Loading...
HomeMy WebLinkAboutW&S Plan_1994 Update• WATER PLAN -Washington County, Maryland. 1994 Update GE Prepared y the Washington County. Planning Department;. CERTIFICATE OF AMENDMENT WHEREAS, Title 9, Subtitle 5 of the Health -Environmental Article of the Annotated Code of Maryland required the governing body of each County to adopt and submit to the Department of the Environment, amendments to the existing plan dealing with water supply systems and sewerage systems, and WHEREAS, following a public hearing by the Board of County Commissioners for Washington County on March 29, 1994, the Board adopted text and map amendments to the Water and Sewerage Plan as required by Title 9, Subtitle,5 of the Health -Environmental Article of the Annotated Code of Maryland for submission to the Maryland Department of the Environment for approval. THIS IS TO CERTIFY, that the Board of County Commissioners for Washington County have adopted on May 17, 1994 and declared their intentions to faithfully execute and implement, to the best of its ability,- all aspects of the amendments as they pertain to the Washington County Water and Sewerage Plan. Signed this J' Day of ATTEST:: Jam' L . BIttner, Clerk .i 1994. i hard E.Roulet e,President Board of County Commissioners for Washington County IN ACCORDANCE WITH SECTION .02 OF THE REGULATIONS FOR PLANNING WATER SUPPLY AND SEWERAGE SYSTEMS, TITLE 9 OF THE ANNOTATED CODE OF MARYLAND, NOTICE HAS BEEN GIVEN TO ALL MUNICIPAL CORPORATIONS REGARDING THE PREPARATION OF THE COUNTY PLAN AND SUCH OFFICALS OR ENTIITIES HAVE BEEN GIVEN AN OPPORTUNITY TO BE HEARD WITH RESPECT TO THE PREPARATION OF THIS PLAN. THE WASHINGTON COUNTY WATER AND SEWERAGE PLAN AND AMENDMENTS HEREIN ARE CONSISTENT WITH THE COMPREHENSIVE PLAN FOR THE COUNTY ADOPTED BY THE BOARD OF COUNTY COMMISSIONERS ON FEBRUARY 17, 1981. 0 -LL ROBERT C. ARCH, PLANNING DIRECTOR WASHINGTON COUNTY PLANNING COMMISSION Mcty 7, 1q'?y ATE ii CERTIFICATE OF ADOPTION WHEREAS, Article 43, Section 387C of the Annotated Code of Maryland requires the governing body of each County to adopt and submit to the Depart - went of Health and Mental Hygiene., a plan dealing with water supply systems and sewerage systems, and WHEREAS, following a public hearing by the Washington County Planning and Zoning Commission on September 26, 1974, by the Board of Washington County Commissioners on November 19, 1974, by the Washington County Planning Commis- sion, Hagerstown Planning Commission, Board of Washington County Commissioners, and City of Hagerstown Mayor and Council on April 8, 1975, the Board of Washington County Commissioners on May 13, 1975, adopted a Water and Sewerage Plan as required by Article 43, Section 387C of the Annotated Code of Maryland: THIS IS TO CERTIFY, that the Washington County Board of County C3'rissioners have adopted and declared their intentions to faithfully execute and'implement, to the best of it's ability, all aspects of the Washington County Water and Sewerage Plan. Signed this /J day o , 1975. Marti L. nook, resident Washington County Board of ATTEST: County Commissioners `rte onald L. Charles, Cler Washington County Board of County Commissioners iii TABLE OF CONTENTS PAGE I. GOALS AND ORGANIZATION Purpose I - 1 Goals I - 3 Objectives I - 4 Organization I - 7 Development Review Procedures I - 10 II. BACKGROUND INFORMATION Physical Features II - 1 Population Analysis II - 57 Land Use II - 61 Growth Management and Land Preservation Strategy II - 69 III. EXISTING AND PLANNED WATER SUPPLY SYSTEMS Existing Water Service Areas. III - 2 Planned Service Areas III - 7 Projected Demands III - 25 Water Problem Areas & Water Conservation III - 30 Program for Correction III - 34 Policy For Water Line Installation In Areas Where Service Is Not Available III - 47 Service Area Requirements III - 48 Priority Area Requirements III - 5]. iv PAGE IV. EXISTING AND PLANNED SEWERAGE SYSTEMS Existing Sewerage Facilities and Service Areas - Washington County Sanitary District IV - 1 Planned Sewerage Service Areas - Washington County Sanitary District IV - 16 Existing and Planned Sewerage Service Areas - City of Hagerstown, Other Municipalities and Service Providing Agencies IV - 20 Projected Demands IV - 29 Sewage Flow Allocation IV - 43 Sludge Management IV - 60 Policy For Sewer Line Installation In Areas Where Service Is Not Available IV - 69 Policy On Sewage Disposal Alternatives IV - 71 Policy On Interim Treatment Plants IV - 74 Service Area Requirements IV - 76 Priority Area Requirements IV - 79 V. ADMINISTRATION AND IMPLEMENTATION.. Introduction V - 1 Water Facilities V - 2 Sewerage Facilities V - 3 Management Of Connection Allocations V - 6 County -Wide Water And Sewer Authority V - 6 APPENDICES A Definitions A - 1 B Amendment Procedures B - 1 v C Listing of Service Agreements C - 1 D Policy On Interim And Permanent Community Water And Sewerage Systems D - 1 E Revised Policy Statement for City of Hagerstown Water Pollution Control Plant Capacity Allocation E - 1 F Resolutions Adopted by the Board of County Commissioners of Washington County and -the- Mayor.and Council of the City of Hagerstown Relating to the Hagerstown Urban Growth Area, Water and Sewer Study prepared by BCM Engineers, Inc. F - 1 G Compilation of Financial Management Statistics, "FS" Schedules for Publicly Owned Community Sewerage Systems G — 1 vi:. LIST OF MAPS FOLLOWS MAP NO. PAGE I Generalized Topography II - 2 II Ground Cover II - 2 III Soil Drainage Characteristics II - 2 IV (Deleted), V Major Watersheds II - 16 VI Water Provinces II - 40 VII Aquifer Characteristics II - 45 VIII (Deleted) IX Washington County Election Districts II - 58 and Planning Sectors X Generalized Existing Land Use (Out of Print) XI Major- Public' Institutions II - 75 XII Smithsburg Town Growth Area II - 75 XIII Boonsboro Town Growth Area II - 75 XIV Urban Growth Area II - 75 XV Hancock Town Growth Area II - 75 Series of Water Service Priority Area Numbers Maps (1" = 20001) III - 55 Series of Sewerage Service Priority Area Numbers Maps (1" = 2000') IV - 83 Water and Sewerage Facilities And Service Inside Areas (1" = 1 mile) Front Pocket Flow Allocation Schematic for Hagerstown Inside and Halfway Sewerage Service Areas Front Pocket vii LIST OF TABLES TABLE NO. PAGE 1 Washington County Population Patterns II - 59 1--A Washington County Projections By Election District II - 60 2-A Historic, Land_.Use_Change 1973.-.1990 II - 66 2-B Land Cover Forecast 1990 - 2000 II - 67 2-C Zoning Classifications 1991 II - 68 2-D Population Of Major Public Institutions II - 75 3 Projected Water Supply Demands And Planned Capacity III - 28 4 Inventory Of Existing Community Water Supplies III - 29 5 Inventory Ofysater Supply Problem Areas III - 38 6 Immediate Five And Ten Year Priorities For Water Development III - 43 9 Projected Sewerage Demands And. Planned Capacity IV - 31 viii TABLE NO. 10 Inventory Of Existing Sewage Treatment Plants 10-A Inventory Of Existing Interceptors, Pumping Stations And Force Mains For Large Service Areas 11 Inventory Of Discharge Permits 12 Flow Allocations For Sewage Treatment Plants 12-A Flow Allocations For Interceptors Or Pumping Stations For Large Service Areas 12-B Flow Allocations For Major Developments 13 Inventory Of Sewage, Drainage, And Water Pollution Problem Areas 14 Immediate Five And Ten Year Priorities For Sewerage Development 15 Inventory of Current Sewerage Sludge Generation and Utilization ix PAGE IV - 33 IV - 36 IV - 40 IV - 44 IV - 45 IV - 50 IV - 54 IV - 55 IV - 68 Chapter One GOALS AND ORGANIZATION PURPOSE The State of Maryland's fundamental purpose in establishing regulations which require the governing body of each County to develop an on -going plan for water supply and sewerage systems is to achieve a consistency with the County's adopted Comprehensive Plan for guiding development. Inherent in this purpose is the realization that the planning and implementation of water and sewerage facilities constitute the most physically direct method of guiding development within the County. In virtually every instance growth is contingent upon the availability of the necessary facilities to sustain the higher orders of development._._The,znstallation of water distribution lines, sewage collection lines, and adequate transportation networks serve as a magnet for the location of new residential projects, industrial complexes and supportive commercial activities. Although the exact timing and magnitude of the higher development forms will be determined in part by much more regional economic conditions, the fact remains that their location will directly manifest the development policies of Washington County and its incorporated municipalities. Consequently, it becomes well apparent that a Water and.. Sewerage Plan, in order to be truly comprehensive, must go beyond merely the crisis oriented approach of abating existing problems, and strive to contribute and reinforce the overall planning objectives of the study area. While zoning establishes the developmental guidelines for primarily private sector initiatives, the process of implementing water and sewerage plans is a direct, more immediate public effort to move from plan to reality. This plan provides information in the form of maps, charts, and tables which give a general overall picture of the current and projected status of water and sewerage systems in Washington County. The plan is intended to provide the basis for more detailed planning at the projected level. The general level of information and the scale of mapping within the plan do not reflect such details as the specific location of all water and sewerage lines, or the availability or economic feasibility of service to particular parcels of land. For such information, the applicable agencies and.municipalities.providing. these services must be contacted. Plan maps within this document do not represent a commitment by the Board of County Commissioners or by any agency or municipality to provide water and sewer service by a specified time. Service priority designations shown on the plan maps indicate the general time frame in which it can be reasonably expected that these services will be provided and are based upon I-2 the current intentions of service providers and of private land owners and developers to the extent that they are known. The actual construction of facilities and extension of services will depend upon a number of factors such as economic feasibility, availability of funds, and initiative on the part of private land owners and developers. GOALS It is the purpose of the Comprehensive Water and Sewerage Plan to provide for the continued health and well-being of Washington Countians and our downstream neighbors through extensive, thorough public and private sector cooperation in the formation of long range plans for adequate water supply and effective sewerage disposal and treatment for Washington County. To this end, the following goal s..- are - -hereby- established. 1. To protect the health, safety and welfare of the people of Washington County by providing acceptable and adequate water supply and sanitary sewerage facilities to all areas of the County. 2. To coordinate the policies and plans relative to land use and the provision of water and sewerage facilities to assure a logical growth pattern in Washington County. 3. To identify and analyze all sources of pollution within the County and devise the means by which the adverse impact can be minimized or eliminated. I-3 4. To provide for the qualified management of water resources in the County in cooperation with th 'aunicipalities of the County, in order to effectively cope with water pollution and to conserve and/or improve the quality of streams and groundwaters within and adjacent to the County. 5. To establish plan priorities which can be directly related to the programming and budgetary processes of Washington County, the City of Hagerstown and other municipalities. 6. To provide for the periodic amendment of the Comprehensive Water and Sewerage Plan as required by changes in need or conditions within the County. OBJECTIVES In refinement of the overall goals for Washington County, the following itemizes the objectives which specifically encompass the policy guidelines relative to water and sewerage planning. 1. Develop a plan. for water and sewerage facilities which is fiscally responsible and reasonable and at the same time provide facilities which will eliminate the extraordinary problems of groundwater pollution caused by existing development as well as following the implementation policies of the Comprehensive Plan for the County. 2. On -lot septic disposal systems in Washington County have, in many cases, proven inadequate in terms of implementing the goals of this plan. As a result, a primary objective is to lIL 4 provide to the greatest extent possible, alternatives to these systems without encouraging increases in development density in those areas designated in the Plan for the County. 3. To seek the closest possible cooperation between Washington County and the City of Hagerstown in the implementation, operation and management of applicable existing and planned water and sewerage systems. 4. To encourage andguideresidential growth to those areas which are served or planned to be served with community water and sewerage systems to provide opportunities for new and adequate housing at reasonable costs for the citizens of Washington County consistent with the plan for the County. 5. To assure a logical development pattern and continued ability of the County and municipalities to provide the other necessary public.. facilities..and services (in accordance with existing land use plans and controls) as a result of the availability of new systems in areas outside planned service areas. 6. Encourage development of an organizational framework which will result in "REGIONAL" planning, programming and implementation of the plan. 7. Prepare guidelines which are both permissive and prohibitive with regard to the use of various types of systems and levels of treatment which will be compatible with the planned staging policy and its feasibility for implementation. 1-5. 8. Provide for adequate water supply, storage, treatment and distribution on a regional bas -is. 9. Encourage resource conservation -by particularly large water users through cooperative recycling programs. 10. To encourage the extension and expansion of existing water and sewer lines and facilities to ultimately serve all of the land which is considered to be within the designated urban and town growth areas and to streamline the review process for development proposals within designated growth areas. 11. To assure that the Water and Sewerage Plan and any amendments will take into consideration the "six visions" of the Maryland Economic Growth, Resource Protection and Planning Act of 1992. -6. ORGANIZATION The following charts illustrate the existing organizational framework relative to planning and implementing water and sewerage within the County and incorporated municipalities. FIGURE No. 1 WASHINGTON COUNTY IBOARD OF COUNTY COMMISSIONERS PLANNING WASHINGTON COUNTY PLANNING COMMISSION IMPLEMENTATION WATER AND SEWER WASHINGTON COUNTY SANITARY DISTRICT* *Sewerage system responsibilit-y currently includes the Towns of Sharpsburg and Keedysville (Subdistrict #4-1), Smithsburg (Subdistrict #12), Clear Spring and Sanitary Subdistricts within the County. (Subdistrict #1 Halfway, #5 Potomac (Tammany/Van Lear), #5-1 Cloverton/Greenlawn, #6 Fountainhead, #9-1 Highfield/Cascade/PenMar, #14 Sharpsburg Pike, #15 Maugansville/Orchard Hills, #18 Conococheague and #19 Sandy Hook.) S- 7 Water sy-,tems responsibility currently includes the Town of Sharpsbi_ and adjacent areas (Subdistrict #4) and Subdistricts within the County (Subdistricts #9 Highfield/Cascade, #15-1 Martins Crossroads/Cearfoss, #17 Elk Ridge, #19-1 Sandy Hook, #18-1 Conococheague and #7 Mt. Aetna). 1-8 FIGURE NO 2. CITY OF HAGERSTOWN MAYOR AND CITY COUNCIL PLANNING** HAGERSTOWN PLANNING COMMISSION ICITY ADMINISTRATORI HAGERSTOWN WATER DEPARTMENT DEPARTMENT OF PLANNING IMPLEMENTATION SEWER* DEPARTMENT OF WATER POLLUTION CONTROL *Water and Sewer System responsibility includes both city and non -subdistrict, unincorporated areas of the County. **Planning responsibilities (directly) only City. Substantial input to County Planning process. TOWNS. OF-.HANCOCK CLEAR SPRING WILLIAMSPORT, KEEDYSVILLE* BOONSBORO, SMITHSBURG AND FUNKSTOWN MAYOR AND COUNCIL PLANNING TOWN PLANNING COMMISSION IMPLEMENTATION WATER AND SEWER I COMMITTEE OF COUNCILMENI I TOWN EMPLOYEES I *The Washington County Sanitary District is responsible for the sewer system in Keedysville. I-9 DEVELOPMENT REVIEW PROCEDURES The following are brief descriptions of development review procedures within Washington County unincorporated areas and within the limits of municipal incorporations. For developments planned for unincorporated areas, the review procedures of the Washington County Planning Commission are applicable. However, where such developments are dependent upon municipal water or sewerage service, the munnicipalities concerned should be consulted early in the process. The following descriptions are intended to assist citizens and prospective developers in becoming familiar with the organizational and procedural relationships between approving authorities and water and sewer service agencies. Washington County (Unincorporated Areas') Proposals for development. within unincorporated areas are submitted for review and approval to the Washington County Planning Commission. The Commission meets on the first Monday of each month at 7:00 P.M. in the County Administration Building. Initial contact may be made with the Washington County Planning Commission staff. At this stage the proposed development is reviewed for conformance with the County Comprehensive Plan, Zoning Ordinance, Subdivision Ordinance and Water and Sewerage Plan. Upon request, the staff will arrange for a preliminary consultation at which the developer can informally discuss the proposal with representatives from the applicable review agencies I-10 including the Health Department and water and sewer service providers. In lieu of a preliminary consultation, the appropriate water and sewer authorities should be contacted individually. Developments which are proposed for wells and septic systems should be discussed with the Division of Environmental Health of the Washington County Health Department. Developments which are proposed for service by means of the extension of existing community water and sewerage systems should be discussed with the responsible municipality or with the Washington County Sanitary District as applicable. Any development proposed for an unincorporated area which is intended for service by a- new --community water or sewerage system or by the extension of existing Sanitary District facilities should be reviewed by the Washington County Planning Commission staff to determine if the proposal is consistent with the adopted plan for the County. The development proposed should then be brought to the attention of the Washington County Sanitary District. Such developments shall first be included in the Washington County Water and Sewerage Plan, then must be located within the boundaries of a Sanitary Subdistrict. Procedures for inclusion of an area within an established Sanitary Subdistrict or for the creation of a new Sanitary Subdistrict are provided for by Sanitary District Law. Formal application for development approval is made to the Washington County Planning Commission or Department of Permits and Inspections in the form of a subdivision plat or site plan respectively. Water and sewerage system construction drawings are submitted along with the application for final plat approval. Copies of submitted plats, site plans, and construction drawings are circulated to the appropriate agencies and municipalities for information, review and -approval'. Approval of water and sewerage construction drawings by the Washington County Sanitary District constitutes a firm commitment to allocate the needed water supply or sewage treatment capacity for the proposed development. The Sanitary District issues an approval letter to the Planning Commission for the final development plat upon._recei.ptof._an approved construction permit from the Maryland Department of the Environment. The Washington County Health Department issues an approval letter for the final plat after the issuance of- approval letters from water and sewer service providers when the development is to be served by a community system. Upon the receipt of correspondence from all applicable review agencies, the plat or site plan is reviewed for approval by the Planning Commission at the regular monthly meeting. I-12 CONTACT: Washington County Planning Commission 791-3065 Washington County Health Department 791-3270 Washington County Sanitary District 791-3083 223-9416 Town of Boonsboro For developments proposed within the municipal limits, a tentative sketch plan may be submitted to the Town Manager in the Municipal Building. The tentative sketch plan procedure is optional but strongly recommended as an early and informal method of consulting with the Boonsboro Planning Commission. Preliminary and final plat submittals are also made through the Town Manager who circulates plat copies to the appropriate review and approval agencies including the Boonsboro Municipal Utilities Commission for availability of water and sewer services. Upon receipt and consideration of the comments of the review and approval agencies, the Boonsboro Planning Commission considers the plat at its regular monthly meeting at the Municipal Building. Developments located outside the Town limits which desire water and sewer service, should contact the Town Manager through the municipal office to discuss annexation procedures. CONTACT: Wayne Winebrenner, Town Manager 432-5141 Barbara Rodenhiser, Clerk Fax 432-4050 I-13 Town of Clear Spring Water and sewer facilities are constructed within a development at the developer's expense and dedicated to the Town of Clear Spring. Initial proposals are made to the Mayor and Council which meets on the first Tuesday of each month at 7:00 P.M. in the Town Hall. CONTACT: Paul Hose, Mayor or 842-3344 Nancy L. Keefer, Clerk 842-2252 Town of Funkstown All areas within the corporate limits of Funkstown are considered physically capable of being served by the Town water and sewer systems. For areas outside the Town, Public Works personnel should be contacted. AL CONTACT: Roger Griffith.._. or Timothy Faulder 797-3228 or 791-0948 For proposed developments within the Town limits, application must be made to the Funkstown Zoning Administrator who reviews plans for conformance with the Comprehensive Plan, Zoning Ordinance, and Subdivision Ordinance. Town water and sewer personnel then review the plans for placement o€ utilities. The Planning and Zoning Commission considers the application at its regular meeting on the first Tuesday of each month at 6:30 P.M. in the Town Hall. CONTACT: Brenda Haynes, Clerk 791-0948 I-14 City of Hagerstown Proposals for large developments intended to be served by the City of Hagerstown water and sewerage systems should be brought to the attention of the City Planning Department. Developments proposed within the municipal limits will receive guidance from the Planning Department on the City of Hagerstown's development process. Developments proposed for outside the municipal limits will receive guidance on annexation procedures if applicable. A preliminary consultation between the applicant and the Planning Department staff is recommended but not required. For developments within the municipal limits, the staff may recommend a preliminary consultation with the City of Hagerstown Planning Commission. Early discussions with the City Water Department and with Water Pollution Control -are also advisable. Formal application for development approval within the City is made in the form of a site plan or subdivision plat submission to the Planning Department. Copies of the plat or site plan are circulated to various review agencies including the City Water Department, Water Pollution Control, and the County Health Department. Plat or site plan submission must occur on or before the first working day of the month to be reviewed at the regular Planning Commission meeting. The Commission's regular meeting is held on the last Wednesday of the month at 7:00 P.M. in City Hall. I-15 CONTACT: City Planning Department 790-3200, Ext. 138, 139 City Water Department 790-3200, Ext. 171 City Water Pollution Control 790-3200, Ext. 165, 166 City Engineer 790-3200, Ext. 125 Town of Hancock The Town Manager issues individual water and sewer connection permits from the Town Office. Development proposals are submitted for review to the Town Planning Commission which meets the first Wednesday of each-, month" at 7:00 P.M. in the Town Hall. The proposal must include the proposed water and sewer layout and the number of people to be served. Based upon this proposal, a tentative commitment is made by the Town to serve the proposed development. Water and sewer design is reviewed and approved by the Town Engineer and the M.D.E... The. Town. Planning Commission recommends plat approval to the Mayor and Council. With Mayor and Council approval, the proposed development receives a firm commitment for water and sewer service. CONTACT: Stephen Gyurisin, Town Manager 678-5622 Town of Smithsburg Land development proposals are first discussed in concept with the Smithsburg Planning Commission. The Commission meets on the last Tuesday of each month at 7:30 P.M. in the Town Hall. The Commission then refers the applicant to the Smithsburg Mayor and Council for a determination on the provision of water and sewer I-16 services. The applicant may then submit a preliminary plat to the Smithsburg Planning Commission for developments within the corporate limits, or to the Washington County Planning Commission for developments outside the corporate limits. CONTACT: Harold Boyer, Chairman 824-3851 Smithsburg Planning Commission (after 5:00 P.M.) Town of Williamsport Development proposals should be discussed initially in concept with the Williamsport Planning Commission. The Commission meets on an "as needed" basis. At the time of the initial meeting a tentative agreement will be made on the allocation of sewer capacity for the proposed development. This allocation is subtracted from the total allocation granted to the Town of Williamsport by the Washington County Sanitary District. The developer will then meet to advise the Town Mayor and Council of the proposed development. If the development is located within the Town limits, a development plat is submitted to the Williamsport Planning Commission for approval. Current Town policy requires annexation for any development located outside the corporate limits that will connect the Town of Williamsport sewage collection system or water distribution system. CONTACT: George Stumbaugh, Chairman Williamsport Planning Commission 223-7711 (City Hall) 1-17 CHAPTER TWO BACKGROUND INFORMATION In order to establish parameters for the planning of sewer and water facilities, it is necessary to determine the physical, social, economic and land use factors which, in part, dictate the needs and priorities for such systems. The following discussion of background information attempts to summarize the relevant factors which have been previously -developed and analyzed through the preparation of the County's Comprehensive Plan, Solid Waste Plan, and prior Water and Sewerage Plan. 1. PHYSICAL FEATURES An analysis of the physical features of Washington County provides a framework whereby planning and future engineering decisions can be made -in part based upon environmental characteristics. TOPOGRAPHY - The Physiographic characteristics -of Washington County are formed largely from the western slope of the Blue Ridge Mountains, the wide Hagerstown Valley which is in turn a portion of the expansive Great Limestone Valley network of the east; and the eastern ridge of the Appalachian Mountain system. Elevations within the County range from a high of 2,145 feet at the crest of Quirack Mountain of the Blue Ridge to a low of approximately 300 feet near the Potomac River. Topographic features are rather steep at the Blue Ridge, gently rolling within the broad and shallow valley to Fairview Mountain, and with sharp ridges and intervening small valleys or ravines differentiating the westward portion of the County. As illustrated on Map No. 1 - Generalized Topography, slopes are steepest along both the eastern and western boundaries of the County and.within-the areabetween Licking Creek and the Little Conococheague Creek. Approximately 35% of the County's land area has slopes in excess of 15% while the Hagerstown Valley portion of the County comprising slightly more than half of the land area is essentially level or very gently rolling. GROUND COVER - Natural ground cover patterns in Washington County, as illustrated on Map No. II - Ground Cover, are characterized by woodlands both in the mountainous areas and along the ridge and valley section west of Fairview Mountain. Also, in these steeply sloping areas very rocky and stony features prevail. The remaining undeveloped portions of the County are largely in open field/ agricultural coverage or floodplains or wetlands. SOIL CHARACTERISTICS - The soils of Washington County have been categorized into four broad groupings based upon the history 1I-2 I I Ii I I I I I Ii I I I F U j H NASSAOX, HEMSLEY, INCORPORATED L CONSULTANTS WASHINGTON COUNTY PLANNING & ZONING COMMISSION -.1 I 1 I II I I I I �I I I I :1 I I I I I Al NASSAUX-HEMSLEY, INCORPORATED CONSUITANTS WASHINGTON COUNTY PLANNING & ZONING COMMISSION /J1J{ r Sprin US 4U " Hager town 3 it .J. W 1 S T 131 J — V I R C I N I A 1 1 old � ••:,, a c s8 10 13 LEGEND 14 0 Well Drained,Stony & Very Stony " t1 on aio 1 Dekalb-Leetonia-Edgemont•Laidig 2 Oekalb • Highfield KeedpsriHe 600 3 Highfield-Fauquier 11 C Well to Excessively Drained,Shallow, " -~ x 10 r — Medium Textured Shdrpshurg))) 4 Berks • Montevallo t l 10 5 Hazel•Chandler -- 1 6 Talladega 13 i � 7 Litz -Teas WASHINGTON COUNTY WATER 8 CalvimBerks•Litr•Aiontevalio AND SEWERAGE PLAN 13 ' U - Moderately Well to Well Drained, - Deep, Medium Textured WASHINGTON COUNTY :3 12 Holston Monongahela Huntington - Lindside SOIL DRAINAGE CHARACTERISTICS s 0 .1 /4r — (With Soils Associations) WeII Drained, Deep, Medium Textured 10 Braddock•Thurmont-Edgemont-Laidig N 1 0 1 2 3 4 5 Mi. 550 11 Waynesboro :. 12 Fallquier•Myersville Higkfield SOURCE: U.S. Dept. of Agriculture Soil Conservation Service 13 Murrill 14 Hagerstown-Duffield•Frankstown 0► H NASSAUX- HENISLEY, INCORPORATED : CONSULTANTS WASHINGTON COUNTY PLANNING & ZONING COMMISSION V of their formation and position on the landscape. According to the United States Department of Agriculture, Soil Conservation Service, the formations stemmed from soils o€ the uplands, soils of old colluvial deposits, soils of old stream terraces, and soils of the floodplains. A percentage breakdown of the four groupings reveals that the soils of the uplands comprise about 71% of the land area in the County while the -other -formations comprise 16%, 5%, and 8% respectively. The upland soils have been developed in place from materials weathered from the underlying rock. The remaining soil categories are formed from deposits transported by water. There are 14 general soil patterns in Washington County referred to as_.s.o.il._ass.ociations... These associations have been combined into the following four divisions by the Soil Conservation Service based upon drainage and soil depth. 3.. 1. Well drained, stony and very stony soils. 2. Well to excessively drained, shallow, medium textured soils. 3. Moderately well to well drained, deep, medium textured soils. 4. Well drained, deep, medium textured soils. Map No. III - Soil Drainage Characteristics illustrates the generalized location of soil drainage patterns within Washington County. 1I-3 For the purpose of planning water and sewerage facilities an analysis of the soils is fundamental. With both water supply and quality discussed later in this Chapter, attention is directed here to the suitability of the soils to accommodate (properly) on - lot subsurface disposal systems. The most common on - site sewage disposal method used in areas where central sewage systems 'areunava-ilabie-is-the septic tank system. Successful operation of the system depends upon the ability of the soil to absorb and filter the liquid or effluent once it passes through the tile field. The presence of a soil characteristic which impairs proper absorption and filtering of the effluent will cause health hazards as well as public nuisance situations. Soil, characteristics affecting the operation of the tile disposal field include permeability rates, depth to bedrock, depth to seasonal high water table, slope, stoniness, and flood hazard. SUITABILITY FOR ON -LOT SUB -SURFACE DISPOSAL SYSTEMS - Past and present practices with regard to septic system usage seem to indicate that residents have the attitude that such methods of disposal are a matter of right rather than privilege. Furthermore, many residents believe that, so long as no surface malfunctioning is apparent, their household sewage system is operating properly. 11-4' Little concern is directed toward the issue of groundwater contamination except when it affects an individual's own property or well. It is important to have a basic understanding of the sewage decomposition processes that take place within a septic system in order to fully appreciate the serious health hazards which can potentially exist. A septic tank is a watertight receptacle which receives sewage and is designed and constructed to provide for sludge storage, sludge decomposition, and to separate solids from the liquid through a period of detention before allowing the liquid to be discharged to a subsurface absorption area. The sewage is broken down through an oxygen -less process called anaerobic decomposition in which anaerobic bacteria. digest suspended solids,,liquefying much of the material and reducing the rest to inert masses of sludge and scum. This primary treatment stage removes solids so that the effluent or clarified liquid which is discharged from the tank does not clog the distribution system. Septic tanks do not remove pathogenic organisms (harmful bacteria and viruses). The removal of pathogens from the effluent is affected only by percolation through the soil after the effluent is distributed through the tile field. Therefore..., "septic tank effluents cannot be considered safe. The liquid that is discharged from a tank is, in some respects, more objectionable than that which goes in, it is septic and malodorous."* The bacteria are removed, from .the effluent _by- filtration and because the soil presents an unfavorable environment for their existence. In an efficient system, pathogens and other waste products are completely removed from the effluent before it recharges the groundwater table. In an inefficient and unsafe system, the effluent may drain rapidly into solution channels and fractures in the bedrock and may reach the groundwater table before complete. purification occurs. The untreated sewage will then flow with the groundwater to pollute wells and streams with disease causing bacteria. "Studies in the Nittany Valley, Pennsylvania, a hydrogeologic environment similar to that of the study area (the 11-6 Hagerstown Valley) show, on the basis of dye tracings, (Jacobson and Langmuir, 1970) that the groundwater moves roughly 4,000 feet in 2 to 6 days."** In another type of malfunctioning system, more obvious to the homeowner, the effluent flows through the drainage bed until it reaches an impermeable layer such as clay or a fragipan (a compact, brittle layer of soil) or bedrock in which case it is forced to the surface where it becomes an immediate health hazard. A third type of pollution hazard can develop when too many septic systems are constructed within a given area. Permits issued. for.the..repair. of failing systems constitute a large share of the installation process of the Health Department. Approximately 20 percent of the permits issued for the septic system•installation are for repairs. These repairs generally require the complete replacement of all parts of the system except the septic tank itself, including the replacement of *Public Health Service, U.S. Department of Health, Education and Welfare, Manual of Septic Tank Practice, 1969, p. 29. **Nutter, Larry J. Hydrogeology of the Carbonate Rocks,_ Frederick and Hagerstown Valleys, Maryland, Maryland Geological Survey Department of Natural Resources, 1973. ,I.I-17 , drain tiles and distribution box and the relocation of the drain field or seepage pit to another area. These kinds of repairs become necessary when drain tiles are clogged or drain fields are saturated resulting in the back up of effluent to the house or the appearance of effluent on the surface of the ground. Such problems may be caused by poor initial installation, by inadequate_ mairitenance...by. the._homeowner,... or by overuse resulting in saturation of the absorption area. The map does not reflect those failures in which effluent may drain into fracture in the bedrock and for which there are no apparent symptoms on the surface. In an effort to minimize the risks of septic system failure and groundwater contamination, the Washington County Health Department has established standards and instituted procedures for the planning and installation of new on -lot ,.and .sub -surface disposal systems. Prior to the approval of such systems for use on building lots, percolation tests are conducted to evaluate the renovative capabilities of on -site soils. Trenches are excavated to ensure that a minimum filterable soil cover exists between drain tiles and bedrock or groundwater. A reserve area is set aside to allow for the use of alternate drain fields in the event that the first field becomes saturated. The location of septic I1-8 systems and reserve areas are limited to a minimum distance from on -lot and adjacent well water supplies. Where a number of on -lot sub -surface systems are planned for a given area, a geohydrologic study is conducted for the entire area of the proposed development in an effort to evaluate the cumulative effect such systems might have on sub -surface geology and groundwater. The above standards and procedures have their limitations however. Percolation and trench tests are limited to relatively small areas and conclusions drawn from these tests must be generalized to the larger areas of the absorption fields where they may or may not be valid.. Even.the...percolation (absorption) test is seen by some authorities as an incomplete testing procedure: "The principal weaknesses of the absorption test are that it is made -in a short time and with clear water. It should be recognized that two processes take place during the test --infiltration, or entrance of the liquid into the soil, and percolation through the soil. The infiltration rate is largely dependent upon the characteristics of the liquid, while speed or percolation depends upon the soil characteristics. 11-9 When clear liquid is applied continuously to a soil, there is first a drop in the infiltration rate for 1 to several days. As air escapes from the soil, the rate rises to a maximum after a time measured in days, and thereafter it slowly decreases to a small percentage of the original rate. The slow decrease is caused by the following phenomena, which are dependent upon soil characteristics, migration -of fine particles with water movement to accumulate and clog pore spaces; ion exchange, which affects the cohesive force between particles and deflocculates materials, and the continued swelling of colloidal materials. Even with water as the liquid, there will be microbial growths that will clog soil pores and interfere with infiltration and percolation. Obviously, substitution of septic sewage for water will increase the number of fine particles and will encourage microbial growth. .Ion exchangeand colloidal swelling will depend upon the chemical activity of the soil. So far, no soil test or examination method has been devised that will indicate the suitability of a soil for absorption of sewage over a long period... In the absence of a more effective procedure than the absorption test, precautions should be applied that will prevent disposal -field failures or at least postpone them for a long period. Important is II -10 resting, which permits air penetration, the establishment of aerobic conditions in clogged areas, and digestion of solid accumulations. With food no longer available, the bacteria will also die. This housecleaning requires days, not the hours that will be provided by the usual sewerage -flow variations of a residence...* *Ehlers, Victor M., C.E., and Steel, Ernest W., C.E., Municipal and Rural Sanitarian, Sixth Edition, McGraw-Hill Co., 1966, (p.126) As part of the continuing effort to improve on -lot testing reliability and to guard against groundwater contamination by on - lot systems, a County -wide Geohydrologic Study was conducted by the consulting firm of R. E. Wright and Associates. This study was jointly funded by the.Washington County Board of County Commissioners and by a grant from the U. S. Environmental Protection Agency administered through the Maryland Water Resources Administration. By means -of -on -site testing and evaluation within three prototype study areas of the County, three remote sensing techniques were found to be valid in determining shallow bedrock within prospective septic disposal areas. However, the consultant report concluded that the use of these methods "will require the continuation of the conventional site investigation (slit trench evaluation)." A further product of the study was the development of a comprehensive County sub -surface sewage disposal ordinance in accord with minimum State requirements which includes (a) subsurface sewage disposal planning requirements, (b) site investigatory procedures, (c) system design criteria, (d) comprehensive inspection program, (e) legal enforcement procedures, (f) designated enforcement personnel and training program, (g) monitoring of the functionality of subsurface disposal system, and (h) procedures for modifying design criteria. The On -Site Sewage Disposal Ordinance for Washington County was adopted in September 1983. The Washington County Health Department administers the Ordinance with guidance from the companion Technical Manual. The Ordinance also encouraged the use of innovative and alternative sewage disposal methods in light of the County's limestone geology. Pursuant to Health -Environmental Article, Subtitle 9-14 and a Memorandum of Understanding, Washington County participated in the Innovative and Alternative On -Site Sewage Disposal Grant Program. Subsequent evaluation of this program resulted in the acceptance of certain innovative and alternative systems as being conventional when percolation rates are within specified limits. Even the use of the traditional septic system is seen by some authorities as a viable wastewater treatment alternative to 11-12 central treatment processes. A report by the Comptroller General of the United States concludes that, "if properly designed, constructed, operated, and maintained, septic systems - should not fail, - can be as permanent as central treatment facilities, - are often more ecologically sound then sewers and central facilities, and - can provide a high degree of wastewater treatment as good or better than the effluent produced by conventional central treatment processes."* *The Comptroller General of the United States, Report to the Congress, Community -Managed Septic Systems: A Viable Alternative to Sewage Treatment Plants, United States General Accounting Office, November 3, 1978, (p.i.) II -13 The report emphasizes, however, that the key to good septic system performance is a system for public supervision and management of septic systems and recommends that the Environmental Protection Agency establish minimum standards for such public management. The report does not address septage disposal. A management system and criteria which are uniquely suited to the Washington County natural -physical environment in the form of the On -Site Sewage. Disposal Ordinance is an important product of the geohydrologic study mentioned above. SURFACE WATER CHARACTERISTICS - Washington County lies totally within the Potomac River Basin and is drained by the Conococheague Creek in the western portion of the Great Valley and by the Antietam Creek in the eastern section as both Creeks flow southward into the Potomac River. The majority of the County lies within the Upper Potomac River Sub -basin. The remainder, a small section in southeastern Washington County, lies within the limits of the middle Potomac River Sub -basin. The tributaries of the Potomac River drain approximately 342 square miles in Washington County. The pattern and intensity of surface water drainage is dictated by the County's location in the Valley and Ridge physiographic province which is characterized by long, ridge -like, parallel mountains and intervening valleys. In the western, more mountainous area of the County, the TT -14 streams have rather flashy runoff as a result of the steeply sloping terrain and rough topography. Moving eastward into the valleys, the relief is gentle and slightly rolling; hence, the streams are less flashy. and meandering. 9' DRAINAGE SHEDS Washington County is divided into nine major watersheds, as indicated on Map No. V, in addition to those areas draining ' directly into the Potomac. River. The Antietam: Watershed, which, drains approximately 187 square miles or about 40% of Washington County is by far the largest drainage area. The following table indicates the drainage area of each major watershed in the .........................................:...........:............::.......... ...................................:.: County, r aF. ......................... .............. ......:.. ✓t 51: i rA . . ............... .....:..: �..::..:.,.:...... ..,........:..�..::-c' ter„,. .:..........:...... .................:::.:.:.: ,✓ h,„� W,y�' ��Q�jl I r F . :.:..:............ ra ��.. .. .. ... ..... ..: - 111 r � .................................:.......: ............ .. ! I u.I I I =I I f P E N S Y L V A N I A ` r QR- C --KINGsoCONOCOC A E REEK lea nUS40 �_.� VIRGIN I A - o !!`teedvsville WASHINGTON COUNTY WATER AND SEWERAGE PLAN1.,/: WASHINGTON COUNTY rr �� MAJOR WATERSHEDS wv � 1 0 1 2 3 4 5 Mi. SOURCE: Washington County Comprehensive Water & Sewer Plan Q j H NASSAUX - HEMSLEY, INCORPORATED - CONSULTANTS COUNTY PLANNING & ZONING COMMISSION e U, itlisburg 650 1 600 1 550 FIGURE NO. 3 WASHINGTON COUNTY WATERSHED AREAS* WATERSHED DRAINAGE AREA (SQ. MI.) Washington Total County Antietam Creek 187 Conococheague Creek 65 Israel Creek 14 Licking Creek 27 Little Conococheague Creek Little Tonoloway 16 St. James - Marsh Run 20 Sideling Hill Creek 9 Tonoloway 2 16 292 563 14 214 18 26 20 104 114 *Source: Washington County, Plan for the County WATER QUALITY Quality of Washington County's surface water has been studied by the Maryland Department of Natural Resources, Water Resources Administration, in its 1974 Water Survey. Studies have also been done by the Office of Environmental Programs, Maryland Department of Health and Mental Hygiene 1986 Report to EPA According to Section 3.05(b) Clean Water Act (P.L.97-117) and the Water Management Administration,- Maryland Department of the Environment 1988 Report to the EPA According to Section 3.05(b) of the Clean Water Act (P.L.100-4). The 1986 report to the EPA includes basin description and trend analysis of all the watersheds in the County. The 1988 report includes an updated trend analysis of the Potomac mainstem, the Antietam Creek and the Conococheague Creek. The quality of Washington County's surface waters as a source of supply would necessitate considerable treatment prior to consumption. Evena generalized. analysis._. of. the . sampling data compiled by the Interstate Commission on the Potomac River Basin and the Maryland Water Resources Administration indicates a high coliform count. In addition to the high coliform count, most of the watercourses were quite alkaline because of the limestone formation. The predominate cause of the degradation of water quality of the watercourses in Washington County are agricultural and urban runoff, and industrial and sewage treatment discharges. The following dissertation discusses the significant pollution IE-17 problems and predominant causes of pollution of each of the watercourses traversing Washington County. The 1988 report summarized that water quality in the Upper Potomac River sub -basin is Good and suited to water contact recreation and aquatic life and, where classified, trout production. Elevated suspended sediment, nutrient and bacterial levels are primarilydue. to .agricultural' runoff and upstream sources. Urban runoff and failing septic systems also contribute to bacterial and nutrient levels observed in the sub -basin. Overall, water quality has degraded slightly in the Upper Potomac River sub -basin between 1976-7 and 1985. Total nitrogen and total phosphorus levels show significant increases throughout much of the basin. Fecal coliform bacteria and total suspended solids levels generally show no trend. POTOMAC RIVER MAINSTEM The mainstem of the.-Potomac,River..is 112.3.miles in length. It follows a sinuous course through most of its length. Upstream reaches flow through primarily forested land, while the land draining the lower reaches is principally agricultural. Several small towns are located along the River's banks. In 1974 the river met State water quality standards for dissolved oxygen, Ph and temperature. The water was found to be alkaline having flowed through the limestone areas of the Appalachian Region. Nitrogen averages tended to be high particularly in the section of the river from Shepherdstown to the mouth of the Shenandoah River where the average concentration was above 1 part per million (ppm) nitrogen. Phosphate concentrations were found to be higher both in the upper and lower sections. Algae blooms were indicated by occasionally high values for chlorophyll, recorded during the summer months. Bacteriological values met the water quality standard not exceeding a log mean of 200 for fecal coliform bacteria throughout most of the mainstem. Although the Potomac River has a consistently good water quality, the waste flowing from the North Branch resulted in poor bacteriological quality water, therefore influencing the water quality of the Potomac in Washington County. ----Other sect-ions.of-the Potomac River that did not meet the numerical standard were the portion passing through Hancock, Maryland and a stretch below Shepherdstown, West Virginia. Domestic wastes, agricultural wastes and soil erosion are the primary sources of pollution in the mainstem of the Potomac throughout Washington County. Septic tank seepage enters the river from numerous non -point source locations throughout the County. 11.19 In the Hancock area, sewage treatment plant wastes from the Town are discharged into Tonoloway Creek a short distance above its mouth. At Williamsport, the Sanitary District's treatment plant serving Halfway, Tammany, Van Lear, Cloverton/Greenlawn and Williamsport has a discharge to the river. Also, at Williamsport, a tannery discharges wastes to Conococheague Creek, just above its mouth. The Sanitary District is currently constructing a wastewater treatment plant to serve the Sandy Hook area. This plant will discharge into Martins Run which is in the Israel Creek drainage area. In addition to the Maryland discharges, the West Virginia towns of Shepherdstown1Bolivar_and Harpers Ferry have domestic waste discharges to the mainstem of the Potomac River. Also, Jellystone Park discharges wastewater to this segment of the river. The 1988 report to the EPA concluded that in the lower mainstem river (Segment 01), total nitrogen and total phosphorus significantly increased between 1976 and 1985 respectively. The ICPRB reported significantly increased nitrate and nitrite levels are between 1974 and 1984 in this segment (Haywood et al., 1987). Fecal coliform bacteria levels significantly declined between 1976 and 1985. I1-20 ANTIETAM CREEK The Antietam Creek segment lies east of Hagerstown, Maryland having drainage areas in Maryland of 187.0 square miles. Another 104.9 square miles of Antietam Creek drainage is contained in Pennsylvania. Average stream discharge measured at the U.S. Geological Survey (U.S.G.S.) gage four miles upstream from the mouth is 265 cfs. The principal cities in the watershed are Waynesboro, Pennsylvania and-Hagerstown,•Maryland. The 1986 Report to EPA mentioned previously indicates "Unlike most of the sub -basin, land use in this segment is primarily agricultural." Little Antietam Creek, Beaver Creek, and Marsh Run are all classified as Class III (natural) trout waters while the remaining surface waters are classified as Class IV (recreational) trout waters. Water quality in this segment ranges from Fair .. to .Good..