement strategies that deter land uses that would remove large blocks of prime agricultural land from active farm production. e. Promote start up assistance and provide educational awareness to inspire a new generation of young farmers. f. Provide and highlight additional agritourism opportunities for farmers to expand operations with value added products and agricultural industry type uses. Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 9 Revised 02/14/2025 Section V, Part A: Measures and Indicators (§1-208(c)(1)) Note: Measures and Indicators, Section VII, is only required for jurisdictions issuing more than 50 new residential building permits in the reporting year, as reported in Table 1. Table 4A: Amount of Residential Growth (Inside and Outside the PFA) Residential – Calendar Year 2024 PFA Non - PFA Total 1.Total Units Approved on an Existing Lot 3 7 10 2.Gross Acres of Existing Lots in Row 1 1.45 175.26 176.71 3.Net Acres of Existing Lots in Row 1 1.45 175.22 176.67 4.Total Minor Subdivisions Approved 5 11 16 5.Total Minor Subdivision Lots Approved 10 11 21 6.Total Residential Units Approved in Minor Subdivisions* 10 11 21 7.Gross Acres of All Approved Minor Subdivisions 51.96 123.20 175.16 8.Net Lot Area** in Acres of All Approved Minor Subdivisions 14.22 62.50 76.72 9.Total Major Subdivisions Approved 4 1 5 10.Total Major Subdivision Lots Approved 46 1 47 11.Total Residential Units Approved in Major Subdivisions 397 36 433 12.Gross Acres of All Approved Major Subdivisions 69.77 86.8 156.57 13.Net Lot Area** in Acres of All Approved Major Subdivisions 54.59 8.10 62.69 14.Total Residential Units Approved (Minor + Major Subdivisions + Existing Lots) 410 54 464 15.Total Residential Units Constructed (CofO) 128 48 176 16.Total Residential Units Demolished*** 10 6 16 17.Total Residential Units Reconstructed/Replaced*** 3 4 7 * Residential units may be greater than lots if they include duplexes, triplexes. or multifamily **Net lot area is the sum of all developed lots, minus open spaces and right-of-way, other publicly dedicated land. ***Not required. Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 10 Revised 02/14/2025 Table 4B: Net Density of Residential Growth (Inside and Outside PFAs) Residential – Calendar Year 2024 PFA Non – PFA Total 1.Total Units Approved on an Existing Lot 3 7 10 2.Total Gross Acres of Existing Lots in Row 1 1.45 175.26 176.71 3.Total Net Acres of Existing Lots in Row 1 1.45 175.22 176.67 4.Total Residential Units Approved (Major + Minor Subdivisions + Existing Lots) 410 54 464 5.Total Approved Net Lot Area* (Major + Minor Subdivisions + Existing Lots) 70.26 245.82 316.08 *Net lot area is the sum of all developed lots, minus open spaces and right-of-way, other publicly dedicated land. Table 4C: Share of Residential Growth (Inside and Outside the PFA) Residential – Calendar Year 2024 PFA Non – PFA Total 1.Total Units Approved on an Existing Lot 3 7 10 2.Gross Acres of Existing Lots in Row 1 1.45 175.26 176.71 3.Net Acres of Existing Lots in Row 1 1.45 175.22 176.67 4.Total Units Approved (Major + Minor Subdivisions + Existing Lots + Units in Commercial Site Plans) 410 54 464 5. % of Total Units (Approved Residential Units) 88.4% 11.6% 100% Table 4D: Amount of Commercial Growth (Inside and Outside the PFA) Commercial – Calendar Year 2024 PFA Non - PFA Total Site Plans 1.Total # of Commercial Site Plans Approved 17 6 23 2.Gross Acres of All Approved Commercial Site Plans 45.3 11.26 56.56 3.Gross Building Area Approved in Square Feet for Commercial Site Plans 241,103 113,910 355,013 Building Permits 5.Total Commercial Building Permits Issued 35 13 48 6.Gross Building Area Constructed in Square Feet for issued Building Permits 388,711 79,542 468,253 7.Number of residential units approved as part of a commercial site plan (mixed-use), if any. *Only applies to jurisdictions with at least 150,000 residents 342 36 378 Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 11 Revised 02/14/2025 Section VI: Adequate Public Facility Ordinance (APFO) Restrictions (§7-104) (Section VI is only required by jurisdictions with adopted APFOs) Note: Jurisdictions with adopted APFOs must submit a biennial APFO report. The APFO report is due by July 1 of each even year and covers the reporting period for the previous two calendar years. APFO reports for 2023 and 2024 are due July 1, 2025. However, jurisdictions are encouraged to submit an APFO report on an annual basis. (A) Does your jurisdiction have an adopted APFO? Y/N YES If No, skip this Section. If Yes, continue to (B). (B) What type of infrastructure is monitored and may trigger development approval restrictions or require a developer to address deficiencies? (List each for schools, roads, water, sewer, stormwater, health care, fire, police or solid waste.) The Washington County Adequate Public Facilities Ordinance applies to infrastructure including: Roads, Schools, Sewage Disposal Systems, Water Supply and Distribution Systems and Fire Protection. (C) Has APFO impacted development approvals within the PFA? Y/N YES, the County’s current APFO has impacted one (1) residential subdivision approval during the 2024 reporting period. (D) If APFO has delayed, limited, or denied development, defined here as a “restriction”: a. Are there infrastructure or service facility deficiencies that have triggered denials of development requests, or held up development approvals? Y/N Yes, the state rated capacity of the elementary school serving this residential development exceeds 140% Note: This does not include APFO required developer-funded projects, or phased development approvals due to APFO limitations, or APFO required study areas for approval. b. Can the impact area of facility deficiencies/ development restrictions, which temporarily delay development approvals, be mapped? Y/N n/a (E) If yes for (C)(b), where is each restriction located? (Identify on a map, including PFA boundary.) (F) Describe what is causing each restriction. The following restrictions, due to the County’s APFO could be identified in the future. • Schools: Many of the County’s school districts are over the designated school rated capacity due to population growth and there are limited funds for new school construction. • Roads: Many restrictions are in the rural areas where some roads are not considered adequate by today’s standards. • Sewer: Collection systems are aging and need upgrades. Availability of treatment capacity is limited by water quality regulations. Annual Report Worksheet Reporting (Calendar) Year 2024 For counties or municipalities issuing 50 or more residential permits 12 Revised 02/14/2025 • Water: Distribution systems are aging and need upgrades. Availability of water is limited by permitting and water quality regulations. • Fire: There are no restrictions currently. (G) If applicable, what is the proposed resolution of each restriction? The following are proposed resolutions to future restrictions: • Schools: The County has adopted an Alternative Mitigation Contribution option for development that pushes a school district over state rated capacity (up to 120%). Developers can opt to pay a fee to help mitigate the impact of new development on school districts. Changes to current Excise Tax regulations are being explored as a more equitably distributed alternative to the AMC. Funds collected go towards expanding capacity in the educational system. • Roads: Restrictions are mitigated on a case-by-case basis. • Sewer: Developers are required to install and/or upgrade infrastructure to service their development. There is no local control that can resolve the issue of diminishing availability due to State and Federal water quality regulations. • Water: Same as Sewer • Fire: No restrictions currently. (H) If applicable, what is the estimated date to resolve each restriction? All categories are mitigated on a case-by-case basis and have no established timeline for resolution. (I) If a development restriction has been addressed, what was the resolution that lifted each restriction? n/a (J) If a development restriction has been addressed, when was each restriction lifted? n/a