__,.-High_.bacterial levels are due to agricultural runoff and malfunctioning septic systems. Nutrient levels are also high, but there are no eutrophication problems in this segment due-to,the continual streamflow. Because of intense agricultural use and practices and soil type in this segment, the Antietam Creek drainage is designated a "priority watershed" for the potential release of phosphorus from agricultural sources (State Soil Conservation Committee, 1984). The branches and headwaters of Antietam Creek in Pennsylvania are reportedly "water quality limited" (Department of Environmental Resources, 1984). 1I-21 Benthic community structure and diversity from three stations in the mainstem Creek indicate Excellent water quality in the lower portion of the segment (ANT0044), Fair water quality below Hagerstown (ANT0203) and Good water quality just south of the State line (ANT0366). In both 1984 and 1985, 1750 adult rainbow trout were stocked into this segment as a put -and -take fishery (Tidewater Administration, 1984, 1985a). The 1988 report to the EPA stated that in the Antietam Creek basin (Segment 02), total nitrogen and total phosphorus significantly increased throughout the sub -basin between 1977- 1985 and 1976-1985, respectively. The ICPRB reported significantly increased nitrate levels between 1974 and 1984 were reported in this segment. Fecal coliform bacteria levels significantly increased at. mid -basin (ANT0203) although the upstream and downstream stations (ANT0044, ANT0306) showed no trend. In the 1970's, lower fecal coliform counts could possibly be attributed to the use of chlorine as -a disinfectant at the Hagerstown treatment facility. The use of chlorine is now prohibited by State discharge limitations. The Hagerstown treatment facility currently uses ozone for disinfection. Increased fecal coliform counts may be considered an indication that the City has improved effluent quality by eliminating the potential of toxicity from chlorine. 11-22 (The mainstem of Antietam Creek is classified by the State for purposes of water pollution control as Recreational Trout Waters.) In -stream sampling performed by the Maryland Water Resources Administration during 1974 revealed the following conditions of surface water quality. Bacterial concentrations were found to be in violation of State standards throughout the entire course of Antietam Creek. The mainstem of the stream did not meet the fecal coliform standard, and almost all bacterial counts were greatly in excess of the standard. The highest counts were recorded one mile downstream from the Pennsylvania State line. Significantly lower values were recorded -i-mmedi-ately--below the sewerage treatment plants serving Hagerstown and Funkstown. Ultimately though, the water supplied to the Potomac River by Antietam Creek was still bacteriologically poor. Water temperature in the mainstem of Antietam Creek below Hagerstown did not meet the standard for Class IV "Recreational Trout Waters". Temperature elevation downstream from the Hagerstown Municipal Power Plant was pronounced, often 56 degrees F above stream temperatures. Maximum temperatures below the plant reach the high eighties and low nineties on hot summer days. The return to ambient temperature did not occur for miles I1-23 downstream. The Hagerstown Sewerage Treatment Plant, 2.0 miles below the power plant, also releases an effluent warmer than the ambient stream temperature. Factors which contributed to maintaining elevated temperatures far below the two effluents were slow stream flow and a lack of cold water springs entering the stream. Any association between the municipal power plant and stream water temperature is no longer valid because the plant is no longer 'being- used-. -Any--current increased stream temperature in this area may be partially the result of "Memorial Run" which is a stone and concrete culvert exposed to solar heating. Marsh Run and Beaver Creek, tributaries to Antietam Creek, were found to have water temperatures well above the Natural Trout Water Standards (Class III) for these streams. However, no warm water discharges are known, and these waters may be solar heated. The waters of Antietam Creek and its tributaries are used by several industries and municipalities for cooling purposes and sewerage disposal. Hagerstown and Funkstown sewerage treatment plants are located south of Hagerstown about 1 1/2 miles apart and discharge directly into the stream's mainstem. In July of 1990, the Washington County Sanitary District completed construction of a new waste water treatment plant to serve the Sharpsburg Keedysville area. This treatment plant discharges into the mainstem of the Antietam Creek south of Sharpsburg. 1I-24 There are eleven other, small sewerage treatment plants in the segment. Little Antietam Creek in the Towns of Boonsboro and Keedysville has exhibited high biochemical oxygen demand (BOD) as a result of organic wastes utilizing the oxygen in the stream. The BOD in Falls Creek below the Fort Ritchie Military Reservation was also above •normal for- this stream. Antietam Creek waters are found to be alkaline, to contain large amounts of dissolved material, and were greatly enriched with nitrogen and phosphorus. Except for bacteriological degradation and temperature elevation, water quality standards were met during 1974. The effects of murU cipal„_dis.charges on the level of dissolved oxygen in Antietam Creek is the subject of a computer modeling exercise being performed by the State Department of Health and Mental Hygiene: The model -indicates - that some future municipal discharges of secondary effluent would be likely to cause violations of the dissolved oxygen standards (5 mg/i avg.) in Antietam Creek. Therefore, Antietam Creek has been designated as "Water Quality Limited" with respect to dissolved oxygen. Special effluent limitations will be determined by the State in order to protect the Antietam Creek from oxygen depletion. .11-25 Most of the industries located in the Antietam Creek drainage area are in complian-e with the State industrial effluent standards. Those few which are not, are working toward compliance. CONOCOCHEAGUE CREEK The Conococheague Creek segment lies to the west of Hagerstown,., Maryland_. The.drainage. of 65.8 square miles with a main stream length of 22.0 miles. The great majority of the stream's drainage, 497.6 square miles, is contained in Pennsylvania. Most of the segment is agricultural or forest, except for the eastern edge which drains the western urban fringe area surrounding Hagerstown. Few small towns are found in the segment, the largest being the greater part of Williamsport. The average discharge measured at the U. S. Geological Survey gage at Fairview, Maryland, 18.7 miles above the stream's mouth, was 572 cubic feet per second. Conococheague Creek water exhibited poor quality from 1966 to 1969. Extremely high bacteriological values were recorded just downstream of the Pennsylvania State line. Bacterial water quality of the remainder of the stream's length did not meet water quality standards. During summer months, dissolved oxygen concentrations were low and occasionally dropped below 4.0 parts per million; the lower limit for Class IV waters. Water temperatures as high as 86.9 degrees F, well above the 1I-26 temperature standards of 75 degrees F, were recorded, but there is no known source of thermal pollution. High temperatures are probably due to natural conditions. By 1974, water quality had improved. Fecal coliform values still violated the numerical standard but were generally lower throughout the stream. Dissolved oxygen values were generally high and at no time went below the standard. The stream water was found to be alkaline and to contain large amounts of dissolved solids. Nitrate concentration was high and phosphate was unusually high. Computer modeling performed for the Maryland portion of the Conococheague indicated that future planned dischargers from standard secondary treatment plants are not likely to cause violations of the dissolved oxygen standard of 5 milligrams per lit (mg/1) daily average. Conococheague Creek upstream of the Maryland/Pennsylvania line receives a large variety of domestic and industrial wastes. The Towns of Chambersburg and Mercersburg, Pennsylvania discharge sewage treatment plant wastes into the stream. In Maryland, the stream is polluted by farm wastes and individual septic system seepage. A waste water treatment plant serving the W.D. Byron tannery discharges into the stream just above its mouth. In February of 1992, the Washington County Sanitary District began 11-27 using a newly constructed 2.5 MGD wastewater treatment plant which serves a large portion of the Conococheague drainage basin within the Hagerstown Urban Growth Area. This plant discharges directly in to the Conococheague Creek at a point near Kemps Mill. The 1986 Report indicates surface waters are all classified as Class I for water contact recreation. and aquatic life. Water quality in the Conococheague Creek segment is generally good. High bacteria and nutrient levels are monitored throughout the segment and are attributed to agricultural runoff. Because of the intensive agricultural use and practices and soil type, this segment was designated as a "priority watershed" for the potential release of nitrogen from agricultural sources (State Soil Conservation Committee 1984). An extreme range of pH conditions (<6.5, >8.5) has been monitored on occasion in this segment and is considered to be naturally occurring. The upper tributaries of Conococheague Creek in Pennsylvania are generally considered to be "water quality limited" (Department of Environmental Resources 1984). Benthic community structure and diversity at two stations near each end of the segment (CON0005, CON0180) indicate Good water quality. LITTLE CONOCOCHEAGUE The 1988 report to the EPA indicates that in the Conococheague Creek basin (Segment 04), total nitrogen significantly increased throughout the sub -basin between 1977 and 1985. The ICPRB reported significantly increased nitrate levels between 1974 and 1984 in this segment. Total phosphorus significantly increased at the downstream station (CON0005) between 1976 and 1985, at the upstream station (CON0180), no significant trend was found between 1977 and 1985. At the lower station, pH significantly declined but no trend in pH was observed- at the upper- station' between 19.77 and 1985. The ICPRB reported significantly decreased pH between 1976 and 1984 at the downstream station. Fecal coliform bacteria showed no trend throughout the sub -basin. Little Conococheague Creek is located just west of Conococheague Creek. Of its total drainage area of 18.0 square miles, 16.7 square_ miles. -.are, -contained in Maryland. A large tract of land in the upper segment, the Indian Springs Wildlife Management Area, is forested. The watershed is generally sparsely population with -some -farm -,land -in --the lower section. Clear Spring, the only Town in the watershed, is located on Tom's Run, which is the largest tributary. Water quality of the stream was monitored in 1974 in Tom's Run just below Clear Spring and at the mouth of the Little Conococheague Creek. At both points, these streams did not meet the bacteriological numerical standard. Water quality was especially degraded below Clear Spring where fecal coliform 1I-29 counts were always in the thousands or organisms per 100 milliliter of sample. However, dissolved oxygen, pH and temperature met water quality standards. It is likely that water quality with respect to dissolved oxygen and bacteria improved in Tom's Run and the Little Conococheague due to the construction of a sewage treatment plant serving Clear Spring and discharging to Tom's Run. No industrial wastes are known to enter the stream. The 1986 Report confirms that water quality has improved. All surface waters in this watershed are classified as Class III (natural) trout waters. Water quality in this segment is Good. High bacterial levels are due to agricultural runoff. Benthic community structure and diversity at a station near the confluence with the Potomac River (LCC0001) indicates Good water quality. LICKING CREEK Licking Creek is located west of Little Conococheague Creek. Its largest drainage area is mostly in Pennsylvania (185.5 square miles), and only 27.6 square miles are included in the Maryland segment. Most of this area is forest. Part of the Indian Springs Wildlife Management Area is located in the western segment of the drainage area. One small town (Pectonville) lies II -30 on the stream's western bank approximately two miles above the stream's mouth. Water quality of Licking Creek has been monitored by the Water Resources Administration at a single station 0.4 miles above the mouth. At this point, stream quality met State standards, except for bacteriological values which were in violation of the numerical standard-forthis parameter. Nutrient (nitrogen, phosphorus) concentrations were slightly below the average for streams in the Upper Potomac Basin. There are no known sources of contamination of this stream. Farm animals undoubtedly contribute to the fecal coliform count in the stream. Other possible sources of contamination in Pennsylvania are. not _known-.-- The .office of Environmental Programs indicates in its 1986 Report to EPA that surface waters in this segment are classified as Class IV (recreational) trout waters. Water quality in this segment is very Good, however, some high temperatures are occasionally monitored during the summer months. This is a natural condition, but it probably reflects a lack of stream cover and may stress cold water fishes such as trout. In both 1984 and 1985, 1000 adult rainbow trout were stocked into this creek (Tidewater Administration, 1984, 1985a). Benthic community structure and diversity at a single station near the confluence with the Potomac River (LIC0004) indicates Good water quality. Most of the upper drainage in Pennsylvania is 11-31 classified as "water quality limited" (Department Environmental Resources 1984). TONOLOWAY CREEK The Tonoloway Creek drainage segment is located just east and northeast of Hancock, Maryland. This segment is quite small consisting of only 2.1 square miles. The remainder of the watershed is in Pennsylvania--and-is.111.,5 square miles in size. Several orchards are found in the segment, but no towns and very few dwellings. Water quality of Tonoloway Creek was determined 0.4 miles above the stream's mouth and 0.4 miles downstream from the point of discharge for the Hancock Sewerage Treatment Plant. Except for fecal coliform values which exceeded the numerical standard of 200 MPN per 100 ml, water quality met the State standards in 1974. Dissolved oxygen was sufficient for aquatic organisms and nutrient values were generally low. All surface waters in this segment are classified as Class IV (put -and -take) for recreational trout. Water quality in the Tonoloway Creek segment was considered Good in 1986. High bacteria and nutrient levels from runoff from the limited agricultural land and failing septic systems are the segment's most serious water quality concerns. 11-32 The town of Hancock's treatment plant is probably the major cause of high bacteriological values. The nature of wastes entering the stream above the Maryland/Pennsylvania State line is, as yet, undetermined. Benthic community structure and diversity at a single station near the confluence with the Potomac River (TOC0004) indicate Good water quality. In 1985, the State stocked 500 adult rainbow trout into this stream (Tidewater Administration, 1985a). LITTLE TONOLOWAY "All surface waters in this segment are classified as Class IV (recreational) trout waters. Water quality in this segment is Good. Elevated bacterial levels from agricultural runoff and failing septic systems and high suspended sediments from agricultural runoff are the primary water quality concerns in this segment. In 1984.and 1985, 500 adult rainbow trout were stocked each year into this segment as a put -and -take fishery (Tidewater Administration, 1984 1985a)." The State of Maryland recently constructed a package sewerage treatment plant to serve the Sideling Hill Interpretive Center located off of I-68 on Sideling Hill Mountain. Discharge from this plant is into Munson Spring Branch, a tributary of the Little Tonoloway. 1I-33 SIDELING HILL CREEK The Sideling Hill Creek segment includes 23.1 square miles. The total drainage area includes an additional 80.5 square miles in Pennsylvania. Sideling Hill Creek and all tributaries are classified as Class IV waters (to be protected for use as recreational trout waters). Average.stream.discharge_was_124,.,cf-s, measured at the U.S. Geological Survey gage 1.2 miles upstream from the mouth. Land in the watershed is largely forested with some farm land. Included in the drainage area is the Sideling Hill Wildlife Management Area. Water quality of the stream was excellent in 1974, as determined one and one-half miles above the mouth. All water quality standards were met, and fecal coliform values were very low at this point. Measurements of pH, although not very high, were on the alkaline side of neutral. Dissolved ionic constituents were low, including nitrate which was very low in concentration. Phosphate was below average for many streams in the sub -basin. Few domestic wastes enter the stream and little agricultural pollution is present. A boy scout camp near the mouth of the stream, and above the sampling station, discharges treated wastes into the stream. There are no known industrial discharges. 11-34 The 1986 Report to EPA indicates that water quality in this segment is Good to Excellent. Elevated bacterial and suspended sediment levels are due to agricultural runoff. Benthis community structure and diversity in the lower portion of the segment (SID0015) indicate Good water quality. In 1984 and 1985, this segment was stocked as a put -and -take fishery with 3000 to 4000 adult rainbow trout, respectively (Tidewater Association, 1984 1985a).- DARGAN AREA DRAINAGE The Dargan Area Drainage is located just above the Town of Harpers Ferry between Antietam Creek and Israel Creek. It consists of 11.1 square miles of drainage, and includes several small unnamed tributaries which enter the Potomac River directly. The watershed is sparsely., populated and contains forest land and small farms. Accessibility to the river is good and boating, fishing and camping are popular along the river's banks. There is no known quality data for the streams in this segment, but no probable sources of pollution are suspected. DOWNSVILLE AREA DRAINAGE The Downsville area segment lies to the west of Antietam Creek between Williamsport and Shepherdstown, and contains many streams directly tributary to the Potomac River. The area is 52.4 square miles in size. The largest stream in the segment is St. James -Marsh Run whose headwaters originate at St. James, a suburb of Hagerstown. One station was monitored in Marsh Run at stream mile 1.6 in 1974, but no data is available for the other streams. Plans were recently approved for the construction of a package sewerage treatment plant to serve St. James school. The purpose of this plant. is to..eliminate_the _school's present failing septic system. Discharge from the plant will be into an unnamed tributary to St. James Run. II -36 Marsh Run was found to be polluted by high concentrations of fecal coliform bacteria, but the other parameters met the water quality standards. The stream was found to have hard water due to a high total alkalinity measured as calcium carbonate. The pH was generally a little above 8, but well within the limits of the pH standard. The stream receives wastes from urban and agricultural runoff. Probably the agricultural activities are the major cause of the bacteria counts.- PINESBURG STATION AREA DRAINAGE Pinesburg Station Area Drainage is a small segment (6.3 square miles) being at the southwest of the Conococheague Creek. It consists of a few small unnamed tributaries and is sparsely populated. Water quality of these streams is not known, but there is no reason tobelieve_...that..the. streams do not meet water quality standards. GREENSPRING AREA DRAINAGE• This segment which drains 20.5 square miles is located between the Conococheague Creek and Licking Creek watersheds. Fort Frederick State Park adjoining Big Pool, a large lake, on the C & 0 Canal, is found near the Potomac River. No data is available for the small streams of this small segment, but no water quality problems are suspected. II -37 TIMBER RIDGE DRAINAGE AREA The Timber Ridge segment (11.0 square miles) lies to the west of Licking Creek. Ditch Run and several small tributaries drain this area. Water quality of these streams has not been tested, and no wastes are known to enter the stream. TONOLOWAY RIDGE DRAINAGE AREA Tonoloway Ridge Area -Drainage -(20.a square miles) is located west of Tonoloway Creek and east of Sideling Hill Creek. Little Tonoloway Creek contained almost entirely within Maryland is the largest stream in the segment. Plans were recently approved for the construction of a package sewage treatment plant to serve a proposed campground along the Potomac River on the east side of Tonoloway Ridge. Discharge is into an unnamed tributary. The Town of Hancock, Maryland_is_.found. within the Little Tonoloway drainage area, although the Town's sewage treatment plant discharges into Tonoloway Creek, another watershed. Sideling Hill Mountain and Tonoloway Ridge, which pass through the area, are forested. Orchards and small farms characterize the cultivated areas. Little Tonoloway, which was sampled in 1974, by the Water Resources Administration, seems to be degraded. by farm runoff, although exact sources have not yet been determined. Fecal coliform values did not meet the water quality standard and were extremely high in two samples taken during spring months. Other water quality parameters met the standards. II -38 FIGURE NO. 4 CLASSIFICATION OF THE WATERS OF WASHINGTON COUNTY UNIT CODE NAME DESCRIPTION Class II Waters NONE NONE Shellfish Harvesting (NONE) Class III Waters - Natural Trout Waters Class IV Waters - Recreational Trout Waters Beaver Creek Marsh Run Sideling Hill Creek and all Tributaries Tonoloway Creek and all Tributaries Licking Creek and all Tributaries Conococheague Creek and all Tributaries Antietam Creek and Tributaries, Except Classified Above as Natural Trout Waters Mainstem only, in Antietam Creek Watershed Mainstem only, in Antietam Creek Watershed Entire Sideling Hill Creek Watershed Entire Tonoloway Watershed Entire Licking Creek Watershed Entire Conococheague Creek Watershed Entire Antietam Creek Watershed Except Those Designated Natural Trout Waters Source: Water Resources Administration iI-39 FIGURE NO. 5 - WATER QUALITY STATUS Water** Water Quality Standards Met? Quality Segment Temp pH D.0 Bact.* Turb. Limited Major Causes of Degradation Potomac River, Yes Yes Yes Yes Yes WQ Bacteria standards not met in four sections Mainstem (01) below Sewer Treatment Plants, otherwise standards are met. Antietam Cr. Yes Yes Yes No Yes WQ Agricultural and urban/suburban runoff. (02) industry, sewage systems. Conococheague Yes Yes Yes No Yes WQ Tannery wastes, agricultural runoff. Creek (03) Little Conoco- Yes Yes Yes No Yes WQ Runoff from agriculture and failing cheague Cr. (4) septic systems. Licking Creek Yes Yes Yes No Yes WQ Agricultural activities. (05) Tonoloway Yes Yes Yes No Yes EL Sewer Treatment Plant serving Hancock, H Creek (06) located near mouth of Tonoloway Creek. H Sideling Hill Yes Yes Yes Yes Yes EL Relatively few possible sources of pollution. C3 Creek (07) 0 Dargan (10) EL No water quality data. No known sources of pollution. Downsville (11) Yes Yes Yes No Yes WQ Marsh Run polluted by residential and agricultural runoff. Pinesburg (12) EL No water quality data. No known sources of pollution. Green Spring (13) EL No water quality data. No known sources of pollution. Timber Ridge (14) EL No water quality data. No known sources of pollution. Tonoloway Yes Yes Yes No Yes WQ Little Tonoloway Creek polluted by unknown source(s) *'Noindicates that the numerical aspect of the bacteria standard is exceeded, but water is not technically in violation unless cause is known to be a health problem. ** WQ - Water Quality Limited (all with respect to bacteria). These segments will require non -point source controls. EL - Effluent Quality Limited, standards are or can be met with point source controls. SOURCE: Water Resources Administration U I P E N N S Y E V A N I WASHINGTON COUNTY WATER AND SEWERAGE PLAN WASHINGTON COUNTY WATER PROVINCES 1 0 1 2 3 4 5 Mi. SOURCE: Md. Dept. of Geology, Mines & Water Resources Bulletin 24 , 1962 Q j H NASSAUX _ HEMSLEY, INCORPORATED _ CONSULTANI[jll WASHINGTON COUNTY PLANNING & ZONING COMMISSION GROUNDWATER CHARACTERISTICS AND AQUIFERS - Washington County is divided generally into four water provinces based upon physiographic formations. As illustrated on accompanying Map No. VI - Water Provinces, the division includes the South Mountain - Elk Ridge province averaging three miles in width along the eastern boundary of the County; the Hagerstown Valley province extending approximately 18 miles in width to the base of Fairview and Powell Mountains; the Hancock -Indian Springs province reaching westward from the Fairview and Powell Mountains nearly 19 miles to the base of Sideling Hill Mountain; and the Sideling Hill -Town Creek province extending to the County line. 1. Within the South Mountain -Elk Ridge water province, only small differences exist in the water -bearing capacities of the geologic formations. According to compiled data, the mean yield from wells is less than__1D._,gpm._with_.a range from 1 to 60 gpm. The best yields appear to be located in the Catoctin metabasalt formation in the Cascade-Highfield-Fort Ritchie area. Springs in this water province, although-numerous,•are-generally small with discharges ranging from less than 10 to 100 gpm. The chemical quality of groundwater is considered suitable for most uses with spring water lower in mineral content, but slightly more acidic than well water. 2. The Hagerstown Valley water province covering an area of approximately 300 square miles is considered hydrogeologically complex because of the broken and folded characteristics of the limestone and similar carbonate rocks such as dolomite. "In consolidated carbonate rocks, most of the water is stored in in joints, bedding planes, irregular fractures, and solution openings and at many places in the intergranular pores of the residuum (soil derived from weathered rock). ..The number, size and degree of interconnection of the joints, solution cavities and other secondary openings of the carbonate rocks determine their capacity to transmit water."* The major direction of groundwater movement in the Hagerstown Valley province is southward to the Potomac River. Although local variations may exit in rock permeability, the water table contours within the Hagerstown Valley closely• parallel the topographic patterns. Groundwater recharge in. this. province occurs primarily by precipitation filtering through the soil and subsoil. "Streams that flow off South Mountain to the east...and Powell and Fairview Mountains to the west are major sources of recharge."** Surface depressions and sags acts as efficient basins to collect rain water and a sinkhole at Jugtown, Washington County is known to have "captured" a perennial stream with a flow of 220 gallons per minute.*** The quantity of groundwater available in the limestone and dolomite aquifers of the Hagerstown Valley is quite large. As Nutter has noted, "Carbonate rocks...are often excellent sources II -42 of water because the interstices (fractures and solution cavities) are large and hence yield freely nearly all the water being held against gravity."**** Wells drilled in the Hagerstown Valley yield from 2 to 400 gpm with the Tomstown dolomite, Conococheague limestone, and Stonehenge limestone evidencing respectively the highest yields. Springs also occur throughout the Hagerstown Valley water province and have a discharge range from 25-100 gpm to 2000-3000 gpm. 3. The third major water province in Washington County, the Hancock -Indian Springs province, extends westward from the Fairview -Powell Mountains to the eastern base of Sideling Hill. With shale as the dominant rock type in this province, groundwater recharge is low. Shale soils evidence a low to moderate moisture holding capacity and a relatively high direct surface runoff results. Hydrogeologic conditions, therefore, are unfavorable for large capacity wells of any sustained yield. Springs occur in all of the formations in the Hancock -Indian Springs water province, and are for the most part, gravity fed. Although sufficient amounts of water may be available for modest domestic and farm use, test results indicate rather poor aquifers are present. • *Nutter, Larry J., Ibid., p. 13 **Ibid., p. 13 ***Ibid., p. 13 ****Ibid., p. 32 II -43 The quality of water in this province is generally satisfactory. However, both a high iron content and a hardness factor prevail. One of the least desirable water supply areas is along the Tonoloway Ridge west of Hancock where hardness and nitrate content were significantly high. 4. The Sideling Hill -Town Creek water province occupies the small portion of Washington County between Sideling Hill and Sideling Hill Creek. The best well in the province yields only 36 gpm which indicates the absence of any significant groundwater supplies. Also in the province hardness and iron content may necessitate treatment of water supplies. Additionally high sulfur and nitrate contents have been found in certain wells in the Jennings formation. The accompanying map generally illustrates the aquifer characteristics in Washington County in terms of the following three Hydrologic Units. Hydrologic Unit I - Contains the most productive aquifers. Average yields and specific capacities fall in the upper 25%. Well yields range from 1 to 580 gpm. There is approximately a 20% chance of getting a well yielding 50 gpm or more. Hydrologic Unit II - Aquifers are of intermediate productivity. There is approximately a 6% change of I1-44 getting a well yield of 50 gpm or more. Hydrologic Unit III - Contains the poorest aquifers within the County. Well yields range from 1 to 200 gpm with only a 2% chance of getting 50 gpm or more. GROUNDWATER QUALITY - Although ample groundwater quantity is apparent, groundwater quality continues to be a problem. One method of determining the pollution level of groundwater is to count the coliform organisms. Positive coliform bacteria which are found in the excreta of warm blooded animals are harmless, but their presence indicates the groundwater is likely contaminated by pathogenic organisms. Unfortunately, "there is no easily applicable method of demonstrating the presence or absence of pathogenic micro-organisms in water" as Ehler and Steel note.* Groundwater quality has been monitored in Washington County for many years pursuant to requirements of various projects and regulatory programs.- One of the most- comprehensive sampling programs conducted was in 1981 when R. E. Wright and Associates of Pennsylvania conducted a countrywide sampling program. This study included a comprehensive water quality sampling and analysis program to determine existing groundwater quality and specific problems within three designated prototype areas. Analyses included total coliform, fecal coliform, fecal streptococci, nitrates, chlorides, and ABS to establish water quality relationships to point and nonpoint pollution sources �I-45 II I I I I I I I i 1 f 1 �I 1 I f �I U 1 H NASSAUX - HEMSLEY, INCORPORATED : CONSULTANTS WASHINGTON COUNTY PLANNING & ZONING COMMISSION such as malfunctioning septic systems, agricultural sources (cattle barns, feed lots, chemical fertilization, and manure application), storm water sources, background water quality, etc. As a result of these analyses, the following conclusions were presented in the consultant's report: *op. cit., p.31. A 11-46 SUMMARY OF CONCLUSIONS* Conclusions Relative to Coliform Contamination 1. Twenty-four percent of all wells sampled from the three prototype areas exhibited total coliform contamination as measured by the MPN method. However, only thirteen percent of the wells were characterized by the presence of total coliform in three or more tubes of the five - tube MPN method. 2. Seven percent of all wells exhibited fecal coliform contamination as measured by the MPN method; however, only two percent of all wells exhibited fecal contami- nation in three or more of the five -tube MPN tests. 3. The MPN method of total coliform analysis is considerably more sensitive than the MF method to the presence of non -fecal coliform organisms. (environmental coliforms) and other bacterial organisms which yield positive results by this method. 4. The hydrogeologic environment- of Washington County is quite susceptible in many locations to contamination by naturally occurring shallow bacterial organisms. Such susceptibility, as demonstrated by the results of the MPN test results is undesirable from a public health standpoint as it indicates that potential avenues of bacterial or pathogenic communication exist between the surface and the subsurface groundwater supply. *From Groundwater Quality of Washington County, Maryland, R. E. Wright Associates, Inc., August, 1981 II -47 5. Subsurface sewage disposal practices in Washington County appear to Igenerally providing adequate wastewater renovat_ :gin before the infiltrate from these systems reaches the groundwater system. Three -fourths of the incidences of contamination are attributed to non -septic system sources. These sources are believed to be naturally occurring environmental coliform organisms associated with soil, plant, insect, and cold-blooded animals. However, twenty-five percent of the incidences of contamination are generally attributed to incomplete renovation of subsurface disposal sewage effluents. Livestock and other warm- blooded animal (non -human) sources are considered to be negligible as sources of fecal contamination of the sampled wells. 6. Many wells contaminated by environmental coliforms, will periodically be free of contamination due to the lack of fluid mechanism for transport. This means that many cases (+75%) of contamination are dependent upon rainfall frequency and intensity, vertical soil permeabilities, and travel time to subject wells. Conclusions Relatives to Well Construction 7. Deeper wells generally have a lower incidence of bacteriological contamination. Conversely, the shorter the well casing length, the more likely a well is to have bacteriological contamination. 8. The closer a well is to the on -site or neighboring septic system, the more likely it is to be contaminated. Conversely, the greater the isolation distance between well and septic system, the less likely the well is to be contaminated. 9. The age of a well is directly related to its probability of being contaminated. Newer wells are more likely to be uncontaminated and older wells are more likely to be contaminated. This is attributed to improved well construction practices as well as improved septic system planning, design, and enforcement procedures in practice in recent years. 10. The greater the depth to the static water level, the less likely a well is to be contaminated. Conversely, the shallower -the -static -water level, the more likely the well is to be contaminated. 11. Well casings extended well below the static water level will provide an added-,-degree,of -sanitary protection to the subject well. Conclusions Relative to Plannina. Desicm and Management 12. Certain aquifer units in the County appear to be more sensitive to groundwater contamination. Specifically, the Beekmantown (48%) and the Metamorphic Aquifer (36%) are much more likely to have wells which are contaminated. This conclusion is relative to the average rate of contamination across the three II -49 prototype areas (24%). For this reason, special planning and other protective measures may be especially warranted for these aquifer units. 13. Wells (and septic systems) are no more likely to be contaminated when placed on hydrogeologic and soils limitations than are those which are placed upon more ideal sites. This does not, however, refute the fact that sites. characterized• by. bedrock outcroppings or shallow and rocky soils generally provide incomplete renovation of infiltrating sewage effluent. 14. Improvements in planning and design standards for the following criteria will result in improved groundwater quality.* (a) Well depth. (b) Length of well casing. (c) Isolation distances. (d) Soils and hydrogeologic conditions. (e) Depth to static water level. (f) Wells drilled in the Beekmantown and Metamorphic Aquifer Units. 15. Any groundwater quality management, plan which succeeds in significantly improving groundwater quality must be multi -faceted, designed to address and regulate point and non -point sources of surficial bacteriological contamination and to require appropriate well siting and construction standards. *Editorial Note: Any changes to design standards for wells could only be made by, and with the cooperation of, the Maryland Department of the Environment. Groundwater, and to a limited degree, surface water quality in Washington County has been extensively investigated by the Maryland Geological Survey. In 1962, the Maryland Department of Geology, Mines, and Water Resources published Bulletin 24 titled the Water Resources of Allegheny and Washington County (J.M. Darling). In 1991, the Maryland Geological Survey published Bulletin 36 titled Water Resources of Washington County (Duigon and others). This is the most up-to-date, comprehensive water quality document available for the area. This report provides an updated assessment of the availability and quality of ground and surface water resources in Washington County and presents an evaluation of the spatial and temporal variations in the,.pr_operties__of _these resources. The report is based on a compilation of data collected over many years; the basic data are published separately in a document titled: Basic Data Report No. 18, Ground - Water and Surface -Water Data for Washington County, Maryland (Duigon and others, 1989). In summary, these reports found that groundwater and stream flow characteristics show that water volume is adequate and that there is no consequential pesticide or volatile organic chemical contamination of the ground or surface water supply in Washington County. 11-51 In 1990 and 1991, Washington County Health Department's Division of Environmental Health conducted a survey in an attempt to assess the quality of groundwater, specifically, any change which could be noted from the parameters presented in the 1981 study. In an attempt to do this, a random sampling was conducted of 50 percent of the sites originally used by R. E. Wright and Associates. The conclusions of the Health Department survey are presented- in Figure 6.. ii -52 FIGURE 6 GROUNDWATER SURVEY STUDY WASHINGTON COUNTY A uifer Unit Negative Total Fecal Metamorphic Wright 32/47 (68%) 15/47 (32%) 7/47 (15%) H.D. 17/24 (71%) 7/24 (29%) 2/24 (8%) Lower Wright 52/68-'(T6%) - 16/68 (24%) 4/68 (6%) Cambrian H.D. 19/26 (73%) 7/26 (27%) 0/26 (0%) Conococheague Wright 92/114 (84%) 18/114 (16%) 6/114 (5%) H.D. 37/48 (77%) 11/48 (23%) 4/48 (8%) Beekmantown Wright 11/21 (52%) 10/21 (48%) 3/21 (14%) H.D. 10/20 (50%) 10/20 (50%) 3/20 (15%)_ Shale Wright 40/46 (87%) 6/46 (13%) 0/46 (0%) H.D. 10/16 (62%) 6/16 (38%) 3/16 (19%) 11-53 The results of the resurvey of the 1981 R. E. Wright and Associates, Inc. report indicate that while there has been a seemingly minor decrease in groundwater quality, especially in the shale aquifer unit, on the whole the overall water quality in the County (within the parameters tested) has remained relatively constant. Rates of contamination for these two studies are also consistent with results of other sampling which has been done by the Washington, County -Health Department.' The hope for an increase in groundwater quality due to a more stringent on -site water and sewer regulation has not been seen; however, it should be born in mind that in the ten-year period 1981 through 1991, 3,834 permits for the installation of new septic systems were issued by the Washington County Health Department. This growth has occurred during a period of increased stringency for construction and siting. _of. .on. -site. systems and it may well be that the regulations imposed by the Washington County Commissioners in 1983 has had the effect of stemming ground water contamination at earlier levels. Currently, study continues on the ground water quality within the County with the County Health Department modifying study methods and attempting to assess the effect of external variables, eg, seasonal, agricultural activity, on water quality. It is anticipated that the Washington County Sanitary Commission will soon have the capability of performing a more wide range of laboratory analyses and when that is possible, increased I1-54 screening, especially from volatile organic compounds and heavy metals, is planned. WATER QUALITY PLANS - The Federal Water Pollution Control Act of 1977 made improved water quality a national priority and authorized funding for the planning, design and construction of sewerage facilities. The planning and construction grants programs established by this Act have provided the means by which the County and municipalities can meet many of the local objectives for the development of sewerage facilities. Under Section 303(e) of the Water Pollution Control Act, the Water Resources Administration of the State of Maryland prepared the Upper Potomac River Basin Water Quality Management Plan in 1976. The Plan evaluates existing water quality, sources of pollution, and recommends management approaches for the Basin, which includes all of Washington County. The scope of the Plan is much broader than the need for sewerage facilities. The Plan classifies streams according to the degree of water quality to be achieved, and thus determines either directly or indirectly the type of treatment works and operational efficiency required of sewerage facilities. The inventory of existing systems and problem areas is useful in establishing priorities for the construction of improvement sewerage facilities. While the Basin Plan prepared under Section 303(e) deals primarily with pollution which can be traced to point discharges 11-55 to surface waters, the Basin Plan prepared pursuant to Section 208 deals with non -point sources. The 208 Plan, completed in 1979, identifies non -point sources of water pollution and current management activities in the areas of stormwater runoff, sediment control, surface mining, residuals management, failing septic systems, forestry operations, agriculture, and snow and ice controls. Section 201 of the Water Pollution Control Act established a construction grants program for public sewerage facilities. Until 1989 funds were allocated by EPA to local areas on the basis of state-wide priorities in a three step process. In step 1, Facilities Planning, the specific sewerage requirements of a planning area designed by the State are investigated, alternatives evaluated, and a particular solution recommended. The Antietam Basin Facilities Plan for Hagerstown metropolitan, area, including the incorporated towns of Funkstown, Williamsport and Smithsburg, was prepared with a Step 1 grant. The 201 Plan for Boonsboro-Keedysville-Sharpsburg was originally prepared in 1981 and updated. in 1985. Steps 2 and 3 of the construction grant program funded the preparation of detailed engineering plans and specifications and the construction of facilities respectively. There was a tendency to consolidate steps 2 and 3 into 'step 4'. EPA grants also funded facilities planning for Clear Spring, Highfield-Cascade-PenMar, Hancock, and Sandy Hook. 1I-56 k The Maryland Department of the Environment, State Revolving Loan Fund has served as a replacement source of funding for EPA grants since they were phased out in 1989. The Washington County Sanitary District as well as other service providing agencies are using this source as well as Farmers Home Administration, Community Development Block Grant, Appalachian Regional Commission, and Economic Development Administration funds for facilities planning purposes-. Plans for the -St. James area and the Rte. 64/Jefferson Boulevard corridor are currently in preparation by the Washington County Sanitary District. 2. POPULATION ANALYSIS The 1990 population of Washington County at 121,393 persons represents an increase of 7.3% or some 8,307 residents since 1980. In addition to.total_population changes, the internal County patterns are significant to the planning of water and , sewerage facilities. Table No. 1 outlines the 1970-1990 population patterns for each Planning Sector and Election District within the County. The table illustrates that the County wide growth rate for the period 1980 to 1990 was 7.3%. This rate of growth was somewhat lower than the growth rate of 8.9% between 1970 and 1980. Planning Sector I (metro) which includes the Hagerstown Urban Growth Area accounted for approximately 65% of the total population of the County in 1990. This percentage remained 1I-57 virtually unchanged from the 1980 census. Within Planning Sector I, the Chewsville and Cedar Lawn election districts experienced the most significant increases in population, 21.3% and 30.2% respectively. The City of Hagerstown reversed its loss of population reflected in the 1980 census and showed an increase of 1.6% between 1980 and 1990. Planning Sector II (Mid) which, includes 'the Boonsboro Growth Area experienced the highest percentage of growth between 1980 and 1990 with a residential growth rate of 19.8% (this does not include a significant increase in group quarters population at the state prison complex). According to the 1990 census, Planning Sector IV (North East) which includes Smithsburg and Ringgold election districts decreased in population by 6% between 1980 and 1990. PROJECTIONS For purposes of water and sewerage planning, population projections developed by the Department of State Planning for the County as a whole will be used as a base. These total projections are broken down to election district projections in Table 1-A based upon a pattern of distribution developed by the County Planning Commission. 1I-58 p WASHINGTON COUNTY ELECTION DISTRICTS PLANNING SECTORS a 11 0 2 4 Scale L 1 I I ' un 1 c77 z TABLE NO. 1 WASHINGTON COUNTY 1980 TO 1990 POPULATION PATTERNS SECTOR AND NET PERCENT PERCENT OF ELECTION DISTRICT 1980 1990 CHANGE CHANGE CO. POP.(1990 I METRO 75,708 78,787 3,079 4.1 64.91 2 Williamsport 4,718 4,345 - 373 - 7.9 3.58 9 Leitersburg 3,070 2,814 - 256 - 8.3 2.32 10 Funkstown* 7,801 9,034 1,233 15.8 7.44 13 Maugansville 5,030 5,351 321 6.4 4.41 18 Chewsville* 5,532 6,346 814 14.7 5.23 24 Cedar Lawn 867... 1,129_ 262 30.2 0.93 26 Halfway 9,489 9,418 - 71 - 0.7 7.76 27 Fountainhead* 5,069 4,905 - 164 - 3.2 4.04 Hagerstown 34,132 35,445 1,313 3.8 29.20 II MID 14,825 19,013 4,188 28.3 15.67 1 Sharpsburg 2,313 2,697 384 16.6 2.22 6 Boonsboro 3,927 4,652 725 18.5 3.83 12 Fairplay 3,089 5,506 2,417 78.2(12.0) 4.54 16 Beaver Creek 2,725 3,141 416 15.3 2.59 19 Keedysville 1,216 1,259 43 3.5 1.04 20 Downsville 1,555 1,758 203 13.1 1.45 III SOUTHEAST 3,451 3,800 349 10.1 3.13 8 Rohrersville 1,901 2,137 236 12.4 1.76 11 Sandy Hook 1,550 1,663 113 7.3 1.37 IV NORTHEAST 8.,56.8._...- 8,060 -508 - 5.9 6.64 7 Smithsburg 4,413 4,297 -116 - 2.6 3.54 14 Ringgold 4,155 3,763 -392 - 9.4 3.10 V CENTRAL 6,925 7,901 914 14.1 6.51 4 Clear Spring 2,368 2,552 184 7.8 2.10 15 Indian Springs 1,694 1,842 148 8.7 1.52 23 Wilson 2,863 3,507 644 22.5 2.89 VI WESTERN 5 Hancock 3,609 3,832 223 6.2 3.16 TOTALS 113,086 121,393 8,307 7.3 100.00 II -59 TABLE NO. 1-A WASHINGTON COUNTY PROJECTIONS BY ELECTION DISTRICT ELECTION GROWTH RATE % OF TOTAL COUNTY (2) SECTOR DISTRICT BETWEEN 1980-1990 POPULATION 1990 1995 2000 2010 2020 1 2 Williamsport -7.9% 3.58% 4345 4511 4622 4786 4901 9 Leitersburg -8.3% 2.32% 2814 2923 2995 3101 3176 10 Funkstown 15.8% 7.44% 9034 9374 9605 9947 10,185 13 Maugansville 6.4% 4.41% 5351 5557 5693 5896 6037 18 Chewsville 14.7% 5.23% 6346 6590 6752 6992 7159 24 Cedar Lawn 30.2% 0.93% 1129 1172 1201 1243 1273 26 Halfway -0.7% 7.76% 9418 9778 10,018 10,375 10,623 27 Fountainhead -3.2% 4.04% 4905 5090 5216 5401 5530 Hagerstown 3.8% 29.20% 35,445 36,792 37,697 39,040 39,974 II 1 Sharpsburg 16.6% 2.22% 2697, 2797 2866 2968 3039 6 Boonsboro 18.5% 3.83% 4652 4826 4945 5120 5243 (3) 12 Fairplay 78.2% 4.54% 5506 5720 5861 6070 6215 16 Beaver Creek 15.3% 2.59% 3141 3263 3344 3462 3545 19 Keedysville 3.5% 1.04% 1259 1310 1343 1390 1423 20 Downsville 13.1% 1.45% 1758 1827 1872 1938 1985 III 8 Rohrersvflle 12.4% 1.76% 2137 2218 2272 2353 2409 11 Sandy Hook 7.3% 1.37% 1663 1726 1769 1831 1875 IV 7 Smithsburg -2.6% 3.54% 4297 4460 4570 4733 4846 14 Ringgold -9.4% 3.10% 3763 3906 4002 4144 4243 V 4 Clear Spring 7.8% 2.10% 2552 2646 2711 2807 2874 15 Indian Springs 8.7% 1.52% 1842 1915 1962 2032 2080 23 Wilsons 22.5% 2.89% 3507 3641 3731 3863 3956 VI 5 Hancock 6.2% 3.16% 3832 3982 4080 4224 4326 TOTALS 121,393 126,024 129,127 133.716 136,917 CHANGE 3.8% 2.5% 3.6% 2.4% 4631 3103 4589 3201 Total County Growth Rate 1980-1990 - 7.3% Notes: (1) Figures are based on Maryland Office of Planning Population Projections (December 1992). Projections for Election Districts are based on each District's percent of the County's total population in 1990 as a part of the projected total County population. This method does not account for different growth rates in Election Districts but assumes a constant rate of growth throughout the County for each projection period. (2) 1990 figures from actual Census counts. (3) Election District 12 contains large Group Quarters population. 78.2% increase reflects growth of resident population, as well as Group Quarters. True growth in resident population was 12.0% between 1970-1980. 11-60 3. LAND USE A generalized land use analysis of Washington County indicates that the highest orders of development are located in the Hagerstown Valley. In particular, the City of Hagerstown and the surrounding adjacent communities evidence the most intense residential, commercial, and industrial land use activities. With the Hagerstown Metropolitan Area as the virtual hub of the County, small incorporated towns and communities are situated along almost every primary corridor emanating from the City. Considerable strip development has taken place along those roadways between the Hagerstown Metropolitan Area and the established communities. Outside the Hagerstown Valley, land use patterns are manifested largely by open space/agriculturaluses and sporadic residential clusters. Tables 2A and 2B illustrate the -historical and projected changes in land use composition of the County from 1973 to 2020. Also shown is the current composition of County land area by Zoning districts (table 2C). Zoning districts are shown on the detailed Water and Sewer Maps at the conclusion of this document. In order to provide a continuous up-to-date source of data on what type of development is occurring and where it is occurring, the County Planning Department compiles a data base of subdivision and building permit activity as applications are made and approved in order to provide a continuous up-to-date source of data on what type of development is occurring and where it is occurring. An additional source of land use data is nearing completion through a project to assign house numbers to all significant structures in the County, and enter the data into the computer. Summary reports are now produced for subdivision activity. All data files will soon be converted to a PC format from a mainframe computer, allowing quicker access and more flexibility. Planning'has begun in the development of a Geographic Information System (GIS) to provide graphic and analysis components. The integration of separate data files into a GIS environment will allow much more detailed and comprehensive analysis of development factors in facilities and infrastructure planning. The Comprehensive Plan for Washington County separates the County into three specific planning areas: the Urban and Town Growth Areas, the Rural/Agricultural Area and Special Planning Areas. Areas where public facilities and services either exist or can be cost-effectively planned and programmed over the next twenty years are designated as Growth Areas. An area around the City of Hagerstown, Funkstown and Williamsport has been designated as the Urban Growth Area. Town Growth Areas have been designed around II -62 Smithsburg and Boonsboro. A Town Growth Area for Hancock was designated and adopted in January of 1990. The Comprehensive Plan encourages development of all types within the designated growth areas. In order to support this development the Plan also encourages extension of public water and sewer facilities to all of the land considered to be located within the growth area. The entire growth area is considered to be ultimately served in the future. The remainder of the land in the County, outside of the boundaries of the Urban and Town Growth Areas, is designated as the Rural/Agricultural Area. Of highest priority in this area are the goals of preserving agricultural land and conserving open space, water supply sources, mountain and woodland areas and other natural and scenic resources. Development within the Rural/Agricultural Area should be in keeping with the rural character of the environment and should not require public investments in services.. or, f acilities. which would result in increased growth pressures and divert priorities from the Growth Area. In several areas of the County extension of public water and/or sewer facilities exist within the rural -agricultural area. These may be lines which connect a water supply source or treatment plant with service areas in a growth area or rural village. They may also be extensions of lines outside of the Growth area into portions of the rural -agricultural area that have been necessitated by water quality problems with existing 11-63 wells documented by the Health Department. The presence of these lines shall not be considered a catalyst for new development above that which normally would be expected to occur in the rural -agricultural area. Within the rural -agricultural area are small communities called rural villages. These small communities possess characteristics such as small clustered populations, a few small local businesses, a church, and perhaps a fire station. Some of these villages may currently have their own small public water and/or sewerage system. Most however depend on individual private wells and on site septic systems many of which are old, substandard, and possibly failing. This could be resulting in groundwater contamination. New public water and sewer facilities may be necessitated in these villages to alleviate these problems. Residential development policies for rural villages should be generally the same as for the rest of the rural -agricultural area. Residential andlimited commercial uses of a function and scale appropriate to the character of the communities should be permitted. Three areas have been identified as being particularly critical at the present time for natural resource protection. These areas are the Edgemont and Smithsburg Reservoir Watersheds, the Beaver Creek Watershed, including the Albert M. Powell Trout Hatchery, and the Appalachian Trail. They have been designated as Special II. -64 Planning Areas and are identified on the General Plan map in the Comprehensive Plan. 11-65 TABLE NO. 2-A H H rn 0 WASHINGTON COUNTY 1973 LAND USE IN ACRES 1981 1985 1990 1973-1990 Acres LAND USE Percent CHANGE 1985-1990 Acres Percent Low Density Residential 7,225 8,479 8,709 15,242 8,017 111.0% 6,533 75.0% Med/High Density Res. 4,902 5,023 5,177 5,594 692 14.1% 417 8.1% Commercial/Industrial 3,896 4,395 4,804 5,314 1,418 36.4% 510 10.5% Institutional/open 1,995 2,046 2,264 2,874 879 44.1% 610 26.9% 95 133 396 524 429 451.6% 128 32.3% Bare Ground 18,113 20,076 21,350 29,548 11,435 63.1% 8,198 38.4% TOTAL DEVELOPMENT Agriculture 160,468 158,530 157,576 151,166 (9,302) -5.8% (6,410) -4.1% 114,897 114,840 114,417 112,585 (2,312) -2.0%. (1,832) -1.6% Forest Extractive/Barren 461 506 609 587 126 27.3% (22) -3.6% 32 19 19 19 (13) -40.6% 0 0.0% Wetland 275,858 273,895 272,621 264,357 (11,501) -4.2% (8,264) -3.0% TOTAL RESOURCES 293,971 293,971 293,971 293,905 (66) -0.0% (66) -0.0% Total Land 5,921 5,921 5,921 5,987 66 1.1% 66 1.1% Water TOTAL AREA 299,892 299,892 299,892 299,892 Note: Totals may not add due to rounding. 1973 and 1981 land areas are based on 91.8 acre grid cells which have been adjusted with 1985 and 1990 polygon data. Water area before 1985 was assumed to be constant. Source: Maryland Office of Planning Maryland's Land 1973 - 1990 A Changing Resource October 1991 TABLE NO. 2-B LAND COVER FORECAST Land Cover in Acres County: WASHINGTON 1990 2000 2010 2020 Total Development 40,917 45,927 49,897 52,998 Residential 32,205 36,199 39,365 41,837 Very Low Density(1) 11,369 12,850 14,023 14,940 Low Density(2) 15,242 17,154 18,670 19,854 Med/High Density(3) 5,594 6,195 6,672 7,044 Non-residential 8,712 9,728 10,532 11,161 Commercial and industrial 5,314 5,973 6,495 6,903 Institutional and open 2,874 3,230 3,513 3,734 Bare ground(4) 524 524 524 524 Total Resources 252,988 247,978 244,008 240,907 Agriculture 144,650 141,779 139,503 137,726 Forest 107,732 105,594 103,899 102,575 Extractive and barren(4) 587 587 587 587 Wetland(4) 19 19 19 19 Total Land 293,905 293,905 293,905 293,905. Water(4) 5,987 5,987 5,987 5,987 299,892 Total County 299,892 299,892 299,892 (1) 1 du/5 acres to 1 du/20 acres. Source: Maryland Department of Assessments and Taxation; compiled by Maryland Office of Planning. The Land Use/Cover Inventory has been determined to be inaccurate for very low density parcels; Assessments and Taxation data is used as a supplement. (2) .2 du/acre to 2 du/acre (3) 2 du/acre to >8 du/acre (4) Assumed constant over forecast period Methodology: Forecast uses 1990 Maryland Office of Planning Land Use/Cover Inventory as a base. To calculate increase in residential land, A and T average parcel sizes are multiplied by OP household projections. Other developed uses are increased proportionally and resource uses are decreased proportionally. See text for complete discussion. Source: Maryland Office of Planning Maryland Land Use/Land Cover 1990 - 2020 Forecast September 1992 11-67 TABLE NO. 2-C ZONING CLASSIFICATIONS (As of December 31, 1991) Z of County Zoning District Total Acreage Land Area Conservation 105,449 35.7 Agricultural 143,944 48.7 Residential Rural 7,222 2.4 Residential Suburban 3,933 1.3 Residential Urban . 2,49.4- .8 Residential Multi -Family 558 .2 Business Transitional 1 >.1 Business Local 641 .2 Business General 853 .1 Airport 384 .1 Industrial Transitional 0 0 Industrial Restricted 148 .1 Industrial General 2,196 .7 Industrial Mineral 5,283 1.8 RS - PUD 484 .2 A - PUD 82 >.1 Planned Business 207. >.1 Planned Industrial 1,203 .4 Highway Interchange 11,442 3.7 Historic Preservation 562 .2 Hagerstown 5,587 1.9 Other Municipal 3,015 1.0 TOTAL 295,688 1002 11-68 4. GROWTH MANAGEMENT AND LAND PRESERVATION STRATEGY In an effort to implement the policies regarding land use in the Comprehensive Plan for the County and to address the "Six Visions" of the Maryland Economic Growth, Resource Protection and Planning Act of 1992, the County has adopted, or is currently working on the following policies: Adequate Public Facilities Ordinance: On October 16, 1990 the Board of County Commissioners adopted an A.P.F.O. which became effective December 1, 1990. The Ordinance follows closely the subdivision and site plan review procedures now in effect. it delegates approval or disapproval, authority tp-the. Planning Commission based on the service providing agency's determination of whether the subject facility is adequate or not. The facilities included are -County roads•,_ public schools and all forms of water and sewerage systems. There is also a requirement for interim fire protection systems in areas where public water is not yet available. Provisions within the Ordinance allow the developer to make the necessary improvements to bring the facility up to minimum standards in order to gain development approval. Much subjectivity in the determinations of adequacy is removed by specifying the agency which has the responsibility to determine projected 11-69 demands on the infrastructure and the standards to be used. The Ordinance tends to direct development toward the Growth Areas where facilities are adequate. This tendency accomplishes a major goal of the Comprehensive Plan. It also shifts much of the new infrastructure costs to the appropriate parties, ie. the developers. Forest Conservation Ordinance: On February 2, 1993, the County Commissioners adopted the Forest Conservation Ordinance. The purpose of this Ordinance is to meet the requirements of Natural Resources Article 5-1601--5-1612, Annotated Code of Maryland. This Ordinance provides the requirements and guidance for the. preservation or replanting, whichever is applicable, of trees or forests during certain development activities by requiring forest stand delineations, forest•conservation plans, maintenance agreements and sureties. Rural -Agricultural Area: New subdivision regulations have been adopted to restrict the use of panhandle lots and immediate family member conveyances. Subdivisions on sub -standard roads are not permitted unless provisions are made to improve the road based on the County's policy to determine adequacy of II -70 existing roadways for additional development. The Washington County Health Department conducted a water quality study by testing wells in the rural areas. The Health Department continues to monitor ground water quality through ongoing testing of wells. Water and/or sewer facilities which are located outside of a designated growth area and not within a rural village are considered "Restricted Use" facilities. Connections to these facilities are only permitted for existing dwellings or lots of record directly adjacent to the line and for new subdivision lots that can be served by the existing line without extension. The presence of these lines shall not be considered as an enticement for new development or for new development at a density greater than what could occur without public facilities. In an effort to encourage agricultural preservation, the Board of County Commissioners in 1990 approved a ten year Agricultural Land Preservation District Tax Credit Program. In exchange for restricting land to agricultural use only, farmers receive a County property tax credit. To date 144 farms totaling 20,236 acres have been enrolled in the Program. Of these 12 farms totaling 3100 acres have sold development rights easements. Rural Villages: Existing or planned water and sewer facilities located within areas considered as Rural Villages by the comprehensive plan shall be designated as a "Rural Village Service --Area, Thee -purpose -of these systems is to eliminate contaminated wells and correct water quality problems created by failing septic systems within these villages. The service area established around these villages would allow for in -fill development on existing lots and some limited growth in accordance with the policies of the Comprehensive Plan dealing with., Rural_ Villages.. Urban and Town Growth Areas: The Urban Growth -Area is established around the City of Hagerstown and includes the towns of Funkstown and Williamsport. Town Growth Areas have been established around Smithsburg and Boonsboro. Hancock was completed by early 1990. Maps XII through XV show the adopted Growth Areas. On August 22, 1989, the Hagerstown Mayor and Council and the Board of County Commissioners entered into an agreement with 11-72 BCM Potomac, Inc. to perform a 20 -year comprehensive water and sewer study for the Hagerstown metropolitan area commonly referred as the adopted Urban Growth Area (UGA). The BCM Study was presented in draft form in August of 1990 with a revised Executive Summary and Technical Memoranda presented in May of 1991. The consultants study contains the following elements: 1. Population and development trends for the Urban Growth Area between 1990 and 2010 and their inter- relationship with current and future land use patterns. 2. Projected water and sewer system demands to the year 2010. 3. Developed a Hagerstown water systemimprovementand expansion master_-plan_.for...1990. to 2010. 4. Developed an Urban Growth Area sewer system master plan for 1990 to 2010. 5. Developed and evaluated alternatives for the implementation of the recommended water and sewer system improvements. In March and April of 1993, the Mayor and Council and the County Commissioners each adopted resolutions pertaining to the intent and affect of the BCM study. Copies of these resolutions are included in Appendix F. In summary, the governing bodies resolved that the II -73_. _ ..:.. primary use for this study is that it is to be used as a guide and basis for amending the Water and Sewerage Plan where applicable and for assisting the Mayor and Council and the Board of County Commissioners in providing water and sewerage services within the Hagerstown Urban Growth Area. In order to streamline, the review and approval process for development within designated urban and town growth areas, development proposals which involve the extension of water and sewer lines into these portions of the growth area will be considered to be consistent with the comprehensive Plan. An individual amendment to the Water and Sewerage Plan will not be necessary. 0 II -74 TABLE NO. 2-D POPULATION OF MAJOR INSTITUTIONS (FIGURES FOR WINTER 1991-92) Map Total Map Total Ref. Educational Institutions Enrollment Ref. Educational Institutions Enrollment E-1 North Hagerstown High School 1,012 E-31 Sharpsburg Elementary School 311 E-2 South Hagerstown High School 823 E-32 Clear Spring High School 404 E-3 Northern Middle School 626 E-33 Clear Spring Middle School 362 E-4 E. Russell Hicks School 685 E-34 ' Clear Spring Elementary School 379 E-5 Western Heights Middle School 464 E-35 Smithsburg High School 645 E-6 Bester Elementary School 555 E-36 Smithsburg Middle School 550 E-8 Conococheague Elementary School 266 E-37 Smithsburg Elementary School 370 E-9 Emma K. Doub Elementary School 228 E-38 Cascade Elementary School 381 E-10 Fountaindale Elementary School 601 E-39 Williamsport High School 685 E-11 Funkstown Elementary School 239 E-40 Springfield Middle School 604 E-12 Lincolnshire Elementary School 507 E-41 Williamsport Elementary School 405 E-13 Maugansville Elementary School 365 E-42 Fountain Rock Elementary School 330 E-14 Old Forge Elementary School 268 E-43 Hancock Middle School 396 E-15 Pangborn Boulevard Elementary School 642 E-44 Hancock Elementary School 317 E-16 Paramount Elementary School 222 E-45 Hickory Elementary School 247 E-17 Potomac Heights Elementary'Schoul 358 Pleasant Valley 248 E-18 Salem Avenue Elementary School 444 Alternative Center 47 E-20 Winter Street Elementary School 337 E-46 Hagerstown Junior College * 5,733 E-22 Marshall Street Education Center 85 * Hagerstown Junior College has enrolled 3,361 Credit Students and 2,372 Continuing E-23 Job Development Center 83 Education Students E-24 Boonsboro High School 726 Major Health Centers Capacity E-25 Boonsboro Middle School 650 H-1 Washington County Hospital 317 beds E-26 Boonsboro Elementary School 527 H-2 Coffman Health Center 51 beds (Administrative Offices) E-27 Greenbrier Elementary School 293 H-3 Western Maryland Center 175 beds Governmental Establishments G-1 Maryland Correctional Institute Maryland Correctional Training Center and Roxbury Correctional Institute 6,594 G-2 Fort Ritche 1,301 11-75 GENERALIZED EXISTING LAND USE OUT OF PRINT CURRENTLY BEING REVISED P E N N S Y_ L V A N I A JR10 R9 W is T LEGEND El - E46 Educational Institutions H 1 - H3 Major Health Centers Cl - C3 Governmental Establishments R1- R13 Recreational Facilities WASHINGTON R4 V I RC I N I A E G3 WASHINGTON COUNTY WATER AND SEWERAGE PLAN WASHINGTON COUNTY MAJOR PUBLIC INSTITUTIONS 1 0 1 2 3 4 5Mi. SOURCE: Washington County Planning - Zoning Commission R3 , E j H NASSAUX - HEMSLEY, INCORPORATED CUMSULTAN]j] COUNTY PLANNING & ZONING COMMISSION 1 146 ;a E38 G2 35 E3 mithsburg i R8 x � v • R5 R6 RV 9 � 600 1 Map No. XIII BOONSBORO'town Growth Area 6ki CAS 1 �� MAP SCALE O 1 2ML.G5 Map No. XIV Urban Growth Area • ;;I::. O •�, 1 3 1 • {- I ,. i r a• •. • ♦� ♦ %near. � -, • . ' ra Y�r . ,,- b: Y c d • •. i • � _ 7 ( � 151.. '•- . U ;P . • -. .., — ,; !: .• ST • 3jS • ..•!<, �r � S • i. ♦ 4 � r , • .15 ' i I I C •• 1'•s • • � • air raw �• , • I f •I wnI pa . •• �• t • • r I • ♦ ^1 :pi j !. _ `• - 3 y 11 r ' •Nr v.Y :.::• ":: ... p .,. d '� fir` •. 3 5. �.. 1'p•::'• : I' H �" I • • .l „' � - . at o •o m = :-- :± ice } c5'1'. :C 77 • Id • t •t. .i*:. •d Q +� r 1 "i''' _'! •!L -- • : • . a •r j I • MAP NO. XV Hancock Growth Area HANCOCK CHAPTER THREE EXISTING AND PLANNED WATER SUPPLY SYSTEMS WASHINGTON COUNTY SANITARY DISTRICT: The Washington County Sanitary District operates and maintains several water distribution systems and water treatment plants within Washington• County.-.}These--systems,-serve the communities of Subdistrict No. 4 - Sharpsburg, Subdistrict No. 7 - Mt. Aetna, Subdistrict No. 9 - Highfield/Cascade, Subdistrict No. 17 - Elk Ridge and Subdistrict No. 19-1 - Sandy Hook. The District also owns water distribution systems which serve Subdistrict No. 15-1 - Martins Crossroads/Cearfoss and Subdistrict No. 18-1 - Conococheague. The City of Hagerstown provides operations and maintenance on these systems. The City also provides billing services and collects the fees for these subdistricts and forwards the debt fees. to the District collected from the customers to pay the loans against the project costs. The District is actively preparing for several planned water service area extensions. The Pen Mar community and the Victor Cullen Center are proposed to be incorporated into Subdistrict No. 9 - Highfield/Cascade. Water line extensions on Bower Avenue, Leonard Avenue, Kemps Mill Road, Rock Hill Road and Honeyfield Road, Cedar Lawn and Green Lawn are being planned and are proposed to be incorporated into Subdistrict No. 18-1 - Conococheague. The following information will provide data on each of the existing and planned water service areas. EXISTING WATER SERVICE AREAS: SHARPSBURG AREA - SUBDISTRICT NO. 4: The Town of Sharpsburg is_.situated.12.miles south of Hagerstown. The District owns, operates and maintains the water filtration plant and water distribution system which extends through the corporate boundaries of the Town of Sharpsburg and to adjacent subdivisions of Forge Hill Estates, Battlefield Knolls, Potomac Crest and Confederate Hills. The water distribution system also serves the Antietam Battlefield Visitors Center and extends west on Maryland Route 34 to the end of the developed area. The water filtration plant is situated along the Potomac River, which is the raw water source.. The District. processes and chemically treats the raw water and adds fluoride prior to distribution. The water system also includes a 200,000 gallon elevated storage tank. The capacity of the filtration plant is 230,000 gpd. This water system presently serves approximately 479 residential and 18 commercial units which represents 570 Equivalent Dwelling Units (EDU's). This is considered a Rural Village Service area. 111-2 MT. AETNA AREA - SUBDISTRICT NO. 7: At the request of the Mt. Aetna Water Association, Inc. the Sanitary District has assumed operations and maintenance of the Mt. Aetna Water System. Transfer of ownership of this community water system to the Sanitary District is to occur by mid -1994. Various improvements to the water system are being planned to bring the supply-and•d,istribution systeminto compliance with State regulations. This water system serves approximately 126 residential units and 4 commercial units which represents 201 Equivalent Dwelling Units (EDU's). This is considered a Rural Village Service area. HIGHFIELD/CASCADE AREA — SUBDISTRICT NO. 9: The Washington County Sanitary District began operating the Highfield/Cascade Water System (previously known as the Blue Ridge Water Company). October 1,.. 1978 following revocation of the franchise by the Maryland Public Utilities Commission and a subsequent Washington County Court Order sought by the Maryland State Health Department. The Highfield/Cascade area is located in the northeast portion of Washington County and is considered a Rural Village Service area. Followed by six years of legal entanglements, in July 1984 the Washington County Sanitary District became owners of the water 111-3 system. Soon after the District began operation and maintenance of the water system in 1978 it was realized that the deteriorated system would have to be replaced with a new one. Study, planning and subsequent design began shortly thereafter. In October 1987 construction was completed for a new water distribution system with fire protection, a 400,000 gallon storage tank and upgrade of the Cascade and Willard Wells. In 1988 the Sanitary District drilled a third well, known as the "Highfield Well" to supplement the Highfield/Cascade distribution system. The District chemically treats the well water without filtration prior to distribution. In the fall of 1990 a fourth well known as the "Pennersville Well", was drilled to supplement the Highfield/Cascade system plus to provide water supply for the future Pen Mar water system. Together with the Cascade, Willard, Highfield and Pennersville wells, the average maximum capacity is 200,000 gallons per day. This water system presently serves 367 residential and 4. commercialunits which represents 449 Equivalent Dwelling Units (EDU's). MARTINS CROSSROADS/CEARFOSS - SUBDISTRICT NO. 15-1: The Washington County Sanitary District managed the water line extension program for the Martins Crossroads/Cearfoss area (Map Nos. 10, 23, 24 and 36). Upon completion of the planning, study, and design phases, construction began July 1987 with completion 111-4 one year later (July 1988). The system was an extension of the City of Hagerstown's lines which includes the following areas: Route 40 at Huyetts Crossroads; Maryland Route 63 from Route 40 to Route 58; portions of Mt. Tabor Church Road, Resh Road, Pinecrest Road, Broadfording Church Road, Route 58 and Route 416. Public water is presently being supplied to approximately 365 residential and 14 commercial units which represents 422 Equivalent Dwelling Units,(EDULs)The water distribution system is maintained by the City of Hagerstown. This is considered a Restricted Use Service area and is consistent with a policy adopted by the Planning Commission on July 11, 1983 concerning future development in this area. ELK RIDGE AREA - SUBDISTRICT NO. 17: In November 1987 the Washington County Sanitary District assumed the operations and maintenance of the Ridge Water Corporation which was privately. owned by the citizens of the community known as Elk Ridge located adjacent to Chestnut Grove Road in South Washington County. In April 1989 the Sanitary District assumed ownership of this water system pursuant to the request of the property owners. This water system supplies 29 residential units which represents 29 Equivalent Dwelling Units (EDU's) with the source being three wells. (No. 1, 2, and 3). An average of 2,700 gallons per day is presently being pumped. The District proposes to implement an improvement program for this water II1-5 system which includes installation of water meters, additional storage, another well for additional quantity and equipment to improve the water quality. This is considered a Rural Village Service area. CONOCOCHEAGUE AREA - SUBDISTRICT NO.18-1: A 16" water main extension project on Hopewell Road initiated the creation of this.. subdistrict._. An. interconnection was made to the water main at the intersection of MD Route 144 and Hopewell Road. The water main was extended on Hopewell Road to an approximate point several hundred feet north of the railroad crossing on Hopewell Road south of the Halfway Boulevard intersection. Several 12" and 8" laterals have been installed for future extensions. Approximately 14 residential and 6 commercial units are provided water service which represents 59 Equivalent Dwelling Units (EDU's). This subdistrict is located within the Urban Growth Area. SANDY HOOK AREA - SUBDISTRICT NO.19-1: The water supply and distribution system for the Sandy Hook community was completed March 1993. Two wells provide water supply, capable of producing 45 gpm or approximately 65,000 gallons of water per day. The treatment process includes iron and manganese removal with chlorine addition. The distribution system includes fire protection with a 100,000 gallon storage 1I1-6 tank. The system serves 1 commercial and 58 residential units which represents 59 Equivalent Dwelling Units (EDU's). This is considered a Rural Village System. PLANNED WATER SERVICE AREAS: PEN MAR: In July 1988 the Washiigtbfn`Cbturity-Board -of -County Commissioners were petitioned by the property owners of the Pen Mar area to investigate the probability of extending public water service to their area. The petition was presented to the Washington County Sanitary Commission and they directed the Sanitary District to perform a Feasibility Study Report for the Pen Mar area. In March 1989, the Feasibility Report was completed and the Sanitary District held a public_.hearing-regarding the project on May 22, 1989. The proposed outlay of the project is to extend the Highfield/Cascade water supply system which would require the current subdistrict boundaries to be extended to include the Pen Mar area. This project would include a water supply distribution system with fire protection, above ground water (100,000) gallon storage tank, well and disinfection facilities. This water system would serve approximately 77 Equivalent Dwelling Units (EDU's). Funding options are currently being investigated to allow the same user rate for Subdistrict No. 9 - Highfield/Cascade to be maintained for the Pen Mar area as it is for Subdistrict No. 9 - Highfield/Cascade. This would be considered a Rural Village Service area. VICTOR CULLEN CENTER: The Maryland Environmental Services and the Maryland Department of Juvenile Services have requested the District to extend the Highfield Water System to serve the state complex known as the Victor Cullen Center which is located in Frederick County. The eight inch water lineextension.with.applicable appurtenances is expected to be completed by mid -1994. CEDAR LAWN: The District has been petitioned by the property owners of Cedar Lawn to provide public water supply. Planning and design of the water line extension project has been completed. This area has been included in Subdistrict No. 18-1 - Conococheague and is located within the Urban Growth Area. Connections will be made to the existing 24" water main in MD Route 144 and extended to the existing development. Public water supply will be provided to 60 residential units and 1 commercial establishment representing a total of 61 Equivalent Dwelling Units (EDU's). Construction of the water line extension project is proposed to begin by March 1994 and completed by September 1994. III -8 KEMPS MILL ROAD, ROCK HILL ROAD AND HONEYFIELD ROAD AREA: The District has been petitioned by several residents of Kemps Mill Road, Rock Hill Road and Honeyfield Road areas for public water supply. The District has completed preliminary engineering and completed the public participation segment for these projects. The funding and design of the water line extension projects are expected to-be-eompleted=by... early 1994 with construction to begin by August 1994 and completed by June 1995. These areas have been incorporated into Subdistrict No. 18-1 - Conococheague Water and is located within the Urban Growth Area. To provide service to existing homes on Kemps Mill Road and Celeste Drive, a connection will be made to an existing 8" water line on Kemps Mill -Road -south 9f the intersection at Kemps Mill Road and Rock Hill Road extending south to the railroad tracks. A second 8" water line connection will be made to an existing water line at the intersection of Kemps Mill Road and MD Route 63. Connection will be made to an existing 8" water line at the intersection of Rock Hill Road and Everly Drive to extend water service to existing homes on Rock Hill Road north of the intersection. To provide water service to existing homes on Honeyfield Road, an 8" water line connection will be made to an existing 24" water line north of the Town of Williamsport's corporate limits. Water service is expected to be provided to 35 residential units which represents 35 Equivalent Dwelling Units (EDU's). BOWER AND LEONARD AVENUES: By petition, the District is planning to, extend public water to 42 existing residential units on Bower and Leonard Avenues (17 units in the Leonard Avenue/Halfway Boulevard area and 25 units on Bower Avenue). The Bower Avenue and Leonard Avenue area has been incorporated into Subdistrict No. 18-1 - Conococheague Water and is located within the Urban Growth Area. A connection to an existing 8" water line at the intersection of Tamarack Drive and Bower Avenue will be made extending an 8" water line south on Bower Avenue to the I-70 overpass. To provide water service to the Leonard Avenue/Halfway Boulevard area, water line extensions consist of an 8" water line on Leonard Avenue, a 2" water line on Halfway Boulevard and a 12" water line on MD Route 632 to serve the 17 existing homes in this area. Construction of these lines are to be completed by late 1994. GREEN LAWN: The Green Lawn area is located in the County, southeast of the corporate limits of the Town of Williamsport and is located within the Urban Growth Area. Several property owners in the Green Lawn area have requested the District to upgrade existing water lines and extend public water service to existing homes in the Green'Lawnarea. Planning and -public -participation are anticipated to begin by January 1994. To provide service to the remaining portions of the area that do not have public water, three connections to the existing water main are required. One connection will be made at the intersection of Sunset Avenue and Britner Avenue with a second connection being. made -to -an --existing 8" water line on South Artizan Street. An 8" connection will be made to an existing 8". water line in MD Route 68 to loop the system. Substandard water lines and water services will be upgraded in the area where water service is being presently provided. It is proposed that meters will be placed on the system, whereas the District will bulk purchase water from the Town of Williamsport. However, the Town of Williamsport and the Sanitary District will have to negotiate a water service agreement. This area is proposed to be incorporated into Subdistrict No. 18- 1 - Conococheague Water. Water service is proposed to be upgraded and/or provided to 39 residential units and 1 commercial unit representing 40 Equivalent Dwelling Units (EDU's). CITY OF HAGERSTOWN The City of Hagerstown Water Department serves more than 75,000 people within the Hagerstown corporate limits, in unincorporated areas, and in . other municipalities...__. The _Hagerstown, system provides the entire water supply for the towns of Funkstown and Williamsport and some of the water for the Town of Smithsburg. These towns purchase their water from Hagerstown but they retain responsibility for the operation and maintenance of their own distribution facilities such as pumps, water lines, and water services. The Hagerstown system also serves large industrial and institutional water users such as Mack Truck, the Maryland Correction Institution, and Washington County Hospital. The Hagerstown system is served by.the R.C. Willson Filtration Plant on the Potomac River and is listed in Table No. 4. The Potomac River provides a reliable and adequate source of drinking water for the Hagerstown service area. Use of the Edgemont and Smithsburg Reservoirs for public water supply was suspended on July 1, 1987. These facilities remain on standby for emergency supply only. The City continues to maintain the reservoirs and watershed land as public water supply facilities. Safety improvements to the Edgemont Dam and Spillway were completed in 1993. The addition of filtering facilities at the Smithsburg Reservoir are being considered by the City. PLANNED WATER SERVICE AREAS Using a prioritized program of capital improvements such as major upgrades, future- trunk • mains;--water-t'anks and pumping facilities, the Hagerstown Water Department will meet the needs of a growing urban area. Planned improvements to the Hagerstown system are listed below. a. Richard C. Willson Water Treatment Plant - Upgrade of the plant_ is...planned_..to. _enable the treatment of up to 20 MGD at future water quality standards. The current, maximum treatment flow is 15 MGD. b. Watershed Land Acquisition - Continue program of acquiring watershed property above the reservoir as it becomes available to preserve the integrity of same. c. Pipe Lining Program - The City is in the final stages of a program which has reconditioned over 476,900 lineal feet of existing lines within the service area. The program is scheduled for completion by the end of fiscal year 1994. d. Williamsport Transmission Main - A third twenty-four inch (24") or larger water transmission main is needed to deliver the future demands from the filter plant to the southern portion of the Hagerstown system. e. Edgemont Water Filtration Plant - Install filtration facilities to enable the use of the Edgemont Reservoir as a source of potable water supply. Must meet current and future waterquality., standards... f. Western Maryland Parkway - Extend sixteen inch (16") waterline north from the intersection of Underpass Way and Railway Lane to Western Maryland Parkway at the County Detention Center, thus completing a major interconnection between two 24 -inch transmission mains. g. Hopewell Road - To service area bounded by 1-70, I-81, IA MD 144, and MD 63, extend a 16 -inch main in Hopewell Road from MD Route 144 to I-70. The interconnection should be made from this line to the existing 16 -inch main in Elliott Parkway on the south side of 1-70. h. Zone 2 Storage - To improve service to areas along Hump Road and south of the West End Reservoir to Wesel Boulevard, construct a storage tank in the vicinity of Wesel Boulevard. i. Southern Transmission Main - A sixteen inch (16") transmission main along the southern portion of the water system is needed to carry an increased demand to the east and to a proposed water tank site near 1-70 and U.S. Route 40. j. Eastern Transmission Main - To deliver water to the northeastern portion of the system, a sixteen -inch (16") water-- main• i sneeded'• f rom, the Londontowne- Brightwood area to Jefferson Boulevard and Eastern Boulevard to the north. k. West End Reservoir - Install a cover and liner for the existing concrete reservoir at Hellane Park to provide for a safer, more secure and leak proof storage facility in anticipation of future regulations dictating- the same. -- 1. Robinwood Drive - Extend twelve inch (12") waterline from Route 64 to the Hagerstown Junior College to complete a major loop to the Dual Highway and proposed elevated storage near same. M. Oak Ridge Industrial Area - Oakmont Drive - Oakmont Drive area is presently being served by a twelve inch (12") waterline. Provisions should be included to extend the system along East Oak Ridge Drive to Roadway and the former Plummer Construction Company site. This line should eventually be interconnected with the mains in the Ravenswood Lutheran Home area. 111=15 n. Paramount Loop - The distribution system should be looped with a twelve inch (12") main from West Longmeadow Road to Marsh Pike in the vicinity of Avalon Manor to eliminate a long stretch of single source piping. o. Paramount Storage - Locate elevated storage tank in the Avalon Manor area for the purpose of increasing supply capabilities .in. _the .area. p. Downsville Pike - Extend twelve inch (12") line along Downsville Pike from West Oak Ridge Drive to the Potomac Edison office building. (Map Nos. 49 and 57) q. , Potomac Avenue Booster and Transmission Main - Project includes installation of a booster pumping station at Northern Avenue and extension of a transmission main from Northern Avenue up Maryland Route 60 to Marsh Pike. This project is necessary to meet additional demands as residential and planned commercial development is permitted upon the installation of sewerage facilities. (Map Nos. 25 and 38) SMITHSBURG The Town of Smithsburg has two sources of water supply in the form of springs. One is located south of Town (Map No. 52) near the existing reservoir. The reservoir receives the spring water. Water is then fed by gravity to the Town distribution system. A new spring has been developed northeast of Town (Map No. 27). Also, a water pumping station and transmission line from the spring to the Town distribution system have been built. In addition, the reservoir storage capacity has been expanded to 360,000 gallons. During the Smithsburg Town Growth Area Study adopted by the County Commissioners on July 22, 1986, Town and County officials recognized the need to investigate and develop new sources of public water supply in order to meet the demands of expected growth in ••population. - The study recommends investigation of new sources including land for a permanent storage facility, continued cooperation in use of water from Hagerstown's Edgemont reservoir and improvements to the existing transmission system. Government officials acknowledge the purpose and effect of Growth Areas establishment_to.encourage_development and make use of existing public health facilities. The Town purchases water from the City of Hagerstown only in cases of emergency. Water mains have been extended to serve property recently annexed into the Town. This property is located on the west side of Town and includes new residential developments called Meadows of Grove Creek and Whispering Hills. The Town is currently awaiting State approval for the use of two (2) existing wells located west of Town to supplement the existing sources. Future plans also call for the extension of a 12" line through the Whispering Hills development to connect with the existing line in Cavehill Road in order to form a loop. Also proposed is the replacement of an existing line in E. Water Street and the extension of this line to serve a new residential development called Mountain Shadows. To date, subdivision approval has been granted to Section 1 which involves 13 lots. The Town is currently exploring additional sources for water such as new production wells -and/or the possibility of bringing existing private wells on line to supplement the existing supply. In January of 1992, a Maryland Department of the Environment study reported that Hauver Spring is directly influenced by a surface water source (Little Antietam Creek) and that the town would have to comply with the Surface Water Treatment Rule regarding meeting standards for the control of certain viruses, bacteria and turbidity. To comply with this report, the Town is. currently monitoring the water supply and forwarding information to the MDE in order for them to determine if this supply will continue to be acceptable. Service priority designations for individual properties inside the Growth Area boundaries have not been changed in this plan. It is acknowledged that requests for service and would be considered consistent with the Plan and will complement and coincide with other planning activities and goals. FT. RITCHIE The Fort Ritchie system provides water service to approximately 1,296 persons residing on post and an additional 1,612 persons who live off post and work on post. In the past, this system also served several off post residential customers however as of the fall of 1992 these customers were taken off this system and connected to the Sanitary District's Highfield/Cascade System (S.D.9). Water for this system is provided by a spring and seven wells that feed two reservoirs having a total capacity of 1,300,000 gallons.: As a result of a groundwater study and report made by the Army Environmental Hygiene Administration, well number three was permanently closed in early 1992. At the recommendation of the Maryland Department of the Environment, spring number one was disconnected in January 1990 in order to better insure overall water quality based on the requirements of the Safe Drinking Water Act. Work on a new well to supplement the existing supply was to be completed by 1992. BOONSBORO-KEEDYSVILLE The Boonsboro-Keedysville water system is supplied by two active springs and one well--Keedysville Spring located outside the Town of Keedysville (map no.73), Warrenfeltz Spring located within the Town of Boonsboro (map no.73), and Well #8 located outside the Town of Boonsboro (map no. 68). An additional new water supply referred to as the Crestview well is currently under construction. The water is treated with chlorine disinfection by the town of Boonsboro at each location. Excess water is stored in a 1.5 million gallon reservoir located east of Boonsboro (map no. 68) and again treated with chlorine before reentering the system. The Town of Keedysville purchases water from the Town of Boonsboro, but owns and operates its own distribution system. Much of the maintenance of the Keedysville system is performed on a cost reimbursement basis by the Town of Boonsboro. In Boonsboro, an apparent high per capita consumption caused mainly by unaccounted water losses has been significantly reduced by the installation of residential meters, the lining and covering of the storage reservoir (to reduce the need for overflows), and a triennial leak detection program. A serious problem of inadequate fire flows and water pressure in many areas of Boonsboro has been corrected by installing larger mains, completing loops in the distribution system, replacing old and/or defective fire hydrants, and adding new fire hydrants to the system. An equally serious deficit in supply was corrected when Well #8 behind Graystone Hills in Boonsboro went on line yielding 100,000 gpd (70 gpm). iII-20 To address the impact of growth on the water supply, the Utilities Commission adopted a policy requiring each developer (except minor subdivisions of 5 or less units) to provide a minimum new water supply of 100,800 gpd (70 gpm) in the form of a well to be connected to the existing distribution system. Also, to address the impact of growth of the Town, the Mayor and Council has -adopted--a,new•Comprehensive-Development Plan and a new Growth Management Ordinance. The Boonsboro Town Growth Area, adopted in 1986 by the Town and the County, identifies an area surrounding Boonsboro where growth and extension of public utilities is encouraged. Service priority designations for property within the growth area will be assigned once development., proposals are reviewed and approved by the County and the Town. The Boonsboro Utilities Commission is willing to make extensions of the water system within the growth area. However, it is clearly -the policy of the Town to require that the cost of all such extensions be borne by the developer. I11-21 WEVERTON The Pleasant Valley Elementary School and approximately twelve residences in southern Washington County are served by the water system for the Town of Brunswick in Frederick County. Service is provided via the transmission main leading from the Yourtee Springs to the Town of Brunswick. This is considered a restricted use service area. The Town is currently making improvements at the spring to conform with Clean Water Act requirements. These improvements involve enclosing the spring in a building and placing a liner in the clay slope to divert rainwater away from the spring. CLEAR SPRING The Town of Clear Spring and a few residences outside of Town are supplied by a series of wells and springs feeding a 1.5 million gallon reservoir at the foot of Fairview Mountain. The Town recently expanded its service area with the construction of a second transmission main from the reservoir to Clear Spring and has recently completed the extension of a water line south of Town to create a loop with the existing line in Martin Road. In the past, the Clear Spring water system has experienced high domestic per capita water use, probably due in part to the lack of residential metering. To correct this, the Town is currently installing meters. Recent water line replacement also found and corrected some significant leakage. 111-22 The Town recently completed a water study done by a private consultant for the Town. This study found that the existing water recharge area serving the existing water sources (wells and springs) is nearing its maximum and that only a few additional hookups would be available utilizing the existing water sources. The study recommended that the Town explore the possibility of finding additional sources of water and recommended 15 possible well sites. The study also recommended improvements that need to be made to the water distribution system. The Town is discussing the possibility of constructing a water storage tank at the reservoir site based on a recommendation for the water study. In late 1993, the Town will be extending a new 6" water line from an existing 8" line in Big Spring Road south to the Clear Spring Fire Company carnival ground .to serve a new building and fire hydrant. The Town will also be replacing an existing 2" water line in South Hawbaker Circle to Houck Avenue with an 8" line and extending the line to the Amber Associates property to serve future development. The Comprehensive Plan for Washington County recognizes Clear Spring as a Town Growth Area, however a growth area study has not been done nor has a growth area boundary been defined. In the near future the Town intends to develop a growth management plan :III -,23 that will address the Town's ability to handle new development. This may affect the existing planned water service area. HANCOCK The Hancock water system provides water for approximately 1926 people who are mostly located within the municipal limits. The principal source is the. Little Tonoloway Creek with two storage tanks and a reservoir providing a total storage capacity of 1.3 million gallons. A new modular water treatment plant was recently constructed with Federal funding assistance from the Economic Development Administration and the Farmer's Home Administration. The volume of water flowing in Little Tonoloway Creek is highly variable, and during many summer months, the flow is insufficient to meet the existing water supply demands of the Town. During these times the Town has used water from the Potomac River to supply its water needs. The Town has recently hired an engineering consultant to do a complete water study of Hancock's water system. One of the major concerns that will be addressed in the study will be an alternative water source other than surface water. The existing well located north of I-70 will be one of these alternatives, along with recommendations for changes, improvements and III -24 expansions of the water system. A portable pump has been purchased to supply the Town with water during times of dry weather. The Town recently completed construction of a new eight inch (8") water line east of Town. A Town Growth Area Study for Hancock was initiated in 1988 and was adopted by the County Commissioners and the Mayor and Council in January of 1990. A Growth Area for.the Town was delineated and recommendations made in regard to the water system. PROJECTED DEMANDS Projected water supply demands for existing water service areas are shown in Table No. 3. Note that present year per capita water consumption in each service area was used as a factor in determining future supply._ requirements (See Note #9). As a result, Table No. 3 reflects projected water supply demands for the future assuming present consumption rates remain the same. It is anticipated that some service area consumption rates will decrease in the future due to system improvements. It is assumed that present water consumption rates will not appreciably increase due to current conservation trends, especially for hot water. 111-25 Notes for Table No. 3 1) Water Service Area - That area served, or potentially served, by a single distribution system under control of a single utility, or, in a very large system, sub -areas as delineated by the County. 2) Population Served - From service providing agencies. Projections for 1995, 2000. and 2010 based on projected growth trends for the applicable election district (See Table 1-A). 3) Domestic Corporation - (Million Gallons Per Day) - Water consumed for domestic or residential purposes. 4) Other Consumption - (Million Gallons Per Day) - Water consumed for other than domestic purposes such as industrial, commercial, and institutional uses. 5) Total Consumption - (Million Gallons Per Day) - The sum of Domestic and Other Consumption. Figures provided by agency or municipality concerned. 6) System Capacity - (Million Gallons Per Day) - Based upon 'Design Capacity' from the Drinking Water Supplies System print-out by the Department of Health and Mental Hygiene dated 2-8-79 and updated by municipalities. Unless 111-26 indicated otherwise, projected SYSTEM CAPACITY for future years will be considered the same as for the present year. 7) Domestic Per Capita Consumption (Gallons Per Capita Per Day) - Determined by dividing DOMESTIC CONSUMPTION (3) by POPULATION SERVED (2). This is a more realistic figure for water use per person than TOTAL PER CAPITA CONSUMPTION (8), but it may include 'unaccounted for' losses. 8) Total Per Capita Consumption - (Gallons Per Capita Per Day) - Determined by dividing TOTAL CONSUMPTION (5), by POPULATION SERVED (2). This is an overall figure for water use per person which includes water use by businesses, industry, institutions, and 'unaccounted for' losses. 9) Total Consumption - (Million. Gallons Per Day) - A projected figure determined by multiplying the projected POPULATION SERVED (2) by TOTAL PER CAPITA CONSUMPTION (8). III -27 TABLE NO. 3 PROJECTED WATER SUPPLY DEMANDS AND PLANNED CAPACITY SERVICE AREA (1) PRESENT YEAR 5 YEAR PLANNING 5-1O YEAR PLANNING 10-20 YEAR PLANNING (1995) (2000) (2010) (2) (3) (4) (5) (6) Per Capita (2) (9) (6) (2) (9) (6) (2) (9) (6) Consumption NAME a a u 0 ..tea 0 (7) (8) ccro �� il� U upA. pq�Q(1,. Qv q 6ui H 6�a aro gp p �+ p y ^ N o0 01pp. �+ 0 p�.tA �lUv P HU v_ 8.... U .% HAGERSTOWN Hagerstown 35,445 36.792 37.697 39,054 Funkstown 1,193 11238 1.269 1,315 Williamsport 2,095 2.175 2.229 2,309 ii Unincorporated 30,765 31.934 32,732 33,91 I-4 MCl/MCTC/RCI I I0TA1 6 594 76,092 3.98 5.88 9.86 15.0 52 130 6 858 97 11 20 6 858 8085 11.8 20 6 85 N ,44 12.5 20 0D SMITHSBURG 1,554 .250 .300 196 196 1,613 .256 1.653 .259 1,713 .263 HIGHFIELD/CASCADE 1,362 .070 .070 .200 51 51 1.414 .072 1.449 .073 1.501 .074 FT. RITCHIE 1,296 0.233 0.250 106 1.326 0.233 1,326 0.233 1,326 0.233 BOONSBORO/ 2,942 0.201 0.500 68 3.341 0.227 3.684 0.251 4,361 0.297 KEEDYSVILLE SHARPSBURG 1.178 0.091 0.091 0.160 77 77 1,223 .094 1,254 0.091 1,299 .100 WEVERTOM 40 0.350 40 40 40 CLEAR SPRING 660 0.123 0.200 186 685 .104 702 .106 727 .110 HANCOCK 1,926 .100 .100 .200 0.806 52 104 1,926 .200 1,982 .250 2,042 .275 MT. AETNA 350 0.070 0.110 200 363 372 385 ELK RIDGE 75 .005 .005 0.009 67 67 75 .005 75 .005 75 .005 SANDY HOOK 170 .010 .010 0.03 59 59 174 .010 176 .010 17 .011 Table No. 4 Permitted Town Water Source Coordinates Appropriation Withdrawals Reported Population Permit No. Avg/Max Pumpage Served (mgd) (mgd) Hagerstown Potomac River N648 E0560 WA28S001 (02) 15/18 10 76,092 Smithsburg Hauver Spring N675 E0639 WA76G143 (01) .120/.175 Oiffendahi Spring N659 E0641 .180 1,554 Two wells in N665 E0636 WA76G043 (01) .065/.100 Whispering Hills Highfield/ 4 wells N685 E0666 WA88G032 (02) .08/.12 N/A 1,362 Cascade Boonsboro/ Warrenfeltz Spring N6I1 E0624' WA79G013 (02) .13/.15 .062 Keedysville 2,942 Keedysville Spring N604 E0605 WA79G012 (01) .210/.215 .203 Well #8 H613 E0613 WA88G006 .103/.147 .129 Crestview Well N600 E0601 WA89G022 .087/.103 .087 Sharpsburg Potomac River H588 E0575 WA67S002 (04) .1/.2 .072 1,178 Brunswick Yourtee Spring H562 E0613 WA83G012 (01) .35/.5 Serves 40 (FR CO) Weverton Clear Spring 4 wells N666 E0530 WA67G001 (05) .2/.3 .116 660 2 springs Hancock Little Tonoloway Creek N682 E0468 WA75S007 (03) .3/.5 .260 1,926 Mt. Aetna 2 springs N642 E632 WA75S001 (02) .061.1 .062 350 Elk Ridge 4 wells N577 E0605 WA60G005 (04) .0117/.0195 N/A 75 Ft. Ritchie 8 wells N682 N0655 WA82G200 (01) .25/.34 .25 1296 2 springs File only - no permit Source: Maryland Department of Natural Resources Water Resources Administration Water Supply Division III -29 WATER PROBLEM AREAS WATER CONSERVATION Compliance with the Maryland Water Conservation Plumbing Fixtures Act - Investigation of compliance with MWCPFA revealed some shortcomings. Although planning officials were advised of the intention to adopt requirements for documenting compliance in 1964 and subsequent adoption in 1986, building officials were not advised of the new statute. In an effort to comply, the Washington County Plumbing Board has made an initial attempt by contacting all businesses that sell plumbing fixtures. This method also included contact with all persons who hold "Master Plumber" licenses. The Board has requested documentation that all fixtures currently available for sale and installation in Washington County comply with MWCPFA. The Board must first determine the degree of non-compliance, if any, prior to formulating a plan of corrective action. The needed action may involve a simple amendment to the Building Code or a large scale program yet to be developed. Other water conservation efforts are noted below. Hagerstown - By far the largest water provided in Washington County, the Hagerstown Water Department does not have a formal program of educating its customers about water conservation. However, the City's ongoing program of water line rehabilitation and leak protection does qualify as a conservation effort. Also, 11I-30 the Department advises that encouraging the customer to rehabilitate private water lines is accomplished through billing for water used, even when high consumption is the result of leakage. This promotes correction and conservation rather than waste. Washington County Sanitary District - The Sanitary District provides a potable water supply to the incorporated municipality of Sharpsburg (Subdistrict #4), Mt. Aetna (Subdistrict #7), Elk Ridge (Subdistrict #17), Sandy Hook (Subdistrict #19-1), and the Highfield/Cascade area (Subdistrict #9). Presently, the Sanitary District does not have a formal conservation plan. During low water emergencies, the District employs the news media to advise consumers of a ban on all non -essential water uses such as watering lawns and.. washingcars.. The District also uses "bill stuffers" during these times if the emergency should coincide with the billing. As with the City of Hagerstown, the Sanitary District also has an ongoing program of water line rehabilitation and leak detection which does qualify as a conservation effort. Also, the Sanitary District encourages customers to rehabilitate private water lines through billing for water used, even when high consumption is the result of leakage. This promotes correction and conservation rather than waste. Boonsboro - The Utilities Commission has adopted a low -flow plumbing fixtures ordinance which requires low -flow toilets and other water saving devices in all new construction. The Commission has encouraged active conservation through an aggressive public information campaign on water conservation with the help of the University of Maryland Extension Service. Clear Spring, Funkstown, Hancock, Williamsport and Smithsburg - The other . small.. towns_. in _Washington..Coumty. have indicated that they do not have formal or continuing programs on water conservation. All have indicated that in the event of a need to conserve or any other need to advise customers regarding water use, they have or would use media campaigns on local radio stations and newspapers. IDENTIFICATION Contamination is present in a large percentage of wells in Washington County, particularly in the Hagerstown Valley. Water samples collected from residential wells by the Washington County Health Department between 1976 and 1991 indicated that approximately 30 percent tested positive for coliform bacteria. The data is based upon samples taken from old existing wells and from new residential wells which had been sited, constructed, and approved by the Health Department. It can be reasonably assumed that the pollution of groundwater is I11-32 a direct result of the introduction of contamination from numerous non -point sources in the County. Washington County's topography, underlain by karst limestone, contributes not only to the introduction of contaminants to the groundwater, but also to their rapid and unpredictable dissemination. Extensions to and improvements in public water systems will partially alleviate the problem. The major correction to this situation, however, will be in the form of community or multi -use sewerage service to replace on -lot disposal and serve new developments, thereby reducing the source of groundwater contamination. Table No. 5 lists Water Problem Areas in terms of water quality problems and water quantity problems. First, water quality problems have been identified by the Washington County Health Department and listed in priority order according to the degree of seriousness and number of persons affected. The areas listed in Table No. 5 do not represent all water quality problem areas in Washington County, only those judged by the Health Department as being the most serious and in the most need of immediate attention. Secondly, water quantity problems have been identified by municipalities and local fire companies and are also listed in priority order. 111-33 PROGRAM FOR CORRECTION A multi -faceted approach is proposed for the solution of water quality problems in Washington County. The approach for water quality problems will follow the headings listed below: 1. Geohydrologic Study - This initial study had been conducted by R. E. Wright Associates and funded jointly by the Washington County Board of County Commissioners and the U.S. Environmental Protection Agency in 1981. Specific aquifer units and water problem areas were evaluated by the study and the results published and presented to the County Commissioners. Fri In an effort to supplement and update the R. E. Wright Study, the Washington County Health Department, in conjunction with the Washington County Sanitary District, has initiated a_groundwater sampling program that has resulted in the collection of well samples from across the County. The results are available to County and State agencies for consideration in planning and policy formulation. New problem areas may be identified and added to Table 5 in the future as a result of this program. 2. Data Collection - The Washington County Health Department will compile all relevant data including 111-34 recent water sample reports for the problem areas listed. Data collection work will be performed on a countywide basis as well as in targeted problem areas. In each case the Health Department will determine the need for conducting a house -to -house water sampling survey for the affected area. When available, data indicates that a listed area is no longer a problem, the area will be removed from the list. Where available data indicates a current and potentially hazardous water quality problem, the Health Department will present its findings to the Board o€ County Commissioners, sitting as'the Board of Health. In an effort to address problems of groundwater quality for individual homeowners, several approaches will be applied. First, and already in effect, is the attempt. to guarantee adequate potable water for new subdivision proposals by the drilling of test wells as the site with the intent of ensuring that water quality meets all applicable requirements. Two other proposals currently being developed by the Washington County Health Department in conjunction with the Maryland Department of Environment and the Washington County Planning Commission are (1) the use of public water supplies as an alternative to individual private wells for developments in the Rural -Agricultural area. Such II;I.-35 systems would be restrictive as to conform with growth and development policies outlined in the Comprehensive Plan and (2) the incorporation of continuous on -site disinfection systems onto individual private supplies. Both of these proposals, offering definite and obvious benefits, also involve considerable coordination between agencies for both development and implementation. 3. Feasibility Study - For each problem area so identified to the Board of County Commissioners by the Health Department, the Board will take such action as it deems appropriate. Such action may include the funding of a feasibility study to determine possible abatement measures and the feasibility of a community water system for the affected area. The Board will be assisted in this effort by the Washington County Sanitary District and by the Washington County Planning Commission. 4. Sanitary District Law - As a long term measure, the Sanitary District Law for Washington County will be evaluated for possible amendment to facilitate the future management of community water systems by the Washington County Sanitary District. Specifically, the need for establishing a Sanitary Subdistrict prior to TIT -35., - the involvement of the Sanitary District in the operation and management of a community water system should be reviewed. Based upon the above program, planned correction measures will be identified in Table No. 5 as they occur. Planned correction measures will be listed, not as intentions', but when specific action has been taken, such as the application for a grant or loan, the actual appropriation of funds for a project, or the undertaking or completion of the project itself. IiI" 37 TABLE NO 5 INVENTORY OF WATER SUPPLY PROBLEM AREAS H H w ao GEOGRAPHIC AREA COORDINATE LOCATION POPULATION NATURE OF PROBLEM PLANNED CORRECTION (WATER QUALITY PROBLEMS) Mt. Lena and N630 -E620 400 Inadequate individual supplies (cisterns). San Mar to N610 -E620 Small lot sizes afford no buffer zone between sewage disposal and water supplies. Contamination of groundwater. Leitersburg N675 -E620 400 Cisterns unsafe. Bacteria, unsafe wells. Investigations of hookup to public lines in MD Route 64 or community wells. Problem continues but opposition to proposals. Downsville N620 -E570 300 Gas in wells. Bacteriological and nitrate contamination. Wilson -Shady N665 -E555 400 Wilson -Shady Bower corridor "possessed Bower to N670 -E560 the poorest groundwater quality of any Conococheague area' which was sampled by R.E. Wright Associates in 1981. High percentage of homes with bacteriological contamination. Also high chlorides and nitrate -nitrogen. Falling Waters N620 -E570 150 High rate of groundwater contamination and Neck Road High nitrates and bacteria. Rohrersville N590 -E620 100 Gasoline in shallow wells. Small lots and hand -dug wells. R.E. Wright Associates noted nitrate -nitrogen and coliform contamination. TABLE NO 5 INVENTORY OF WATER SUPPLY PROBLEM AREAS H H GEOGRAPHIC COORDINATE POPULATION NATURE OF PLANNED AREA LOCATION PROBLEM CORRECTION (WATER QUALITY PROBLEMS) Tilghmanton N620 -E590 200 Groundwater contamination. Some lots have inadequate supply. R.E. Wright and Associates found no coliform but did find that nitrate -nitrogen' concentrations approach the maximum contamination level in many of these wells. Cedar Lawn N663 -E585 360 Cisterns and contaminated wells. Washington County Sanitary District to extend public water lines to area. To be completed 9/94. Antietam Drive N665 -E605 200 Contaminated wells from Security to Northern Avenue. Greenlawn 94 Substandard water distribution system, Washington County system deteriorating in part of area. Sanitary District Remaining area utilizes unsafe proposing water cisterns. Insufficient for fire system upgrade and protection. extension of water lines to remainder of area. To be completed by 3/95. Kemps Mill, 85 Contaminated wells, unsafe cisterns Washington County Rock Hill Area Sanitary District proposing water line extension to be completed by 6_195. TABLE NO 5 INVENTORY OF WATER SUPPLY PROBLEM AREAS H H H 0 GEOGRAPHIC AREA COORDINATE LOCATION POPULATION NATURE OF PROBLEM PLANNED CORRECTION (WATER QUALITY PROBLEMS) Bower/Leonard Avenue Area 100 Contaminated wells, unsafe cisterns Washington County Sanitary District proposing water line extension to be completed by 12/94. Resh, Spade, Kaiser Ridge Road Area 76 Contaminated wells, fecal coliform Possible extension of water line from existing Martin's crossroads system. Elk Ridge Area 75 Inadequate production, low quality raw water inadequate finished water storage. Washington County SanitaryDistrict to provide additional water source (well) and upgrade storage facility. HJC-Youngstoun N655 -E613 600 Inadequate fire flow. Flow tests in 1991 indicated only 800 gpm available for fire protection. Area served by dead-end water Looping eyetem within within pressure zone boundary. main which is undesirable from hydraulic and reliability standpoint. Pen Mar N686 -E658 221 Inadequate individual supplies. The Washington County Cisterns and wells. Sanitary District has proposed to extend Sub- district No. 9 boundaries and water distribution from the existing Highfield Cascade system. TABLE NO 5 INVENTORY OF WATER SUPPLY PROBLEM AREAS GEOGRAPHIC I COORDINATE I POPULATION Mt. Aetna Boonsboro H Smithsburg ,cam Maryland Correctional Institute N611 -E616 350 N/A 1554 6594 NATURE OF (WATER QUANTITY PROBLEMS) Inadequate fireflow, spring supply subject to surface water contamination. System required chlorination and PH adjustment. Inadequate water system, leakage and pressure problems. Insufficient water volume and fire flows on Rte. 40A south from Reeders Home to High's Store. Low water pressure in vicinity of Cave Hill Road Area. Existing water lines serving the prison complex are inadequate to meet the fire flow requirements established by the State Fire Marshall. PLANNED ORRECTION Washineton County Sanita District proposes spring head improvements and upgrade and improvements on water distribution system. Develop new storage facilities higher than current reservoir. Loopingof existing 12` line. No additional hookups along Cave Hill Road. Maryland Environmental service to construct a new water transmission line from the City of Hagerstown. Notes for Table No. 6 1) RESPONSIBLE AGENCY, MUNICIPALITY, OR DEVELOPER - Responsibilities include project initiation and management, but not necessarily financing. 2) WATER SERVICE AREA - That area served, or potentially served, by a single. distribution. _system.. under control of a single utility, or, in a very large system, sub- areas as delineated by the County. 3) LOCATION - In accordance with the Maryland Grid System. 4) GRANTS ELIGIBLE - Dollar amounts indicate funds for which the project may be eligible from sources shown in parentheses. Source abbreviation represent agencies and programs as follows: EPA - Environmental Protection Agency EDA - Economic Development Administration UDAG - Urban Development Action Grant CDBG - Community Development Block Grant FmHA - Farmers Home Administration ARC - Appalachian Regional Commission MDE - Maryland Department of the Environment The local cost for any project may be assumed to be the total cost estimate less any amount shown as grants eligible. III -42. TABLE NO. 6 IMMEDIATE FIVE AND TEN YEAR PRIORITIES FOR WATER DEVELOPMENT H H RESPONSIBLE AGENCY, MUNICIPALITY OR DEVELOPER (1) SERVICE AREA (2) LOCATION 3 PROJECT DESCRIPTION TOTAL COST ESTIMATE GRANTS ELIGIBLE(4) COMPLETION SCHEDULE PLANNING DESIGN CONST. Washington County Pen Mar N-686 Installation of 13,100 feet of 4, 6, 2,009.567 FmHA Contingent upon funding Sanitary District E-658 and 8 inch line, well and well house CDBG booster pumping station, 79 meter MDE services, and 100,000 gallon storage tank. Washington County Conococheague/ Waterline extension to provide 61 homes 250,000 Soaking Complete Complete 9/94 Sanitary District Cedar Lawn with public water supply including fire CDBG and (SD 18-1) protection MDE funding Washington County Mt. Aetna Springhead Improvement and upgrade of 350,000 Soaking Springhead Improvements Sanitary District (SD 7) water distribution system MDE funding complete by 1O/93.Upgrade contingent upon funding. Washington County Elk Ridge Distribution/water supply and storage 100,000 Soaking Contingent upon funding Sanitary District (SD 17) improvements CDBG and MDE funding Washington County Kemps Mill/ Waterline extension to provide 35 homes 600,000 Soaking Complete 6/94 6/95 Sanitary District Rockhill Rd homes with public water CDBG, MDE Area (SD 18-1) and FmHA Washington County Bower and . Waterline extension to provide 41 homes 386,000 Soaking CDBG, 9/93 10/93 12/94 Sanitary District Leonard Ave. with public water FmHA and MDE (SD 18-1) funding Hagerstown Water Hagerstown H-648 R.C. Willson Plant - Sedimentation 850,000 Contingent upon 15 mgd Department E-560 equipment when 15 mgd production is production reached. Hagerstown Water Hagerstown N-650 Pipeline program to recondition 102,000 1,530,000 N/A N/A N/A Department E-604 lineal feet. Hagerstown Water Hagerstown N-670 Watershed land acquisition in vicinity of 200,000 N/A N/A N/A Department E-650 Edgemont Reservoir. Hagerstown Water Hagerstown N-652 Water line extension to Robinwood Drive 350,000 Contingent upon Department E-610 in vicinity of HJC. development TABLE NO. 6 IMMEDIATE FIVE AND TEN YEAR PRIORITIES FOR WATER DEVELOPMENT H H RLPONSILU AGENCY. MUNICIPALITY OR DEVELOPER J1L SERVICE AREA II(3) LOCATION PROJECT DESCRIPTION OTAL COST ESTIMATE GRANTS ELIGIBLE 4 COMPLETION SCHEDULE PLANNING DESIGN CONST. Hagerstown Water Hagerstown N-675 Paramount Loop, Extension of loop system 200,000 Contingent upon Department E-602 from Longmeadow Road to Marsh Pike. development Hagerstown Water Hagerstown N-670 Extension north between railroad and 1-81 75,000 Contingent upon Department E-590 to Route 40 and Cedar Lawn area. development. Hagerstown Water Hagerstown N-650 Extension along Downsville Pike to Oak 288,000 Contingent upon Department E-590 Ridge area. development. Hagerstown Water Hagerstown N-665 Zone 2 Storage - Elevated storage in 550,000 Contingent upon Department E-590 vicinity of 1-81 and U. S. Route 40. development. Hagerstown Water Hagerstown N-680 Paramount Storage 687,000 Contingent upon Department E-608 development. Hagerstown Water Hagerstown N-668 Potomac Avenue booster and transmission 455,000 Contingent upon Department E-604 main in Route 60 and Marsh Pike vicinity. development. Hagerstown Water Hagerstown H-658 CONRAIL Site - Water distribution 720,000 Contingent upon Department E-592 improvements, development. Hagerstown Water Hagerstown N-642 Installation of an additional 24 inch or Not Not Contingent upon Department E-668 larger transmission main and water storage Available Available development. to tank southern portion of service area. N-642 E-610 Town of Hancock Hancock N-683 New well and storage tank north of 1-70 to N/A N/A Contingent upon E-468 increase water supply in east end of town. development. Town of Hancock Hancock N-683 Complete study of water system possible 20.000 N/A Improvements to be determined E-468 water plant upgrade (study) after water study Town of Smithsburg Smithsburg N-663 Supplement water supply with 2 new N/A N/A Contingent upon E-630 wells. Extend existing 12 inch line development. at Whispering Hills to form loop at Cave Hill Road. TABLE NO. 6 IMMEDIATE FIVE AND TEN YEAR PRIORITIES FOR WATER DEVELOPMENT H H to RESPONS RESPONSIBLE AGENCY MUNICIPALITY OR DEVELOPER (1) SERVICE AREA (2) LOCATION (3) PROJECT DESCRIPTION TOTAL COST ESTIMATE GRANTS ELIGIBLE(4) COMPLETION SCHEDULE PLANNING DESIGN CONST. Town of Smithsburg Smithsburg N-663 Replace and extend existing line in N/A N/A Contingent upon development E-630 E. Water Street to serve Mountain Shadows Subdivision Town of Funkstown Funkstown H-648 Replace approximately 1.000 ft. of N/A N/A Contingent upon funding E-600 water line along Rt. 40A between Cemetery Street to E. Baltimore St. Town of Clear Clear Spring N-663 Supplement water supply with new wells. N/A N/A Contingent upon development Spring E-537 possible system improvements including installation of a water storage tank Town of Clear Clear Spring M-663 Extension of new 6" line from Big Spring N/A N/A Complete Complete 11/93 Spring E-537 Road, South to Clear. Spring Fire Company carnival ground Town of Clear Clear Spring N-663 Replacement of existing 2" line and N/A N/A Complete Complete 11/93 Spring E-537 extension with new 8" line to serve Amber Associates property Maryland MCI complex Construction of a new 16" and 20" N/A M.E.S. Complete Complete starting Environmental and Rt. 65 water line beginning in the vicinity funding date Service corridor of Halfway County Park and extending 12/93 south eastward to the M.C.I. complex completion with service to the surrounding area by 7/94 Town of Boonsboro Install 2150 L.F. of 12 inch waterline 238,200 contingent upon funding Boonsboro on Rt. 34 from square to King Road replacing existing waterline. Town of Boonsboro Abandon 2 -inch main and bore new 118,100 contingent upon funding 800nsboro service lines under Rt. 40A north to the existing water line from Stouffer Avenue to Knode Circle Town of Boonsboro Install 2,000 L.F. of 12 -inch waterline 200,900 contingent upon funding Boonsboro on Rt. 40A south from Reeders Home to the Highs Store replacing existing waterline TABLE NO. 6 IMMEDIATE FIVE AND TEN YEAR PRIORITIES FOR WATER DEVELOPMENT RESPONSIBLE A MUNICIPALITY OR DEVELOPER 1 SERVICE AREA 2 LOCATION (3) PROJECT DESCRIPTION TOTAL COST ESTIMATE GRANTS ELIGIBLE(4) COMPLETION SCHEDULE PLANNING DESIGN CONST. Town of Boonsboro Install 3,100 L.F. of 12 -inch waterline 340,800 Contingent upon funding Boonsboro on Rt. 66 north from Rt. 40A to Kinsey Heights replacing existing waterline Town of Boonsboro Misc. repairs and replacement Items for 83,484 Contingent upon funding Boonsboro for springs, distribution and reservoir Town of Boonsboro/ Filtration system 500,000 - MDE Contingent upon MOE Boonsboro Keedysville Keedysvilie Spring 1,500,000 (Partial) requirements Boonsboro Boonsboro Extend waterlines in Boonsboro West unknown N/A Contingent upon developer West East of Rt. 40A Crestview Boonsboro Extend waterline in Crestview unknown N/A Contingent upon developer Developer Development south of Rt. 34. Construct a well house and connect well to the Town's water system POLICY FOR WATER LINE INSTALLATION IN AREAS WHERE SERVICE IS NOT AVAILABLE All new development shall be served by an adequate water supply and distribution system which provides sufficient water and service pressure for domestic consumption and fire protection pursuant to Article VII of the adopted Adequate Public Facilities Ordinance of Washington County. In order to prevent street and other damage encountered in providing public water service to developed areas, and to provide for efficient and effective connection to public water service, the following policy is presented for water line installation in areas where water service is not available at the time of street and residential construction but will be made available at some future time: 1. Requests for such installation will only be accepted where interim systems are permitted by the Water and Sewerage Plan. 2. Each application for a water construction permit must be accompanied by a letter from the County Health Officer requesting that such installation be permitted. 3. Building permits, subdivision plats, and well approvals shall include a provision requiring the connection of the premises to community water within twelve (12) months of announced availability. 4. Water lines shall be designed and installed in I11-47 accordance with applicable municipal or Commission specifications. 5. The connection of the "dry" system shall be plugged with a visible and readily inspectable plug at the future point of connection to the existing system. 6. New commercial and industrial development in adopted Urban or Town Growth areas where public water is not currently available shall comply with Article VIII of the adopted Adequate Public Facilities Ordinance of Washington County regarding interim fire protection systems. SERVICE AREA REQUIREMENTS The following shall be applicable to each respective designated service area. Criteria for creation and amendment of service areas are outlined in Appendix B. 1. Urban and Town Growth Area Service Areas The provision of community water and sewer facilities within the designated Growth Areas of Washington County is encouraged. Development proposals which involve the extension of water and sewer lines within the boundaries of a designated Growth Area will be considered to be consistent with the policies of the Comprehensive Plan for the County and will therefore not require an individual amendment to the Water and Sewerage Plan in order to proceed with the review and approval process for development. II1-48 Specific arrangements between the developer and the appropriate service providing agencies shall be finalized prior to the development receiving an appropriate Service Priority Classification of W-3 and S-3 as part of the bi-annual update of this plan. Determinations as to whether or not a property is considered to be within the influence of a Growth Area will be made by the Washington County Planning Commission. 2. Rural Village Service Areas Existing or planned community water and sewer facilities located within areas considered as Rural Villages by the Comprehensive Plan shall be designated as a Rural Village Service Area. While primarily designed to serve the existing development in the village, a service area established around these villages could allow for in -fill development on existing lots of record and some limited growth. Development proposals for new subdivision lots within existing Rural Village Service Areas will require Planning Commission review and approval to determine if the proposal is consistent with policies of the Comprehensive Plan dealing with Rural Villages. The Rural Village designation may also be used for development proposals utilizing innovative planning techniques such as clustering which, as the most environmentally sound method, necessitate community water and sewerage facilities. Such development proposals shall be presented as a package in order that the Planning Commission may determine if the proposal is consistent with the policies of the Comprehensive Plan. 111-49 3. Restricted Use Service Area Community Water and/or sewer facilities that are located outside of a designated Growth Area and not within a Rural Village are considered restricted use facilities. These service areas are created to correct documented public health problems generally associated with contaminated wells or failing septic systems. The use of the facilities within these service areas is limited to the following conditions: a. To provide service to existing uses or new uses on existing lots of record which are directly adjacent to the right-of-way containing the water or sewer line. b. To provide service, where sufficient capacity is available, to new subdivision lots that can be served by the line without extension. Density shall be no greater than what could occur without public facilities. c. To provide service to areas where the Health Department determines that access is necessary to solve an existing Health related problem and the County Commissioners agree to permit access to the line. d. To provide service to properties where a written agreement with the service providing agency, executed prior to the restricted access designation, obligated the service providing III -50 agency to permit access to the particular line to provide service to a specific property or a specific use or provide a specific number of taps. PRIORITY CLASSIFICATION REQUIREMENTS The following requirements shall be applicable to each respective designated priority classification within established service areas: 1. W-1 Priority (Existing Service or Under Construction) a. Individual water systems shall not be permitted, except as follows: If an existing community water facility is inadequate or is not available,* an interim individual water system may be used subject to the following, conditions: (1) Such interim systems are adjudged by the local health department to be adequate, safe, and in compliance with pertinent State and local regulations. *The adequacy or availability of community water service to a particular parcel of land is a judgement which must be made in each case through consultation among the responsible agencies and cannot be made on the basis of this Plan alone. (2) Permits for such interim systems shall bear a notice regarding the interim nature of the permit and stating that connection to a future community system shall be made within 1 year or less after such system becomes available. (3) Provisions shall be made, whenever possible to locate such systems so as to permit connection to the public facilities in a most economical and convenient manner. b. Extensions of existing community water systems shall be permitted and encouraged. 2. W-3 Priority (Programmed Service) a. Individual water systems may be permitted on an interim basis provided that: (1) Such interim systems are adjudged by the local health department to be adequate, safe, and in compliance with pertinent State and local regulations. (2) Permits for such interim systems shall bear a notice regarding the interim nature of the permit and stating that connection to a future community system shall be made within 1 year or less after such system becomes available. (3) Provisions shall be made, whenever possible, to locate such systems so as to 111-52 permit connection to the public facilities in a most economical and convenient manner. b. Extensions of existing community water or sewerage systems shall be permitted and encouraged. 3. W-5 Priority (Planned Service) a. Individual water systems shall be permitted. b. Extensions of existing community water systems shall not be permitted, except as provided by Policy for Water Line Installation in Areas Where Service is Not Available. c. New, permanent community water systems shall not be permitted. I NPS Designation (No Planned Service) This designation is not applied within established service areas. a. Individual water systems shall be permitted. b. Extensions of existing community water systems shall not be permitted. c. New, permanent community water supply systems shall not be permitted. In all cases where interim or permanent community water systems are permitted, they shall be subject to the standards and III -53 ..... • regulations of the applicable State and Federal agencies. Adequate documentation that the State and Federal standards can be complied with shall be evidenced prior to County Plan amendment consideration. All interim or permanent community water systems, or multi -use water supply systems in Washington County, excluding municipal systems, shall be approved by and when applicable dedicated to the appropriate agency for ownership, and/or operation, and maintenance in accordance with established County and State standards and procedures. WATER SERVICE PRIORITY AREA MAPS (1" = 2000') The maps on the pages that follow show existing and planned facilities and service areas that have priority designations of W-1 or W-3. Letter designations shown on the maps are County zoning districts for which more information may be found in the Zoning Ordinance. Planned service areas having a designation of W-5 are shown on Map No. XII Water Facilities and Service Areas (1" = 1 mile) found in the inside front pocket of this Plan. While every effort was made to insure accuracy in the preparation of these maps, errors may have resulted from the transfer of information from maps at different scales. The classifications of parcels of land as having either existing service or programmed service was based upon the location of existing service lines and upon the best estimates for future service by the service providing agencies. The delineation of the boundary 1I1-54 for the W-5 (Planned Service) classification is based on the land use policies of the adopted Comprehensive Plan for Washington County. W-5 priority classifications within the Urban and Town Growth Area service area are based on the established growth area boundaries. Determinations as to whether or not a particular parcel of land is considered to be within the influence of a Growth Area shall be made by the Washington County Planning commission and when applicable, the Planning Commission of the affected incorporated municipality. Because of these inherent accuracy limitations, these maps should be used for general planning purposes only. For certainty as to the exact location of all existing facilities or to the status of particular parcels of land, the Washington County Planning Department and the service providing agencies should be contacted. Changes to these maps which may be required by errors or inaccuracies may be made in accordance with the administrative procedures set forth in Appendix B (Page B-10) of this Plan. 1I1-55 ;. M HIGHF!ELD- CASCA it - 118 31 CLEAR SPRING 0 %IV MP WATER SYSTEMS INDEX MAP WATER AND SEWERAGE PLAN WASHINGTON COUNTY. MARYLAND O 6101141 lteafltll t1 T• U all etlatl►tfloaf 11AIIA /TIVIM 1t11T1fAt flit? olMUIt AU ltlataN"$ loelllil IA 1119 11AIII 1T1flNI section of Toot PlAll 11111 TO WAINIott/n tltoff TAI NAPS 1ltr/11/ 1 • $3 1 110 A1ltllllot MAP$ N Alin Nlllollt WAtIf..1111151 Iw... w1t1o1MIOR 1INY IIM MM JAM fl MAr ft.r...1 IT. 11.MNMtfe$ M11T KNNNIMI low-II10N ..t.. l.N M M t. iii 35 HAGE $i-�- PUNKS TO WN WILLIAMSPORr 1MOUNT AITNA O !lOONSSORO KFEDVSVILLE 0 SHARPSBURO ELM RIDGE LAME \Io WATER MAP SYMBOLS ExIstlna Proposed ;'WATER TREATMENT PLANT A O .. h1ATER PUMPING STATION WATER STORAGE TANK * O WELL W W PRING s RESERVOIR tRANSMISSION MAIN • SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 ExistIng a Under Construction W-3 Programed Service w a . . ■ . a w ►" w wa a a wawa ar a. W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR w- WATER MAP SYMBOLS Existing Pronosed WATER TREATMENT PLANT A Q WATER PUMPING STATION I I WATER STORAGE TANK O WELL SPRING � -a RESERVOIR I I TRANSMISSION MAIN • - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing & Under Construction W-3 Programed Service W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■Li WATER STORAGE TANK WELL SPRING s 'a' RESERVOIR TRANSMISSION MAIN - SERVICE AREA BOUNDARIES SV* URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing a Under Construction W-3 Programed Service % f ■ NW ! ■ ! ■ : ■ ■ k k ■ ■ • NW ■ ■ ■ N ■ ! N SNIPUN ■ %% M N F ■ N ■ N ■ W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS Existina Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■T I WATER STORAGE TANK O WELL SPRING � -a RESERVOIR TRANSMISSION MAIN • SERVICE AREA BOUNDARIES ♦,URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing Bi Under Construction W-3 Programed Service M N ■ ■ s ■ M ■ ■■ ■ M ■ ■ M ■ • ■ t MM M ■ M W-5 Planned Service INSIDE SERVICE AREA BOUNDARY NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR Sr WATER MAP SYMBOLS Existina Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■ WATER STORAGE TANK ci WELL SPRING RESERVOIR TRANSMISSION MAIN • - SERVICE AREA BOUNDARIES W* URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service ■ ■ M ■ 1 ■ ■■ ■■ ■■ ■ ■ ■ ■ M■M M ■ ■■ ■ W 5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR l � Q\ V W Q yl •<' E: r,// , j I \L �• a 1 ' I 'L HI I Q a I \ , r / WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION L I WATER STORAGE STORAGE TANK WELL SPRING :RESERVOIR I I TRANSMISSION MAIN - • SERVICE AREA BOUNDARIES URBAN 8 TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing & Under Construction W-3 Programed Service N r r x R ■ N r r K r r r ■ N K r r NW r ■ t r r r r r r ■ rr r r -■ rrN ■r r ar rr rN r ■ r ■ r W-5 Planned Service INSIDE SERVICE AREA BOUNDARY NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR 0 RURAL VILLAGE C .' ay 17 SERVICE AREA \' - RR at R R • ..• *6GHFlELD 1{URAL YILLM SERVICE AR . A 7RURAL iEINMVAIMA VILLAGE SERVICE AREA - _ _ x __ _ u �r ` ; ;`.. •err ���. � .. .:.: RESTRICTED USE 9L "El 1102. 636 659 662 665 NO. •� .._ -- - -- .�._.. - NT lur Mo 666 671 11 WATER MAP SYMBOLS Exlstlno Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK O WELL SPRING RESERVOIR TRANSMISSION MAIN • - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -1 Existing 8 Under Construction W-3 Programed Service N PSI , PS , N " N, ■•■ f N N ■ N N Y , N N N N K N N M M U NM ■N N ■ N NN M Y N UN N N ■ N N ■ N W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS Existln4 Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■I I WATER STORAGE TANK WELL SPRING RESERVOIR TRANSMISSION MAIN - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing 8i Under Construction W-3 Programed Service K ■ NW K ■ ■ X K $ K X ■ X X K r ■ K ■ K X a K X N ■ ■ ■ K K K ■ K XK ■ X a a ■ K ■ X I •wK ■KK M■wwX K X X ■ ■ X X W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR r r/T � p. WATER MAP SYMBOLS ExIstIn4 Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■ WATER STORAGE TANK WELL SPRING RESERVOIR I I TRANSMISSION MAIN - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing 8t Under Construction W-3 Programed Service N N N N N N N • N N N ■ NN ■ •t N N N N N a N N NNN N ■ N NUNr NN N RN N N N ■ N N Nr NN N ■ N ■ K N N NNN N N N N ■ N N N K W 5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS Extstinn 15mm-tart WATER TREATMENT PLANT Q WATER PUMPING STATION ■Li WATER STORAGE TANK O WELL SPRING FtESERV0IR TRANSMISSION MAIN N - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service x r x r■ r■ x ■ x r ■ x r ■ ■ s x ■ ■ ■ ■ r ■ ■ x ■ r ■ ■ r ■ s NUN rx k xrr ■ ■r x ■ x■ xr N r x N N .ay W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR .'� x % •-y,fJi�O:`. . P . . . X x K X 1\I X x w.�K IM •! , ll♦\ X N X % X; x M !; \\, / I � X x x x '/x x x m z%< x x f r�_`x . 11."ti•,`i �i .�/�'� . /= {'#}#f11} ##kkzx%xxx' ..... . , . { I::�•ty. _W may a' f N � , Q - :::::: x x �x� ... :Q�✓ : - I ' M IT�ti •ii:• N x ' ilifnM b '� �'� w •% X% x :Z X x . .tiT. ��.. x X X x K i . ' fr —• _ 'r x (D Z ..x` G:7 1 -1 i .v. x X �� .' x x C• r! K k '`� x xx xX xx%XXXxX xxx%x t{ X X X �% �% K,•.% x M 1 . . '. . ' xxxx x% /xx X %%X xX xxx��'•i...Y �Y } .�. . x `11 \: X X% M x X % % x X {}j . Tr. Q, r. y, Y• �. x % % X xf �x YX X .t} rt x, % f *i xrX ^�e + � + + ___ - / (' /Y/ :.•: :.::/:: <LI -- �,� s K X II \'<+ ., < If n WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q 'WATER PUMPING STATION ■I I WATER STORAGE TANK 'WELL SPRING RESERVOIR TRANSMISSION MAIN - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service ■ N Sx x ■ x x ■ x Rx R ■ K ■■ ■ ■ K ■ ■ K X ■■ k x ■ xx ■ x i ■ x ■ ■ x x M ■ x M M N ■ ■ K ■ K K ■ x x x + ■ K ■ W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR /\ ,< jam,_-�.-- 7 MI a 'f. WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK CD *ELL SPRING RESERVOIR TRANSMISSION MAIN - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service N ■ ■ r r MN r , K KM r ■ •X _ K r MM UN ■ r r w i r . ■ = w ■ r ■ X K r w ■ F r w r r r r + r w w w w r w w w K i r w w ■ r w W 5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR RESTRICTED USE p*� .......... C 5 i ............. : %' RUFAL VI /LAGE ICE AREA ::.:Fogg ::: Wawa ; *' + + t / / + C BLOCK 3 Y. ..;::::G::::::::' ``(�- / y'RR 'a:s:ieii• ��.�yo �t� �•�:•'-• .•RR•• - a . ....... . 13i'4�1 C __ ____ I / //{. n . RU AL VILLAGE �; ..:. s': R. SERVICE AREA { i4 iJB 659 B!2 _ 6i6 iii . bill 7 -i I 4781 67. Ii w WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK O WELL SPRING RESERVOIR TRANSMISSION MAIN - -. SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing & Under Construction W-3 Programed Service KK■ S K ■■ KK K K ■ KK ■ K ■ ■ ■ K K K K NW K ■ N K Y K s KK KKK rK■■■■ ■K V Y ■ K ■K W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR n « te` �7/ �v\ �y� 1 5 —Tt' ____ - / , / L.y / / #xk#xX � a LL. „ � # ' x # x kx � r. Yep � I xx xx x# xx xk / lrJ IMM1 xX kk kx kk xk / •Q txx kkxx kk k kkkxk"Y / kk x kk i,k k J K x _ p• • R. M ...� x X •<'�.J x x .� ,/ � s f'y •• Kx xk4 ^',f R% if xrX/e '- —-------- •�• x xXx�� x . . ' ' • .. /Itx x % x M x• . . . - • �'X X X K x T. • x x N K .... /.... )p�•` .r''C x x �} k*NK%%xCXXz )f„ �; *# •#.. :•..�. �k i}•:.,<- ���H+xy€X KX x% CC CC K. f # •� # # 4 # x• M % X N X X Q ` H rp, r 'air. ;�:. .-�•} •�✓ �Ai?, i • � 1 ' � w M WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK O WELL SPRING RESERVOIR [ I TRANSMISSION MAIN - • SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing a Under Construction W-3 Programed Service N N M N N ■ ■ • N N `N N NM MNN N• N ■ N N N N N N N N Y N ■ NWN N N N N N N N N ■ N N ~ N N MN N N N Y N NN N ■ N ■ N N N N NW N N N W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR I I nl n «I r a 1 I. I /7r' WATER MAP SYMBOLS EYtstInn Prnnne*A WATER TREATMENT PLANT A Q WATER PUMPING STATION ■1 1 WATER STORAGE TANK O WELL SPRING RESERVOIR TRANSMISSION MAIN • -. SERVICE AREA BOUNDARIES V* URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service ' • • ■ ■ ■■ M M ■ i• ■ M • • N a r r • • R M F■ t W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE REA BOUNDAR I Ar.: ( \ hc <N V A \ / 11 \ X 7 ,2 '1 \ I \. _ / ____ A- -\ / ,\ s A / A / - (ti \ \ \_ .rr :•.RR - ..: `i - -� - y �' R R J .`< H! Rz-3I5 �( RR RIB 1 A J H.... A xxxxtL�` r *y I C A 1 1 i1_ CLEAR S IN T R AREA E CE`ARE OWN G 0TH ,BOUNDRY NOT MAPPED. "HI" ZONED LAND -W-5 (PLANNED SERVICE) wrxa. 334 533 •53• 536 542 545 548k Dh WATER MAP SYMBOLS Exlstina Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■T I WATER STORAGE TANK • O WELL SPRING RESERVOIR 1 TRANSMISSION MAIN - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -I Existing & Under Construction W-3 Programed Service • R • R R ■ ■ •C a IS • R R R R • ■ • R ■ • R R R ■ • • R • PU.NC • R R R • R ■ N • R • W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR u ' A /\17 ((J A Ti A( ___ 7 8G � 7 A C RZ-284 ' L4 ' L I A 1 / i r R124 A A %Xr Xxx x%r xx X kXxx % x xk x Xxxx 1 xYkX k x x k x k x Y %Xxx RESTRICT x xx Xxxxxx x 544 061 554 557 660 663 "4 Zs WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK O WELL ______ () SPRING '(- RESERVOIR TRANSMISSION MAIN - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -i Existing 6 Under Construction .................. W-3 Programed Service S ■ ■ ■ ■ w ■ ■ w ■ R ■ ■ ■ ■ w ■ w w ■ w w ■ UNNU ■ ■ ■ w w ■ ■ ■ ■ w ■ IN w w ■ UN w ■ NI t w w■ UN w W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR x _ '7, X k r 1 U \ VT. r ?" " /1 A ,17 f/ // I- -. - - Ix II 'A C Fy L •� A / (lxxxxxxxxx x \� I�` A ��xxxxx' X � C, H i'l RZ 91 $2 ¶ �„ xx x x x # / I _ %~ A ___ r 11� * * ** *tf4 * RS 'YI/ \\ / ) /AtR ......... . WA► N0. bee 56f 572 575 ale eel 5e 0e NOT[ . LL*TNt (O.JTP%XTYM .n.i. 7K u<f•...010. COU.tI ICfd1&L .l.►o.T C( IO4. 7! ftt YU tprt11L faq P..f 1T- MAO.fa.T 7u.IACtt . WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK WELL SPRING RESERVOIR TRANSMISSION MAIN SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -I Existing a Under Construction W-3 Programed Service NN ■ N ! N R k ■ W NN N ■ INK ■ ■ w NN ■ N NN a a ■ NN ■ N ■ ■ ■ N I N ■ N N N N NN l N N N N ■ N N N NN NNNN Na ■ N N N N W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR J o � + ��� + +++�+'ir ry �++ }+ •/}JTAN.. � .,yam,.. + } + + + +, 'r } �1�•7 N . . . . . . . . . . . . K . . •-- .�1.. 1 .j% . . . . . , . . . . . . . s. Q . . ._• . . . . . , , ::. ::...............•..... .-�.� .. !: ...... . : . . . . • . • . . . . . . . . ' . . : .:. : ._.� . R . . . • • .� • • Ate.~,•. • • . . .. . . . . . . . '`• • • . :r` ..:::.:::K ::: xx$4 xxXx x ..... • 3t 1 x x .. K x X I� x .•^ : . .... x X x XxxiK�x,�Jx., \�`•. ..;. .(L.. ... �i.:•x x x x x x x k �.. ' x x x x x x� •V f .. .. .. r �,,. - - X. X "«. x - �i� 1 • ....... • •V .. r. iC Iii �� e\ X x x x x ♦ I T. r. OL X: 71'rx x t. IL rF % x x a � % % K M % 1 I �• of C WATER MAP SYMBOLS Exisfina Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION WATER STORAGE TANK O WELL SPRING RESERVOIR F I TRANSMISSION MAIN N N - SERVICE AREA BOUNDARIES URBAN 8TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing & Under Construction W-3 Programed Service •■ a a a NUN` a ■ k ■ NUN a a■ s a a s an a s■ ■ a a a ■ a a ■ a ■ ■ a a a a ■ ■ ■ a ■ s e a N. a a w a a a a ■ sMa k R a a a ■ a k W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR N w • n � b r Y • Z • N i r r �• � o At Ti/ 17 T-3 Ia, : /_I / N/ __ ___ is / /1 < --___ L_ !I w N .4. a. w• *. r,. .,, NX� N . x x x x x x x x x X x x x x x R'• z x x K . x x x R 11 N x• x x x x X• ih ? % % M R M % % % % % YkXNxX x,1 X NBC x. ... B • N M M N x %. X I Y x x x N N x X. N. .. .. N x K % K % M K R % X � N N % x M N fx Y % R x x •( JC X N NM R X •% x xR % x •. N N t X X �xx%X xNI . .. N '• .•x x z ?I K X X x INN Y NY K XXX x •. •• .. •. Ir x x x x x NXXXX % M X XXX •••••••• .• 1 • % N X M %xN . .. ' x %xx N K N x %N x/xNxxY 14 111 r.. .. .. -s.....+• . . . •I. % % .. r_ 0 WATER MAP SYMBOLS Exisfin4 Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■L I WATER STORAGE TANK WELL SPRING '€' RESERVOIR TRANSMISSION MAIN - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -1 Existing a Under Construction W-3 Programed Service KK N NE K K K N ■ K K K KIN K K K KK ■ K K K K K KK K ■ K KK K NW K K k KK Y KK *• wKY K* }• W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR ) ___ �. 1 � {/ � X Ill•. .. � % x �F' f 1 k N• x X •••� ••� �F �M �, +!r I � �.J¢ N N Kx � { r kN x kN •'�c• ' • '� Z x c-.+-�.-'�, � ; N N N •k N, N x l / x N R . N k xN kN x N N k x I / __ I - : % x x `.7/)!/ / <./ .i / __ ><(/\,: / /\ N< ':-* 7. <- ;Z 7----.- — I __ __ - - I- .�� / I r-•-i'-- / a •/f: /7 r-• // (I V R WATER MAP SYMBOLS Fiktlnn Prnnncnrl WATER TREATMENT PLANT A WATER PUMPING STATION ■I I WATER STORAGE TANK WELL SPRING {s} -a RESERVOIR TRANSMISSION MAIN SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -I Existing a Under Construction W-3 Programed Service ' a ■ ■ ■ a . r a M M UWN M ■ MU ' ■ M ' M M i k M 1 M M M k a K M M■ a a a • M M 1 t a M M ■ M MW ' ■ M a a a a M ■ M M ' M M ■ ■ p ■ M M W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS ExIstIng Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■I I WATER STORAGE TANK WELL SPRING RESERVOIR 1 11111 TRANSMISSION MAIN - • • SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction w-3 Programed Service ■ K ■ f i K 11 k X K K K ■ % ■ X % % K S K k k % X • NW ■ ■ XN X K K k % ■ ■ V k %kk %NVNN % K N X ■ VNVN W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR IAA 1 A A A \ IN 4 / ( L YA ( IM IM I; � o�p TOW( oP (RZ-431) Mnu. PORT �'� __-_!i- - yet J(RZ 91- 16 ) RZ - 39fi 24 H `:.•• a ` A of u f 24. IMf w°. 349 331 554 557 04O SW OK ♦7 I0 WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK O WELL SPRING RESERVOIR TRANSMISSION MAIN • SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service e N N N N ■ K R ■ N K K K N K K ■ K ■ N N N NN ■ K N K N NK P K NI K N ■ K K K K ■ K K N R ■ N N K K■ K K K N N K N K N N K ■ K ■ N N N W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR -1 / ¶ // 4 I - 4 rJ — ....: }�-Y4 +*�� ++ + :: ** ** * * * iI +44 : i: .y . . # . ,,,/ .. - 4 + + *++ *+ *++ ** +* *+ «+ r • 111 * + �. *+ •.Q' 1 > + * * •_ 1. '` • ''. ,�' j /'; •.• ••tom' ' .•• •j 1 � r y ' til Q • 1 nfk'7VIA �� WATER MAP SYMBOLS Exisiino Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION . WATER STORAGE TANK � O WELL SPRING ' 'a RESERVOIR TRANSMISSION MAIN SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -t Existing t31 Under Construction W-3 Programed Service K K ■ K USX N K NUNU N N K K N: K % N N N N M K a N % K U K ■ K N ■ K t K N % %K ■N K % KNN W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR ::12 ::12 WATER MAP SYMBOLS Exlstina Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■[1 WATER STORAGE TANK O WELL SPRING RESERVOIR TRANSMISSION MAIN • - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service f t ' w M ■ • M M ' M . ■ 1 ' M y M ■ NW M X M' N NWN I SW M Ml ' f fl ' k f M ■ Y f ' • • M M ' M t Y M • N ' M M ' M M ■ K MM M S S MM W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR 2 g a ST - RU e„ Rd 112-408___ / Lx % y X� 4 y •, � •\ � s Rs.. }}}}t k.. } j AbA J(VF1 1/::)::'' ' RS r;. 111-290 �ii' } k x }viT7 • /++ q. �/�.+ y } fix/ } ++ ++ a } } z l..�J++++ o• }}Yxz}N Yxk YXxx + } x .•"(�' xy xxx XXx XN` RU \,\\ \x x% x x �_,� . :9C:.�' }}}"}} } ,�:; :f 2j r=xx xxx I .. .. �:��M � {{ �}/7 IA}� }} } { } • � � M.%N Kx KyxX �xx� - .� :::::::: RI -331- / } } k* } }Jc1 /} '1 x x X x x x N X x/X A i l. }k}'}} }k} j' j': xxx% xxx I / —" )' } }{ } }} . : .... .... .. x xxX xx x/z.x xx X yx xx lY V �//``�•}}. t x xyXyyxxx.,.l: :'�.■ 'xx z} xxxxxxxx �+ . 8.( c. X N X N' Y X % • 44 lib (es'ej • S: x x�y N x N A \\/ — __ — x;:x:: : 'I f / I( 105 w2 $N 114 617 szo WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ I ] MATER STORAGE TANK . 'WELL SPRING ' 'a' RESERVOIR 1 TRANSMISSION MAIN • - - SERVICE AREA BOUNDARIES URBAN R TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -t Existing 8 Under Construction W-3 Programed Service I■ w B UN w w w ■ a w NB a wa w w a UN a w UN w a RN a a w a w a ■ w NW a w BU ■ a aw a w w ■ • w a a a w aa w a w a NW w NB w a a ■ W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR . K % % •,� cis i K % I is L i /1 i•. 4f≤/ flT b<1 /1 + j. ' +ms's+. ' \ : a �,+ / t1. • / ,, r/ • i t -. ____ • '1—Zi\ /+ } / c\ .7 ; / a /.1 \.-__• \' / ,V'• 'N 11 \ \ \YI\ K n :/ \ ___ : ///>_ ` % ' •••• _Th':- .:.: •• WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■ii WATER STORAGE TANK KID WELL SPRING RESERVOIR TRANSMISSION MAIN • - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing & Under Construction W-3 Programed Service • K K M ■ t i t ■ t at a ■ K K a t a ■ t ■ Y K K K K a a 1 t N. ■ a s ataaNNMM t 1 S ■ kKM ■tit k ■ a Y K Kt tK ttt W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS ExIstina Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■ WATER STORAGE TANK O WELL SPRING RESERVOIR TRANSMISSION MAIN • - SERVICE AREA BOUNDARIES r* URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W • I Existing a Under Construction W-3 Programed Service + ' % • % % M % i i % % i R % + ■ e M % i% k i i % i % % % % i r •+ % k Y % % Y T •+ k It kIt i ik W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS Extstino Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■T I WATER STORAGE TANK O WELL SPRING RESERVOIR I I TRANSMISSION MAIN • • • SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing & Under Construction .................. w-3 Programed Service W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTS ID E SERVICE AREA BOUNDAR I -ii WATER MAP SYMBOLS Exlstlna Proposed WATER TREATMENT PLANT A WATER PUMPING STATION ■I I WATER STORAGE TANK WELL SPRING '' -('?J- RESERVOIR TRANSMISSION MAIN N - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing & Under Construction W-3 Programed Service • • • ■ M MM l 1 N M M ■ = k • ■ ■ • M M NN M ■ M M M N N N • W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR •t t 3xxX, 7 i \L) o % x Hx X x / / a ' II _ rr i x� x :::x> x ( K X X X x N p X N N l! `fix X x x 0. ( X N N x �Y % IN k x~ NN % N X —•+~r % x % % x % x % % X K x X % i.•% X `� x x N X N N X% x a' �- N X� % x % X X K 1r M N M % %Xx %% ('�` x% x% x�a x.Tx x x x x x x x N t xxxx :%xx Il ►�- !� X x x •I (.! t( x Xxx x N x NX .O }Y^ xxxx 3 Nxx R X fi iw%vm ., j fix N �x % x # .fix '��'✓ xXx x�x Xx.xN - NNL____•' „�.• N x # x • x xXxx xN xM x''' �"'r`Rx xx x! x X ,< 7 # ..... ,\• "r kx XXx xxNXx .'ice^+; �'' x%�x%xxxx ... .. .. ,• xfixX xk-I xxkxXL, xXX X x # xX xX•#xx xXX _ X ... Xx x h X x #k1�x X#xXx XX x N X .. _ k mL xqlX x x X X R x X R XIf • , . xx �x�{�/� xXX X % X x x�".YT7`�^ R X x Xx '.ir .. xX XX #ryN x # x xX xXx '^ xxxx N fi x x . :. •::: xX kRN xN # X X # Xx x x x % x i x x ' .. y X X x,` x N k x x x 1_ _ x x N / ----�_xx4 •'. x x� ��,• `X' Q XN N * :J::: .:. NNN NWjVP" \ V / f x x X X X x X .. ix xxxx #rX �Xx xx • -'�( Y xXX X MxV X x Q � jj � V I J :• _ x N \N X X X X X f f! C • [xN,>jN*NNNxNk I. / a :\ ' N : 6.�"y• x , NNX xx N*'NN NxX - \rte\ r r G .r .. � -"5-- I 11. • . Mx Xxx . . ; ///JJJ�///,,,/// I� \, '— �x N' f i �\�\ WATER MAP SYMBOLS Existlna Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK O .WELL SPRING ,RESERVOIR TRANSMISSION MAIN SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing a Under Construction .................. W-3 Programed Service y M y y } ■ y • i y M ■ y y y r y M N M Y y y t y N yM N N y ■ y N M y ■ N ■ f y R M y f • M y M M M N S 5 y yM M M M N NNrNMM M W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR ,I 1 O I WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■LI WATER STORAGE TANK O WELL SPRING RESERVOIR TRANSMISSION MAIN • -. SERVICE AREA BOUNDARIES 1* URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -1 Existing a Under Construction W-3 Programed Service N r ■ ■ ■ ■ r ■ ■ N K r NNNN r r r ■ T rr N % ■ i K a N . N I ■ . . . it ,.... N r r • N ■ Y ` rxrr w ■ r r r r ■ M R N W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA 8OUNDAR f • i M p r . • r r / // •///! / / /1. 1-� _: r• • c. X/X K /� 7 rX x�aF'y�(�JL1 k� R X a / 1 KI r 4�m YI WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION 1 1 WATER STORAGE TANK O WELL SPRING RESERVOIR I I TRANSMISSION MAIN - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing B Under Construction W-3 Programed Service ■ M ■ M ■ ■ ■ ■ w ■ ■ K ■ Y Y ■ ■ w ■ k w ■ W-5 Planned Service INSIDE SERVICE AREA BOUNDARY NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR i � SSA I 1 N +_ / / I1 Q C � ` •e•) A 11 / A (4 'K r---.4 __ _ _ /1/ \\; 1 h1' 1 .x x xrx K .. .... :. .J K y K x K�Y K Y X.. N K X K X X k ,({[ SKX N M % N % N . ., � rN 1 L J x z z x x x X x • .. J S K K x x x N x K N x K xNxN K K x K K X K K K N X • .. Ir ( 11 KNINNx x N KX x x Y x x NN N XxN Nx l XNK k N K x KKbIC N / If K M M Y y y x x X K Y 4( N N K K 1 M N Nx NxNNN N N Ny KK, • N X X x k K x x M X K y y ` \ M N X X x x x x N X Y x x K K r �' fx % k K x X Y k XNM YNx Kx NX K}� : \'� \ x X 1 x y 1. xxN xN xxK k x K Y K x! % N x K x K X x Y K x N N I •\ / 1 h x�x JR x x x x F • /:� Q .A: WATER MAP SYMBOLS Exlstina Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■I I WATER STORAGE TANK WELL SPRING RESERVOIR I I TRANSMISSION MAIN • - • SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing 8, Under Construction W-3 Programed Service ! p NP ! ! N ! ■ ■ M N M MiM ■ ! ■ ■ M P N M W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE REA BOUNDAR WATER MAP SYMBOLS Existlno PrnnnsAd WATER TREATMENT PLANT A Q WATER PUMPING STATION I I WATER STORAGE TANK � O WELL Y Y SPRING RESERVOIR L I TRANSMISSION MAIN • - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service S ■ NW r r r R S ■ N N N r R N N ■ N N r ■ r r r r r N M N r N N N NUN r r r r r r N r r r NN*•NU r N N r r k N N r r N R N N N N N W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT At Q WATER PUMPING STATION ■ WATER STORAGE TANK O WELL SPRING '' RESERVOIR I I TRANSMISSION MAIN SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing & Under Construction W-3 Programed Service ■ w■ w ■ r r • w ■ ■ ■■ w ■ w ■ U ■ N U w w MU r NW w . NUN w ■ w■ w• N P r ■ ■ w ■ • • U w w w ■ R w ■ww w r w w w ■ w r r r W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTS ID E SERVICE AREA BOUNDAR Ir WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION L I WATER STORAGE TANK � O WELL SPRING -a RESERVOIR TRANSMISSION MAIN - - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service F M N K M M t ■ ■ Y R R ■ R ■ • • ■ • • K • ■ ■ R R i N ■ • Y ■ M • Y ■ • • K IS M R * ■ ■■KN F W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR / 1 `' 1 \ \jj'a JJi> t t« -)i' r![jI xx x x K / do x y x Q f x x # * f 4 WATER MAP SYMBOLS Exlstlnn Prnnntarl _WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ dWATER STORAGE TANK ..WELL Y Y SPRING {s} RESERVOIR I I, TRANSMISSION MAIN SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service M M ■ M M ■ a MN M M ■ M M M ■ M M M NM M X N M M M ■ M M M ■ M M ■ ■ M ■ ■ ■ ■ M ■ M ■ ■ ■■■■M ■■MMM■ ■ M NM M M M ■ M W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR L • w a w , J Q 5w J a W i WATER MAP SYMBOLS ExIstlne Proposed WATER TREATMENT PLANT A WATER PUMPING STATION ■ ElWATER STORAGE TANK WELL SPRING RESERVOIR i TRANSMISSION MAIN M SERVICE AREA BOUNDARIES ** URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing a Under Construction W-3 Programed Service ■ N ■ ■ ■ " N ■ w w ■ M N Y '" ' w■ ■ w ■ w Rw ■ W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR Antietam Ov&, la y Zone iiiiiiiiuQU!l11111Ri11! A O •1 A02 ......... A 0.3 . i . S A A :�A A � kk PORTERSTOWM A/ AOT3i 3A �• s ..7 . A •1.12 \ c ( J.. :i±, / T' yam' C FLICKER Ll I-.5..... .J _1 • 7 599 SO �� WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■TI WATER STORAGE TANK O WELL SPRING RESERVOIR TRANSMISSION MAIN • SERVICE AREA BOUNDARIES I* URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing a Under Construction W-3 Programed Service • • K ! , • MN • Y r N • r r iY , ■ N , ■ r NW ■ • rr■ • r • rr l • N ■ • ••r ■ •N rK Pt W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR 514 I 557 Nnti a tans uvt ay c. uric rrunurrnunirruurur AO - 1 AO- 2 AO.3 If . LC 'O-3 t f f...f ~ J -j ,/ / V'r'f J 5.5 11.rp LJ 590 593 5.. 599 602[ 57. WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■f] WATER STORAGE TANK O WELL SPRING RESERVOIR I I TRANSMISSION MAIN -- - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing & Under Construction W-3 Programed Service %% MN K NW K• ■ % K ■ M M K K KK K MN M % ■ K ■ ■ K •■ K M K $N • M r r r • ■ : rK • K K ■ K r K • K N K K M • • K K K %K K M M%N N N • W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR -I S I .9I WATER MAP SYMBOLS Exlstlna Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■I i WATER STORAGE TANK WELL SPRING RESERVOIR TRANSMISSION MAIN SERVICE AREA BOUNDARIES W* URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction .................. W-3 Programed Service N a ■ a s r ■ r a s■ ■ a s w ■ ■ a a a a a a i a N ■ r a■ r a a a a w ■ ■ a wa a a w ■ w a ■ aw ■ ■ ■ a w a r r r ■ a a ■ ■ i a w W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■I I WATER STORAGE TANK WELL SPRING RESERVOIR L J TRANSMISSION MAIN • -_ SERVICE AREA BOUNDARIES SV* URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W -I Existing a Under Construction W-3 Programed Service M N Y. N N NM N MN N N MM Y N N N N ■ N N N N ■ ! N ■ N M N PPM NY M N N N a N N N N N N 1 WI N N N N N Y N ■ M N Y NY N N NNNSN W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) N 0 PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR 4 li' ____ IT /1 £ / - ) - i NAPT•�I I run /'AT1011AL UONUId T \� �j (HP) c Hi P / G / IJ • 144 I • �: z...� _ r-'�-tom' _ HP =- URAL VILLAGE H P f4vE8 C H p SERVICE AR A RURAL VILLAGE :::: sz aye SERVICE AREA �: Ray<�� HP P O- 114 667 110 693 f f -' 6•v MAP wo. 611 399 102 9T WATER MAP SYMBOLS Existing Proposed WATER TREATMENT PLANT Q WATER PUMPING STATION ■11 WATER STORAGE TANK O WELL SPRING s 'a' RESERVOIR TRANSMISSION MAIN N - SERVICE AREA BOUNDARIES URBAN d TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W - I Existing a Under Construction W-3 Programed Service N N N ■ ■ N N t N ■ N ■ f N N N N N ■ N ■ N M NN NW ■ s N x ! •N N ! N N N N Y NN N N N! NNN NN NN NN NNNN N N ■ N W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR WATER MAP SYMBOLS Existina Pronosed WATER TREATMENT PLANT A Q WATER PUMPING STATION ■ WATER STORAGE TANK O WELL Y Y SPRING Y RESERVOIR TRANSMISSION MAIN • - - SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA RESTRICTED USE RURAL VILLAGE SERVICE PRIORITY DESIGNATIONS W-1 Existing a Under Construction W-3 Programed Service ' K ■ Y K a KK K K Ki K K N K ■ Ka K K K K K K ■ K KK K K *5 K , • a a a a a a ■ ■ K a K 1 , K a K KKK KKKK KK K a K K K W-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDAR CHAPTER FOUR EXISTING AND PLANNED SEWERAGE SYSTEMS WASHINGTON COUNTY SANITARY DISTRICT TheWashington County Sanitary District owns, operates and maintains several public wastewater collection systems and treatment plants throughout Washington County. The Sanitary District has jurisdiction to any area serviceable with public wastewater facilities which is not incorporated or is not served by an incorporated_municipality—..- IV-1 A listing of the plants, the service area for which treatment is provided, the treatment plant capacity, the average daily flows and the discharge parameters are described in the following: Wastewater Treatment Average Daily Discharge Plant Area(s) Served Capacity Flow Parameters Nicodemus SD -1 Halfway 1.6 MCD .700 MCD 30 mg/IS.S. SD -5 Potomac (Tammany/Van Lear) 30 mg/i BODS SD5-1 Cloverton/Greenlawn Town of Williamsport Conococheague SD -1 Halfway 2.5 MGD .800 MCD 30 mg/l S.S 20130 mg/1 BOD5 Antietam SD4-1 Sharpsburg/Raedysville .163 MCD .100 MGD 30 mg/l S.S. 30 mg/l BOD5 Sandy Hook SD -19 Sandy Hook .030 MCD .010 MCD 30 mg/2 S.S. 30 mg/1 BODS Winebrenner SD9-1 Highfield/Cascade .600 MGD .450 MGD 10 mg/1 S.S. Pen Mar., Pt. Ritchie 10 mg/L BOD5 Smithsburg SD -12 Rolling Hills-Cavetown Area, Holiday .180 MGD .093 MCD 30 mg/l S.S. Acres (future) (Present) 10 mg/l BOD Town of Smithsburg - (present) .333 MGD Upgrade & (Future) Expansion complete by 12/94 Conococheague (Waste to be trucked -in) Potential users - .125 MGD Scheduled Pretreatment Washington County (Landfill leachate) Construction Industrial waste generators of Washington Completion - County 2/94 * Monthly Average of S.S. - Suspended Solids DOD - Biological Oxygen Demand IV -2 John "Al" Nicodemus Wastewater Treatment Plant The John "Al" Nicodemus Wastewater Treatment Plant (formerly called Halfway) is located along the Potomac River on Lockwood Road on the outskirts of Williamsport, Maryland. The plant is a secondary treatment facility and the plant's process includes primary clarification, high rate trickling filters, secondary clarification and disinfection. The plant discharges effluent into the Potomac River. The Nicodemus plant processes wastewater from various types of collection systems such as conventional gravity, low pressure/grinder pump and small diameter gravity systems. No major expansion..of._-this. treatment facility is probable due to the terrain of the land immediately adjacent to the Nicodemus site, A Solids Handling Facility at the Nicodemus Plant receives and processes septic waste from septic haulers of Washington County as well as sewage sludge generated at other treatment facilities throughout Washington County. Conococheague Wastewater Treatment Plant The Conococheague Wastewater Treatment Plant is located in the 70/81 Industrial Park off of MD. Route #63 approximately one mile IV -3 north of Williamsport. The treatment process includes mechanical bar screens, grit removal, activated sludge, tertiary filters, and UV disinfection. The tertiary process is an added "plus" and insures that State discharge limits are far exceeded. Solids handling is by belt filter press with capability of lime addition for bulking or stabilization. The plant also incorporates advanced odor control systems to insure that it remains a "good neighbor". The Conococheague Plant currently processes waste from conventional gravity and low pressure/grinder pump collectors. Adequate space at the Conococheague Wastewater Treatment Plant site will allow three additional modules of 2.5 MGD each to be added as needed. A chemical toilet/raw sewage receiving station has been added to the facility to handle trucked in holding tank and "Sans -Pot" type waste. Landfill leachate is also received at the facility at a separate truck receiving station. All wastes are closely monitored to insure continuance of the high quality effluent discharged from the facility. Antietam Wastewater Treatment Plant The Antietam Wastewater Treatment Plant is located south of the town of Sharpsburg along Harpers Ferry Road. Wastewater received in this facility is from a grinder pump pressure sewer collection IV -4 system. There is no planned expansion for the Antietam Wastewater Treatment Plant. The treatment plant utilizes an activated sludge multi -channel oxidation ditch process and till disinfection to insure a high quality discharge. Odor control is also incorporated into the plant to insure an odor free facility. Sludge generated at the facility is transported to-, and -processed'by the Nicodemus Solids Handling Facility. Effluent is discharged into the Antietam Creek. Sandy Hook Wastewater Treatment Plant The Sandy Hook Wastewater Treatment Plant is located on Sandy Hook Road in the south Washington County community o€ Sandy Hook. Wastewater received in this facility is from a low pressure/grinder pump collection system. The facility utilizes a clarigester for primary treatment followed by trickling filters, secondary clarifiers and W disinfection with odor control. The Sandy Hook Wastewater Treatment Plant site is restrictive of any enlargement or expansion because of the terrain of the land. Sludge generated at the facility is transported to and processed by the Nicodemus Solids Handling Facility. Effluent is discharged into Martins Run. -;V-5_ C. Wm. Winebrenner Wastewater Treatment Plant The C. William Winebrenner Wastewater Treatment Plant (formerly Ft. Ritchie Wastewater Treatment Plant) is located off MD. Route 550 in the northeast Washington County community of Highfield/Cascade. Wastewater received into this facility is from gravity and septic tank effluent pump (STEP) collection systems. The treatment plant utilizes primary clarifiers, Rotating Biological Contactors (RBC's) for secondary treatment, secondary clarifiers, and chlorination for disinfection followed by dechlorination to meet strict effluent standards. Sludge generated at the facility is dried in on -site sand drying beds or transported to and processed by the Nicodemus Solids Handling Facility. Effluent is discharged into Falls Creek. No major expansion is planned for the Winebrenner Wastewater Treatment Plant. However, improvements to the plant are planned for the treatment facility to maintain the quality of effluent when additional flows are received upon completion of the Highfield, Cascade and Pen Mar collection systems. mithsburg Wastewater Treatment Plant The Smithsburg Wastewater Treatment Plant is located at the south side of Leitersburg-Smithsburg Road approximately 200 feet west of IV-�6. Stevenson Road. The plant is currently being upgraded to .333 MGD using Sequencing Batch Reactors (activated sludge) followed by tertiary filters and UV disinfection. Existing components of the facility currently in use will be converted to sludge holding and flow equalization prior to discharge in order to maximize the cost efficiency of the project. Discharge of effluent is into Little Grove Creek. Wastewater received at this facility at present is primarily from conventional gravity collectors. Conococheague Pretreatment Facility Conococheague Pretreatment Facility is located adjacent to the Conococheague Domestic Wastewater Treatment Plant at the 70/81 Industrial Park outside of Williamsport, Maryland off of MD. Route 63. This state-of-the-art pretreatment facility has been designed to handle .125 MGD of higher strength waste that would be generated by industries located in Washington County. Construction of this facility is to be completed by February 1994. The facility will handle metals bearing, high strength organic waste streams, landfill leachate, waste streams requiring pH adjustment, and oily waste streams requiring oil/water separation. Each waste will be independently analyzed and matched to the design capability of the plant to insure that final treatment by the Conococheague Wastewater Treatment Plant will not cause pass -through or violation of water quality standards. IV.7 Waste is received into the plant via computerized truck receiving stations which record the amount of waste discharged by each hauler. Direct flow to the treatment train through which waste are programmed to be processed, and control automatic samplers which sample all discharge into the facility for control purposes. Sludge from the facility is dewatered using a plate -and -frame filter press to dewater to approximately 40% solids for disposal. Existing Sewerage Service Areas The Sanitary District currently provides service in twelve (12) sanitary sewer subdistricts. each. Subdistrict No. 1 - Halfway The following is a description of n The Halfway area is situated approximately three (3) miles south of Hagerstown and three (3) miles north of Williamsport. The Halfway area consists of primarily conventional gravity collectors system with a small amount of grinder pumps which serves the following areas: Halfway, Parkview Meadows, Towne Oak Village, Oak Ridge, Woodmoor, Greenberry Hills, Valley Mall, Valley Plaza, Lakeside Trailer Park, the 70/81 Industrial Park and the Virginia Avenue IV -8 corridor from the corporate city limits of Hagerstown south to the 1-70 overpass. Within the Halfway sewer service area there are three (3) pumping stations: 1) Potomac Edison Pump Station, 2) Oak Ridge Pump Station/Oak Ridge Ejector Station, and 3) Wright Road Pump Station. Generally the treatment is provided at Conococheague Wastewater Treatment Plant, however, some flow is treated at the Nicodemus Wastewater Treatment. There is capability of transferring flow to either plant. The Halfway sewer area currently has a total of 2,404 residential and 49 commercial units representing 3,949 Equivalent Dwelling Units (EDU`s). This service area is located within the Hagerstown Urban Growth Area. - A proposed major development project in this subdistrict known as Cross Point is a mix of residential and commercial units. Subdistrict No. 4-1 Sharpsburq Keedysville A low pressure/grinder pump sewer collection system serves the Sharpsburg/Keedysvi1le subdistrict and surrounding subdivisions of Forge Hill Estates, Battlefield Knolls, Potomac Crest, Confederate Hills, Trout Run, and the Antietam Battlefield Visitors Center. This is considered a Rural Village Service area. This sewer system .HIV -9 presently serves approximately 701 residential and commercial units which represents 843 Equivalent Dwelling Units (EDU's). Two conventional pumping stations collect the waste generated from the area and transported to the Antietam Wastewater Treatment Plant for treatment. Subdistrict No. 5 - Potomac (Tammanv/Van- Lear The Potomac subdistrict is situated south of the Halfway area and north of the town of Williamsport's corporate limits. This area includes subdivisions of Mt. Tammany Manor and Van Lear Manor and the Interstate Industrial Park. This service area is located within the Hagerstown Urban Growth Area. The collection system is a conventional gravity system which includes four (4) pumping stations. The wastewater flow from the west side of U.S. Route 11 gravity flows to the Wright Road Pumping Station, whereas the wastewater generated from the east side of U.S. Route 11 ultimately collects at the Industrial Park Pumping Station. The wastewater is then transported for treatment to the John "Al" Nicodemus Wastewater Treatment Plant via a 16 inch force main. Sewer service is provided to 476 residential and 16 commercial units representing 866 Equivalent Dwelling Units (EDU's). IV -10 Development occurring in this subdistrict includes extensions of the subdivision known as Van Lear Manor. Subdistrict No. 5-1 - Cloverton/Green Lawn The District completed a small diameter gravity sewer system for the communities of Cloverton and Green Lawn adjacent to the town of Williamsport in December 1990. This type,of system utilizes septic tanks for each unit for primary treatment with the liquid waste ultimately being piped to the Nicodemus Wastewater Treatment Plant for treatment. Two pumping stations and modifications at the Nicodemus Treatment Plant consisting of septic receiving tanks and pumps, belt filter press, a sludge dewatering facility are utilized to process the wastewater generated from this subdistrict. Odor control facilities were -also part of the project for this area. The District serves a total of 164 residential units which also represents 164 Equivalent Dwelling Units (EDU's) and is located within the Hagerstown Urban Growth Area. One major development project in this area is a proposed 35 house subdivision known as Cloverton II. Subdistrict No. 6 - Fountainhead The Washington County Sanitary District managed the planning, design and construction projects for providing public sewer service ,TV -:11 to the Urban Growth Area north of Hagerstown's city limits. The subdistrict encompasses the area bordered by Northern Avenue, Pennsylvania Avenue, Longmeadow Road and Marsh Pike. The Fountainhead subdistrict's conventional gravity system and one (1) pumping station has been operational since summer 1980 with the City of Hagerstown providing treatment of the wastewater generated from this area. . Currently_ there are.• 914 residential and 34 commercial services in this subdistrict representing 1,126 Equivalent Dwelling Units (EDU's). Major development has occurred in this subdistrict during the last several years, including the development projects of - Arbor Gate, Fountainhead Estates, and Foxleigh Meadows. Subdistrict No. 9-1 - Highfield/Cascade/Pen Mar Construction of a combination Small. Diameter Gravity Sewer (SDGS) system and a Septic Tank Effluent Pump (STEP) pressure sewer system and three pumping stations is scheduled to be complete by October 1993 to provide sewer service to the communities of Highfield, Cascade, and Pen Mar. These rural village communities are located in the north eastern section of Washington County. The C. Wm. Winebrenner Wastewater Treatment Plant (formerly Ft. Ritchie) will provide treatment of wastewater generated by these IV -12 areas. Approximately 479 units will be served which represents 559 Equivalent Dwelling Units (EDU's). Subdistrict No. 14 - Sharpsburg Pike At the request of the Board of County Commissioners, in February 1987 the District implemented the planning and design for extending public sewer service south on Route 65 -(Sharpsburg Pike) to a point approximately 1000 feet beyond the 1-70 overpass. The construction consisted of approximately 4,085 feet of 8 inch and 10 inch gravity sewer, 4,556 feet of 8 inch force mains, and 1 pumping station with the City of Hagerstown providing treatment of the wastewater generated from this area. The present design } capacity of the pump station is 108,000 gpd. With upgrading the pump motors and impellers of the station, ultimate capacity of the station and collection system can be increased to 350,000 gpd. The District is presently serving 10 commercial and 18 residential units representing 56 Equivalent Dwelling Units (EDU's). Development activity is ongoing in this subdistrict. The sewer line has been extended approximately 700 feet south on the Sharpsburg Pike to serve new development. A new subdivision known as Cross Creek is also currently being developed. This service area is located within the Hagerstown Urban Growth Area. IV -113 Subdistrict No. 15 - Mau ansvi11e Orchard Hills The Washington County Sanitary District completed the planning, design, and construction of gravity sewer system in 1985 with the City of Hagerstown providing treatment of the wastewater generated from this area. The subdistrict is within the Hagerstown Urban Growth Area and includes the areas of Maugansville, Orchard Hills, North Ridge, Fountainhead North, Maugans Meadows, State Line, a portion of Paramount, Citicorp and the Washington County Regional Airport. A significant amount of growth is ongoing in this subdistrict, such as developments of Northbrook, North Village, extension of Garden Spot Apartments, Maple Valley, proposed development of the Horst and Martin properties and expansions at the Washington County Regional Airport. The area serves 1,123 residential and 90 commercial units which represents 2,038 Equivalent Dwelling Units (EDU's). Subdistrict No. 18 - Conococheapue The Conococheague area consists of the MD. Route 63 corridor from the Town of Williamsport's corporate boundary, bordered to the west by Walnut Point Road, bordered to the east by Interstate 81, bordered to the northeast by the subdivision known as Ceder Lawn f IV -14. and bordered northwest and running concurrent with the Urban Growth Area boundary. A collection system, force main, pump station and interceptor sewer make up the infrastructure in this area. Service is currently provided to 204 residential and 8 commercial units which represents 270 Equivalent Dwelling Units (EDU's). By mid 1994 sewer service is scheduled to be extended to serve existing units on Honeyfield Road, Kemps Mill Road (to the intersection of Kemps Mill Road and Rock Hill road north from Celeste Drive), and Rock Hill Road (from Kemps Mill Road north to dead end). Proposed new development in this area includes Hap Park, Highland Manor East and Walnut Road Estates Limited. Subdistrict No. 19 - _Sandy Hook The sewer collection system and a wastewater treatment plant for the Sandy Hook rural village was completed in March 1993. The collection system is grinder pump/pressure sewer servicing 58 residential and 1 commercial unit which represents 59 Equivalent Dwelling Units (EDU's). Treatment is provided at the Sandy Hook Wastewater Treatment Plant. Planned Sewerage Service Areas The District is actively pursuing the task of providing sewerage facilities to various areas throughout Washington County where there is a need. The following is a description of each. Subdistrict No. 12 - Rolling Hills Subdistrict No. 12 encompasses the area from the City of Hagerstown's corporate limits near Pangborn Boulevard to and including the Smithsburg Town Growth Area. The Sanitary District completed a facilities plan for Subdistrict No. 12 in October 1992, which has been approved by the Maryland Department of the Environment. Sewer service will initially be provided to the Pangborn area with construction beginning by December 1993. Approximately 160 residential units will be served by a combination of conventional gravity and grinder pump/pressure sewer collection system extension. Connection to the City of Hagerstown's collection system will transport the wastewater to the City of Hagerstown's treatment plant for treatment. The Cavetown Area is scheduled to be provided sewer service by the end of 1995. A collection system to serve Holiday Acres, a pump station and force main is planned to be constructed by the end of 1996. Treatment of wastewater collected from these areas will be provided at the Smithsburg Wastewater Treatment Plant. IV -1f, The Village Square Shopping Center development required a pump station and force main to provide sewer service. The wastewater ultimately flows through the Town of Smithsburg's collection system with treatment at the Smithsburg Wastewater Treatment Plant. The pumping station that serves the Village Square Shopping Center will also serve the area of Cavetown. Subdistrict No. 16 - St. James The District has completed the study phase of Subdistrict No.16 with the development of wastewater facilities planning document. The subdistrict area to be served initially is the Wolfe Tract (Rockland) and Earley Industrial Park which is located within the Hagerstown Urban Growth Area. Pump station and force main piping to the Potomac Edison pumping station is scheduled to be built by mid 1994. The collection system to serve Earley Industrial Park is scheduled to be built by early 1996. The Sanitary Commission has been petitioned by residents of Chaplewood Lane, Deanewood Lane, Summerlin Drive, Woodside Drive and portions of Sharpsburg Pike to be included in the proposed project to be provide sewer service. Additional public information meetings and a public hearing will be held before a final decision of the Commission is made. IV -17 The development known as Rockland is planned to be built on the Wolfe Tract. This development consists of 731 residential units, a golf course and club house which represents approximately 900 Equivalent Dwelling Units (EDU's). Treatment of wastewater collected from the St. James area will be transported to and processed at the Conococheague Wastewater Treatment Plant. The St. James School complex required immediate attention to address the problem of failing septic systems. Therefore, the school procured a package wastewater treatment plant to process the wastewater generated on main campus. The collection system and the treatment plant became operational in June 1993. Bower Avenue/Leonard Avenue Areas Approximately 42 homes are scheduled to be provided sewer service on a portion of Bower Avenue and Leonard Avenue. The areas are within the boundaries of Subdistrict No. 1 - Halfway and the Hagerstown Urban Growth Area. Service will be provided by a combination of conventional gravity and grinder pump/pressure sewer systems. Construction is scheduled to begin by December 1993 and completed by November 1994. Spring Valley Area This area of Spring Valley is within the boundaries of Subdistrict No. 15 - Maugansville/Orchard Hills. The Sanitary Commission was petitioned to provide service. However, additional information is being coordinated for the Sanitary Commission's consideration. Future public information meeting(s) and/or hearings will be conducted to determine the need for service. Existing infrastructure "down stream" is planned to be able to accommodate the wastewater flow from the Spring Valley Area. Town of Williamsport Inflow and Infiltration In March 1992, the Washington County Board of County Commissioners requested the Sanitary District to perform a sewer system inflow and infiltration analysis of the Town of Williamsport sewerage. The town's sewer system is hydraulically overloaded, especially during rainfall events. If the study determines cost effective measures to remove the inflow and infiltration, it will be of great benefit for Williamsport's maintenance costs and in preventing possible sewage backups or spills. The removal of the inflow and infiltration is important to the District because it inhibits the hydraulic capacity and bacteriologic treatment process of the Nicodemus Wastewater Treatment Plant. IV -19 The study will include continuous and instantaneous flow monitoring and manhole inspection and is schedule to be completed by November 1992. Town of Smithsbura Inflow and Infiltration An analysis of Smithsburg Wastewater Treatment Plant flow records by BCM Engineers, January 1992, has indicated approximately 50,000 gpd of infiltration and as much as 250,000 gpd of inflow during rainfall events. The current deficiency of the Smithsburg Wastewater Treatment Plant to perform in accordance with Maryland discharge limitations, as well as washout problems, is partly due to the excess inflow and infiltration. It is expedient for the District, by direction of the County Commissioners, to assist the Town of Smithsburg to identify and remove the inflow and infiltration. The urgency of this study goes hand -in -hand with the State regulated improvements to the Smithsburg Wastewater Treatment Plant that is currently needed. CITY OF HAGERSTOWN EXISTING SEWERAGE SERVICE AREA The City of Hagerstown's wastewater collection and treatment system serves approximately 35,600 persons and numerous commercial and IV -20 industrial concerns within the city. Outside the corporate limits, approximately 12,600 people are served in Fountainhead, Maugansville/Orchard Hills/Paramount, Colonial Park, Londontowne, Brightwood Acres East, Youngstoun/Robinwood Court, part of Greenberry, Sharpsburg Pike Area and a small area west of Hagerstown. Service is also provided to industrial, commercial and institutional customers in the County such as Mack Truck, Citicorp and Hagerstown Junior College. All of, these service areas are located within the Hagerstown Urban Growth Area. The Hagerstown wastewater treatment plant is located in the southern part of the city along the Antietam Creek. It provides secondary treatment of both domestic and industrial wastes by means of grit, oil, and grease removal, bar screen oxygen, activated sludge treatment, secondary clarification, and disinfection. The plant's present capacity is about 8 MGD (million gallons per day). Some facilities located within the Hagerstown sewerage service area, outside of the corporate limits of the City are managed and maintained by the Washington County Sanitary District with the city providing treatment only. These areas include the Fountain Head district, Maugansville/Orchard Hills district and the Sharpsburg pike district. A General Service Agreement between the city of Hagerstown and the Washington County Sanitary District was signed on May 1, 1978. A listing of all service agreements is presented in Appendix C. 1 IV -21 The following Water Pollution Control projects have recently been completed or are currently in progress: Water Pollution Control Plant Improvements: The conversion of the anaerobic sludge management system to Enviro- Gro sludge pellitization was completed and placed on line in 1989. Planning is currently underway- for an expansion of the treatment plant to expand the plant's capacity and provide for an increased level of treatment involving a nutrient removal process. Water Pollution Control Collection System Improvements: In late 1993, the City completed the rehabilitation of the collection system and sewer.mains in the Belview Terrace area to correct inflow and infiltration problems. This project was the first step in addressing the Hamilton Run interceptor problem area. The existing Hamilton Run interceptor has a design capacity of approximately 4 mgd. The capacity of the interceptor was determined to be inadequate based on the sewer modeling performed as part of the UGA-Water and Sewer Study completed in 1992. Future plans are to construct a new Hamilton Run relief interceptor for the purpose of increasing capacity and eliminating inflow and infiltration. IV -2.2 CITY OF HAGERSTOWN SEWER On August 20, 1991 the Mayor and Council adopted a revised policy statement regarding the distribution of remaining Water Pollution Control Plant Capacity allocation among development projects. This policy which applies to developments both inside and outside of the city, basically appropriates sewer allocation on a first come, first serve basis when an owner/developer secures the required development proposals which involve 25 equivalent dwelling units or more must be approved by the City Council following approval of the final site plan. This policy also allows developers to request "set aside" allocation for projects. Such allocations must be approved by the Mayor and Council and a benefit charge paid to the City of Hagerstown. These "set aside" allocations are good for a period of two years. Water Pollution Control capacity allocation has also been reserved for several "special priority" projects that have a significant influence on the community. These projects do not require a benefit charge or have a time limit. A copy of the revised policy statement is presented in Appendix E. Funkstown The Town of Funkstown operates a wastewater collection and treatment system which serves approximately 1,100 residents and the Funkstown Elementary School east of town. The Town is part of the Hagerstown Urban Growth Area. Treatment is accomplished by IV -23 utilizing a system of lagoons with effluent chlorinated and dechlorinated by sulfur dioxide before discharge to the Antietam Creek. The Antietam Basin 201 Facilities Plan determined that Funkstown sewerage was subject to excessive infiltration and inflow. The Plan recommended that the Funkstown lagoon system should: (1) remain in service, (2) be modified for capacity expansion with more efficient operation from 0.12 MGD to 0.15 MGD and (3) eventually serve certain areas outside the town limits. In 1982 the Town completed pursuing a major project of sewage treatment plant modification, system rehabilitation, and pumping station improvements. U SMITHSBURG The Town of Smithsburg and its surrounding Growth Area are served by a wastewater treatment system that is owned and operated by the Washington County Sanitary District. Details as to the design of the facility and planned improvements are outlined in the Sanitary District's section of this Plan. MARYLAND CORRECTIONAL INSTITUTION The present treatment facility is operated by the Maryland Environmental Service and has a rated capacity of 0.58 MGD. A major improvement project at the plant has expanded this capacity IV -24 to 1.23 MGD to accomodate a population of approximately 6,600 persons. BOONSBORO The Town of Boonsboro provides public sewerage to a population of about 2,445 people residing within town limits. The two -cell lagoon system wastewater treatment plant with chlorination and dechlorination has a design capacity of..460 mgd. The Town anticipates replacement of all five aerators with three new aerators and sludge removed from one or both lagoons within the next two years. Also, equipment and structural modifications (existing and new) at the lagoons are anticipated to meet new discharge permit requirements. To address the impact of growth on the town, the Mayor and Council has adopted a new Comprehensive Development Plan and a new Growth Management Ordinance. The Boonsboro Town Growth Area Study, adopted in 1986 by the Town and the County, identifies an area surrounding Boonsboro where growth and extension of public utilities is encouraged. Service priority designations for property within the Growth Area will be assigned once development proposals are reviewed and approved by the County and the Town. The Boonsboro Utilities Commission is willing to make extensions of the sewer system within the Growth Area but only, for annexed properties. It remains the Town's policy that public sewerage will not be extended beyond corporate boundaries. CLEAR SPRING The Town of Clear Spring's wastewater collection and treatment system serves a population of approximately 663 people mostly located within the town limits. By contractual agreement, the Washington County Sanitary District provides operation and maintenance of the system. The Town completed modification in 1988 to it's sewerage treatment plant that was initially constructed in 1976. The Maryland Department of Environment rated capacity of this plant is 0.2 mgd. The present treatment facility consists of an influent channel with flow measurement and recording equipment and a comminutor to reduce the size of the solids entering the plant. The influent flow is directed to an oxidation ditch -equipped with Mannoth Rotor Aerators to transfer oxygen to the mixed liquor. The oxidation mixed liquor is pumped to a single final clarifier where suspended solids are separated for return to the oxidation ditch or wasted to an aerobic sludge digestion tank. The clarifier overflow is routed through sand filters prior to ultra violet light disinfection and discharge to Tom's Run. = ,. a s.. V-26 In 1991 at the request of the Mayor and Council, an engineering study of the Clear Spring waste water treatment plant was completed by a private consultant. The study concluded that: "The Clear Spring treatment plant has been operated at a high level of efficiency during the study period (July 1, 1989 to May 31, 1991). The plant treatment capacity is limited by the low concentration of the waste sludge from the existing settling tank which results in reduced hydraulic detention time--in-the, aerobic sludge digester. The plant is capable of handling up to 200,000 gallons per day from both a hydraulic and organic loading perspective. The plant influent flow cannot be increased to the full 200,000 gallons per day level until the sludge digestion capacity is increased by addition sludge thickeners or additional digestion capacity." The Town is currently pursuing. funding for the installation of sludge thickeners in order to increase the plant's solids handling capacity and efficiency. The Town has also taken steps to reduce the amount of inflow and infiltration into the system by installing water meters and replacing leaking lines. The 201 Facilities Plan prepared for Clear Spring does not call for any improvements to the treatment plant, however the 201 Plan does not address possible future expansion of sewer service beyond the current Town limits and the possible resultant need for plant improvements. The Town of Clear Spring is identified in the Comprehensive Plant as a "Town Growth Area", however, a Growth Area IV-27- boundary has not been established. The Town is currently considering conducting a growth management study to determine how the future growth of the Town will be handled. HANCOCK The Town of Hancock owns and operates a wastewater collection and treatment system which serves a population of about 1,926 people mostly located within the town limits. The town has a designated growth area. Treatment is afforded by 12.8 acre aerated lagoon from which the treated effluent is discharged to the Tonoloway Creek. The lagoon was designed to treat an average daily flow of 0.38 MGD. The 201 Facilities Plan which as been prepared for the Town of Hancock states that the existing lagoon system has been unable to attain the degree of treatment required by the current MPDES permit for the facility. Infiltration and inflow to the collection system has caused pumping capacity of pumping stations to be exceeded and resulted in periodic discharges of untreated wastes to surface waters through pump station. overflows. The Town has received a grant for system rehabilitation that was outlined in the facilities plan. Since 1988, several improvement projects to the wastewater collection and treatment facility have been completed. Those remaining improvements to be completed are listed below. 1. Complete study of the Town's collection and treatment facilities. IV -28 2. Treatment plant upgrades: Aeration, new out fall, P.T. flow paced chemical feed system. 3. Rehabilitation of pumping stations and ejector stations, replace undersized pumps to eliminate untreated overflow and handle future growth. 4. Installation of a new collection line in Dale Street. FORT RITCHIE The Fort Ritchie military installation which has a population of about 1,300 people is served by the Winebrenner wastewater treatment plant operated by the Washington County Sanitary District. This plant also serves the Highfield, Cascade and Pen Mar Service area. A description of this system can be found outlined in the Sanitary District's section of this Plan. PROJECTED DEMANDS Projected demands for existing service areas are shown in Table No. 9. Future demand projections presented in this table are based upon future population projections for each area and a figure for TOTAL PER CAPITA FLOW in gallons per capita per day. rc IV -29 i- NOTES FOR TABLE NO. 9 (1) SEWAGE TREATMENT PLANT - The facility which serves specific service areas within the County and municipalities. (2) POPULATION SERVED - From agency or municipality. Interpolated for 1995 - 2010 (3) DOMESTIC FLOW (Million Gallons Per Day) - Sewage flows from domestic or residential sources. Figures provided by the agency or municipality. (4) INDUSTRIAL/COMMERCIAL FLOW (Million Gallons Per Day) - Sewage flows from industrial and commercial uses. Figures provided by the agency or municipality. (5) INFILTRATION/INFLOW (Million Gallons Per Day) - Infiltration is groundwater entering a sewer system and service connections through such means as defective pipes, pipe joints, connections, or manhole walls. Inflow is water discharged into a sewer system from such sources as roof leaders, drains, cooling water discharges, manhole covers, catch basins, surface runoff, and street washers. Figures provided by the agency or municipality. (6) TOTAL FLOW (Million Gallons Per Day) - Based upon 'Calendar Year 1992 Average Flow' from the Sewerage Flow Allocation Table published by the Maryland Department of the Environment. (7) DOMESTIC PER CAPITA FLOW (Gallons Per Capita Per Day) - Determined by dividing DOMESTIC FLOW by POPULATION SERVED. (8) TOTAL PER CAPITA FLOW (Gallons Per Capita Per Day) - Determined by dividing TOTAL FLOW by POPULATION SERVED. (9) TOTAL FLOW (Million Gallons Per Day) - These projected figures are determined by multiplying TOTAL PER CAPITA FLOW for the present year by POPULATION SERVED for the planning year. (10) SYSTEM CAPACITY (Million Gallons Per Day) - Present year system capacity is based upon 'Design Capacity' from the Sewerage Flow Allocation Table published by the Maryland Department of the Environment for Calendar Year 1992. Future system capacity figures are assumed to remain the same as present year unless indicated otherwise. IV -30 TABLE NO. 9 PROJECTED SEWERAGE DEMANDS AND PLANNED CAPACITY SEWAGE PRESENT YEAR 5 YEAR PLANNING 5-10 YEAR PLANNING 10-20 YEAR PLANNING TREATMENT PLANT (1)..: (1995) (2000) (2010) Per Capita (2) (3) (4) (5) (6) Flow (2) (9) (10) (2) (9) (10) (2) (9) (10) NAME o (7) (8) o u 0 0 0 Z W b ,4 W v i Ii M N U aJ ►. t/1 W .-' 1W . ai 3 r-1 b rti B ,-+ 4) U U ,I - u A Vl . , A u 31 v u E ,+ W to V s�'i 6 ,+ awl ro v 4-) a -.a > 0.H 8 3 ��® "4-4 44 W 3(q,ry /'' a� ro 43 0. Wp�p3,, Bbt r-1 pp.i, rl 0) a r-1 .-. of 3q N U . 4j rotpph 0.Z N 0) > 1 w , W 0 r+ 431 r1 W . .-4 ro 3qq "roroA� P. 41W.� HUW� F HH O� HW� Vi Q.. C7 0. O. -'Z cn �.,, 0 3)i 0. 0'-'Z 31X Vii 1X 00. 0) 0 cnU£ Hagerstown 48,255 6.647 8.000 138 50,089 6.900 51,341 7.072 53.189 7.327 funkstown 1.141 0.063 0.150 55 1,184 0.065 1,214 0.068 1,25 0.069 i Smithsburg 1,340 0.135 0.180 101 1,391 0.094 0.333 1,426 0.096 1,477 0.097 MCI 6,600 N/A 1.230 N/A 6,829 N/A 6,829 N/A 6,82 N/A Boonsboro 2.445 0.207 0.470 85 2,787 0.236 3,073 0.260 3,64 0.309 Clear Spring 663 0.115 0.200 173 688 0.119 705 0.122 73 0.127 Hancock 1,926 0.270 0.380 140 1,999 0.280 2,049 0.287 2.12 0.298 Nicode ws 4,495 0.600 0.100 0.700 1.600 4,666 0.727 4,783 0.745 4,95 0.772 Conococheaghe, 10,736 0.700 0.100 0.800 2.500 11,144 0.830 11,423 0.851 11.83 0.882 Winebrenner 2,967 0.450 0.600 3,080 0.467 3,157 0.479 3,27 0.496 Sandy Hook 170 0.010 0.030 177 0.010 181 0.011 18 0.011 Antietam 2,143 0.093 0.163 2,224 0.097 2,280 0.099 2,36 0.103 NOTES FOR TABLE NO. 10 (1) TREATMENT TYPE is described more fully in the text of this Plan. Both TREATMENT TYPE and STP DESIGN CAPACITY information has been extracted from the applicable Facilities Plans. (2) RECEIVING WATERS The stream or river into which the treated effluent is discharged. (3) GENERATED SLUDGE information is from the MD Department of Environment, Sewage Sludge Division and represents 1992 data. (4) Little sludge generated. A IV -32 TABLE NO. 10 INVENTORY OF EXISTING SEWAGE TREATMENT PLANTS SEWAGE TREATMENT PLANT STP COORDINATE LOCATION TREATMENT TYPE (1) STP DESIGN CAPACITY (1) MGD RECEIVING WATERS (2) GENERATED SLUDGE WET TONS/YEAR (3) Hagerstown N-651 E-600 Oxygen Activated Sludge 8.00 Antietam Creek 1429 Nicodemus N-641 E-567 Trickling Filter 1.60 Potomac River 734 {Halfway) Funkstown N-645 E-660 Lagoons, Chlorination, Aeration 0.15 Antietam Creek (Note 4) Smithsburg M-667 E-567 Extended Aeration 0.18 Grove Creek 109 FIC1 N-627 E-600 Trickling Filter 1.23 Tributary Antietam Creek 8444 -Boonsboro N-610 E-612 Lagoons, Chlorination. Dechlorination 0.47 Tributary Little Antietam (Note 4) Creek Clear Spring N-661 E-539 Oxidation, Chlorination. Ditch 0.20 Toms Run 627 Hancock N-684 E-475 Lagoon. Chlorination, Aeration 0.380 Tonoloway Creek (Note 4) Winebrenner N-685 E-660 Rotating Biological Contactors 0.60 Falls Creek 535 Broadfording N-676 E-575 Aeration, Chlorination 0.010 Tributary Conococheague (Note 4) Church Doubleday Co. N-662 E-637 Aeration, Chlorination 0.006 Beaver Creek Fahrney Keedy N-626 E-618 Septic tank, open sand filter. 0.025 Little Beaver Creek Home Chlorination Fairchild N-685 E-595 Trickling Filter 0.114 Marsh Run Republic Corp. Greenbriar N-622 E-628 Extended Aeration, Chlorination 0.050 Tributary Little Antietam 42 'State Park ;Hi.ghland View N-643 E-627 Extended Aeration, Chlorination 0.030 Tributary Beaver Creek 1 Hunter Hill N-641 E-567 Extended Aeration, Chlorination 0.030 Tributary Marsh Run Apartments r ; SEWAGE STP COORDINATE TREATMENT LOCATION PLANT Roadway N-647 E-595 Express South Mountain N-602 E-625 Inn Washington N-675 E-598 Center Conococheague Brookdane Sandy Hook N-545 E-600 Antietam N-585 E-590 St. James N-635 E-587 School TABLE 00. 10 INVENTORY OF EXISTING SEWAGE TREATMENT PLANTS TREATMENT TYPE STP DESIGN RECEIVING WATERS (1) CAPACITY (1) (2) Aeration, drain fields Aeration, Chlorination Aeration, drain fields Sequencing Batch Reactors Activated Sludge (Package Plant) Trickling Filter Multi -Channel Oxidation Ditch Activated Sludge (Package Plant) 0.015 Underground Stream In Frederick County 0.011 Underground 2.50 Conococheague Creek 0.010 Grove Creek 0.030 Potomac River 0.163 Antietam Creek 0.025 St. James Run GENERATED SLUDGE WET TONS/YEAR (3) 932 8 493 0 NOTES FOR TABLE NO. 10-A (1) This table lists only those facilities which are considered critical to the future service of significant land areas for which future development is likely. (2) COORDINATE LOCATION - In accordance with the Maryland Grid System. Grid reference shown for interceptors are the locations of critical points of most restricted flow. References shown for force mains are the same as those for their respective pumping stations. (3) CAPACITY (MGD) - Average daily flow capacity in million gallons per day for which a facility is designed. This figure does not represent the capacity for peak loads. Average daily flow capacity for Sanitary District facilities has been determined by applying peak pumping rates to the Standard Sanitary Sewer Design Peak Flow Curve. For the City of Hagerstown facilities, peak pumping rates have been divided by a peak factor of 2.5. . t• ! .. - •� � � '.l a .L , 'T: TABLE NO. 10 A SERVICE AREA AND SUB -AREA INVENTORY OF EXISTING INTERCEPTORS. PUMPING STATIONS. AND FORCE MAINS FOR LARGE SERVICE AREAS (1) INTERCEPTORS PUMPING STATIONS FORCE MAINS IDENTIFICATION COORDINATE LOCATION GN FCAPACITY IDENTIFICATION COORDINATE LOCATION DESIGN CAPACITY IDENTIFICATION COORDINATE LOCATION (MGS) (2) (3) (MGS) (2) (MGD) (3) (MGS) (2) HAGERSTOWN Sub -Basin 3B Hamilton Run From N-666 E-604 4 Interceptor to N-651 E-601 P. S. # 10 N-665 E-604 0.076 r -a P. S. 1 3 N-657 E-602 0.238 rn P. S. # 6 N-656 E-603 0.230 P. S. 1 4 N-652 E-602 1.036 P. S. # 7 N-651 E-599 1.700 Sub -Basin 3C P. S. # 8 N-654 E-612 0.248 Sub -Basin 3F P. S. # 9 N-648 E-606 0.088 Sub -Basin 10 P. S. # 13 N-659 E-585 0.600 P. S. # 15 N-655 E-590 1.600 P. S. 12 N-667 E-592 0.048 Sub -Basin 3F P. S. # 16 M-583 E-660 0.046 P. S. # 17 N-593 E-648 0.068 NICODEMUS Sub -Basin lE 15" Interceptor N-652 E-581 0.375 Van Lear N-648 E-579 0.094 3" F.M. from from Valley P. S. P.S. Mall Area DESIGN CAPACITY (MCD) (3) SERVICE AREA AND SUB -AREA Sub -Basin iF C I WILLIAMSPORT CONOCOCHEAGUE Sub -Basin 2 TABLE NO. 10 A INVENTORY OF EXISTING INTERCEPTORS. PUMPING STATIONS, AND FORCE MAINS FOR LARGE SERVICE AREAS (I) INTERCEPTORS PUMPING STATIONS FORCE MAINS COORDINATE DESIGN COORDINATE DESIGN COORDINATE DESIGN IDENTIFICATION LOCATION CAPACITY IDENTIFICATION LOCATION CAPACITY IDENTIFICATION LOCATION CAPACITY (MGS) (2) (MGD) (3) (MGS) (2) (MGD) (3) (MGS) (2) (MGD) (3) 21' Interceptor to Wright Road P. S. 18" Interceptor to P. S. 11 N-652 E-579 2.000 I N-643 E-573 0.900 Wright Road P. S. Cloverton P.S. Industrial Park P.S. 12 Green lawn P.S. Industrial Park P. S. 11 Williamsport P.S. Oak Ridge P.S. Potomac P.S. N-650 E-572 N-647 E-571 H-639 E-571 H-640 E-569 H-644 E-573 N-641 E-567 N-648 E-587 H-645 E-586 0.800 16" F.M. from N-650 E-572 0.800 0.103 0.050 0.060 0.108 0.500 0.820 0.090 Wright Road P.S. to Sewage Treatment Plant 4" F.M. to Wright Rd F.M. 4" F.M. from P.S. 0 2 4' F.N. to Wright Rd F.M. 8" F.M. from P. S. Ii 12" F.M. from Oak Ridge P.S. 10" F.M. from Potomac Edison P.S. N-647 E-571 H-639 E-571 N-640 E-569 N-644 E-573 H-648 £-587 H-645 E-586 0.103 0.050 0.060 0.108 0.820 0.090 SERVICE AREA AND SUB -AREA Sub -Basin 10 SHARPSBURG PIKE M FOUNTAIN HEAD CITICORP MAUGANSVILLE/ ORCHARD HILLS TABLE NO. 10 A INVENTORY Of EXISTING INTERCEPTORS. PUMPING STATIONS, AND FORCE MAINS FOR LARGE SERVICE AREAS (1) INTERCEPTORS PUMPING STATIONS FORCE MAINS COORDINATE DESIGN COORDINATE DESIGN COORDINATE DESIGN IDENTIFICATION LOCATION CAPACITY IDENTIFICATION LOCATION CAPACITY IDENTIFICATION LOCATION CAPACITY (JIGS) (2) (MGD) (3) (JAS) (2) (MGD) (3) (MGS) (2) (MGD) (3) 15" Interceptor N-650 E-585 0.900 from Oak Ridge Area 48' Interceptor H-653 E-574 10.000 Keeps Mill N-653 E-571 0.150 8" F.N. to to Conoco. P. S. Conoco. S.T.P. S.T.P. 10' Interceptor N-645 E-595 0.108 Sharpsburg H-645 E-595 0.108 8" F.M. from south of 1-70 Pike Pumping Sharpsburg Route 65 area Station Pike P in Fountain Head Pumping Station Citicorp Pumping Station Route 11 Pumping Station Farm Lane Pumping Station Airport Pumping Station N-665 E-596 N-687 E-593 N-678 E-598 N-681 E-598 N-683 E-598 .102 .072 .265 .138 .072 ump g Station 6" F.M. from Fountain Head Station 6" F.M. from Fountain Head Pumping Station 10" F.M. from Route 11 Pumping Station 8" F.M. from Farm Lane Pumping Station 6" F.M. from Pumping Station N-652 E-511 N-645 E--595 N-665 E-596 N-681 E-593 N-678 E-598 N-681 E-598 N-683 E-598 0.150 0.108 .102 .072 265 .138 .072 TABLE NO. 10 A INVENTORY OF EXISTING INTERCEPTORS, PUMPING STATIONS. AND FORCE MAINS FOR LARGE SERVICE AREAS (1) SERVICE AREA AND SUB -AREA INTERCEPTORS PUMPING STATIONS COORDINATE DESIGN COORDINATE IDENTIFICATION LOCATION CAPACITY IDENTIFICATION LOCATION (MGS) (2) (MGD) (3) (MGS) (2) Maugansville N-676 E-590 Pumping Station Countryside H-680 E-588 Pumping Statio Paramount N-675 E-602 P. S. State Line N-688 E-597 P. S. Garden Spot N-676 E-587 P. S. Haugans N-675 E-590 Meadows P. S. NORTHBROOK Northbrook N-671 E-606 P. S. ANTIETAM Sharpsburg N-591 E-588 P. S. Keedysville N-600 E-600 P. S. WEINBRENNER Highfield N-684 E-661 P. S. Pen Mar N-686 E-657 P. S. Old N-687 E-668 Sabillasville 'Rd. P. S. DESIGN CAPACITY IDENTIFICATION (MGD) (3) .120 10' F.M. from .030 .030 .030 .014 .068 .135 .135 .072 .204 .024 .003 Maugansville P.S. 4" F.M. from Pumping Station 3" F.M. from P. S. 4' F.M. from P. S. 2.5" F.M. from P. S. 4' F.H. from P. S. 8" F.M. from P. S. 8" F.H. to S.T.P. 6' F.M. from P. S. 8" F.M. from P. S. 4" F.M. from P. S. 2 1/2" F.M. from P. S. FORCE MAINS COORDINATE LOCATION (MGS) (2) H-676 E-590 N-680 £-588 N-675 E-602 H-688 E-597 N-676 E-587 N-675 E-590 N-670 E-607 H-591 E-588 N-600 E-600 H-684 E-661 H-686 E-657 N-687 E-668 DESIGN CAPACITY () (3) .120 .030 .030 .030 .014 .068 .135 .135 .072 .204 .024 .003 0 Tk . NO. 11 DISCHARGE PERMITS IN PROCESSING BY COUNTY —._— _..____ .—_ IAdustriat1$usietpat-Dtscharg.?errits tu-toanty-Order --Active Sts NPDES Status Expire S I NAME CITY ZIP CNTY PERMIT Number ID STATUS Date Date G M AEROQUIP CORPORATION - NILLIAMSPORT -- -•21795 -- WSHO 86 -OP -2277 -'$00061701 NDPUP9862277 ISSUED/REFILED---02/28/9t-03/01/91r S-i---- 91-DP-2277 $00061701 BEING PROCESSED 03/11/91 S I ANTIETAM WASTEWATER TREATMENT PLANT SHARPSBURG 21782 7 93 -DP -2354 $00062303 NDPDP9372354 APPLICATION REVIEW 07/09/92 S M "�� 37 -DP -2354 -.$00062308 -,'."-" I ISSUED/REFILED --"--07/09/92 06/10/92.5 N B T C TRUCKING COAL LOADING FACILITY HAGERSTOWN 91 -OP -2324 MDPPP9912824 ISSUED 02/15/91 02/15/96 G I BOONSBORO W. W. T. P. BDONSBQRO 21713 93 -DP -0126 $00020231 MDPOP9370126 APPLICATION REVIEW 04/20/93 S M 37 -OP -0126 ' $00020231 ISSUED/REFILED 03/22/33 - S A 79 -DP -0126 $00020231 ISSUED/REFILED 02/26/37 06/15/87 S M BROADFOROING BIBLE BRETHREN CHURCH HAGERSTOWN 21740 1 83 -OP -1006 MO0051373 140POP9831006 ISSUED 06/01/39 05/31/94 S N BROOK LANE PSYCHIATRIC CENTER "- " -' - HAGERSTOWN 21740 81 -OP -1243'- $0005319$ MDP0P9311243 ISSUED/REFILED --"-- 09/03/92 11/30/92 S N 93 -DP -1243 $00053193 APPLICATION REVIEW 09/03/92 S N CALDWELL MANUFACTURING COMPANY WILLIAMSPORT 21795 89 -OP -2630 MDPDP9372630 ISSUED 11/06/29 11/06/94 G I CERTAINTEED CORPORATION WILLIAMSPORT -- -' - 21795 ----- '92 -OP -1676 -$00057541 $00000221275 APPLICATION REVIEW - 05/07/92- - ----S I 86 -OP• -1676A $00057541 ISSUED/REFILED 05/07/92 11/23/92 S I CLEAR SPRING W. W. T. P. CLEAR SPRINGS VILLAS 88 -OP -1254 $00053325 MDPDP9381254 ISSUED 09/01/39 03/31/94 5 N -CONOCOCHEAGUE W. N. T. -P.' ---- -------' HAGERSTOWN----.......-22740 "-- 88-OP-2563^ $00063509 MDP0P9332563 ISSUED ----12/01/89 11/30/94 S M CSX TRANSPORTATION, INC. - HAGERSTOWN 21740 90 -DP -0539 $00002321 MDPDP9350539 ISSUED 03/11/91 03/11/96 S I DANZER METAL WORKS HAGERSTOWN 21740 i 87 -DP -1400 $00003077146 ISSUED 09/27/90 09/27/95 G 1 --DEPT. OF ARMY - USASTRATCOM FT.-RITCHIE -CASCADE -------------21719 ---{ 91-OP-2516-M0000322t-NDPDP9882516 ISSUED--- ---- -11/01/91 10/31/96 S N DUVINAGE CORPORATION HAGERSTOWN ' 21740 83 -DP -1420 MDPDP9831420 ISSUED 07/24/9 07/24/94 6 I ELECTROMET ENGRAVING 6 MANUFACTURING CO. HAGERSTOWN 21740 ' 89 -OP -2647 $00071217095 ISSUED 10/16/39 10/16/94 G I ENVIRONMENTAL AIR CONTROL, INC. _'------'-- HAGERSTOWN -'--- 21740 -87-DP-0339• -$00051071 $00054906201 ISSUED ---- 12/18/97 12/18/92 S I - H FAHRNEY-KEEDY MEMORIAL HOME, INC. BOONSBORO 21713 S9 -DP -1229 $00053066 MDF•DP9891229 ISSUED 09/01/39 08/31/94 S M C FAIRCHILD REPUBLIC CO HAGERSTOWN 21740 81 -DP -0295' $00041956194 ISSUED/REFILED 06/20/91 08/01/91 G I -__- _ ------------------------ Q FIL-TEC, INC. O -------- ------- 'SMITHSBURG - 21733 91 -OP -0295 92 -DP -0246 - --- --- $00002917 - -APPLICATION MOD022679377 REVIEW APPLICATION REVIEW -06/20/91 04/03/92 ---G I S I 87 -DP -0246 $00002917 ISSUED/REFILED 04/03/92 05/12/92 S I --FUNKSTOWN 9. T. P. - "-. '_FUNKSTOWN ---------21734 ----- 85 -OP -0169 $00020362 ROPOP9850169 ISSUED -----------06/01/89 05/31/94 S M GARDEN STATE TANNING WILLIAMSPORT 21795 83 -OP -1267 $00053431 $00003062114 ISSUED 12/27/33 12/27/93 S I GENERAL RECREATION, INC. HAGERSTOWN 21740 80 -OP -1005 $00051365 MDPDP9301005 ISSUED/REFILED 03/22/88 S N _......_ --- _ . - -------- ._ - -,.-- ...._.. .--•.-- - -. --- --- 75 -OP -1005 - $00051365 - ISSUED/REFILED 01/21/30 02/01/80 S N 93 -OP -1005 $00051365 APPLICATION REVIEW 02/23/93 S N GRANO VIEW COUNTRY INN KNOXVILLE 21753 84 -DP -2192 $00061107 NOPOP9342192 ISSUED 06/01/37 05/31/92 S N• GREENBRIER STATE PARK W. M. T. P. - -_-BONNESBORO - ' "` --- -- -_--- 93 -OP -0753 $00023368 MBPOF9380753 APPLICATION REVIEW--- 06/23/93 - --- 9 N - 83 -OP -0753 $00023368 ISSUED/REFILED 01/01/39 12/31/93 S N 14 6 H STORAGE, LTD. HANCOCK 21750 87 -DP -0372A $00020023 MOPUP9370372 ISSUED/REFILED 11/07/90 03/07/93 S I ' ----_--_-- -_ .•. .. _..-.------- -- ------- -------------- -- ._ . ---93-UP-0372 - $0002002$ - - APPLICATION REVIEW -01/05/93- -_ - --- -$� HAGERSTOWN FIBER L.P. HAGERSTOWN 21740. 93 -DP -3077 $00066974 MOPDP9933077 APPLICATION REVIEW 06/14/93 S I HAGERSTOWN W.N.T.P. HAGERSTOWN 21740 86 -DP -073$A $00021776 $00000731323 ISSUED 12/01/39 01/31/92 S N HANCOCK W.W.T.P. - ''"'' - ---HANCOCK --------------21750--------- -92-DP-0832 --$00024562 HOPOP986OS32 APPLICATION REVIEW --01/17/92 - ------S N -- 86 -OP -0832 $00024562 ISSUED/REFILED 01/17/92 04/30/92 S M HARDELL CORPORATION HAGERSTOWN 21740 89 -DP -2627 HOPOP9892427 ISSUED 10/27/39 10/27/94 G I . --HESCO■ INC.------------------------------------ HAGERSTOWN - 21740 ---- 88 -DP -2073 - $00060267 $00003090016 ISSUED/REFILED - 07/27/83 07/27/93 S I 93 -DP -2073 $00060267 APPLICATION REVIEW 01/20/93 S I HETZER, C. WILLIAM INC. HAGERSTOWN 21740 92 -OP -2993 HOPOP992=993 APPLICATION REVIEW 04/10/92 6 I HIGHFIELD/CASCADE W.W.T.P. -- - ---HIGHFIELO -- 21753 ---- 90 -DP -2749 -$00064718 MOP0P9902749 ISSUED ---- --------11/01/91 10/31/96 S N HIGHLAND MANOR W.W.T.P. HAGERSTOWN 21740 39 -OP -0813 $00024376 NUPOP9390313 ISSUED 01/01/90 12/31/94 S M HIGHLAND VIEW ACADEMY W.W.T.P. HAGERSTOWN 21740 93 -OP -1034 $00024627 MDPDP9301034 APPLICATION REVIEW 04/21/93 S N _ _ _ _... 80 -OP -1034 --$00024627 -- ISSUEC+/REFILED --• -03/01/29 32/31/93 S A HUNTER HILL APARTMENTS W.W.T.P. HAGERSTOWN 21740- 80 -DP -0610 $00022926 $DPOP9300610 ISSUED 02/01/37 12/31/91 S N INDEPENDENT CEMENT CORPORATION HAGERSTOWN 21740 37 -DP -0356 900002151 $00003075694 ISSUED/REFILED 05/27/92 11/13/92 S I -..., _.. _._...... ..._ - w .------.., 92 -DP -0356 $00002151 APPLICATION REVIEW --0E/27/92 .......--5 I JEFFERSON CHEESE MFG. INC. HANCOCK 21750 94 -OP -2576 $00063592 MDPOP9^•^;2576 APPLICATION REVIEW 03/23/93 S I 83 -DP -2576 $00063592 ISSUED/REFILED 02/21/39 02/21/94 3 1 ---LAKEVIEW FISHERY - FAIRPLAY - 21733 91 -DP -2897 MDF0P9912897 BEING PROCESSED ---- 06/01/91 S I Source: Maryland Department of the Environment TABLE NO. 11 DISCHARGE PERMITS IN PROCESSING BY COUNTY ONNJ-VeL-a77S . - . ...... .... .............-.- .. ...---.---.�.-_- -"-`....�-.w. Ma yr..i..xy-y --Isdustrial/MusicipaI Discherge Peewits -is--County Order---Activt Status — -- ----- •--------- NPOES Status Expire S I NAME ---------------------------------------- CITY -------------------- ZIP CNTY PERMIT. Number ID STATUS Date [late G M MACK TRUCKS, INC. HAGERSTOWN --------- ---------------- 21742 ----- WSHG 87 -DP -0390 --------- --. - ---- ------------ M00003071776 -------------------- ISSUED ••-•-_._......--.- -------- 02/15X^9 -------- 02/15/94 - - G I -- MARTIN MARIETTA AGGR. CBOONSBORO QUARRY) MARTIN MARIETTA AOGR. (PINESBURG QUARRY) BOONSBORO WILLIAMSPORT 21713 21795 90 -OP -0538 -.93-OP-I405 M00002623 $00055026 MOPCIP9840538 NDPOP9371405 ISSUED APPLICATION REVIEW 05/11/90 09/01/92 05/11/95 S I S I -.----. -'•' -- _ ------- -------'----' -----'--------- _-- -- --87-OP-1405 $00055026 - - _.. ----ISSUED/REFILED ---09/01/92 11/23/92 S I-- MARYLAND CORRECTIONAL INSTITUTE HAGERSTOWN 21740 87 -OP -0759 MC10023957 MOPOP9870759 ISSUED/REFILED 09/01/38 03/31/93 S N 93 -DP -0759 $00023957 APPLICATION REVIEW 02/04/93 S M MARYLAND CORRECTIONAL INSTITUTION ----HAGERSTOWN - -21746 --- --91-DP-2880 -- ---'- - MOPOP9912880 BEING PROCESSED ---- 12/28!90 ......-------11 I- NAUGANSVILLE ELEVATOR 6 LUMBER CO..► INC. NO STATE MILITARY FACILITY MAUGANSVILLE HAGERSTOWN 21767 21740 ..._- ' 88 -DP -1447 91 -DP -2876 MDPOP9831447 MDD9S1933053 ISSUED ISSUED 04/15/33 11/08/41 04/15/93 11/08/96 G I G I -MELLOTT ESTATE - BEAVER CREEK QUARRY--HAGERSTOWN --- - - 21740--- 88 -DP -1387 - MOPOP9981387 ISSUED ---- -v4/03/89 04/03/94 G I-- MELLOTT ESTATE - HANCOCK QUARRY HANCOCK 21750 ;'88 -OP -2086 MD0060356 MOPOP93320S6 ISSUED 03/16/39 03/16/94 S I MELLOTT ESTATE, INC. CLEAR SPRING 21722 93 -OP -3039 $00066711 MOPOP9933039 APPLICATION REVIEW 10/14/92 S I --METAL FINISHING, INC. - - -- -- MEYERS, KEITH SLAUGHTERHOUSE HAGERSTOWN -------------21740 SHARPSEURG - 21732 . -- 89 -OP -0059 87 -DP -1351 - MD0056596-N00003102763 HOPOP9371351 ISSUED ------•-- ISSUED 09!29/89 11/01/38 09/29/94-S--I- 11/01/93 - G I MILBURN, CHARLES L. NEAR HANCOCK 89 -OP -2636 M00064262 MOPDP9392686 PENDING 05/08/39 S M ---MOUNT ROUND TOP CAMP SROUND W.W.T.P.--- HAGERSTOWH ---------21741 --- ---91-DP-2836 N00065757 MOPDP9912836 ISSUED --02/91/92 01/31/97 S i{- MT. AETNA WATER ASSOCIATION, INC. HAGERSTOWN 21740 93 -DP -0240 $00050954 MOPDP9360240 ISSUED 10/29/92 $ M NICHOLSi ROBERT N. - PRIVATE RESIDENCE HAGERSTOWN 21740 ' / 90 -DP -2731 MD0064572 MDPDP9902731 HEARING HELD 04/26/90 - S N --NICODEMUS W.W.T.P. --- - - - WILLIAMSPORT 21795 - '.-9O--OP-O701- N00020214 MDPDP9790701-ISSUED --- OE/01/91 04/30/94 S M- _PANGBORN CORPORATION HAGERSTOWN 21740 92 -DP -1298 $00053775 M000462829S4 APPLICATION REVIEW 06/02/92 S I 67 -DP -1293A M00053775 ISSUED/REFILED 06/02/92 10/21/92 S I H --POTOMAC EDISON COMPANY ----------NILLIAMSPORI- '----21795 ----B7-DP-0026A -MD0000532 $00980555783 ISSUED/REFILED-----• 03/11/91 01/31/9-4-S I- 94 -DP --0026 $00000522 APPLICATION REVIEW 03/05/93 S I `POWELL, ALBERT M. FISH HATCHERY HAGERSTOWN 21701 93 -DP -1326 M00054054 NOPOP9381326 APPLICATION REVIEW 01/25/93 S I W ------ ------ -- -- ------ ------ ,- 88-OP1326- MD0054054 - - - --- ISSUEDlREFILED -----45124/88 05/24!43 S I -- POWLEN EQUIPMENT CO., INC. S HAGERSTOWN 21740 87 -DP -2419 NDPDP9872419 ISSUED 07/24/89 07/24/94 G I REOLAND BRICK INC. WILLIA14SPORT 21795 1 91 -OP -1050 M00051527 NDPOP936L050 ISSUED 02/12/92 02/12/97 S I RESH ROAD LANDFILL --- - -- NEAR SYLVAN GROVE - -- -- ---- --90-OP-2764 -. M00064866 MOPOP9902764. ISSUED ------•- 12/26/91 -12/26/96-S--I- ROGER BUHRMAN - SABILLASVILLE 21780 91 -DP -2914 MDPGP9912914 APPLICATION REVIEW 05/17/91 G I SAINT JAMES SCHOOL W.W.T.P. ST. JAMES 91 -DP -2855 $00065536 MOPOP9912855 ISSUED 11/01/91 10/31/96 S M ---SANDY HOOK W.W.T.P. ---- - ----------------- SANDY HOOK ----------- ---- ---•--90-DP-2728MO0064530 NDPOP9902728 ISSUED ------09/01/90-03/31/-96- S- 4- SHARPSBURG WATER TREATMENT PLANT SHARPSBURG 21732 - 86 -OP -1361 MDPOP9361361 ISSUED/REFILED 03/13/92 08/20/92 0 M SHARRETT OLDSMOBILE/MAZDA HAGERSTOWN 21740 91 -DP -2859 MDPCP9912859 BEING PROCESSED 12/28/90 - G I SIDELING HILL REST AREA -.- BIDELING HILL--------21401----------•-93-DP-2434 --M0062821--MDPOP9832434 APPLICATION REVIEW ---03/24/93 ---•-6-M- 88-DP-2434 $00062321 ISSUED/REFILED 09/01/33 08/31/93 S M SMITHSBURG S. T. P. SMITHSBURG 21733 s 91 -DP -102? M00024317 HOPOP9801029 ISSUED 04/01/92 03/31/97 S N --------------•-----------------------------.- 80 -OP -1029-0 MD0024317 -- -_ ._._._ _-ISSUED/REFILED- - 03/18/91-12/31!41- 6-M- STATE HIGHWAY ADMIN.- STATION FURNITURE COMPANY HAGERSTOWN 21740 88 -OP -2557 3 MDPDP9332557 ISSUED 03/16/89 033/16/94 0 I MANUFACTURING HAGERSTOWN 21740 88 -DP -2078 MOPOP9882078 ISSUED 10/27/83 10/27/93 G I SUN CHEMICAL IN IRT `- - ? Y 99-DP-2638 ---------MDPDP9392638 ISSUED -- ---- ---•--09!06!39 09/06/94 G I-- TH ARGON ASFHAGERSTOWN SUN FLIGHT LICORPINC.O88-OP-2492 21799138 M00063223 $00921940950 ISSUED/REFILED 05/20;33 05/20/93 S I TROUPE RUN MOBILE HOME PARK W.W.T.P. HAGERSTOWN 21740 83 -OP -2469 M00063061 MDPC'P9332469 PENDING 11/19/37 S N - UNITED PARCEL SERVICE, INC.---- -- -- -- • HAGERSTOWN -- - - 21740 - 92 -DP -1929 86-DP-1929 ----------- - MDF•OP9861929 APPLICATION REVIEW ISSUED/REFILED - 05/10/92 06/10/92 - -- - 06/30/92 G -I-- G I WEAVERTON DEVELOPMENT TRUST N.N.T.P. WEAVERTON 87 -OP -0619 M00023612 MDPDP?e706l9 ISSUED 09/01/33 03/31!93 S N WILLSON, RICHARD C.. N. T. P. - --- -- WILLIAMSPORT -- ---21795 --- 90 -DP -0626 NDPDP9060626 APPLICATION REVIEW 12/07/92 12/07/97 G M Source: Maryland Department of the Environment TABLE N0. 11 DISCHARGE PERMITS IN PROCESSING BY COUNTY 0411 J-uvt-L71J f . .. I., .., .. .. _.. . -. . --....-.1.-... . ... .. 1.a Sc - rt.i.... -_.-__- - __ _ .-._. _... _._.__._-.--.. Industrial/NunicipaI Discharge Persits in County Order ---Active Status -- --- --•------ ------- r NPDES Status Expire S I NAME CITY ZIP CNTY PERMIT Number ID STATUS Date Date G M HONEYW000 HOMEOWNERS ASSOCIATION NEDGESVILLE ................--WV -79-DP-0120 MD0023540 9OPOP9790120 ISSUED/REFILED --.--04/22/91 03/31/91.6 N 91 -DP -0120 M00023540 ISSUED 05/01/92 04/10/97 S M PAW PAW W.W.T.P. - PAW PAW 83 -DP -1261 H00027405 MOPOP9831261 ISSUED 01/01/S7 12/31/91 S N • RIOGELY W.W.T.P. - - - - RIDGELY - 21660 -----= -81-OP-0819 - ND0050342 NDPDP9810919 ISSUED --10/01/85 06/30/90S M. - RIVER BEND PARK (FORMERLY YOGI BEAR) FALLING WATERS 80 -DP -0609 MD0024236 MOPOP9800609 ISSUED 01/01/£7 12/31/91 S N 92 -DP -0609 MD0024236 ISSUED 08/19/91 12/31/91 S N SH£PHEROSTOWNI CORP. OF SIP -- SHEPHEROSTOWN - :- 83 -OP -0464 M00050938 MDPDP98330464 ISSUED -- -----• 11/01/£7 09/30/93 S N Source: Maryland Department of the Environment SEWAGE FLOW ALLOCATION The following tables are intended to assist in the long-range planning of sewage flow allocation. This flow data is not intended to represent a commitment by Washington County or by any incorporated municipality to provide service to any particular development. The data is used for planning purposes only. Commitments are made formally with sewer service providers by such means as are described in notes to these tables. The tables provide flow data from the general to the more specific. Table No. 12 compares flow allocations to available flow capacity of sewage treatment plants. Table No. 12 A compares flow allocations to available flow capacity of important collection facilities for the large sewerage service areas of Hagerstown and Halfway. Finally, Table No. 12 B lists existing and planned developments with flow allocations for each, and indicates thq collection facilities to which these developments are expected to contribute sewage flow. IV -43 TABLE 12 SEWAGE FLOW ALLOCATION TABLE 1992 Allocation Washington County 1991,TAverage SEWA(* Design NPDES Calendar Year Gross Comments TREATMENT PLANT. Capacity MGD Permit } D Average Flow Capacity MGD MGD Ant`f6tam 0.163 0.141 0.093 0.048 Boorsboro 0.470 0.290 0.207 0.083 t5 Clerspring 0.200 0.200 0.115 0.085 Conccocheague 2.500 2.000 --- 0.500 Initial allocation for new facility. Fun Btown 0.150 0.150 0.063 0.087 Haggrstown 8.000 8.000 6.647 1.353 Flow allocation contingent on correction of 5i fecal coliform violations. Consent Order in effect September 16, 1992. Hancock 0.380 0.380 0.270 0.110 NicUdemus 1.600 1.371 1.385 0.050 Allocation as per letter of October 4, 1988. Smi ,hsburg 0.180 0.140 0.129 0.011 Allocation contingent on compliance with *Winrenner 0.600 Consent Order. 0.600 0.450 0.150 *San*Hook 0.030 0.015 0.010 0.005 *Antietam 0.163 0.163 0.100 0.063 Source: State of MD Department of Environment * Washington County Sanitary District TABLE NO. 12 A FLOW ALLOCATIONS FOR INTERCEPTORS OR PUMPING STATIONS FOR LARGE SERVICE AREAS H Ln S(WERAC1E SERVICEINTERCEPTOR AREAS AND SUB-tEAS PUMPING STATION 1 D NA LOCATION 1 DESIGN CAPACITY (MGD) 1 ALENDAR YEAR (2) AVERAGE FLOW MGD) GROSS AVAILABLE FLOW (MGD) (3 TOTAL ALLOCATED FLOW (MGD) (4) NET AVAILABLE FLOW (MCD) (5 PENDING FIRM NICODEMUS Sub -Basin 1E Wright Road P.S. N-650 E-572 0.800 0.051 0.040 0.071 0 Sub -Basin 1F Industrial Park P.S. #1 N-644 E-573 0.108 0.086 0.060 0.046 0.041 Industrial Park P.S. #2 H-630 E-571 0.050 0.005 0.040 0.050 Sub -Basin 1E Cloverton P.S. H-647 E-571 0.103 0.012 0.091 Sub -Basin 1F Greenlawn P.S. N-640 E-569 0.060 0.003 0.057 Williamsport Williamsport P.S. N-641 E-567 0.500 0.206 0.294 0.294 CONOCOCHEAGUE Sub -Basin 2 Oak Ridge P.S. N-648 E-587 0.820 0.300 0.520 0.020 0.500 Potomac Edison P.S. N-645 E-586 0.090 0.005 0.085 0.015 Sub -Basin 10 48' Interceptor to N-653 E-574 10.000 0.800 9.200 9.200 Conococheague S.T.P. Sub -Basin ID Kemps Mill P.S. H-653 E-571 0.150 0.030 0.120 SHARPSBURG Sharpsburg Pike P.S. N-645 E-595 0.108 0.007 0.101 0.103 FOUNTAIN HEAD Fountain Head P.S. 0.102 0.035 0.100 0.135 CITICORP Citicorp F.S. 0.072 0.0095 0.0625 MIAUGANSVILLE/ Orchard Hills Route 11 P.S. 0.265 0.1360 0.129 0.250 farm Lane P.S. 0.138 0.039 0.099 0.138 Maugansville P.S. 0.120 0.100 0.020 0.250 Countryside P.S. 0.030 0.011 0.019 0.028 Paramount P.S. 0.030 0.007 0.023 0.018 State Line P.S. 0.030 0.007 0.023 0.018 Maugans Meadows P.S. N-675 E-590 0.068 0.002 0.066 0.031 0.035 Garden Spot P.S. H-676 E-587 0.014 0.001 0.013 TABLE NO. 12 A FLOW ALLOCATIONS FOR INTERCEPTORS OR PUMPING STATIONS FOR LARGE SERVICE AREAS SCWERGE SERVICEINTERCEPTOR AREAS AND SUIT -AREAS PUMPING STATION 1 DINAT LOCATION 1 M CAPACITY (MGD) (1) CALENDAR YEAR (2) AVERAGE FLOW MGD) GROSS AVAILABLE FLOW (MGD) (3 TOTAL ALLOCATED FLOW MGD (4) NET AVAILABLE FLOW (MGD) (5) PENDING FIRM NORTHR OOK Northbrook P.S. M-671 E-606 0.135 0.002 0.133 0.023 0.110 ANTIETAAM Sharpsburg P.S. N-591 E-588 0.135 err, Keedysville N-600 E-600 0.072 WINEBRNNER Highfield P.S. N-684 E-661 0.204 0.204 0.218 as Pen Mar P.S. N-686 E-657 0.204 0.024 0.024 Old Sabillasville Rd. P.S. N-687 E-668 0.003 0.003 0.002 0.001 HAGERRJDWN 38 Hamilton Run Interceptor FroSublasin N-666 Em 604 to M-651 E-601 4.0 P.S. #10 N-665 E-604 0.076 0.012 0.064 0.064 P.S. #3 H-657 E-602 0.238 0 0.238 0.P38 P.S. #6 N-656 E-603 0.230 0 0.230 0.230 e96 ?'} P.S. #4 M-652 E-602 1.036 0.140 0.896 0.342 0.896 P.S. #7 N-651 E-599 1.700 0.460 1.240 0.113 1.240 Sub -%%sin 3C P.S. #8 N-654 E-612 0.248 0.018 0.230 0.158 0.230 r,p Sub4asin 3F P.S. #9 M-648 E-606 0.088 0.005 0.083 0.083 P.S. #17 M-593 E-648 0.069 0.008 0.061 Sub.4asin 1D P.S. #2 H-667 E-592 0.048 0.011 0.037 0.027 0.037 P.S. #13 N-659 E-585 0.600 0.069 0.531 0.037 0.531 P.S. 116 (planned) M-583 E-660 0.046 0 0.046 NOTES FOR TABLE NO. 12 A (1) INTERCEPTOR OR PUMPING STATION, COORDINATE LOCATION, AND DESIGN CAPACITY (Million Gallons Per Day) - Are taken from Table No. 10 A. DESIGN CAPACITY does not represent the capacity for peak loads. Average daily flow capacity for Sanitary District facilities has been determined by applying peak pumping rates to the Standard Sanitary Sewer Design Peak Flow Curve. For City of Hagerstown facilities, peak pumping rates have been divided by a peak factor of 2.5. (2) CALENDAR YEAR AVERAGE FLOW (Million Gallons Per Day) - Average flow rates are based upon records of sewer service providers. For the Halfway Sewerage Service Area, flow rates are based upon average daily flows which were measured over the last six months of 1992. For the Hagerstown Sewerage Service Area, flow rates are based upon electric meter readings to determine the length of time pumps are in operation in the course of a 24 hour period. (3) GROSS AVAILABLE FLOW (Million Gallons Per Day) - The numerical difference between DESIGN CAPACITY and CALENDAR YEAR AVERAGE FLOW. Where CALENDAR YEAR FLOW is greater than DESIGN CAPACITY the difference is shown as zero. (4) TOTAL ALLOCATED FLOW (Million Gallons Per Day) — These figures represent the allocation for planning purposes of excess capacity to existing and planned developments which are itemized in Table 12 B. TOTAL ALLOCATED FLOW for each facility in Table 12 A is the summation of the allocated flows tributary to that facility listed in Table 12 B. For the Halfway Sewerage Service Area, allocations are FIRM when sewer construction drawings are approved by the Washington County Sanitary District. For the Hagerstown Sewerage Service area, allocations are FIRM when the Sewer Service Connection Permit is approved by Water Pollution Control. In all other cases, TOTAL ALLOCATED FLOW is considered tentative and is listed as PENDING. Allocated flow for a planned development which has received an approval letter from a sewer service provider, for example, would be considered PENDING allocation. (5) NET AVAILABLE FLOW (Million Gallons Per Day) - This figure is the difference between GROSS AVAILABLE FLOW and the total of FIRM allocations. NOTES FOR TABLE NO. 12-B {1} DEVELOPMENTS TO BE SERVED - include both existing and planned developments. (Note that Number of Dwelling Units are listed either EXISTING or PLANNED). Existing developments are existing residential developments which have been proposed for service by a 201 Facilities Plan or existing commercial or industrial developments which have requested additional allocations from the sewer service provider. Planned developments are those which have been submitted for development review to the applicable Planning Commission and have received at least Preliminary Approval and an approval letter from the service provider. (2) NUMBER OF DWELLING UNITS - This column shows the number of dwelling units, both existing and planned, which are currently not served by public sewer and are planned to be served. A dwelling unit is one or more rooms in a residential building for use by one or more persons maintaining a common household. A dwelling unit may be an owned or rented apartment, town house, single family residence, mobile home, or any other arrangement which meets this definition. Numbers of dwelling units for existing developments are based upon estimates from facilities plans and design studies for imminent projects and upon County land use maps (1975) for projects to be done in the more distant future. Where known, vacant buildable lots within existing developments are listed under planned dwelling units. The number of dwelling units for planned development are based upon plans which have been submitted for approval to the applicable Planning Commission. (3) ALLOCATED FLOW PER DWELLING UNIT (Gallons Per Day) - This is an estimated figure which is used by the sewer service provider for planning purposes only and not for sizing such facilities as sewer lines. These figures are based upon metered water consumption readings for the various types of dwelling units within the two sewerage service areas. (4) TOTAL ALLOCATED FLOW (Million Gallons Per Day) - In the case of residential developments, this figure is determined by multiplying the number of dwelling units by the allocated flow per dwelling unit. For commercial and industrial developments, this figure is the total allocated flow as determined by the sewer service provider. For the Halfway Sewerage Service Area, allocations are FIRM when sewer construction drawings are approved by the Washington County Sanitary District. For the Hagerstown Sewerage Service Area, allocations are IV -48 FIRM when the Sewer Service Connection Permit is approved by Water Pollution Control. In all other cases, TOTAL ALLOCATED FLOW is considered tentative and is listed as PENDING. Allocated flow for a planned development which has received an approval letter from a sewer service provider, for example, would be considered PENDING allocation. (5) TRIBUTARY TO - This column indicates the major facilities listed in Table No. 12-A to which the development will be contributing sewage flow. Proposed facilities which are not listed in Table No. 12-A are shown in parentheses. TABLE NO. 12B FLOW ALLOCATIONS FOR MAJOR DEVELOPMENTS H to 0 SEWERAGE SERVICE AREA AND SUB -AREAS DEVELOPMENTS TO BE SERVED (1) COORDINATE LOCATION NUMBER OF DWELLING UNITS ALLOCATED FLOW PER DWELLING(3) UNIT (GPO) TOTAL ALLOCATED FLOW MGD (4) TRIBUTARY TO (5) EXIST1NG PLANNED PENDING FIRM HAGERSTOWN Sub -Basin 38 Antietam Heights N-657 85 230 0.020 Hamilton Run Interceptor E-604 Pangborn-Antietam Drive Area E-660 280 230 0.064 Hamilton Run Interceptor E-603 Jefferson Heights -Sunset Acres N-660 416 230 0.096 (Proposed P.S.) E-609 Hamilton Run Interceptor Sub -Basin 38 and Brightwood Acres N-650 70 15 230 0.020 Existing P.S. #4 Sub -Basin 3F E-607 100 32 230 0.030 (Proposed Interceptor) (Proposed P.S.) Existing P.S. #4 Sub -Basin 3C Robinwood-Sycamore Heights M-658 544 58 230 0.138 (Proposed Interceptor) Greenhill Acres E-615 Existing P.S. #8 Existing P.S. #4 Youngstoun, Section 1, Phase 1 H-654 108 184 0.020 Existing P.S. #8 E-613 Existing P.S. #4 Sub -Basin 3E Brightwood Acres East, Section A N-651 54 230 0.012 Undetermined E-612 Londontowne, Section 8 M-648 122 230 0.028 (Proposed P.S. E-609 (Proposed P.S. Existing P.S. #4 Sub -Basin 3F Londontowne, Section A N-647 232 230 0.053 (Proposed Interceptor) E-607 (Proposed P.S.) Existing P.S. #4 U.S. 40 Area Residential N-646 100 42 230 0.033 (Proposed Interceptor) Commercial/Industrial E-606 0.020 (Proposed P.S. #15) Existing P.S. #4 TABLE NO. 12B FLOW ALLOCATIONS FOR MAJOR DEVELOPMENTS H SEWERAGE"SERVICE AREAAND SUB -N EAS DEVELOPMENTS TO BE SERVED (1) COORDINATE LOCATION NUMBER OF DWELLING UNITS ALLOCATED FLOW PER DWELLING(3) UNIT (GPO) TOTAL ALLOCATED FLOW MGD (4) TRIBUTARY TO (5) EXISTING PLANNED PENDING FIRM Sub -Bann 1D Cedar Lawn N-663 159 230 0.037 (Proposed P.S.) ii E-585 Existing P.S. 113 Existing P.S. #15 Existing P.S. #7 '•� Cearfoss Pike Area N-669 117 230 0.027 (Proposed P.S.) E-590 Existing P.S. #2 Paradise Homes N-677 108 230 0.025 To be determined by E-602 Facilities Plan Spring Valley H-675 265 230 0.061 To be determined by. E-606 Facilities Plan Hunter Hill Apartments N-674 105 230 0.024 To be determined by E-607 Facilities Plan Sub -Basin 3B Doub Meadow N-651 95 230 0.022 Existing P.S. 17 E-594 Washington Gardens N-663 100 230 0.023 Hamilton Run Interceptor E-604 +Fi+ Fi... la i Gr C7 ✓ Y ♦ i C 1 a I 0 I 0 0 ♦ A I 0. CO w I Fo:r. O CnC.a C � q✓ d w 1 41 I o I i a rr i i ++ a a Q d 0✓ 47 O 0 a7 01 q -a.—.—.— r ti — .41 +I ✓ ✓ i i a r.. Q i Q o w a 0 0 a a a 0 0 o 1 a d✓ s e o V 4 i O a a1 ✓ .r -w .r .r .r ✓ ..r .r — d w oa 01 01 d) CI! 47 07 li r. 01 ✓ ... O .4 ✓ ✓ ..I d7 �+ +`I COC•) Or r a 4 i r i .4 i i i i 1 4 a .O+ M 71l 7M al: V 0 .✓ ✓ ••••I . 4.4 .✓ tr +, all L. d 4 4 a O 0. P) 01 01 H `J7 01C I 0101 C Cr U s Ir •a4 •o. �e, •O.•e o. .4.4 a+ o. 7.s a► al. .d an er aw v 40 a b y Ir !- W 4. 1- I- L. w a 4 a w a a /- C a I.- Of l- C C a w d a w a 00 00 O O 0 0 0 O 410 r 0." O O •-.• .• r 0 •.•1 -.. 00 ...a ... ✓ a+ -.I v •r1 0. 0. 0. 0. 4 7 w 0. 0._i - 40.4 0. 0. 0. 0. 0. 0 0. 0. 0 r.' 0. q 0. r,r w 0. r 4 O. 41 s 4 4 0-41 a a..... Y a a r a a a V a Y• r o Y 41 J . r Y Y 9 = o r'•ts 41 •4 0 w 0 Cl 0 C.) a Q 0. Cl .r_ .0 J.1 .0 Y 0. U 0. 0. Cl 0. CJ 0. O. A. 4 4 7 41 ++ Y Ilr w v I.. .. w 1r •••• .� •� _ r. V ♦. w 1+ O 0 v Y Y Y 9 Y 41 Y -J 41,0.0.0. 0.0. 0.41 Y a Y Y a Y Y Y Y 4 4 0 U �.r ...1 p ✓ ✓ .1+.-- - •. r ar — ... .r+ or ar r N ..�-q•rl i .r a d a { 0 w r a M M Y'.i +. Q r a O _ r Y -•.:r. Y so a. a. 1.. 4. �. .0 •� r .•+ M O F.. •r •r �- .r1 .r .� y •O 0.41 0 0 0 41«O> .O: 0 0 0 • 01..0 '0 0.41 .14..N Or es 0.s.0O O. /. 41.0 r 4 OJ r M (4 41 Y L i V Cl s C) V V 'J Y M w 4 4 4 a - au U a a C) 0041 a 4104141 a a 0.4 a a 0 r/ d 0.0.0.0.00 a r i d .L a a a i i i. r a G� .r .r w .- -w r r -.-1 Y .- - • Y .-. — a0 all r 41.— r — M — — M a- .r w -J t ♦ a . • I a 1 i i .s i i✓ J 1 •- ,O 1 Y I 7 0 J -J 0 y ✓ -. O O 4. 01 O 1.. O .a l! C.0 .r i- K i e 4. O a i i i i i i ••+ i .... -� U r ... V w p 01 40 01 h C-) Z •`- Z S r 0— y 01 Z Y Z 01 01 C. 4. e 0 0101 0 0 O •e7 CS Q 0 0 0 0 O O O O e 0 3 O O O — O 0 0 0 O d o r O .O W Iq .V 0 0 N o! 441-001 a0 .Y N - ' -r N aq .-7 r. e. a rs .-► . a w r +• Ce 001001 0 O 0101 O 0101 Cl O Ca 40 010 01 I'd . .V N Ca —IM 10 •9 01 ICe 01 O 01 C/ 101 N 17 a- I M Y I Q 1 - r / . 1 01000 00 e e v Q o0e 01 01 e o Q I o o e e o a o _ Osa a e a o e o 0 0 0 Z 0 0 �� ; N 0101010101 N. � N N N N N N N 0144* N I a :n ao z - E- 1 .. - f4 44 I I'401 Ca 0101 01 01 ' 01 01 - 41 01 40 `I OR ✓ 104401 --01 Y N V V N- . N U - aI N , • 0 0 I -' 1 T ' s - I N ii,; rb,l�r.t•' };i g e r Q.1./ rr w r r w H ..► r,► 7 w yr a. w • r s w .r w ♦ a .40410 04141— 1 oa.011, 1• s .04100 0001ig V 1 t>/ a r a O Y •0 ../ 7 O r/ y w ..► . M ... Y -+ 4 .di 0 , r 101 r 04 w Is a r `p 01.0 a -o-- • Y r S.. �. w w w .► w ••••� 1 r .-1 . Y Y r O 7 41014100010100 w rr Y a 1 rl Oa -001 p O 001411 r p 4101001 4141410 Y Y r+� v w v i 4101 e r w .I Ole• .. 0.+. p • O+ a— Y w w w Y d r .O W as y Y ..) w .s w 4101 - w .401 .01 • I 41 0.a Y • w 01 41 I. O ` Y .M 4141 +.4 Y r ++ 4. 1 .0 .0 et .0 .0 + 4 ti, O 41I41 0.01 41.00141 O 3m ace -a 1 O O +4 Q w O Y 4 p Q.'0 Y 01 4100 4 •1u1 I a s...l I 01l U40.- .-. } ..1 M 41-144141 1- 40—_i-- w w w w y r • 0410 41- i s w i- a w w 041141 w Y w 4141004101 41a a.— • a.. .. .4 .. 4101 .d v O w .r 0 01 41.4.40.40 w di w 0141001 I O .`.. w+ +` 41000 41.041— Y -A . w 0 0 0•`- 1 Ol 0' 4141041.4 w a 4141.40I04141041041.0 Y i 1. Y 0 w w Y ' s1 Y I .. Y w 1 q 0 0 0 0 0 0 0 0 0 C) i w �. O Q s 0 0 0 •r � w i 0 4l i •.— s I r. 00 Oa. a 4..0. r. p Ci = L O 0 G wl Cl C) Or >!Q •ti K CO C7 it Y CO CO 4i q 1 '�..' 1•. •1. •1 01•M Ills s7s` `Vs+.r "0. O r V V w N N +1 M t.. w w /• i I Ys A e � N 417 M N N Ir. r O n. O V Ms N a 01101 R 3 r —p440. ..•1 i. 1 ` 01 44* fJ N M 0100101 M `••IN N N N N s•S1N M N M 01 0541 IA w V ♦ Ik � 11 `Ji • 1 I - 01001 ^ .7 C O'« N � >a Vi 1A G.f 2 CO •a4 Y7 a.• .-.1 "41 y_ ,rr• ` y IV -52 4- 4.- TABCE 1!1O.' 1 — •1'. FLOW ALLOCATIONS FOR MAJOR DEVELOPMENT ts WASHINGTON COUNTY SANITARY DISTRICT 'rnl No Major Developseat —15! Terse Oak Vil1aj4; acting!'.•*• -+-- - 51 200 10 161 lepewel l Miaor1 motet Ii' 113 Salgkta lea �� :• 22i Towse Oak Village, 8ectioa l 38 •311 A.C.OT. Project Valley Towse Oak Village, sect ?s' Parkriev Meadows ry Lakeside Park Section Muylaed Paper M:: Soatkaide Meadowmf'.- Towee Oak Village 1ect VCSD Admiaistratioa lei Valley Mall Bowman Mattress Nosewood Vas Lear Masora!Jeo 8 lovely lug Reii Pstt Londoatowne Corp. Sterling Oaks Van Lear Manor, See. 10 I C, P►aa 1 l 23 .200 100 200 1f Zoo 55too 120 200 35 200 W.P. Witter Co. .?• y4, Via Lear Masor, leotios 1t'`:` i;: :r 35 200' Pacts lg Serticeit Cloverton/Creealawm sewer allocation (SD Projectl 163 200 Cloverton 11 (T. Shank) 31 200 No. Read'l Flow per Total GFD Total L'P9 Total CPO Units Unit aendi fira Connected Tributary to 10800 . Wright Road Pumping Station 5800 Wright Bold Pumping Station _ 1618 Wright Road Pumping Station 6800 Wright Road Pumping Station 5000 Wright Road Pumping Station 1600 Wright Road Puiping Station • 43100 Wright had Pumping Station 2235 •'.. :;... Wright 5Vpi Station 845 .&'. Wright >lod Fuipint Station 1200 3100 Wright Road Pumping Station 20000 Wright Road Pumping Station 1400 8050 Wright Road Pumping Station 15000 i Wright Rood Pumping Station 11000 1 Wright .Read ;?umping Station 9600 V V •';'' Wright Road Puioing Station LOGO Wright Road Pumping Station X210') 85200 Wright Road Pumping Station 3500 Wright Road Pun ing Station 6300 :' induotrialaPatk Pumping Staion .2600;• Industrial} -Pik Pumping Staion 200 • 2800 Industrial Park Puaping Staion 3300 Industrial Park Pumping Staion 2.1000 pusping Station No. 3 1000 Industrial Park Pumping Station 980 Industrial Part Pumping Station 4000 " Ioduattial Piro Pumping Station 2800 Industrial Patk Puaping Station 32600 Cloverton A Creenlawn Pumping Stations— b��1C Cloverton Pumping Station ' F¢ .': t;. y a}� ' ¢ •; i`.. a TABLE NO. 13 INVENTORY OF SEWAGE. DRAINAGE•AND WATER POLLUTION PROBLEM AREAS H Ut SERVICE AREA COORDINATE LOCATION POPULATION NATURE OF PROBLEM PLANNED CORRECTION St. James H-638 980 Failing septic systems Public sewer to be provided (Subdistrict 16) E-593 Spring Valley Area N-676 Failing septic systems Area to be evaluated and studies for (Subdistrict 15) E-606 possible public sewer. Rolling Hills N-660 (Subdistrict 12) E-603 to Failing septic systems Public sewer to be provided Pangborn area 1994 N-660 Cavetown area 1995 E-635 Holiday Acres 1996 West Oak Ridge Drive area N-648 Failing septic systems Area to be evaluated and studies for '(Subdistrict 1) E-593 possible public sewer. Bower/Leonard Avenue N-648 108 Failing septic systems Public sewer to be provided by 1994. (Subdistrict 1) E-582 Hagerstown N-666 Inadequate capacity of Construct new Hamilton Run relief (Subbasin 3B) E-604 to existing interceptor interceptor N-651 E-601 TABLE NO. 14 IMMEDIATE FIVE AND TEN YEAR PRIORITIES FOR SEWERAGE DEVELOPMENT H 4i I Ui Ui RESPONSIBLE AGENCY. SEWER LOCATION PROJECT DESCRIPTION TOTAL GRANTS COMPLETION SCHEDULE MUNICIPALITY OR SERVICE AREA COST - ELIGIBLE DEVELOPER (1) (2) (3) ESTIMATE (4) PLANNING DESIGN CONST. Washington County St. James N-638 Provide sewerage N/A N/A Contingent upon results Sanitary District E-593 facilities for existing from request for Proposal residential community Washington County Smithsburg N-664 Sewage treatment plant 2.656,000 500,000 Complete Complete 1993-94 Sanitary District E-639 improvements and (MOE) ex ansion Washington County Subdistrict 12 N-660 4.8 SRL Complete Ongoing Sanitary District Rolling Hills E-603 million Pangborn Extension of sewer 12/94 lines Cavetown Extension of sewer 12/95 lines Holiday Acres Extension of sewer 12/96 lines, force main and pump station Washington County Subdistrict 1 N-648 Extend public sewer to 600.000 None Complete 9/93 12/93 Sanitary District Bower & Leonard E-582 43 homes Avenue Washington County Subdistrict 1 N-648 Pump station & 1.3 SRL & 7/95 10/95 5/96 Sanitary District W. Oak Ridge E-593 collection system to million Reserve Drive service primarily existing commercial units Washington County Subdistrict 1 N-664 New intercepter to 300.000 SRL Complete Complete 9/93 Sanitary District Greenberry E-587 correct inflow & Hills infiltration problems Washington County Subdistrict 9-1 N-684 Winebrenner W.W.T.D. 630,000 SRL,EPA, Complete Complete 9/93 Sanitary District Highfield/ E-661 Improvements upgrade MDE Cascade/Pen Mar plant components TABLE NO. 14 IMMEDIATE FIVE AND TEN YEAR PRIORITIES FOR SEWERAGE DEVELOPMENT H U' rn RESPONSIBLE AGENCY, SEWER LOCATION PROJECT DESCRIPTION TOTAL COST GRANTS COMPLETION SCHEDULE MUNICIPALITY OR SERVICE ESTIMATE ELIGIBLE PLANNING DESIGN CONST. DEVELOPER (1) AREA (2) (3) (4) Washington County Subdistrict 16 N-636 Phase I -Force Main 1.1 million SRL Complete Complete 9/93 Sanitary District St. James E-595 Phase II -Pump Station 500,000 SRL Complete 10/93 12/93 Phase III -Collection System/ 1.0 million SRL Complete 9/94 2/96 Industrial Park Washington County Subdistrict 18 N-649 Extension of public sewer to 600,000 SRL Complete Complete 7/94 Sanitary District Hone field Road E-570 service 41 residential units Washington County Subdistrict 15 N-676 Pump station & collection N/A N/A Contingent upon study Sanitary District Spring Valley E-606 system findings City of Hagerstown Hagerstown N-652 Sewage treatment plan N/A N/A Complete Complete 1997 E-601 expansion and upgrade to add nutrient removal process City of Hagerstown Hagerstown Construct new lower Hamilton N/A N/A Complete Complete 1997 Run relief intercepter to increase capacity and eliminate I & I Town of Boonsboro 800nsboro N-610 Lagoon Upgrade Pond 120,000 Contingent upon funding E-615 Aerators and Sludge Removal Lagoon Upgrade - Equipment 150,000 Contingent upon funding and Structural Modifications/Additions Crestview Developer Boonsboro N-608 Extend sewer lines in unknown N/A Contingent upon funding E-612 Crestview Development south of Route 34 construct a gravity main TABLE NO. 14 IMMEDIATE FIVE AND TEN YEAR PRIORITIES FOR SEWERAGE DEVELOPMENT RESPONSIBLE AGENCY, SEWER PROJECT DESCRIPTION TOTAL COST GRANTS COMPLETION SCHEDULE MUNICIPALITY OR SERVICE AREA LOCATION ESTIMATE ELIGIBLE DEVELOPER (1) (2) (4) PLANNING DESIGN CONST. (3) Boonsboro West Boonsboro N-615 Extend sewer lines in unknown N/A Contingent upon developer E-615 Boonsboro west east of Rt. 40A. May have to construct a sanitary sewer pumping station and force main and gravity mains. Town of Boonsboro Boonsboro N-610 Miscellaneous repairs and 194,400 Contingent upon funding E-615 replacement items for lagoon, collection system and pumping stations —Town of Clear Spring Clear Spring N-665 Sewage treatment plant N/A N/A Complete Contingent upon E-537 improvements. funding Installation of sludge thickeners Town of Clear Spring Clear Spring N-665 Construct approximately 700,000 N/A Contingent upon E-537 15.000 feet of interceptor development sewer. Construct a sanitary sewer pumping station & force main. Town of Funkstown Funkstown N-648 Sewage treatment plant N/A N/A Complete Complete Contingent E-600 system rehabilitation & upon maintenance funding Town of Hancock Hancock N-683 Sewerage treatment plant & 290,000 N/A Complete Complete Ongoing E-468 sewer system rehabilitation & improvements TABLE NO. 14 IMMEDIATE FIVE AND TEN YEAR PRIORITIES FOR SEWERAGE DEVELOPMENT RESPONSIBLE AGENCY, SEWER LOCATION PROJECT DESCRIPTION TOTAL COST GRANTS COMPLETION SCHEDULE MUNICIPALITY OR SERVICE AREA ESTIMATE ELIGIBLE DEVELOPER (1) (2) (3) (4) PLANNING DESIGN CONST. Town of Smithsburg Smithsburg N-664 Design and construction of 50,000 42,500 Complete Contingent upon E-639 plant modification to meet (EPA) funding. disinfection standards 3,800 using ultraviolet (DHMH) irradiation Town of Williamsport Halfway N-644 Sewer system rehabilitation 39,200 29,400 Complete Contingent upon E-568 to correct inflow and (EPA) funding infiltration 4,900 (DHMH) Washington County Halfway H-644 Extend sewerage lines to 150.000 150,000 Contingent upon funding Department of Housing (Williamsport) E-568 Fenton Avenue area west of (CDBG) & Community Conococheague Creek. Development H Ui NOTES FOR TABLE NO. 14 (1) RESPONSIBLE AGENCY, MUNICIPALITY, OR DEVELOPER Responsibilities may include project initiation and management but no necessarily financing. (2) SEWER SERVICE AREA - That area served, or potentially served, by a system of sanitary sewers connected to a treatment plant, or, in a very large system, sub -areas as delineated by the County. Sub -basins refer to drainage areas shown in the applicable 201 Facilities Plan. Subdistricts refer to Sanitary Subdistricts of the Washington County Sanitary District. (3) LOCATION - In accordance with the Maryland Grid System. (4) GRANTS ELIGIBLE - Dollar amounts indicate funds for which the project may be eligible from sources shown in parentheses. Source abbreviations represent agencies and programs as follows: EPA - Environmental Protection Agency MDE - Department of the Environment EDA - Economic Development Administration UDAG - Urban Development Action Grant CDBG - Community Development Block Grant FmHA - Farmers Home Administration ARC - Appalachian Regional Commission HUD - Housing and Urban Development Grant SRL - State Revolving Loan Fund The local cost for any project may be assumed to be the total cost estimate less any amount shown for grants eligible. IV -59 SLUDGE MANAGEMENT Sludge is defined as the solid residuals of sewage treatment. Primary or raw sludge is obtained in the primary state of a treatment plant by collecting solids that have settled. Sludge is stabilized after the organic matter has been decomposed into a relatively stable material. A common method of stabilization is anaerobic digestion. Sludge management is an integral part of the sewage treatment and disposal process. The disposal of treatment plant sludge is regulated by the Maryland Department of the Environment in accordance with the code of maryland Regulations 10.03.48. Sludge disposal sites are approved after an analysis of such factors as the site surface drainage, soil type, depth to bedrock and sludge composition. On November 25, 1992, the Environmental Protection Agency (EPA) adopted the National Sewerage Sludge Use and Disposl Regulation (Chapter 40 Code of Federal Regulations Part 503). The rule addresses three general categories of use and disposal practices for sludge that is; 1) land -applied, distributed, or marketed; 2) disposed of at dedicated sites or in sludge -only landfills; and 3) incinerated in sludge -only incinerators. The new rule includes standards that apply to generators, processors, beneficial users, or disposers of sludge or septic wastes. The rule sets standards in two areas. First, it sets standards for 10 heavy metals, pathogens, and total hydrocarbon emissions from incinerators. Second, it sets standards for managing sewage sludge use and disposal. The prescribed management practices have been designed to limit human and ecological exposure to any contaminants and ensure that sewage sludge is used on the land or disposed of in ways that are protective of human health and the environment. Several methods of sludge disposal are described in the Upper Potomac River Basin Water Quality Management Plan. The methods include land spreading, incineration, ocean disposal, sanitary landfilling, and composting. The key methods of sludge disposal in Washington County are land spreading and landfill. Land Spreading Land spreading refers to the process of sludge application to lands used for farming, forestry, or recreational purposes. Sewage sludge is generally not as easily handled nor as high in nutrient content as commercial fertilizers. However, it does greatly enhance soil physical fertility when applied to marginal lands. Sludges may contain pathogenic bacteria or viral organisms. They may also contain heavy metals which could pose a threat to public health through transmission of toxic levels in crops grown on treated land or through leaching into groundwater. For these reasons, sludge must be stabilized prior to land spreading to IV -61 reduce public health hazards and to prevent nuisance odor conditions. In order to ensure that harmful contaminants do not enter the human food chain, sludge application rates are controlled and crops grown on sludge treated land are restricted based upon recommendations by the University of Maryland. The University of Maryland warns that "sewage sludge should not be considered an innocuous or harmless product. The implications of the uptake by plants of heavy metals and persistent organics from sludge, their intake by grazing animals, and their ingestion by humans are not entirely understood. Therefore, the University of Maryland cannot predict the long term effects of sewage sludge on the environment and does notaccept responsibility for any such effects." The Upper Potomac River Water Quality Management Plan describes further implications of land spreading. "When contemplating instituting a land spreading program, municipalities must consider the availability of land, the time frame within which that land can be leased or otherwise controlled and potential alternative sites. Should public pressure or public health considerations cause termination of land spreading activities, municipalities must be prepared to undertake interim sludge disposal operations until more acceptable permanent solutions can be devised. Similarly, it must be recognized that land for sludge spreading may have a finite useful lifetime. Thus, additional land should be available nearby. Gaining access to large tracts of land is always difficult near urban areas. Hence, land spreading of sludges may not be a realistic alternative for most large metropolitan areas, especially on a long-term basis. "When land is to be leased, or sludge is to sold to private landowners, municipal officials will have to deal with problems of general acceptance. The extra time and costs associated with transporting and spreading sludges, a natural reluctance to work with sewage sludge, and the limited nutrient value compared to commercial fertilizers may make it difficult to sell sludge to farmers. Where sludge spreading is an attractive sludge disposal alternative, wastewater officials will need to have the flexibility to offer additional incentives. These would be most effective irk the form of indirect subsidies such as free delivery of bulk lots of processed sludge and low cost rental of spreading devices. Municipalities should also consider the possibilities for nutrient enrichment of sludges to enhance their value to the farmer. This could be contracted out to a private fertilizer concern."** Sanitary Landfillin Sanitary landfill of sludge containing no free moisture, either separately or along with mixed municipal solid waste, is an environmentally acceptable method for disposal of sludge. The 4 IV -63 sludge must be stabilized as described for land spreading in order to prevent nuisance odors and reduce hazards to those working in the area. The relative benefits of sanitary landfill disposal are discussed in the Upper Potomac River Water Quality Management Plan as follows: "Many of the considerations that must be taken into account in evaluating the land spreading option such as protection of groundwaters are pertinent to the discussion of sanitary landfills. Typically, however, sanitary landfills have less problems with surface runoff, and uptake by crops is generally not a prime consideration. Further, sanitary landfill obviously requires less land than land spreading-..- -..._ IV -64 The trade-off required to obtain this added protection and decreased land requirement is the loss of most of the advantages of resource recovery realized in land spreading. landfill offers little more than the use of a solid material to fill natural depressions or replace soils or gravel that can be used elsewhere. Areas where landfill has been practiced can be reclaimed for recreational or other purposes."** NOTES• * From Sewage Procedures for Approval, Division of Solid Waste Control, January 25, 1977. ** From Upper Potomac River Basin Water Quality Management Plan, Maryland Water Resources Administration, September 2, 1976 (Section 12). IV -65 Sludge Management Practices in Washington County Table number 15 provides an inventory of current sewerage sludge generation and how it is utilized. All municipal and non -municipal treatment plants that generate sludge and have a sludge utilization permit are listed. Sewerage treatment plants for the Towns of Boonsboro, Hancock and Funkstown utilize lagoons and therefore produce no sludge. The majority of the sludge produced in Washington County is disposed of in the Washington County sanitary landfill. The remainder of the sludge is disposed of by landspreading. Non - municipal treatment facilities which transport sludge to larger plants generally do not have the facilities to adequately de -water the sludge. De -watering is provided at the receiving treatment plant and is either disposed. of at the Washington County sanitary landfill or landspread. All sludge transported to the Nicodemus, (Halfway) treatment plant is disposed of at the landfill. Some non -municipal, package treatment plants produce insignificant amounts of sludge, however, these plants do have permits for disposal. The method for utilizing or disposing of sludge generated by proposed sewerage treatment plants is discussed in the narrative for each new project addressed in this Plan. The City of Hagerstown recently placed on line a sludge IV -66 pellitization plant. This plant completely replaced the previous anaerobic digestion process. The new plant is operated and maintained by Enviro-Gro Technologies Inc. under a lease agreement with the City of Hagerstown. The following is a general explanation of the sludge pellitization process. Sludge produced by the treatment plant is gathered together and thickened in a holding. tank. Specification grade sludge is delivered continuously to the pellitization plant during one shift per day. Once in the plant, the sludge is conditioned with a polymer additive. The conditioned sludge is pressed in a belt press and placed in a rotary kiln where it is heat dried, sludge pellets are produced in the kiln and then deposited in a silo for storage. The pellets are then shipped to a fertilizer manufacture. The City of Hagerstown, Water Pollution control, waste water, facility currently produces 1429 wet tons per year of sludge which is processed in the pellitization plant. IV -67 TABLE NO. 15 1992 SEWAGE SLUDGE UTILIZATION IN WASHINGTON COUNTY, MARYLAND All figures in terms of wet tons of sludge H 4 m WWTP TOTAL GENERATED HAULED TO ANOTHER WWTP APPLIED TO - AGRICULTURAL LAND DISTRIBUTED AND MARKETED DISPOSED IN LANDFILL Antietam 493 335 0 0 158 Blue Plains 835 0 835 0 0 Brooklane Psychiatric 8 0 0 0 8 Clear Spring 627 168 419 0 40 Conococheague 932 0 0 0 932 Fort Ritchie 535 0 517 0 18 Greenbriar State Park 42 42 0 0 0 Hagerstown 1,429 0 0 1,429 0 Highland Manor 136 133 0 0 3 Maryland Correctional Inst. 8,444 0 8,444 0 0 Nicodemus (Halfway) 734 0 0 0 734 Sidling Hill 17 17 0 0 0 Smithsburg 109 0 0 0 109 TOTALS 14,341 695 10,215 1,429 2,002 SOURCE: Maryland Department of the Environment Sewage Sludge Division POLICY FOR SEWER LINE INSTALLATION IN AREAS WHERE SERVICE IS NOT AVAILABLE All new subdivisions shall be served by adequate sewerage disposal systems pursuant to Article VI of the adopted Adequate Public Facilities Ordinance for Washington County. In order to prevent street and other damage encountered in providing public sewer service to developed areas, and to provide for efficient and effective connection to public sewer service, the following policy is presented for sewer line installation in areas where public sewerage service is not available at the time of street and residential construction, but will be made available at some future time: 1. Requests for such installation will only be accepted where interim systems are permitted and public sewer service is programmed by the Water and Sewerage Plan (S-1, S-3, S-5). 2. Each application for a sewer construction permit must be accompanied by a letter from the county Health Officer requesting that such installation be permitted. 3. Building permits, subdivision plats, and septic tank approvals shall include a provision requiring the connection of the premises to community sewerage within twelve (12) months of announced availability. 4. Sewer lines shall be designed and installed in accordance with applicable municipal or Commission specifications. IV -69 5. The connection of a "dry" system shall be plugged with a visible and readily inspected plug at the future point of connection to the existing system. n IV -70 POLICY ON SEWAGE DISPOSAL ALTERNATIVE Individual On -Lot Systems The traditional septic system should not be discounted as a permanent means of individual, on -lot sewage disposal. Such systems must be properly designed, constructed, operated and maintained to ensure permanent, environmentally sound service. A number of alternatives to the standard septic system for on -lot sewage disposal have been identified and shown to be operationally sound under appropriate circumstances. Such systems include improved septic tank -tile field systems, mound systems, and systems with toilet sewage separated from wash water (composting toilets, incinerating toilets, and liquid recycling toilets). The high cost of central sewerage systems and the fact that on -lot systems are currently failingin someareas. is sufficient justification to experiment with alternative techniques.** Alternative on -lot systems should be preferred in rural areas where there are existing sewage disposal problems and where they are found to be economically and environmentally sound methods of correcting such problems. All plans for the correction of wastewater management problems in these areas should incorporate measures to assure adequate maintenance of new facilities and to reduce sewage generation. IV -71 Community Systems Every effort should be made to investigate the reliability and desirability of community sewerage systems which could serve as appropriate alternatives to conventional central sewerage systems. Such systems may be used as corrective measures to solve existing sewage disposal problems and as interim or permanent measure to serve new development under appropriate circumstances. Within growth areas, pressure sewers and vacuum sewers may be more appropriate and cost-effective than conventional gravity sewers to provide permanent service to a given development. Such measures as dry sewers should be evaluated as a appropriate interim measure until sewer lines are extended to a given development. O7 Within the Rural/Agricultural Area, community sewerage system alternatives acceptable to all approving state and county agencies, should be considered for development proposals utilizing innovative planning techniques such as clustering of rural housing to preserve agricultural land and the rural character. Some alternative systems which are appropriate for on -lot disposal may lend themselves to the clustering approach. The use of package treatment plants may also be considered to serve cluster developments and rural villages within the Rural/Agricultural area. The appropriateness of such development and it's associated sewerage system shall be determined by the Planning Commission based on the policies of the adopted Comprehensive Plan for IV -72 Washington County. The use of such facilities shall be approved by all appropriate state and local authorities as well as meeting all applicable health and water quality requirements. NOTES: * See Report to the Congress, Community -Managed Septic Systems: A Viable Alternative to Sewage Treatment Plants, United States General Accounting Office, November, 3, 1978. ** See Upper Potomac River Basin Water Quality Management Plan, Maryland Water Resources Administration, September 2, 1976 (Section 12). TV -'73 POLICY ON INTERIM TREATMENT PLANTS* 1. An interim treatment plant is acceptable as long as it is an interim step in a regional long-range sewerage treatment plant with a specific date by which permanent facilities will be provided. No permit will be granted for an interim treatment plant which is planned to be in operation longer than five years. 2. The State will issue a permit for such a plant only if it has been included by the County as part of an approved 10 -year Water and Sewer Plan, and adequate measures have been taken by the County to assure that growth will be limited to the capacity of such treatment plant. The State will approve only a limited number -of such plants and only where they are compatible with appropriate regional plans for such sewerage service. 3. Any such plant must meet all applicable health and water quality requirements. 4. Privately finance interim treatment plants must be publicly owned and operated. IV -74 5. When such a plant is proposed for a sewer system from which raw sewerage overflows are presently occurring or threatened, the State may require the capacity of the plant to be enlarged to provide capacity to alleviate or prevent the overflows, where practicable. Financing arrangements for such enlargements must be approved by the Department of Health and Mental Hygiene. *See also the Washington County Sanitary District's POLICY ON INTERIM AND PERMANENT COMMUNITY WATER AND SEWERAGE SYSTEMS in Appendix D of this Plan. Policy on Interim Treatment plants Adopted by the Department of Health and Mental Hygiene - 2.5.73 Approved by Council on the Environment - 2.5.73 IV -75 SERVICE AREA REQUIREMENTS The following shall be applicable to each respective designated service area. Criteria for creation and amendment of service areas are outlined in Appendix B. 1. Urban and Town Growth Area Service Areas The provision of community water and sewer facilities within the designated Growth Areas of Washington County is encouraged. Development proposalswhich_. involve. the- extension of water and sewer lines within the boundaries of a designated Growth Area will be considered to be consistent with the policies of the Comprehensive Plan for the County and will therefore not require an individual amendment to the Water and Sewerage Plan in order to proceed with the review and approval process for development. Specific arrangements between the developer and the appropriate service providing agencies shall be finalized prior to the development receiving an appropriate Service Priority Classification of W-3 and S-3 as part of the bi-annual update of this plan. Determinations as to whether or not a property is considered to be within the influence of a Growth Area will be made by the Washington County Planning Commission. 2. Rural Village Service Areas Existing or planned community water and sewer facilities located within areas considered as Rural Villages by the Comprehensive Plan shall be designated as a Rural Village Service Area. While primarily designed to serve the existing development in the village, a service area established around these villages could IV -.76 allow for in -fill development on existing lots of record and some limited growth. Development proposals for new subdivision lots within existing Rural Village Service Areas will require Planning Commission review and approval to determine if the proposal is consistent with policies of the Comprehensive Plan dealing with Rural Villages. The Rural Village designation may also be used for development proposals utilizing innovative planning techniques such as clustering which, as the most environmentally sound method, necessitate community water and sewerage facilities. Such development proposals shall be presented as a package in order that the Planning Commission may determine if the proposal is consistent with the policies of the Comprehensive Plan. 3. Restricted Use Service Areas Community Water and/or sewer facilities that are located outside of a designated Growth Area and not within Rural Village are considered restricted use facilities. These service areas are created to correct documented public health problems generally associated with contaminated wells or failing septic systems. The use of the facilities within these service areas is limited to the following conditions: a. To provide service to existing uses or new uses on existing lots of record which are directly adjacent to the right-of-way containing the water or sewer line. IV -77 b. To provide service, where sufficient capacity is available, to new subdivision lots that can be served by the line without extension. Density shall be no greater than what could occur without public facilities. c. To provide service to areas where the Health Department determines that access is necessary to solve an existing Health related problem and the County Commissioners agree to permit access to the line. d. To provide service to properties where a written agreement with the service providing agency, executed prior to the restricted. access designation, obligated, the service providing agency to permit access to the particular line to provide service to a specific property for a specific use or provide a specific number of taps. IV -78 PRIORITY CLASSIFICATION REQUIREMENTS The following requirements shall be applicable to each respective designated priority classification within established service areas: 1. S-i Priority (Existing Service or Under Construction) a. Individual on -lot disposal systems including approved alternate on -lot sewerage treatment systems shall not be permitted, except as follows: If an existing community sewerage facility is inadequate or is not available*, an interim individual sewerage system may be used subject to the following conditions: (1) Such interim systems are adjudged by the local health department to be adequate, safe, and in compliance with pertinent State and local regulations, including minimum lot ownership as set forth in Regulation 10.03.28.02 and .03; (2) Permits for such interim systems shall bear a notice regarding the interim nature of the permit and stating that connection to a future community system shall be made within 1 year or less after such system becomes available; IV -79 (3) Provisions shall be made, whenever possible, to locate such systems so as to permit connection to the public facilities in a most economical and convenient manner. b. Extensions of existing community sewerage systems shall be permitted and encouraged. *The adequacy or availability of community sewerage service to a particular parcel of land is a judgement which must be made in each case through consultation among the responsible agencies and cannot be made on the basis of this Plan alone. 2. S-3 Priority (Programmed Service) a. Individual on -lot disposal systems including approved alternate on -lot sewage treatment systems may be permitted on an interim basis provided that: (1) Such interim systems are adjudged by the local health department to be adequate, safe, and in compliance with pertinent State and local regulations, including minimum lot ownership as set forth in Regulation 10.02.28.02 and 0.3; (2) Permits for such interim systems shall bear a notice regarding the interim nature of the permit and stating that connection to a future community system shall be made within one year or less after such system becomes available; (3) Provisions shall be made, whenever possible, to locate such systems so as to permit connection to the public facilities in a most economical and convenient manner; IV -80 b. Extensions of existing community sewerage systems shall be permitted and encouraged. 3. S-5 Priority (Planned Service) a. Individual on -lot disposal systems including approved alternate on -lot sewerage treatment systems shall be permitted. b. Extensions of existing community sewerage systems shall not be permitted, except as provided by Policy for Sewer Line Installation in Areas Where Service is Not Available. c. New, permanent community sewerage systems shall not be permitted. 4. NPS Designation (No Planned Service) This designation is not applied within established service areas. a. Individual-on--lot-disposal systems including approved alternate on -lot sewerage treatment systems shall be permitted; b. Extensions of existing community sewerage systems shall not be permitted; c. New, permanent community sewerage systems shall not be permitted. In all cases where interim or permanent community sewerage systems are permitted, they shall be subject to the standards and regulations of the applicable State and Federal agencies. Adequate documentation that the State and Federal standards and regulations IV -81 can be compiled with shall be evidenced prior to County Plan amendment consideration. ALL INTERIM OR PERMANENT COMMUNITY SEWERAGE SYSTEMS, OR MULTI -USE SEWERAGE SYSTEMS SHALL BE APPROVED BY AND WHEN APPLICABLE DEDICATED TO THE APPROPRIATE AGENCY FOR OWNERSHIP AND/OR OPERATION AND MAINTENANCE IN ACCORDANCE WITH ESTABLISHED COUNTY AND STATE STANDARDS AND PROCEDURES. SEWERAGE SERVICE PRIORITY AREA MAPS (1" 2000') The maps on the pages that follow show existing and planned facilities and service areas that have priority designations of S - 1 or S - 3. Letter designations shown on the maps are county zoning districts for which more information may be found in the Zoning Ordinance. Planned service areas having a designation of S - 5 are shown on Map No. XIII Sewerage Facilities and Service Areas (1" = 1 mile) found in the inside front pocket of this Plan. While every effort was made to insure accuracy in th preparation of these maps, errors may have resulted from the transfer of information from maps at different scales. The classifications of parcels of land as having either existing service or programmed service was based upon the location of existing service lines and upon the best estimates for future service by the service providing agencies. The delineation of the boundary for the S - 5 (Planned Service) classification is based on the land use policies of the adopted Comprehensive Plan for Washington County. S - 5 priority classifications within the Urban and Town Growth Area service area V-82 ez , ;fit , : x are based on the established growth area boundaries. Determinations as to whether or not a particular parcel of land is considered to be within the influence of a Growth Area shall be made by the Washington County Planning Commission and when applicable, the Planning Commission of the affected incorporated municipality. Because of these inherent accuracy limitations, these maps should be used for general planning purposes only. For certainty as to the exact location of all existing facilities or to the status of particular parcels of land, the Washington County Planning Department and the service providing agencies should be contacted. Changes to these maps which may be required by errors or inaccuracies may be made in accordance with the administrative procedures set forth in Appendix B (Page B-10) of this Plan. IV -83 4 JET. RSTCHIE CLEAR SPRING] 0 SEWERAGE SYSTEMS INDEX MAP WATER AND SEWERAGE PLAN WASHINGTON COUNTY. MARYLAND IINIBAt tleAtt.N Sr TIws ANI CIIAII►IIBuuu stwtllA/t $11110 ill Ir1ITISIAt MAP t$M1tSt AN/ //$IIAAN$ FNCtuils tN 151 slwtlA$1 U/rgIM$ uttlel of 111» ►RAN Note$ to tI1*M11111111 CIIMl! VAN -OfPB 1U./(IS I • Is I FBI AIJBININI MA►I IF 11111 M1INI1L ISMIIABI $toYIet hw"twAsmNITON COI*TT NAP ►.N..N y' 1AH1111ITON COVNtT ►LAII*NI CCMMI$1$ON ►1St . wN l ♦ • N I HAGER STOWN °WILLIAMSPORT 0 SEWERAGE MAP SYMBOLS Existing Proposed SEWAGE TREATMENT PLANT A /\ - SEWAGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS m o FFQHCE MAINS IIIIIIIIIIIIIIIIIII ''''''"''''••'' SERVICE AREA BOUNDARIES WURBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S - 3 Programed Service K ■ URN NM K N K M K M ■ KKK ■ RN K RN K KK K K K K N K K MN K r N K K K K K K K K URN ■ K K K R K t ■ K K K M K K K ■ K N K K K K K K S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY ivi Y \i"r II P0 / li XXX x11"" x XXX K �w % I 11 x y X 'i'r51V_\r- y X X X X % I _ X K t K X M X X II K X % � 4 x x X % I I. X iN 'C '• H I r ,1 ` I _ / Q i SEWERAGE MAP SYMBOLS Existina ProDOsed SEWAGE TREATMENT PLANT A O SEWAGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS •• • FORCE MAINS IIIIIIIIIIIIIIIIIII •'••••'•«'•'''' SERVICE AREA BOUNDARIES 0 URBAN a TOWN GROWTH AREA (.AS NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - 1 Existing a Under Construction S - 3 Programed Service NM M M M N M M M M A M M r ■ M N M • M M M ■ M N M % N * M M N N N M ■ ■ Y ■ a MN R N M N a ■ N M ■ 1 M U F ■ M K M ■ NA ■ M • t ■ Y M ■ Y K M S —5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY p SEWERAGE MAP SYMBOLS Existlna Proposed SEWAGE TREATMENT PLANTA Q SEWAGE PUMPING STATION ■ INTERCEPTORS AND OUTFALLS N• - FORCE MAINS 1111111111111111111 uuu•'•'uuuu's.0 SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S-1 Existing a Under Construction S - 3 Programed Service N ■ : a ■ i ■ ■ NI N NI N N NI a a N ■ N N N R ■ ■ NM N N ■ ■ N N a a N N R a a R ■ N N ■ NI MN N N a a a ■ N N a ■ R ■ N N N N N N N • S —5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY i a Q r J i / .�a lid f 4II iF SEWERAGE MAP SYMBOLS EYistlnn Prnnnsnd SEWAGE TREATMENT PLANT Q, SEWAGE PUMPING STATION I 1 IN1ERCEPTORS AND OUTFALLS � m FO CE MAINS IIIIIIIIIIIIIIIIIII r•e SERVICE AREA BOUNDARIES low URBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (A'S NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing 8 Under Construction .................. S -3 Programed Service R 11 s 11 ■ w 11 x ■ Y Y ■ ■ K x t ■ U ■ 11 r ■ M ■ u 11 ■ y t 11 M i r ■ 11 M ■ M ■ * ! ■ Z s e ■ R X R ■ ■ i i it ■ 11 ■ Z NUNU • 11 i Y 11 ■ ■ R Y Y S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY :STRICTED USE esf Z IYIr � IYT MZT ; 0nv BL s�QEY ■o ; xi 662 665 /' _yam • RURAL --r�� '•� moo. VILLAGE `� ,r ' '' i• RR SERVICE .- •-.-. AREA >�• / ••�• •t RR suarr•see• BLOCK NO. 2 R RURAL VILI AGE SERVICE A EA MM NO f611 671 671 SEWERAGE MAP SYMBOLS Existlno Proposed SEWAGE TREATMENT PLANT A ___ SE 'AGE PUMPING STATION ■1 1 INtfERCEPTORS AND OUTFALLS • N - F'Okk E MAINS IIIIIIIIIIiIIIIIIIl ,•.. SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S - 3 Programed Service K K r r R r r r ax r R a RNN r a s a K R R r a R ■ ■ Y R a a r ■ r a a a a r a a a a • s a a a a a a a N a a a a a Y Y r a R a a a Na a a S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY M r [tEl / ...._ 1i is 1 :J1 ti I p p. wIf f ��'_ w !H:�� _ SEWERAGE MAP SYMBOLS Exlstlna Prnnnsed SEWAGE TREATMENT PLANT ,. Q SEWAGE PUMPING STATION ■I 1 INTERCEPTORS AND OUTFALLS -. - FORCE MAINS IIIIIIIIIIIIIIIIIII "•..••.•"•' SERVICE AREA BOUNDARIES lowURBAN a TOWN GROWTH AREA tAS NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S —3 Programed Service MN N N N N N M ■ N N N N N N M N ■ Y ■ N N N N ■ N N N N N ■ N ■ N r : R • N NM N N SNXN INN N NNN N N INN N N N N N N K ■ N N N SNI S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY SEWERAGE MAP SYMBOLS Existlne Prnnnsed SEWAGE TREATMENT PLANT A Q SEW -AGE PUMPING STATION ■1 1 INTERCEPTORS AND OUTFALLS o • FORCE MAINS IIIIIIIIIIIIIIIiIII SERVICE AREA BOUNDARIES lowI URBAN a TOWN GROWTH AREA As NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction .................. S -3 Programed Service M r r M M f. srrY M M r M r NW NM . M NM MN M ■ M Y N NM M N MN . M N M M M . . . NM } MM N MN N M . N M ■ NM NM MS M S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY m �_�� L. }„x . i:�bioE�i►E_' GiQ5*.. ' ss A 2 �'l �s I J- 'r- 'I� x-% XK �i X •x/J.. :�:.:�:... j... Y x x/x X xx x x x X if, x x A �, :: :CAF? ::: 1 x x Y x x A x x x x _-. fFLT/rT—! ��' vR • v«t ... i r_::.. 'z ::::: t::r::::::: as ::..::: :I: X x X X x .xkx I, x Y i x ..1. . .. _ x x x Y x x ..... x'X' x xx x x x. .1. •is"j/ .. : �. ........ :. x x x x xxx x x x :,,,. XxX� xxkx xxxx x x x x x x x x x x I - —�= IL ::::. . .. Y RR : :. :: x x Xx x _ = XXx..XXXxx x .p[7-...:_: Tl :•��:: :s—.�'� x x x Xxx/x iE-.x-J,�.\�x "'�cx x x, . k..' . � . � F{L \x Y x x % x � X x X X 911 % X X x S{( [ �y{� .�. ,% % X x% X I • +. '.�� • :� i. — _R;`Jf4x X x x x x xx x x x x -i •c F.i_f_;.•.Y .p . ..... :( t xi1r1r ; :::.::.r1�.�, X X X Moc X X Y �4 ;k : l �r x x�;xSx x f x x x X .�.r .N1 �,A..311::::. :-1.�: x x —Yx .s:: x xXxxx r�i::: ...:y?.:1 j4E: x x x x x ��.. J I %x xY �.' .... ... . ..... ��: ` f :�:� _ _. :' S: rt :4' ce;_ diiJmt 504 581 590 593 sn 599 i 575 1 •71 E NOTE• FOR VJQXUATION REWLAIx. COITION wITNIII TK WASNINGTON C'JVNTY REGIONAL *'CAI CUAR ZOME• t(E W► ENIIREO FAR FART IT— 1.AGrIARY SI FACES'. SEWERAGE MAP SYMBOLS Existlnn Prnnnand SEWAGE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■[7 INTERCEPTORS AND OUTFALLS � FORCE MAINS II I I I II! II II I it l l ll "•'i'••"'•'•• SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA (As NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S —3 Programed Service % % K M % K , NM T . Ma K K 1 , , % x , K K K % K K , K K Na K K K ■ R K , K K K ■ . • % INN K ■ , MR K K ■ . K K N K , K N S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY a I '2/ N / N / "k r r 2 O \. � /' -. �-- ' <:r v ' / /4 \ j 24/ : 1 / .5 Li /I °r 'JII_ \ , 1 dN . � /,\.,..,xN x r x J' I \ + 4 x x `;'''� j�� x x x x z •x -:y x ax MX <x x J�' ^�4, xx• ••..� Mx 'X3 it x XXKx x: •� X * Xt x K X Xx % K N' xft x XXX x&Dx N x Ix X x x x X x x xl ,X x N x xx x x x xx .x x N. Na M x X N fx X K r N M % K % M M x x : x f K X x % z X % a K M x- !! Q K Y k N x x x..d► X x x K x % X XXX L K X % N x 7.1{XXX X'Xa Mxxa x Nx xxKT/x NK N N ` x x Nx N ltx xx` MMM it x N K. X • N K .x N N K IN x XXX lxxx x x itlx X x x N X N . XXX XXX N x X k K• N x g ;1 • N x. N' N x x x % Nit XXX X *7Th x x N x X x N x• .N N r N N x N, x x x a K x x x x 7!! Ix. a N 1N XXX N X x x N N % x XX XXX Xx X% K % x X N x *X K N x [ XXX It N x x x x! Q XXX lit XIX a X x 1 K x a x x N x K N N K- XXX r N x x x N N - xx x x x x X it x x x N x x x x x x + x x x x tax #. - x N x x x x N K x x x x it -x x • X. x x x xt x x x x X•-- # it it it P* t e t # k N k+� • # r1'1'd ,f# k# t ##'I � N SEWERAGE MAP SYMBOLS Existing Proposed SEWAGE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS � FORCE MAINS I I I I I I I I I I I I I I! I I I I si'r"""""" SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction .................. S-3 Programed Service ■ K 1 k , k K , , NUN UN K N K K k , MN K ■ , K , NUN K NUN k K K K K K UN K K k , K , k K K K K k k U K K K N K k # ■ , K k k K K K K S —5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY SEWERAGE MAP SYMBOLS Existina Proposed SE)GE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS FQI,CCE MAINS 1111111111111111111 ••''•'•«•'"''. SERVICE AREA BOUNDARIES WURBAN a TOWN GROWTH AREA t (AS NOTED ) . RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing 8 Under Construction S-3 Programed Service MX N S N Y M M ■ • NY M K 11 K K K I.E.M K ■ K ■ K M ■ ,Y S EN S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY 3 c, SEWERAGE MAP SYMBOLS Existina Pronosed SELVAGE TREATMENT PLANT A Q SE,1IGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS � FORCE MAINS IlIllIlIllIlI111111 ruune••tn•" SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA (AS NOTED) . RESTRICTED USE (4As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S — 3 Programed Service N N N ■ N N ■ ■ N N N N MX N N NM N N N N N N ■ M M N N N N N N N N N N N N ■ N N NM N N N N M N N N ■ N N N N N N N N N N N N N N N N ■ N N S —5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY SEWERAGE MAP SYMBOLS FYkt1nn Prnnncarl SEWAGE TREATMENT PLANT Q SEWAGE PUMPING STATION ■ 1 1 INTERCEPTORS AND OUTFALLS - • - FORCE MAINS '•'''"'''"'' SERVICE AREA BOUNDARIES WURBAN a TOWN GROWTH AREA f,JAs NOTED) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing B� Under Construction S - 3 Programed Service M K ■ R M NM Xi ■ ■ K M ■ ■ N M M M M } K ■ M ■ K K K A N A N K N M K M a a. K a w ■ ■ Y k K a ■ ■ ■ ■ M K a a K• a R K K a a a ■ a a K ■ 41 N via. iii S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY r A / ( \ tT \\\ \. \ /1 , 1 / zk - / \ /Hi R R — `fir N _ asa / f _ HI A RZ3I t \. A RR R C Aa HI A 1 / A N . r �- /, A (( _______ HI MAP No. 530 633 636 536 542 345 543 34 CLEAR SPRING TOWN GROWTH AREA, SERVICE ANEA bUUNUAt T NOT MAPPED. HI ZONED LAND. S- 5 (PLANNED SERVICE) SEWERAGE MAP SYMBOLS r -001nn Prnnnena4 SEWAGE TREATMENT PLANT ,l. Q SEWAGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS •• - - FORCE MAINS III! III I IIIl I III III ""•'•'•"•• SERVICE AREA BOUNDARIES toW URBAN a TOWN GROWTH AREA Q(.AS NOTED) RESTRICTED USE AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S — 3 Programed Service K a a ■ ■ ■ a ■ Y ■ a K K $ K a K K ■ N. pap p. K a a a a a a a a pa a a a a a K N K K K ■ ■ R a a a a K • a ■ a a K a a ■ pp ■ a ■ K ■ a ■ S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY • r SEWERAGE MAP SYMBOLS EYit Finn Prnnncpr! SEVI'AGE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■ D INT'-'RCEPTORS AND OUTFALLS W • FORCE MAINS llllllllllllllillll '''''''•'e'•'' SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S — 3 Programed Service K X K ■ ■ ■ ■ ■ ■ INN ■ X K ■ X X ■ K K K Y X ■ ■ K ■ ■ NM ■ ■ R K ■ ■ K ■ ■ ■ X K K ■ K K K ■ K K K K K X N ' N ■ WMN K K M K K ■ ■ ■ ■ K ■ f N N INN MN MM S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY FMS¢¢ @.t SEWERAGE MAP SYMBOLS Existing Proposed SEWAGE TREATMENT PLANT ,. Q SEWAGE PUMPING STATION ■ D INtERCEPTORS AND OUTFALLS - • FORCE MAINS 1111111111111111111 ree,r SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Exisling a Under ConstrucBon S-3 Programed Service r ■. ,r . , r Nr N N M N NI NIX N M N K N I SIN . • r r M N NM M N K r . . K . r M . ■ I r N . . M . ■ II N MIX SlIT S —5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY ICJ t` A :.: N*i..... R. HI .... . T ,. x \ :4' t-Rz-290- x . +r�x.3 IL `.�. 1)r-7. .... • �' t � : + }} + >t iif .� . . + X x x Xxx ` HI 18• x . +^ 8L ' x x x i!. R -29 4xx x .......... xx ..... �' .•... .... ..♦ i" HlX or ... '..... ............. L: ... ------- _ - - ! ...... ..... ... t ........ .... _ .... iii A .u/ I/f us40 x -- .. .. .. fis x � .7. r :t0::• ::::: ' :L` IG' .. - - i8'• 1 :tg'- f -... 2 . kY Y %..i�JtJ �1% Yx .. % X . 4 L1.1i31 Li:�tZi ir2' •� - R _ -_-._ _- ', MAP NO 664 557 590 593 094 599 902 S T M NOTE, rn MrO. a1. l AEGV ATMG CO.SIIR]Ctt MTxI TIE ■AjMiN.TGN ' '".TT NZC'C$I L ALPO.. SEC YAP CNIIILCO '1AA •AR! !1- NAT ! CL1 . SEWERAGE MAP SYMBOLS Existlna Proposed SEWAGE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■ D INTERCEPTORS AND OUTFALLS 0 • • FORCE MAINS IIIlIIIHItIIIIIlII SERVICE AREA BOUNDARIES 10 WURBAN a TOWN GROWTH AREA (A5 NOTED ) RESTRICTED USE (_AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S - 3 Programed Service ■ ■ t ■ ■ AN ■■ NW M R M■ ■■■ NA ■ ■ ■ ■ ■ ■ ■ ■■ ■ ■ a ■ ■ M a ■ 1 M S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY x X X X x X•• Q\ A /. x x / : X x ' A / _____ HP x x x Y RX 91-14 X x Y X x= I T XXxx. _ -- x x X Y Y Y IM /jfrr/ ' I__ ___ __ /1/i Y Y Y Y J fM % Y / X Y X x X X x 1 RS x x =X=x= RS .3 IM / a` i Y • x X - � x x XX Im , X X - x x RS 7S RS I , A i x x Y \ 12 / Y x x ! ,� �X xxxxxX �t� `, �,, R R R x X ,, j ::RB; ( RR--I�I , . � � 7 660 SO 605 60s 6s 6N 61? 620 $6 NOTE• AEOULaTMO COX TTOX w1TAM ( TI y&$XNXTOA C0UX*T AEGx%IM. £APOAT CLEif- .!EE YA. EATITL1G -TAR PMT i-WAX*NXXTT SEWERAGE MAP SYMBOLS Existlna Prenoced SEWAGE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■ D INTERCEPTORS AND OUTFALLS • - FORCE MAINS IIIIIIII1IIIIIIIIII '''•'u'u••••.uu• SERVICE AREA BOUNDARIES 10 W URBAN 8 TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (AS NOTED) RURAL. VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction .................. S -3 Programed Service 1 ■ ■ ■ r 1 ■ 1 1 N 1 1 r r ■ ■ 1 1 • 1 1■ 1 r r r 1 r� i ■ 1 r 1 r 1 ■ 1 It 1 r ■ ■ : 1 1 1 IN 1 1 r r r 1 1 ■ S ■ ■ r 1 1 1 1 ■ f 1 N r ■ 1 1 1 S —5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY • H ....: ' A R STRIeTE ! i? N A I' A dI1L1 '. / /t41j / Y A X % X X X xyy{lI ~' / l\ X ' I x x x X / X x Mi �- Xk Y /F I!A XXY :: V II II j 'i / / X x ,., % X � x k �• V XxX x . . .. . .. . . \.. - 1 %- f' -� X % X % Z_J•t • . . . . . . . A I J A X x x X 7�kf R: ::�iliai�wi \ - { '4 { I'! x x x x x 1 �. A i .x x ;RR - �• — { x f, > /RR�/y]/ X Y� � i''tu�N� , x x ! G x '. Xx -...�.\ RR I1I X k I RR _ • a6� . k x x x x x x x Ax % x x k x x x'k k X x x x x 1: « RR RR 420 623 624 629 032 ass 850 39 SEWERAGE MAP SYMBOLS Existlna Proposed SEWAGE TREATMENT PLANT ,. O SEWAGE PUMPING STATION ■ El INTERCEPTORS AND OUTFALLS m -� FORCE MAINS IIIIIIIItiIIIIliiII SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA k AS NOTED) RESTRICTED USE , (AS NOTED) RURAL. VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S - 3 Programed Service ■ Y N ■ N:K,. N k N N ■ N N N N N N N N N NN■■NNNNM■ ■ S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY / T •tom_ /.�►�� l .�i.\\ AR 1 JLdE VI • I SEWERAGE MAP SYMBOLS Exisfna Pronnsed SEWAGE TREATMENT PLANT Q SEWAGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS - FORCE MAINS IIIIIIIIIiIIiIIIII1 •ua''ss.,uuiuu SERVICE AREA BOUNDARIES toW URBAN a TOWN GROWTH AREA (As NOTED) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S — 3 Programed Service K ■ NUN ■ ■ M K K K ■ K K K ■ N K K K■ K K K` K K K K K NUN K ` ■ UK ■ K K NUN K K ■ K K K KU M ` ■ KU K K ■ K ■ K K K K K K K ■ K S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY V MMa• . fl\4__g\/4 ; .�•!: max *\•\*::x: '�. ..::`�� .. • r a � I2T L:(*.,: ,• f f yt x _ I- I W J % % % % x x l x x xl „ xi x M M % % X • Y. N YLj % % x x % % M M x % •• ix / Y IAA X % f L x%%%K Xxx Xxxx% xx x X M M i X % •; x x x xx x• yL x x x�.•� „ „% x K/ % % x x % �• % x x x x K 1 t } S „ „ 1( x x K x/xK x x fI %4•K % J(/� %�,%x %�%x%x %x� K Kx �x+y?�, f y, f :.4::.x x+ x x x xX X &44,,** '� xx xx '4" )4� x x x x"71 x x X /x%&xx x %•••.'••'• x .' •� f % % X x'X x X % X x x % K x .1; • . /• • . ; ,f * x + x f .1 •.� rr ,yR 1 x lam' x-xx�x •• •: ,"j,'.� .�. x + X/ .. \t' : '4 � ��'' •�1 •'' Vie, x x b l N a N ' SEWERAGE MAP SYMBOLS EYistinn Prnnneart SEWAGE TREATMENT PLANT A O SEWAGE PUMPING STATION ■[ 1 INTERCEPTORS AND OUTFALLS • • • FORCE MAINS fflIIIIIIIIiIIIIIII ''''•'"'''"''' SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA Ins NOTED) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S-3 Programed Service a a saw a a a a a ■ a a ■ a x aa a NUNN a ■■ a a R Na ■ a a a ■ } a a a a a ■ a a a a a a a N a f a a N a a■■ a Na a a■ a a a S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY a •� �� X`k Y % x x r k k •7// ` x NAEFWAYx x x x k t +� . • x x x x x x x++ k t ,,: .. .. .. x x x x x x x x' t++ �, k x+ _..s e. _• .• •.� x x x x x x t k ••11�� i MMn ilI I! tit TEA SEWERAGE MAP SYMBOLS Existina Pronosed SEWAGE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■ INTERCEPTORS AND OUTFALLS FORCE MAINS IllIIIII111IlIIIIII •"•i""i SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA ('aS NOTED) RESTRICTED USE (sAS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing Q Under Construction .................. 5-3 Programed Service R K f ■ K K f f K ■ NM K K K f K K MN x f K K f f K M f K R MN ■ K f f N M R M R ! K s f K K M K ■ NM K I Y N K K N K I I R • K N K K MN K K • S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY I. X.. % % / ( x x % l x A1x k k• Y IC k k l:Ik. x. )✓/% yr• % .x x x } Jr j.\ N . } } f }k k • Y' x k X x % N k N IC X} } x x x r } X } N N ,7,,x ,•(�`k }: ��(( } h X N N k .M x Jr.iX w 3. } }} N k N} IC '�`. �'- ICr % •* %-'••r11 4 x x X > 4k }'Y N } k ]., k IC X X x x x x + N N} } X X N N} N�k, % x x x x ••x X % �rN } 'C•kk N k k k k?r �.,•� •\ x ,%.\ - ) x x ) 1 Jt } } } Nh k k + k ICIC. x % x x k X X k )( k N N k k } .R�K % ) K x } k 'C x x x a.x } k } } x�xk/N k } } x ) 1 N k} < % M: x x x x K LiIC x+ N X N X''• ''•'•'•• K } C . x IC f x K % xAX ,' }+ IC 't 'k .•'� •.,',♦ : • `.k x�K" % K %xx C' IC A A. } k k•' ' • CC_ IC •ate' -. at x �x%/t 10 xx x % x r x� :.....:...••• •,� }} t wi )1Kx .x ICI . CI x � IC IC x x /�'� • • IC } } } IC } ax x ICICIC X �x XXX x x IX1 '•;, .. . . . }# } {++�/ + + I 4 'c .., 4 IC I/ ..•......'....' . ,. •:. N Iii m + :r• _:: 7D: Vi• +++ ....i .:.. fir ) ++! �J. } •'::':. A• ++ ' X KK + + + +•r + }r =, k • xKK KK%%x +++V ++ Q. } k• x x % % x r % % % % x ,� '�V1 + 0 ' • .• . k' • % { i K K K x x x x X 4' + . .. a1. . . %x K xx xK%Kx X%X%%x x%xx K % % 3Z x + ��t ..• .1.: % x rx % K KKk%'K x X x L,__x K x SEWERAGE MAP SYMBOLS Existina Pronosed SEWAGE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■1 1 INTERCEPTORS AND OUTFALLS m FORCE MAINS I I I I f II l I I Il I II 1 1 II irre SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA QS NOTED) RESTRICTED USE 'ERAS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S -3 Programed Service M N Na M M w w a w ■ M M ■ M M M • M M w M M MU M M= NM NM KU NUN U UN M N Na Na NUN XXX N M w ' w w M N M M M M M M M UN M NUN M S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY �fp \ L/ 1 )/ / � s / A(L1)c/ is / '—Hr' & I]\ / / °c L. w 14 4 SEWERAGE MAP SYMBOLS Existina Prnnnned SEWAGE TREATMENT PLANT ,. O SEWAGE PUMPING STATION ■ INTERCEPTORS AND OUTFALLS � FORCE MAINS IIIIIIIIII!IIIIIIII •''''''•''E'"•' SERVICE AREA BOUNDARIES WURBAN a TOWN GROWTH AREA ' ('AS NOTED) RESTRICTED USE `(As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction .................. .................. S - 3 Programed Service K K SUN NM K ■ K K K M K K • K K K SUN K 55 5S NM MN R 1$ N K K U MN NMM K K ■ K K M K K f K IN ■ ■ E Y 1 K K K ■ K N SBUS K N S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY 6 N t h 'I 1 i N th"7 1 rJ , � � j U ti � �� _--fit x; � , SEWERAGE MAP SYMBOLS Existing PrnnnSPd SEWAGE TREATMENT PLANT ♦ Q SEWAGE PUMPING STATION ■ INTERCEPTORS AND OUTFALLS - FORCE MAINS II11111111111111111 ''''•'''•••'•••• SERVICE AREA BOUNDARIES lo'URBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S — 3 Programed Service K K K K K■ ■K.% ■ K K K ■ K NUN k K ■ 1 K ■ N K K %. Na 1 K ■ K K NI K■ K K K ■ K ■ . S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY ' i.. SEWERAGE MAP SYMBOLS Existlnn PrnnnePd SEWAGE TREATMENT PLANT A O SEWAGE PUMPING STATION I I INTERCEPTORS AND OUTFALLS F $R:CE MAINS 1111111111111111111 11teri SERVICE AREA BOUNDARIES URBAN 81 TOWN GROWTH AREA (As NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S - 3 Programed Service K ■ K •• ■ K K K K K K EN ■ S K : K K K K l w K K K Y K K K K R K K N K II K N K R K K i K K K K ■ K K K K K K a K K K • K EN ■ K ■ K K K S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY 0 r.i r alimom r.� SEWERAGE MAP SYMBOLS Fvisfinn Prnnncad SEWAGE TREATMENT PLANT Q SEWAGE PUMPING STATION ■ INTERCEPTORS AND OUTFALLS • - FORCE MAINS Illlillllllllllilll es:.ii>Iri SERVICE AREA BOUNDARIES TURBAN 8 TOWN GROWTH AREA f (AS NOTED) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing Under Construction S - 3 Programed Service MN MAN NA 1 ■ s M II I II M M MMIII N I IX s I NM IN I I I M I MINI I I I N NAN MS III M 1 ■ I I ■ I I I MX Na NM XIII S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY t X I (/) xxx>+4++++% n N x++++++++ +/i4+ o I I �� 'r X X+i ' +++++ • 'x xx +++ i +++++++++ x N x • +++++ + + 4 + �F + a x % X x ++1 ,?i+tlY+++ 'XxX% x k +� �(+++;- +++ \X X N N x X x N +++++++ x o ' x x x x x x xxx x x x�x�x x X x x x X N % x x • x X N % X X X X % •Q 1 X. x x X % x N N N X N MN N NX X x ,M X K NXNNN X XXNNN XX X % x x k X % x N X X N N x K x' Sw x ....•..•:• 1 i O N r� ' xX �. •.IxNI. .','.[/'...: ' ... xK K x% j '�l NTf. •��I� .y: i•!{. •_' 11 ` 1 K MN X XI NN % xx(� xK X X +++++ •...•\ .y KKK T'•��zx K%.'. X X % N x . r. . . . . . . T N N % �'•i. X N X% x •• 4+++++++ XNNXN • ••••• ++++++++++ x N N x K N N N• MX K K K N x % x .••.4..4..4.$++++++x v K X N % N % - _ x N Xr NN % % K N K xN N • ate-«- ...-r•i ;�- X -+ xf1 `X N% NN N v x K x • `• �-••../+4++++ •+++++ + x x N :• xxx x :. `•Kr ••• ++ +++++ ++ K x x K K 1T y � x XXK xK • ++++t+}+++ % v $ N xN rx` Kx % % K N x X1x K K +++++i++++ K x% NNNN % N.N -1- xN X x. N t+ t++++++ t+ N N N N N N % y N K N N M « }++4++4++g++ %'N % X Nx Nx x x% .... x x X x ' K • •. .+++++++ x x (Mx K Nrrwl . +++ v % N%N N N xN N - N Nl N % N N N +. 4 K x x x N XN } x x N� N — — �rrrrrrrrrrrrr —;/ 0 I L Q n s f—../ I' III iunnionuffliiiw I /y Q 4 \ �. •i id's. � '� .c•/.. / ��'-• - — q L SEWERAGE MAP SYMBOLS Existinn Pmnnsed SEWAGE TREATMENT PLANT A O SEWAGE PUMPING STATION ■ Lj INTERCEPTORS AND OUTFALLS • FORCE MAINS I I I I I I I I I I I I I I I i i 11 '''""'u''''.' SERVICE AREA BOUNDARIES soW URBAN a TOWN GROWTH AREA ( S NOTED) RESTRICTED USE ('AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction .................. S -3 Programed Service 1! ■ ■ K R N R ■ ■ • K ■ ■ R R R ■ ■ ■ 155 1555 ■ ■ NI NM IRIS I S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY i •,...� _ f <4 J � A T ii J� //• ..� � J I , " •tea I /' 1• � X xx xxkX fT, j, .— ' IJL tti f % •;'s, 1 \ t x X x x x x x x xlxxxxxx R x x L x% x x x x x x x xxx i ' / y I . % x x x x I x x �-•� �� K� � • 4 4 x +x x x ^x I' % x+x x % x x _ x x x 1M• rye+... 4r x x xxxx .;u:xxx•%max Q :\ _i / Q I SEWERAGE MAP SYMBOLS EYistlnn Pmnncort SEWAGE TREATMENT PLANT ,. Q SEWAGE PUMPING STATION ■1 1 INTERCEPTORS AND OUTFALLS • FORCE MAINS 1111111111 111111111 's''''r'rre'''' SERVICE AREA BOUNDARIES WURBAN a TOWN GROWTH AREA ((AS NOTED) ) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S —3 Programed Service ■ % N N■ ' ■% %NN N ■%■ N■ % N N ■ ■ NI N ■ K N N N N N INN N a N x ■ N • N N N N N N N N N N • ■ N N N N N N N N N ■ N N ■ ■ NUN S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY a — 'a t 7 (- ___7 / I____ _I _ / _ ++ + + `11 r +� + t + + + + + t + + f } t +'F'__ _ _ ++r++++++++++ - + .,,�� I ++++++t+ •+ •+++t+++�+ +++++ ++++++++ +++++ ++ \, / �t+ +++}• } _ \ \ \.\ rte/ d /+++ r Ta / ' ,LL. ErY a SEWERAGE MAP SYMBOLS Existina Pronosed SEWAGE TREATMENT PLANT - A SEWAGE PUMPING STATION ■TI IN1 RCEPTORS AND OUTFALLS - m m FORCE MAINS IIIIIIIIIIIIIIIIItI SERVICE AREA BOUNDARIES 01 W URBAN a TOWN GROWTH AREA tJAS NOTED) RESTRICTED USE :AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S - 3 Programed Service NNN■ N N N N N N N N N M N N NN CNN N N N ■■N� N N N K N N N ■ N N N N N N N K N N N ■ N N N N K N K N N N N ■ N K N ■ N N N N K N N N K N S —5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY w a11 � r : Ii&n% J ` ri /: /1,_O ri T tT f?\kftT NI I _ C � -- TL/ I __ -ter Q L! do � �_ y S SEWERAGE MAP SYMBOLS Existina Proposed SEWAGE TREATMENT PLANT O SEWAGE PUMPING STATION ■1 1 INTERCEPTORS AND OUTFALLS • FORCE MAINS IJIIIIIIItIIIIIIIIl '''''••'•''•'''• SERVICE AREA BOUNDARIES URBAN a TOWN GROWTH AREA (ins NOTED) RESTRICTED USE IIAS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S - 3 Programed Service ■ N N N N N ■ N N N ■ N N N N N K N ■ Y N N N N r K N N N N N K NNN ' N K N KS N KK N N UN ■ UN N N N NW N K N N a a ■ N ■ N N N ■ N i N S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY Antietam Ove ✓ Zone uunnnnUUlluunnrsr A O - 1 Sewer' AO' 2 •. • •.s. AO'3 \ � A I A I I A 4j ii I 1 \/ A[ ' A / \/ / - / IIIIHI IIIlillllflll1141Npwnu — — w. /A / A ` `� \• R RALJ � Vl LAG. / ` rf VIC .�. fl A ;F{ r wv eo -aK sQ► sso sss ss� 4 Sys sot re • w:7y -............................._.........-....._... ___ _....,_......__........._...-....,...._._..........._....-._. SEWERAGE MAP SYMBOLS Exlsflna Prnnnced SEWAGE TREATMENT PLANT A Q SEWAGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS - FORCE MAINS IIIIIIIIIIIIIIIIIII •••••••••••••••• SERVICE AREA BOUNDARIES toW URBAN a TOWN GROWTH AREA ;(�aS NOTED) RESTRICTED USE G(AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing B, Under Construction .................. S - 3 Programed Service a a a a a a a NI N NI N a N a a a a. a N N X N K K N N NN K a a y N a N a a a a a a • a N N N N N N N N ■ a K a a a a a a N a K N ■ a N N ■ S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY 7L' ci '? \ k k +• k k k + k k k k k 1 L I iT•' 4.-- c .-j/ j 1 N � f.. SEWERAGE MAP SYMBOLS Fviaflnn Prnnneael SEWAGE TREATMENT PLANT Q SEWAGE PUMPING STATION ■L I INTERCEPTORS AND OUTFALLS - FQQQE MAINS IIIIIIIIIIIIIIIIIII ••••••••••••,. SERVICE AREA BOUNDARIES 0 URBAN a TOWN GROWTH AREA 4qs NOTED) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S-1 Existing a Under Construction S - 3 Programed Service ■ N ■ MN M k K ■ K N N N a a ■ N a K N M Ma N, N ■ K K a K K N K K K N N ■ a N ■ a a a ■■ a a a a a a a • a a K N NM a a a N a NM a a a x S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY w w W W d QU � C to I SEWERAGE MAP SYMBOLS EYIctInn Prnnnepd SEWAGE TREATMENT PLANT O SEWAGE PUMPING STATION I I INTERCEPTORS AND OUTFALLS N N FQ i C E MAINS I I I l I I I I I I I I I I I I I I I '''''••''•''''u' SERVICE AREA BOUNDARIES 0WURBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE .(AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S -3 Programed Service N M N N M MN N ■ ■ M N M N N M N N N■ N ■ M N ■ N N N ■ M N N N ■ ■ NN } N N N N N N S ■ ■ MN N MN N N N N N ■ N• N ■ N N S —5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY 21- 4niialam vi iy curers euummwumuluumu '4 0 - t AO -2 •........ AO.3 IM►IN $84 6.f 690 696 699 soilT9 SEWERAGE MAP SYMBOLS EYistlnn Prnnnsed SEWAGE TREATMENT PLANT A A SEWAGE PUMPING STATION ■I I INTERCEPTORS AND OUTFALLS • - FORCE MAINS IIIIIIIIIiItIIIIiII r•'''rer•''''r SERVICE AREA BOUNDARIES toURBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S-3 Programed Service K K K K 1 M Y Y K K K M Y M 555 Y K M M M M M K M Y K K K K Y K K Y ■ Y K a ■ ■ K K K s ■ ■ MS R K K K N • ■ K K K Y NM ■ K K ■ M M Y ■ Y K S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY NI be? 5.0 bas bas Antietam Ur +ay Zone uuuuniuiuuuuuuc .: J • I ll AO.2 ........• AO.3 • 40.3 a 599 We SEWERAGE MAP SYMBOLS Existing Prnnnsed SEWAGE TREATMENT PLANT ,. Q SEWAGE PUMPING STATION ■ INTERCEPTORS AND OUTFALLS - - FORCE MAINS 1111111111111111111 "•"•"e'• SERVICE AREA BOUNDARIES toURBAN a TOWN GROWTH AREA (As NOTED ) RESTRICTED USE (As NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction .................. S - 3 Programed Service ■ K ■ ■ X X N NW N Y KX■K ■K ■ N k K K X N ■K X� K X NW K K KK K ■ ■ ■ k K N K X ■ ■ X K N R K K ■ K • MN K X K X ■ ■ K N X K K ZR X ■ ■ S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY 71 SEWERAGE MAP SYMBOLS EYIslInn Prnnnarui SEWAGE TREATMENT PLANT A O SEWAGE PUMPING STATION 1 1 INTERCEPTORS AND OUTFALLS FORCE MAINS IIIIltIiIIIIIIiipil ••'i•''r'••ree'' SERVICE AREA BOUNDARIES 1URBAN a TOWN GROWTH AREA (AS NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction .................. S -3 Programed Service NNNa a N a M N NN *N Na a . a NN N N ■ N N N ■ ax xi N N N ■ K MN N N NW a N N N K N N a N N N N a N N k N K N N N N ■ N K N ■ N N S-5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY SEWERAGE MAP SYMBOLS Existina Proposed SEWAGE TREATMENT PLANT Q SEWAGE PUMPING STATION ■1 1 INTERCEPTORS AND OUTFALLS • - FORCE MAINS 111111111111111111! E.saiuuu..'' SERVICE AREA BOUNDARIES toW URBAN a TOWN GROWTH AREA (As NOTED) RESTRICTED USE (AS NOTED) RURAL VILLAGE SERVICE AREA SERVICE PRIORITY DESIGNATIONS S - I Existing a Under Construction S - 3 Programed Service M N N N N N N N N N N N N N ■ N N N ■ N N N N ■ N N N NW NW N N N N N N ■ N N N N N N N ■ N N N N N N N. INN N N N N N ■ N N N N N N N ■ S -5 Planned Service INSIDE SERVICE AREA BOUNDARY (NPS) NO PLANNED SERVICE OUTSIDE SERVICE AREA BOUNDARY 01 CHAPTER FIVE ADMINISTRATION AND IMPLEMENTATION INTRODUCTION The key to the on -going success of providing adequate water and sewerage facilities in Washington County is the positive, cooperative action between the County and the governmental bodies of the incorporated municipalities --particularly the City of Hagerstown. Because of the significant role planned for the water and sewerage facilities of the City of Hagerstown in the realization of this Plan, it is paramount that an equitable, clearly defined management structure between the City and County be established. At the basis of the eventual management agreement should be the fundamental purpose to adequately and effectively serve those residents and those areas where water and sewerage facilities are needed. In this pursuit, it is important to recognize that we no longer live in an era where governmental responsibilities abruptly terminate at corporate boundaries. Both subtle and overt municipal interrelationships demand a high degree of communication and cooperation between governments in an effort to achieve the best possible communities. To further this objective, it only seems realistic that limitations resulting from either statutory restrictions or long standing precedents must be actively resolved. With this in mind, the following ownership and operational structures are strongly recommended. V-1 WATER FACILITIES As previously discussed, the City of Hagerstown supplies water to approximately 38,000 residents outside its corporate boundaries. Since the majority of these residents reside in the County, the City does not have the necessary voice in terms of plumbing codes, guaranteed users, or comprehensive service area formations. Nevertheless, the City has embarked upon an aggressive program to increase plant capacity to meet the water needs largely brought upon by the growing demands in the County. However, it is rather inequitable for the Water Department to ask the City to bear the total bonded indebtedness for improvements which will proportionately serve more residents outside of the City. Furthermore, the County without having any direct role in the implementation of water facilities other than through zoning and subdivision provisions cannot achieve a thorough coordination of development activities. In an effort to achieve a high level of cooperation between the City and County and proportionate obligations for bonded indebtedness, it is recommended that future distribution systems be financed by the County and constructed, operated, and maintained by the City. Additionally, supply and transmission expenditures should be proprotionately financed by City and County as well as outstanding indebtedness on existing transmission. More specifically, the County's involvement would be essentially for appropriate funding responsibility. Design V•-2 and construction would be performed by the City with County review and approval. Rates would be jointly established by the City and County to cover bonded indebtedness and operation and maintenance costs. The actual operation, maintenance, billing and collection functions would be performed by the City. Ownership of the system should eventually be under a unified agency so that the system would remain more comprehensive rather than fragmented. To further the-degree•of cooperation and mutual decision -making the Hagerstown Board of Water Commissioners should have County representation. For those portions of the County outside the Hagerstown service area, and adjacent to the other incorporated municipalities, the County should cooperate with the towns in extending water service based upon adopted plans Wand policies. u SEWERAGE FACILITIES The City of Hagerstown's sewerage facilities are essential to effective plan implementation. The strategic location of the City's sewerage treatment plant enables the County to achieve most economically a concentrated development pattern around the northern and eastern quadrants of the City while correcting significant environmental concerns and health hazards. Obviously, this achievement requires a high degree of cooperation between the City and County in a manner which equitably addresses the needs of all residents. Furthermore, it should be well V-3 apparent that the Environmental Protection Agency is becoming increasingly more involved not only in establishing design criteria but also in determining rate schedules and operation and maintenance procedures. Consequently, local governments --both the County and the City --should not become too preoccupied with the concern for complete and ultimate control in the sense that it hinders adequate service to its residents. To this end, it is recommended that the County shall be responsible for the feasibility studies, designs, rights -of -way acquisition, construction, and financing of the proposed interceptor and collector systems in those areas planned to be serviced by the Hagerstown sewerage treatment plant. The City shall have the benefit of review, inspection, and approval of all phases of the.planning, design, and construction of the proposed systems in order to assure consistency with the engineering and . construction standards of the City. Although the County shall retain ownership of its portion of the system, operation and maintenance responsibilities shall be accomplished by the City through a management agreement mechanism. Obviously such a management agreement must be established in a manner to assure that all portions of the system both in the County as well as in the City receive thorough, efficient, and prompt operation and maintenance service. One method to be considered would be for the County to V-4 be responsible for the operation and maintenance of its portion of the system and to perform this function by subcontracting the services of the City's Water Pollution Control Department. Theoretically, in the event the Water Pollution Control Department personel would be unable to respond to a specific service need, because of scheduling or other prior commitments, the County would have the alternative of seeking assistance elsewhere. Regardless ofthefinal contractual agreement for operation and maintenance responsibilities, both parties should cooperatively attempt to assure a high degree of service so as to maintain the integrity of the complete system. The County shall be responsible for establishing its rates based upon its financial obligations; conveyance to and treatment by the Hagerstown facility; the. City's operation, maintenance, and administrative services; and other equitably related costs. The, City's administrative services shall also include billings and collections which would be further refined in the management agreement with the County having auditing privileges. To further the degree of cooperation and mutual decision making, the Hagerstown Sewer Board should have County representation. For those portions of the County outside the Hagerstown service area, and adjacent to other incorporated municipalities, the County should consider similar arrangements in extending sewerage service based upon adopted plans and policies. Vf-5 MANAGEMENT OF CONNECTION ALLOCATIONS This plan proposes an aggressive program of immediately sewering considerably large portions of the County. However, it is not intended that the availability of sewerage facilities be solely a commodity which can be secured and controlled by the private sector. Consequently, efforts shall be made to allocate and assess connections based upon both prevailing zoning and the entire service area. Sanitary Sewerage Connection Permits, Industrial Waste Permits and any Benefit Charges should be carefully administered to assure equitable development opportunities. Additionally, users should be required to connect to the system within one year from application approval so that permits do not become a speculative resource. COUNTY -WIDE WATER AND SEWER AUTHORITY Recommendations have been made in this plan to evaluate the , feasibility of community water systems in water problem areas throughout the County. Recommendations have also been made to consider the use of alternative on -lot and alternative community sewerage systems to serve areas of failing septic systems and to serve new development utilizing the cluster concept. The key to both recommendations will be the efficient management and operation of such systems by a public agency. Participation by the Washington County Sanitary District in the management and operation of water and sewerage systems is V-6 presently limited to areas within established Sanitary Subdistricts. Under the current practice, a new Sanitary Subdistrict must be established for each new water or sewerage system for which the Sanitary District assumes responsibility. As the number of such systems increase per the recommendations above, so increases the administrative complexity and cost of managing an increased number of relatively small, geographically unrelated, and financially independent Subdistricts. Because Sanitary Subdistricts are established to be financially self-supporting, the costs of providing water and sewerage service to some areas of the County may be prohibitively expensive to consumers in those areas. It is often the case that those areas with the greatest need may also be the most expensive to serve. For this reason.a County -wide approach which provides for a wider distribution of costs by means of a uniform rate schedule may facilitate service to many areas of need. The Sanitary Subdistrict law should be evaluated and amended as necessary to allow for a more efficient and cost-effective approach to the management and operation of public water and sewerage systems throughout the County. Ultimately, the creation of a County Public Works Department should be considered as a means to this end. V-7 APPENDIX A DEFINITIONS The terms defined below are used throughout this plan. Definitions are consistent with those in Maryland Agency Regulation 10.17.01 except where indicated (*) as peculiarly applicable to Washington County. 1. "Approving authority" means one or more officials, agents, or agencies of local government designated by the local governing body or specified by other provisions of Article 43, 387C to take certain actions as a part of implementing these regulations. 2. "Board" means The Board of County Commissioners for Washington County. 3. "Community sewerage system" means any system, whether publicly or privately owned, serving two or more individual lots, for the collection and disposal of sewage or industrial wastes of a liquid nature, including various devices for the treatment of the sewage and industrial wastes. 4. "Community water supply system" means a source of water and a distribution system, including treatment and storage facilities, whether publicly or privately owned, serving two or more individual lots. 5. "County plan" means a plan for the provision of adequate water supply systems and sewerage systems, whether publicly or privately owned, throughout the County A»,1 including its incorporated municipalities and all amendments and revisions to it. 6. "Department" means the Maryland Department of the Environment. 7. "Service Area Designation" means a designation of Urban/Town Growth Area, Rural Village, or Restricted Use, assigned to a service area to assure that development associated with the provision o€ water or sewer facilities is consistent with the policies of the adopted Comprehensive Plan for Washington County and where applicable, the Comprehensive Plan for the affected municipality. 8. "Sewerage service area" is that area served, or potentially served, by a system of sanitary sewers connected to a treatment plant, or, in a very large system, sub -areas as delineated by the County. 4 9. "Water service area" means that area served, or potentially served, by a single distribution system under control of a single utility, or, in a very large system, sub -areas as delineated by the County. 10. "Service Priority Classification" is a classification assigned to a service area indicating the current implementation phase for provision of water or sewer service by means of a community system. The first phase being Planned Service, followed by Programmed Service, then Existing/Under construction. A-2 11. "Existing or under construction" means the service priority classification which is assigned within a service area that is currently served or where actual work is progressing or where a notice to proceed with a contract for this work has been let as of the effective date of the plan. The symbol for this classification shall be W-1, S-1. 12. "Programmed Service Priority" is -a classification assigned to property within a service area indicating that the necessary approvals have been obtained to proceed with the provision of public water and/or sewage service. Such approvals may include where applicable, establishment of a Sanitary Sub -District, approval of a Preliminary Subdivision Plat or Site Plan and inclusion of any capital projects in the. municipality's Capital Improvements Program. 13. "Planned Service Priority" is a classification assigned to property within a service area indicating that the provision of public water and sewage service is considered to be consistent with the policies of the Comprehensive Plan for Washington County. 14. "No Planned Service" is a designation assigned to property that is not located within a water or sewer service area indicating that community water and sewer service is not planned for the area. A-3 15. "Marina" means a dock, wharf, or basin providing mooring for boats which contain on -board toilet facilities, operated under public or private ownership, either free or on a fee basis, for the convenience of the public or club membership. 16. "Individual water supply system" means a single system of piping, pumps, tanks, or other facilities utilizing a source of ground or surface water to supply only a single lot. 17. "Individual sewerage system" means a single system of sewers and piping, treatment tanks or other facilities serving only a single lot and disposing of sewage or individual wastes of a liquid nature, in whole or in part, on or in the soil of the property, into any waters of this State or by other methods. 18. "Multi -use sewerage system" means a single system serving a. single lot, whether owned or operated by an individual or group of individuals under private or collective ownership and serving a group of individuals for the collection and disposal of sewage or industrial wastes of a liquid nature, including various devices for the treatment of sewage and industrial wastes having a treatment capacity in excess of 5,000 GPD. 19. "Multi -use water supply system" means a single system of piping pumps, tanks, or other facilities utilizing a source of ground or surface water to supply a group of individuals A-4 on a single lot and having a capacity in excess of 1,500 GPD. 20. "Non -point source" means pollution originating from land run-off where no specific outfall can be identified. 21. "Interim Plant" means a sewage or water treatment plant that is designed to temporarily serve all of, or a portion of a designated service area established in the Washington County Water and Sewerage Plan. 22. "Major Facilities" mean the principal components of a community or multi -use water or sewerage system. The characteristics of various systems may differ in size, capacity and method of conveyance and treatment of water or wastewater. However, generally, the term is meant to exclude house connections, smaller water distribution lines, and sewer laterals designed as part of a residential development. Examples of major facilities include: a. Interceptors, trunk and outfall sewer lines; and water transmission, feeder mains and storage facilities. b. Community or multi -use wells or impondments, water storage or treatment facilities. c. Sewage treatment plants (permanent or interim). d. Pumping stations or water filtration plants. A-5 APPENDIX B POLICIES, PROCEDURES AND CRITERIA FOR AMENDMENT TO THE COUNTY PLAN FOR WATER AND SEWERAGE I GENERAL POLICIES a. An application for amendment to the Water and Sewerage Plan shall be initiated whenever any person, firm, private agency, public agency, or municipal corporation wishes to: 1) Create major new water or sewer facilities. 2) Change the location, type, size or capacity of existing or planned facilities. 3) Establish new water or sewerage service areas or change the boundaries of existing service areas. 4) Change the priority classification of an area for water or sewerage service. B. It shall be the responsibility of the Washington County Planning Department to coordinate the review of amendments to the Water and Sewerage Plan in cooperation with the staffs of the service providing agencies, the Washington County Health Department and the effected municipality when applicable. Amendments proposed within a municipality or served by a municipality's system must be proposed by that municipality or be accompanied by a letter from the Mayor or a designated municipal official that the municipality has been notified that the amendment application is being submitted. Criteria for amendment of service area/priority classifications and eligibility for priority classifications are outlined in Section II. Applications for amendments to the County Water and Sewerage Plan B-1 shall be considered via four different methods: 1) Biennial Review and Update. State Law Title 9, Subtitle 5 of the Environmental Article of the Annotated Code of Maryland requires the governing body of the County, after reasonable opportunity for public hearing, to review the Water and Sewerage Plan at least once every two years. Requests for Individual amendments to the Water and Sewerage Plan may be considered at that time. Procedures for the Biennial• Review and Update are listed in Section III. 2) Individual Amendment. Applications for individual amendments to the Water and Sewerage Plan may be accepted by the Planning Department at any time. Public Hearings to consider individual applications shall be held at least semi-annually (twice a year). Procedures for the review of Individual Amendment applications and requirements for information to be included in the application are listed in Section VIII. Modifications in facilities design by public agencies should be reported at the Biennial Review, rather than by Individual Application. 3) Administrative Amendment. The Water and Sewerage Plan may be amended to correct errors, omissions, or inaccuracies which may be discovered from time to time in the Plan text or Plan maps. Such amendments shall be initiated by the Planning Department based upon a request and presentation of more accurate information by the service providing agency. Procedures for Administrative Amendments are provided in Section V. 4) Special Amendment. The County Commissioners may at their B-2 discretion initiate amendments to the Water and Sewerage Plan outside of the semi-annual review sequence when necessary; (1) To allow service to an existing structure when a potential health hazard has been declared by the Health Department, (2) to allow requests submitted by a government agency for capital projects to proceed. Procedures for special amendments are provided in Section VI. II CRITERIA FOR AMENDMENT OF SERVICE AREA AND SERVICE PRIORITY CLASSIFICATIONS A. Existing Service Areas The Water and Sewerage Plan shall define the areas planned to be served by community water and sewerage systems within the next twenty years. In order to assure conformance with the policies of the adopted Comprehensive Plan for the County and if applicable, the effected municipality, one of the following. designations shall be assigned to all service areas: Urban and Town Growth Area, Rural Village or Restricted. A description of these designations is given in Chapter Three page 48 for water service areas and Chapter Four page 76 for sewer service areas. Potential service areas established in '201 Facilities Plans' may be taken into consideration, however, the service area designated by the Water and Sewerage Plan shall not be dictated by '201' Plan boundaries and may in fact be larger or smaller. Within the boundaries of defined service areas an assignment of a priority classification of W-5 and S-5 will be given to indicate that extension of water and sewer lines is possible and desirable and iB- 3 that provision of service is considered consistent with the Comprehensive Plan. Priority classifications from W-3 and S-3 to W-1 and S-1 will be assigned at such time as plans to provide service are initiated, either in response to a request from private developer or by the service providing agency. The assigned classification will be based upon the project schedule and satisfactory compliance with eligibility requirements described in paragraph C of this section. A designation of NPS (No Planned Service) shall be assigned to all lands located outside of existing service areas. This designation shall mean that these lands are not included within a service area and not planned to be served in the future. B. Planned New Service Areas Proposals by property owners to establish new service areas or to extend collection or transmission facilities beyond the f boundaries of existing service areas shall be submitted to the Planning Department in the form of a development proposal. Proposals which involve the establishment of a new Washington County Sanitary District, Sub -District or the enlargement of an existing sub -district shall be included in the Water and Sewerage plan prior to creation of the sub -district. The development proposal shall be submitted with an application for establishment of new service area boundaries and shall be consistent with the policies of the adopted Comprehensive Plan B-4. for Washington County. The proposal shall describe the facilities proposed and define the drainage area which could potentially be served if the proposed facilities were established. A Preliminary Consultation shall be held and the development project area shall be identified, with a description of the proposed land use, density and location of the development. The application shall contain all of the required information outlined in Section VIII. In the process of considering proposals to establish new service areas or expansions of existing service areas, the County Commissioners upon the recommendation of the Planning Commission shall also determine the appropriate designation for the service area in order to assure compatibility with the Policies of the Comprehensive Plan as well as providing for the most environmentally sound method of water supply and sewerage disposal within all areas of the County. C. Service Priority Classification The criteria listed below shall apply to requests for amendment of priority classifications for water and sewerage service where major water and/or sewerage facilities are proposed by property owners. It is the intent of these procedures that, within service areas established by the Water and Sewerage Plan, satisfactory compliance by developers with the established criteria should result in appropriate changes to the service priority classification. Once a priority classification of S-5 B-5 or W-5 has been obtained, it may not be necessary to initiate an individual amendment request for a higher classification or wait for the Biennial Review of the Plan before proceeding with the development of facilities. A letter of intent to the appropriate State agency issued by the County Commissioners will satisfy interim approval with formal amendment of the classification being made at the Biennial Review, provided all criteria have been satisfied. It is the responsibility of the developer to satisfy the criteria in each step of the process. 1. Eligibility for S -5/W-5 (Planned Service) Classification: a) The provision of service has been determined to be consistent with the policies of the Comprehensive Plan for the County and if applicable, the appropriate municipality. b) The method of service has been determined satisfactory and has received written acknowledgement by the appropriate public agencies such as the Health Department, Sanitary Commission, and municipalities. Agency acknowledgement will be for the method of service in concept and not in design. c) A Preliminary Consultation has been held with the Planning Commission. d) If necessary, the Planning Commission has determined that the property is located within an Urban or Town Growth Area and has determined an appropriate service area designation, i.e. Urban/Town Growth Area, Rural Village, or Restricted service. .B-6 2. Eligibility for S -3/W-3 (Programmed Service) Classification: a) All of the requirements for S -5/W-5 have been met. b) Arrangements have been made with the appropriate agency for acceptance of facilities, operating and maintenance responsibility, allocation of capacity, and/or connections to the public system. c) When the proposed development is located within an area that is under the jurisdiction of the Washington County Sanitary District, the developer shall have obtained approval of the establishment of a new sanitary subdistrict or expansion of an existing subdistrict pursuant to Sanitary District Policy and Procedures. d) Adequate capacity shall be existing or be programmed by the service providing agency responsible for the system that will serve the site. Any capital. costs to be incurred by public agencies should be included in the Capital Improvements Program of the appropriate jurisdiction. e) Preliminary plat and/or site plan approval has been obtained from the Planning Commission and other appropriate public agencies responsible for approval of plans, or future operating maintenance costs of sanitary facilities. f) A discharge permit, where appropriate, has been approved by appropriate State Agencies. g) A hydrogeolic study, where appropriate, supports the establishment of a community water system which will not be detrimental to adjoining wells. B-7 3. Eligibility for S -1/W-1 (Service Existing or Under Construction) Classification: a) All requirements for S -3/W-3 have been met and, b) Facilities are under construction or completed. III PROCEDURES FOR THE BIENNIAL REVIEW AND UPDATE In the Biennial review year, the Planning Department shall notify the appropriate service providing agencies and municipalities that the Water and Sewerage Plan is being reviewed and updated. The service providing agencies, municipalities and Health Department will be asked to provide information to be included in the draft updated plan. This may include changes to text, maps, tables, charts, or other information within the Plan to reflect changes that have occurred since the previous update or new proposals expected to occur within the planning period. Applications for individual amendments by property owners will also be considered during the Biennial Update. The Planning Department will prepare a Draft Updated Plan to be submitted to the Planning Commission for their review and comments. Copies of the Draft Updated Plan will be made available to the Public and to the Municipalities and service providing agencies. A joint Public Hearing by the Board of County Commissioners and the Planning Commission shall be scheduled. The principle elected official of each municipal corporation that is effected shall be notified of the Plan Update at least 14 days prior to the public hearing. The Planning Department shall publish notice of the time and place of the public hearing, with a summary of the update in at least one newspaper of general circulation, once each week for two successive weeks with the first notification appearing at least 14 days prior to the hearing. Following the public hearing the Planning Commission shall review any testimony presented. The Planning Commission shall certify that the Updated Plan as presented or modified is consistent with the County Comprehensive Plan. Following the Planning Commission's certification, the Board of County Commissioners shall adopt the updated plan. Following the adoption of the updated plan by the County Commissioners, the Plan shall then be sent to the Maryland Department of the Environment for its review and final approval. The State has at least 90 days and may extend its review period. IV PROCEDURE FOR INDIVIDUAL AMENDMENT APPLICATION REVIEW Applications for individual amendments to the Water and Sewerage Plan shall be considered at a joint public hearing by the Board of County Commissioners and the Planning Commission held at least twice a year. Requests for proposed amendments to the Water and Sewerage Plan may be submitted to the Washington County Planning Department, County Administration Building, 100 West Washington Street, Hagerstown, Maryland. Requests for proposed amendments will be processed in at least two cycles a year. Closing dates for amendment requests shall be available at the Washington County Planning Department. Requests for amendments must contain all of the applicable information listed in Section VIII. Incomplete applications or applications that do not meet the applicable criteria listed in Section II will not be excepted. V PROCEDURES FOR ADMINISTRATIVE AMENDMENTS Administrative amendments need not be formally adopted by the Board of County Commissioners via the public hearing process. Such amendments are to correct errors and are for informational purposes. These amendments do not represent changes in policy or future plans. Administrative amendments should generally be limited to existing conditions which fall within the following categories: B-10 1. To correct omitted or inaccurate locations of existing facilities on the Plan maps. 2. To correct erroneous service priority classifications which indicate no service provided when in fact service is being provided to a particular area. 3. To correct erroneous data on existing population served, flow and capacity data on existing facilities, and similar information which is a matter of record. Once an administrative amendment is made by the Planning Commission, copies of amended maps or text will be forwarded to all applicable agencies to replace maps or text which have been found to be in error. VI PROCEDURES FOR SPECIAL AMENDMENTS Special amendments outside of the semi-annual review sequence max only be initiated by the Board of County Commissioners upon the request of the Washington County Health Department or a Municipality or Service providing agency. Special amendments should be limited to: a) allowing service to an existing structure when a potential health hazard has been declared by the Health Department, b) allowing requests submitted by government agency for capital projects to proceed. B-11 Special Amendments shall be considered, following public notification, at a joint public hearing held by the Planning Commission and County Commissioners. VII FEES A fee schedule established by the County Commissioners is to be applied to all applicants, other than municipalities or public agencies, requesting individual amendments to the Water and Sewerage Plan. These fees are not refundable and must be paid at the time application is made. VIII DATA TO BE INCLUDED IN APPLICATIONS FOR AMENDMENT TO THE COUNTY PLAN The following data, as applicable, shall be included in an application for amendment of the County Plan for Water and Sewerage for the creation of a new service area, expansion of an i existing service and the establishment of a priority classification of S-5 or W-5 or higher. Applications for amendment shall address the interrelationship of water supply and waste water disposal. B-12 Applications for the establishment of new service areas or the creation of new or improved major facilities must include the following as appropriate to the project: 1. Proposed type, capacity, size and location of facilities (new or proposed for use) and map. 2. Name and location of development or service area (boundary, drainage area, acreage and map). 3. Number of people (existing in drainage or service area, density of development). 4. Number of people to be served in drainage or service area by planned staged development. 5. Design, average and peak flows. 6. Degree and type of treatment given. 7. Sludge disposal plans. 8. Transmission facilities (size of pipe). 9. Effluent disposal plans (spray irrigation, discharge to stream, etc.). 10. Classification of stream receiving discharge. n 11. Operation and maintenance costs. 12. Proposed means of financing improvement. 13. Description of ground and surfacewaterresources within the service or development area, including the quantity and quality of these resources. 14. Sources of pollution or contamination of groundwater resources within the development or service area. 15. Source and amount of water to be withdrawn. 16. Relationship to Comprehensive Plan. 17. Relationship to Water and Sewer Plan. 18. Reason for change. 19. Alternatives and the rationale used in determining the means of providing water supply. B-13 20. Rationale for selecting a particular design and alternatives for any proposed treatment facility, pumping station or interceptor. Applications which would extend collection or transmission facilities beyond the boundaries of existing ten-year service areas, should include: 1. Location of the proposed development or service area (boundaries, acreage, map) and relationship to existing service area and facilities. 2. Number of people existing in development or service area. 3. Number of people to be served in development or service area by planned staged development. 4. Relationship to Comprehensive Plan. 5. Relationship to Water and Sewerage Plan. All maps included in applications for amendment which delineate the boundaries of the service area, or show the location of facilities shall be prepared at a scale of 1"=2000' on a base provided by the Planning Commission. B-14 APPENDIX C LISTING OF SERVICE AGREEMENTS Agreement For Provision of Sanitary Sewer Service For The Maugansville/Orchard Hills Area By And Between The City Of Hagerstown And The Washington County Sanitary District. March 25, 1982 Supplemental Agreement No. 1 To Contract For Sanitary Sewer Service For The Maugansville/Orchard Hills Area By And Between The City Of Hagerstown And The Washington County Sanitary District. June 22, 1982 Agreement For The Provision Of Sanitary Sewer Service For Fountain Head Area By And Between The City Of Hagerstown And The Washington County Sanitary District. December 5, 1977 Revision Of Fountainhead Service County Sanitary District And The Pollution Control Department) September 1, 1983 Agreement Between The Washington City Of Hagerstown (Water Agreement For The Provision Of Sewer Service To The Sharpsburg Pike Area Between The City Of Hagerstown And The Washington County Sanitary District. January 11, 1988. Memorandum Of Understanding Regarding Industrial Waste Pretreatment Under The General Sewer Service Agreement Dated May 1, 1978 Between The City Of Hagerstown And The Washington County Sanitary District. November 5, 1984 These service agreements are on file at the Washington County Sanitary District Office. C-1 APPENDIX D Washington County Sanitary District POLICY ON INTERIM AND PERMANENT CCMMUNITY WATER AND SEWERAGE SYSTEMS, Anril 27, 1976 The District shall own and operate all interim and permanent water and sewerage system facilities within the County, except those within an incorporated area or approved existing system, under the following conditions: 1. The District shall be the sole judge as to whether a community water or sewerage facility can be approved and accepted for ownership and operation by the District within the framework of the Sanitary District law. It shall have the sole right to determine the conditions of approval and acceptance necessary to satisfying the provisions of said law. 2. The District shall have the sole right to determine what facilities are interim or permanent; as to when the installed facilities shall be modified, enlarged or abandoned; and who may use said installed facilities. However, in making such determinations, the District shall be governed by all applicable County and State regulations and requirements. 3. All applications for community water or sewerage facilities shall be filed with the Washington County Planning Commission. All such applications must include an engineering report prepared by a Maryland registered professional engineer with sufficient experience in sanitary work satisfactory to the District. This report must include estimated construction and operation costs, together with all necessary design and technical data required by the State for effluent discharge and/or water appropriation permits. 4. No community water or sewerage facility will be approved for ownership, operation or maintenance by the District unless such ownership, operation and maintenance jurisdiction encompasses the entire system, including treatment, collection, distribution, storage, etc., except as may be covered by special arrangement with the applicant at the discretion of the District. 5. Construction plans and specifications for all interim and permanent cca munity water and sewerage systems must be prepared in accordance with State requirements but must be reviewed and approved by the District prior to submittal to the State for a construction permit. All construction shall be in compliance with applicable Sanitary District standards. D-1 6. Interim and permanent sewerage and water facilities shall be designed and constructed at no cost to the District. Construction costs to be borne by others include that inspec -1 during construction deemed necessary by the District to protL its ownership and operational interests in the project. 7. No water or sewerage facility will be accepted by the District for ownership, operation and maintenance until a mutually acceptable agreement or contract between the District and the applicant has been consummated and put into effect. 8. The effective date of this policy is April 27, 1976 and it shall apply to all appications submitted consequent to that date. o-2 1 1_ APPENDIX E REVISED POLICY STATEMENT FOR CITY OF HAGERSTOWN WATER POLLUTION CONTROL PLANT CAPACITY ALLOCATION E-1 August 20, 1991 REVISED POLICY STATEMENT Regarding the Distribution of Remaining Water Pollution Control Plant Capacity Allocation Among Development Projects Owners and/or developers are hereby advised that limited capacity is presently available at the Water Pollution Control Plant to support development projects. Allocation of'this capacity will be on a "first come, first serve" basis when an owner/developer secures the required approved Application(s) for Sanitary Sewer Service. An Application for Sanitary Sewer Service will not be accepted until such time that an approved final site plan is issued for the development. Should any project require a Sewerage Construction Permit from the State of Maryland, Department of the Environment, no application(s) will be accepted until such permit is secured. When an owner/developer is issued an approved Application for Sanitary Sewer Service for a specified project, construction of said project must commence within six (6) months and be completed within fourteen (14) months. (Commencement of construction will be demonstrated by the first footer building inspection and completion will be demonstrated by the final plumbing inspection.) The Water Pollution Control Manager may grant a short extension to these deadlines if he is satisfied that a hardship exists and that the delay was due to conditions beyond the control of the applicant. Assigned allocation to any development may not exceed 5,000 gallons per day unless approved by the Mayor and Council of the City of Hagerstown. Furthermore, prior to filing an Application(s) for Sanitary Sewer Service, an owner or developer, through the office of the City Administrator, may request that a specific amount of remaining reserve capacity allocation be "set aside" for a project. Any approval of "set aside" allocation must be approved by the Mayor and Council of the City of Hagerstown. "Set aside" allocation will not be considered as such until the corresponding Benefit Charge at the prevailing rate is paid to the City of Hagerstown.** From time of payment of the Benefit Charge, the owner/developer will have a period of two (2) years to make Application(s) for Sanitary Sewer Service to use the "set aside" allocation. "Set aside" allocation will be monitored through the receipt of required approved Application(s) for Sanitary Sewer Service for the project. E-2 Failure to comply with these requirements will result in the assigned or "set aside" allocation reverting back to the Water Pollution Control allocation bank and the owner/developer being charged an administrative fee of one-third (1/3) the previously - assessed Benefit Charge. The Mayor and Council of the City of Hagerstown reserve the right to rescind "set aside" capacity allocations before the two year expiration date, if in their absolute discretion they determine that the capacity will not be used as originally intended. If the Mayor -and Council of the City of Hagerstown rescind "set aside" capacity allocations prior to the two year expiration date, then no administrative fee shall be assessed. This revised policy shall become effective immediately and shall apply to all future requests for "set aside" and/or Application(s) for Sanitary Sewer Service. ** Payment of the required Benefit Charge is due and payable to the City of Hagerstown within fourteen (14) days of approval of the "set aside" allocation by the Mayor and Council. If such payment is not made within the required period of time, the Water Pollution Control Department shall request that Mayor and Council action be taken to rescind the previously approved "set aside" allocation for the associated project. E-3 APPENDIX F RESOLUTIONS ADOPTED BY THE BOARD OF COUNTY COMMISSIONERS OF WASHINGTON COUNTY AND THE MAYOR AND COUNCIL OF THE CITY OF HAGERSTOWN RELATING TO THE HAGERSTOWN URBAN GROWTH AREA, WATER AND SEWER STUDY PREPARED BY BCM ENGINEERS, INC. F-1 '1 i rt3: ''l l): ,� 1i;{'_ ;_. : t' n •h ? 4t 1�.,, r t?f ,.............. »......, —... w_...»...._—._...�........__......._..,..- 00006 00227 ACTS, ORDINANCES &, RESOLUTIONS - COUN7 '` cis ','sir CUT RESOLUTION of BOARD OF COUNTY COMMISSIONERS OF WASHINGTON COUNTY, MARYLAND relating to Water and Sewer Study prepared by BCM ENGINEERS, INC. WHEREAS, the master plan entitled "Washington County Water & Sewerage Plan' was originally prepared in 1975 and updated through January, 1990; and WHEREAS, the Board of County Commissioners of Washington, Maryland, and the Mayor and Council of the City of Hagerstown, commissioned BCM Engineers, Inc. to present a final report and master water and sewerage plan to the Washington County Planning Commission with the charge to prepare a master plan to guide development of water and sewerage facilities in the Hagerstown area through the year 2010; and WHEREAS, BCM Engineers, Inc. has prepared a Water and Sewer Study for Washington County/City of Hagerstown dated November, 1992, and which has been submitted to the Mayor and Council of the City of Hagerstown and the Board of County Commissioners of Washington County, Maryland. NOW, BE IT RESOLVED by the Board of County Commissioners of Washington County, Maryland, that the study report prepared by BCM Engineers, Inc. Is to be used as a guide and basis for updating the County's Water and Sewer Plan where applicable and for assisting the Mayor and Council of the City of Hagerstown and the Board of County Commissioners of Washington County, Maryland, in providing water and sewerage services in the Washington County area. Notwithstanding the aforegoing, acceptance of the BCM Engineer Study Report does not represent a legal commitment by the County to finance or in any manner create an obligation on the part of the County to provide future water or sewer improvements or utility service to any presently served or unserved area. Adopted this 2'I"day of t4 , 1993. ATTEST: BOARD OF COUNTY COMMISSIONERS SHINGTON C NTY, MARYLAND `L�L Joni L. Bittner, Clerk Ri tard E. Roulette„Pfigsident Approved as to legal sufficiency: Ralph . France, II County Attorney Mail to: Ralph H. France, II F-2 County Attorney 100 W. WA G hincrnn crrvot Ro Id L. Bowerb; Vice President Linda C. Irvin -Craig CITY OF HAGERSTOWN MARYLAND 91740 OFFICE OF THE CITY CLERK City Hall. Room 200 April 5, 1993 Barry A. Teach Washington County Administrator County Administration Building 100 West Washington Street Hagerstown, Maryland 21740 Dear Barry: (301) 790-3200 Extension 112 Attached is a copy o€ the Resolution recently approved by the Mayor and City Council pertaining to their intent and effect of the formal acceptance o€ the water and sewer study for the Urban Growth Area as prepared by BC.�f Engineers, Inc. Do not hesitate to call if you have any questions pertaining to this matter. Very truly yours, , Georgi_z.nn N. Lucas City Clerk Attachment c: BC.M Engineers, Inc. S.M. Feller, City Administrator J. Brittain, County Planner R.L. Kautz, City Planner R.E. Thomas, City WPC Manager E.V. Walzl, City Water Department Manager } Lynn Palmer, Director, Washington Co. Sanitary District ,r. 'rii!:iV:;. '. if1({'. ';1;;:, .'l. i:. 11., :x••�;, 7:,. .i _ ..� .. .. .. -� ....._. ......., ...-..... _.... .... .,..-....,...--s..- r.. ..-..... ....-.,..., ... .. F-3 RESOLUTION WHEREAS, the master plan entitled "Washington County Water & Sewerage Plan" was originally prepared in 1975 and updated through January, 1990; and WHEREAS, the Board of County Commissioners of Washington, County, Maryland, and the Mayor and Council of the City of Hagerstown, commissioned BCM Engineers, Inc. to present a final report and master water and sewerage plan to the Washington County/City of Hagerstown Water -Sewer Committee with the charge to prepare a master plan to guide development of water and sewerage facilities in the Hagerstown Urban Growth Area through the year 2010; and WHEREAS, BCM Engineers, Inc. has prepared a Water and Sewer Study for Washington County/City of Hagerstown dated November, 1992, and which has been submitted to the Mayor and Council of the City of Hagerstown and the Board of County Commissioners of Washington County, Maryland; and WHEREAS, this Resolution is to describe the intent of the Mayor and City Council and the effect of the formal acceptance of the water and sewer study for the Hagerstown Urban Growth Area, hereinafter referred to as the "UGA Water -Sewer Study", prepared by BCM Engineers and dated November 1992. NOW THEREFORE, BE IT RESOLVED by the Mayor and City Council of the City of Hagerstown that: 1. The Mayor and City Council state that the primary use for the UGA Water -Sewer Study is to provide a basis for updating the County's water and sewer plan where geographically applicable. The UGA Water -Sewer Study is intended to support and reinforce the implementation of the Hagerstown Urban Growth Area concept. 2. For areas in which utility service is planned or provided under service agreements between the City and the County, the UGA Water -Sewer Study should be interpreted as recommendations for future consideration to redefine utility service areas with the understanding that existing utility service area boundaries shall remain unchanged until formal agreements are executed to alter any utility service area boundary. F-4 ,q3c? 3 -O? 3. The Antietam Basin 201 Facilities Plan is recognized as an integral part of the general Sewer Service Agreement dated May 5, 1978 and specific sewer service agreements for Washington County Sanitary Subdistricts 06, #14, and 015. These agreements were made between the City and the county through the agency and representation of the Washington County Sanitary District. Until these agreements are formally amended and mutually accepted, they shall take precedence in matters of legal interpretation and administration under the said agreements. 4. Notwithstanding the recommendations of the UGA Water -Sewer Study, acceptance of this study does not represent a legal commitment by either the city or the county to finance or in any manner create an obligation to provide future water or sewer improvements or utility service to any presently cnrvAtq nr tinserved area. 3 Approved this ' ....O - day of (SEAL) ATTEST: GeorgiAnn N. Lucas City Clerk , 1993. CITY OF HAGZRSTOWN BY • �'� �► ven yor F-5 APPENDIX G COMPILATION OF FINANCIAL MANAGEMENT STATISTICS, "FS SCHEDULES" FOR PUBLICLY OWNED COMMUNITY SEWERAGE SYSTEMS G-1 SO IEBJLE FS FINMiCl/1i_ WtKEI1iNT STATISTICS C x ni WATER & S&IEJi PIAKS County Nc�n Washington System Narre Hagerstown WPC ) Fiscal Year ,;1 FY 90 Fiscal Year #2 FY 91 A FISCAL YEAR #1 CQLI..MI 1 7-1-89 6-30-90 FISCAL YEAR d2 COLU4'1 2 7-1-90 6-30-91 B Seher charge revenue 3 ,477 ,093 Serer charge revenue 3,862,409 C Cennecticn charge revenue 46,630 Connection charge revenue 37,430 D Front ft assessment revenue 233,091 Front ft assessment revenue 148,134 E Other revenue (carplete schedule on ace 2 619 , 722 Other revenue (carplete schedule on awe 2) 344,098 F Total revenue 4,376,536 Totai revenue 4,392,071 G Operation expense 3,854,476 Operation expense 3,860,945 It Maintenance expense 149,965 Maintenance expense 10 5613 I Replacennt costs —0— Replacement costs J Fees paid to other jurisdictions -0- Fees paid to other jurisdictions -0- K Total CM & R 4,004,441 Total CM & R 3,966,558 L Interest expense 282,409 Interest expense 261,536 M Depredi ati on expense * 737,638 Depreciation expense 412,559 1-i Total expense 5,024,488 Total expense 4,640,653 O Increase (Decrease) Fund Balance (647 ,952) Increase (Decrease) Fund Balance (248,582) !' Debt principal 43,390 Debt principal 192,100 Q Total flow volume 1,632,749,300 Total flaw volume 1,647,772,700 R Extraordinary repairs and maintenance are those whidi are of such a nature as to be beyond those repairs anticipates in the annual budget. Exarples of "extraordinary" breakdo�ns might include a blower breakdo�n in the zeration syste large purp system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance preblen for this seherage systen. 0 2 Compressor S ( I\pproxiinate cost of this potential repair $250,000 Depreciation on City's contribution of tpra''jAssets value. Excludes value contributed by grants (E tale, Developer) G-2 U SHFEXLE FS FINANCIAL ?t1dGEI4ENF STATISTICS COUNTY WATER & SEWER PL tS County Naie Washington System Nate Hagerstown WPC Fiscal Year #1 Fiscal Year #2 Fv 89 A FISCAL YEAR #1 COLLMV 1 FISCAL YEAR ,,'2 COLU'1 2 6/30/89 3 Setter charge revenue Serer charge revenue 3 , 512, 19 3 C Connection charge revenue Connection charge revenue 40,330 D Front ft assessu nt revenue Frcxrtaft assessment revenue 351,101 E Other revenue (corplete schedule on page 2) Other revenue (carplete schedule on pace 2) .42 4,923 F Total revenue ��€�� revenue 4,328,547 G Operation expense Operation expense 55 i t4iintenance expense Maintenance expense 113 ,934 I Replaceient costs Replacerent costs -o - I Fees paid to other jurisdictions Fees paid to other jurisdictions K Total CM & R Total CM & R 3,680 089 L Interest expense Interest expense 131,835 M Depreciation expense Depreciation expense ti Total expense Total expense 9S9 O Increase (Decrease) Fund Balance Increase (Decrease) Fund Balance (149.412) P Debt principal Debt principal Q Total flaw volume Total flaw volume 1, 650, 909 ,100 R Extraordinary repairs and maintenance are those r iich are of such a nature as to be beyond those repairs anticipi in the annual budget. Exarples of •'extraoramary oreaKoa,ns miynt incivae a uic' r urtanuc'l iiUlu a,.,, large porip system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identi fy the nest costly potential repair and maintenance problem for this setierage system. S 1 Alrproxini to cost of this potential repair Depreciation on City's contribution of tota�DVset value excludes value contributed by GRANTS (EPA, STATE, DEVELOPER). G-3 -2- T i Describe the source of funds to cover this extraordinary item (a bond, line of credit, escrow account, workinc I capital, etc.) Bond, Working Capital if available U Additional comrients Total flow volume is billable consumption and excludes infiltration — average influent flow is 6.7 to 7 MGD. V) Detail of other revenue on Line E (if applicable): Description Ind. Surcharge Interest I/C Misc. Total Capacity: 8 fGt) Users: residential 13,529 (EST) cam�ercial 913 (EST) Year 1 Amount $298,804 295,320 25,598 619,722 Contact Person: Year 2 Amunt $145,286 127,669 71,143 344,098 Rick Thomas, WPC Manager 1 Clean Water Circle ADDRESS Hagerstown, Maryland 21740 301) 791-4528 TB_EPFO1E # G-4 SH-fEE IE FS F1M CIAL h flYT STATISTICS CCUYIY WATER & SB ER PU 1S County Name Washington System Name Funkscown Fiscal Year -1 6/30/91 Fiscal Year 2__________________ FISCAL YEaR T1 COLLM1 1 (1991) FISCAL YEaR z2 l CCLL'T 2 Setter charge revenue 65 , 911.11 SeAer cnnarge revenue Connection charge revenue Connection charge revenue Front ft assessment revenue Front ft assesmient revenue Other revenue (ccnulete schedule on oaae 2) 11, 297.50 Other revenue (camlete schedule on ace 2) Total revenue 77,208.61 Total revenue Operation expense 44,336.02 Operation expense maintenance expense 12 910.04 Maintenance expense Replacement costs Repiace ent costs Fees paid to other jurisdictions{ Fees paid to other jurisdictions tal CM & R 57,246.06 Total GI&R R Interest expense 3 , 488.54 Interest expense Depreciation expense 34, 948.56 Depreciation expense Total expense J 95, 683.16 Total expense Increase' (Decrease) Fund Balance (18,474. 55) Increase (Decrease) Fund Balance Debt principal 10,000.00 Debt principal Total flow volume f_19,588,540.00 Total flaw volume Extraordinary repairs and maintenance are those nich are of such a nature as to be beyond those repairs anticipated in the annual budget. Examples of 'extraordinary' breakda ns might include a blower breakdown in the aeration systelr lame puTTp systen motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance preblen for this sererage systen. Rehab of Pond ximate cost of this potential repair x100,000 (over) G-5 SQ-iEMLE FS FINPI'C .PL MWG&INr STATISTICS C£t.MY 'WATER & S&ER FL445 Ccunty NI W3shinzCon Fiscal Year .=1 6/30/89 Systen lei Funkstown Fiscal Year #26/30/90 Fi.C-& YEAR .1 (1989) CCLLM' I #FISC?L YEAR =2 CCLLM 2 (1990) c-rarge revenue Serer carte revenue 66,673.36 � J. 64, 815.83 ':rnnecticn charge revenue 1 000.00 Ccnnecticn Charge revenue _-- Front ft assessn it revenue J From ft assesnit it revenue t. Other avenue (camlete schedule cn oace 2) 9,714.31 Other revenue (camlete schedule on pace 2) 10, 930.14 eta l revenue 77,387.67 lotaT revenue 75,745.97 Cperaticn expense # 40,178.72 ICperaticn expense 36,909.49 maintenance expense 6,374.95 (Maintenance etC --Ise II 5,798.02 =eplac.Ent costs RlaceTeit costs Fees paid to other jurisdicticns Fees paid to other jurisdictions __ Total CM & R 46,553.67 Total CM & R 42,707.51 Interest expense 4,352.49 Interest use 3,868.80 Depreciation expense 35 ,196.40 Deoreciatic n else I 34, 077.28 ' 1 Total e`cpense 86,102.56 Total expense l 80, 653.59 Increase' (Decrease) Fund Balance (8,714.89) Incase (Decrease) Fund Balance (4,907.62) • t principal 10,000.00 1 Debt principal 10,000.00 Total f v volume 19,588,540.00 IT1flvolum 23,641,110.00 E,z. aordinari repairs and maintenance are those 'Tit are of such a nature as to be beyond those rerairs anticipated in the annual budget. Exarales of "extraordinary" breakda�ns might include a bider breakdohn in he aeration syster ;arse purrs systen motor and control, clarifier sludge scraper arm and bearings, or a Heating aerator. Please identify the irtst costly potential repair and maintenance proalen for this saa.rage systen. Rehab of Pond or;xi r ze :os4 'fir his potential r air $100 000 (over) G-6 _2- v sc be the scur'e of ftids to cover this extraordinary iten (a band, line of credit, escrcw account, a&rking capital, etc.) CD's — Balance @ 10/15/92 $252,000 ' Additional cmmits !I Cetail of other revenue on Line E (if applicable): 'fear 1 Year 2 CescrioticnPntunt. 1989 pmt 1990 199 Interest income $9,100.30 $10,930.14 $11,297.5 Equity Fees 600.00 counts 14.01 Total 9,714.31 10,930.14 11,297.5 Contact Person: :t,: .15 IS Brenda L. Haynes se residential 480 P. 0. Box 235 C Ea GCrnmercial 33 Funkstown, Maryland 21734 (301) 791-0948 iONE G-7 FINANCIAL MANAGEMENT STATISTICS COUNTY WAXER is SEWER PLANS County Name • Washington System Name Smithsburg WWTP Fiscal Year 11 1991 Fiscal Year 42 A FISCAL YEAR 101 COLII)Qi 1 FISCAL YEAR i2 COL'u2-fi 9 I Sewer/Water= charge revenue 110,215 Sewer/Watar charge revenue C Connec_icn charge revenue 26,000 Connection charge revenue 0 Front ft assessment revenue FroFt;ft assessment revenue Other revenue (complete schedule on page 2) 33•,624 Other revenue (complete schedule on page 2) F Tctal revenue 169,839 Total revenue Operation expense 63,745 Operation expense M Maintenance expense 33,290 Maintenance expense I Replacement costs Replacement costs J Fees paid to other jurisdictions Fees paid to other jurisdictions q Total OM & R, Fees 97,035 Total CM & R, Fees L interest expense .5,850 Interest expense M Depreciation expense 15,378 Depreciations expense N Total expense 118,263 Total expense 0 Increase (Dec -ease) fund balance 51,576 Increase (Decrease) fund balance P Debt principal 20,000 Debt principal Q Total flow volume 51,329,800 Total flow volume R Extraordinary repairs and maintenance are those which are of such a nature as to be beyond those repairs anticipated in the annual budget. Examples of "extraordinary" breakdowns might include a blower breakdown in the aeration system, large pump system motor and control, clarfier sludge scraper arm and bearings, or a floating aerator. PLease identify the most costly potential repair and maintenance problem for this sewerage system. S Approximate cost of this potential repair G-8 T Desc_ibe the source of funds to cover this extraordinary item (a bond, line of credit, escrow.account, working capital, etc.) U Additional comments: V s' Detail of other revenue on Line E (if applicable): Year 1 Yea-- 2 Descthtio Amourft ov t Interest Income '33,624 I ' Contact Parson: Capacity: mcd Ms. Elizabeth Martin (Name) Users: residential P. 0. Box 237 commercial (Address) Smithsburg, Maryland 21783 (301) 824-7234 (Telephone Number) G-9 SCHEDULE FS FINANCIAL MANAGEMENT STATISTICS -' COUNTY WATER &.SEWER PLANS County Name Washington Fiscal Year r2 1989 System Name Smichsburg WWTP Fiscal rear 1990 A FISCAL TEAR 41 1 COLUMN 1 I FISCAL YEAR #2 COLUMN 3 Sewer/water charge revenue 88,756 Sewer/Water charge revenue 97,283 C C.onnection charge revenue 14,500 Connection charge revenue 23,500 D Front ft assessment revenue 1.7ront ft assessment revenue 3 Other revenue ccmolete � ( schedule an page 2) 26,140 Other revenue (earaplete schedule on page 2) 33,411 Total revenue 129,396 Total revenue 154,194 ?GPI Operation expense 22,306 Operation expense 27,290 H Maintenance expense 16.992 Maintenance expense 23,464 I Replacement costs Replacement costs — J Fees paid to other jurisdictions -" Fees paid to other jurisdictions .-- K Total OM & R, Fees 39,298 Total OM & R, Fees 50,754 L Interest expense 7,650 Interest expense 6,750 M Depreciation expense 11,794 Depreciations expense 12,596 N Total expense 58.742 Total expense 70,100 O Increase (Decrease) fund balance 70,654 Increase (Decrease) fund balance 84,094 P Debt principal 20,000 Debt principal 20,000 Q Total flow volume 39,350,700 Total flow volume 35,843,700 Extraordinary repairs and maintenance are those which are of such a nature as to be beyond those repairs anticipated in the annual budget. Examples of "extraordinary" breakdowns might include a blower breakdown in the aeration system, large pump system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identi_y the most costly potential repair and maintenance problem for this sewerage system. Flooding of the sewage treatment plant and damage to its oumos and electrical control equipmenc. S Approximate cost of this potential repair $200,000 aer ) G-10 T Describe the source of funds to cover this extraordinary 'stem (a bond, line of credit, escrow account, working capital, etc.) Approximately $375,000 in working capital/future expansion reserve is available for these emergencies. J . 0 i Additional comments: t V ;1 Detail of other revenue on Line E (if applicable): Des criotian Interest Income .2 Capacity : tad tfsers : residential______ commercial 12 Year I amount 26,140 Coatact Person: Ms. Elizabeth Martin (Name) P. 0. Box 237 (Address) Smithsburg, Maryland (301) 824-7234 (Telephone Number) Year 2 ou nt 33,411 4 - G-11 SG RULE FS FINAI�CIA1_ t1 1PGEY€NT STATISTICS CO(XM V ATER & S&IER PIJ'NS County Name Washintnn Systen Nave Hancc-k Wsi-iter Department Fiscal Year #1 Fiscal Year #2 90 per charge revenue Serer charge revenue )nnection charge revenue 3,500 Connection charge revenue 2,500 rant ft assessment revenue -0- ' Front ft assessment revenue -O- ther revenue (camplet.9 schedule on age 2) 33,836 Other revenue (complete schedule on pane 2) 9,202 3ta1 revenue 173 ,O 5 Tota. E revenue 149,138 )eratioi expense 91,728 Operation expense 77,772 aintenance expense Maintenance expense epl acenent costs 35 705 Replacement costs 25,763 ees paid to other jurisdictions -0- Fees paid to other jurisdictions -D- otal CM & R 127,433 Total CM & R 103,535 nterest expense 5 , 730 Interest expense 5, 22 epreciation expense 36,233 Depreciation expense 37,205 otal expense 169,396 Total expense 145,862 ncrease • (Decrease) Fund Balance 3,j49 Increase (Decrease) Fund Balance 3,276 ebt principal 8,549 Debt principal 8,548 otal flow volume 89,571 528 Total flew volume 81,620,000 xtraordinary repairs and maintenance are those Mich are of such a nature as to be beyond those repairs anticipated n the annual budget. Examples of "extraordinary" breakdowns might include a blower breakdonn in the aeration system, arge pup system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please dentify the most costly potential repair and maintenance problem for this senerage system. )roximate cost of this potential repair (over) cr; f G-12 , • -2- 0 Describe the source of funds to cover this extraordinary item (a bond, line of credit, escrow account, vorking capital, etc.) U Additional Cuui nts Detail of other revenue on Line E (if applicable): Description Non Operating income Interest Grant Miscellaneous Capacity: M0 Users: residential commercial Ye89 ar 1 ,yin unt 3,579 30,012 245 $36 33 -TN Contact Person: YS 2unt 5,937 3,109 156 9,202 G-13 i v SOEEX LE FS FINAICIa1_ M'NPGL1{NT STATISTICS CU,NTY SEATER & SEWER PLANS Systen Name H ncock 'last?water Department Y 43 91 Fiscal Year #1 Fiscal Year ff2 A FISCAL YEAR 413 91 COLLMV 1 FISCAL YEAR 42 COLLNV 2 6 Seer charge revenue 137 657 Seer charge revenue C Connection charge revenue 1,000 Connection charge revenue D Front ft assessment revenue -0 _ Front ft assessment revenue E + Other revenue (complete schedule on pane 2) 5,095 ' Other revenue (complete schedule on pace 2) F Total revenue 143 , 752 Total revenue G Operation expense 76,657 Operation expense H Maintenance expense Maintenance expense I Replacement costs 94,580 Replacement costs J Fees paid to other jurisdictions -n- Fees paid to other jurisdictions K Total CM & R T71,23 7 Total CM & R L Interest expense 4 � Interest expense M Depreciation expense 38,816 Depreciation expense. N Total expense 215,002 Total expense 0 Increase* (Decrease) Fund Balance (71, 250) Increase (Decrease) Fund Balance P Debt principal 6,689 Debt principal Q Total flaw volume 91 , 940 , 000 Total flow volume R Extraordinary repairs and maintenance are those Mich are of such a nature as to be beyond those repairs anticipate in the annual budget. Examples of "extraoralnary" oreakdonns m gnt include a oiower areaxoarn in me aeraLiuiI 5y5L large pump system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance problem for this seAerage system. Removal of lagoon sludoe 550,000 Surface aerators at lagoon 31,000 Replacement of pumping & ejector stations 709,000 1 , 290 , 000 S I Approximate cost of this potential repair w G-14 rc1v. o- -2- ', Describe the source of funds to cover this extraordinary item (a bond, line of credit, escrow account, working capital, etc.) Rate increase M0E Water Quality Financing loan I � M0E Grant for Assistance in the Construction of Sewerage Facilities Additional camnts The Town of Hancock combines water and sewer records. Forty _ nine percent (49%) of revenues and exoenses are assianed to sewer. u Detail of other revenue on Line E (if applicable): Year I Year 2 Description Pm ant Arrant Non Operating Income Interest 4,677 Miscellaneous 418 5 Capacity: 380'000 M3D Users: residential 629 176 camrertial /1'l 12 -2 /7 5 a 37 G-15 1 SO 1II7U E FS FINANCIAL. MMNGQi STATISTICS COUNTY WATER & SEWtR PLANS County Plane WASHINGTON Systen Name TOWN OF CLEAR SPRING U Fiscal Year #1 FYs9 Fiscal Year #2 F?90 A FISCAL YEAR #1 COLUt4 1 7/1/88-5/30/89 FISCAL, YEAR #2 COLLf1q 2 7/1/89-6/30/90 B Sewer charge revenue 80, 349 Serer charge revenue 81, 528 C Connection charge revenue 2,530 Connection charge revenue 4,980 D Front ft assessment revenue Front ft assessment revenue E Other revenue (carplete schedule on oaae 2) 22,978 Other revenue (carplete schedule on aae 2) 3,536 F Total revenue 105,857 Total revenue 90,044 G Operation expense 26,624 ration expense 23,082 11 Maintenance expense 38,644 r•iainteilance expense 40844 I Replacement costs Replacement costs .1 Fees paid to other jurisdictions Fees paid to other jurisdictions K Total CM & R 65,268 Total Chi & R 63,926 L Interest expense 10,709 Interest expense 8,176 N Depreciation expense 38,798 Depreciation expense 36,866 Pl Total expense 114,775 Total expense 110,968 0 Increase (Decrease) Fund Balance (9,918) Increase (Decrease) Fund Balance (20,924) 1' Debt principal 54,804 Debt principal 7,780 Q Total flaw volurrn 26,397,000 Total flow.volume 26,817,000 R Extraordinary repairs and maintenance are those which are of such a nature as to be beyond those repairs anticipate: in the annual budget. Examples of "extraordinary" breakda•.ns might include a Deaver nreakUatin in the aeration syst€ large prep systenlnotor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance problen for this setierage systen. ULTRA VIOLET DISINFECTANT SYSTEM S I Approximate cost of this potential repair $10, 000 (over) G-16 -2 - Describe the source of funds to cover this extraordinary iten (a bond, line of credit, escrow account, ,narking I capital, etc.) WORKING CAPITAL r: Additional ca relents Vl Detail of other revenue on Line E (if applicable): Year 1 Year 2 Description Pntunt Wnount Penalties & Interest On Delinquent Acc'ts $ 1,032 $ 1,155 Interest Income 1,107 2,381 Gain From Early Retirement of Long -Term Debt. 20,839 - 22,978 3,536 4 Contact Person: :'apdCi tY: .2 4D PATRICK E. KLINE tW' Users: residential 249.8 FY89 KLINE & LIPELLA, CPA 252.3 FY90 PC0RESS comercial 107.5 FY89 39 EAST WASHINGTON STREET 108.5 FY90 HAGERSTOWN, MD. 21740-5605 TELEPUJNE # (301)739-8733 G-17 SOIUliE FS FINANCIAL WNPGE}(NT STATISTICS axrf WATER & S&lER PL146 County Name WASHINGTON Systen Hare TOWN OF CLEAR SPRING Fiscal Year FY91 Fiscal Year #2 A FISCAL YEAR #1 COLLM1 I 7/1/90 - 6/30/91 FISCAL YE:'R #2 COLLIiN 2 B 5e.Ner charge revenue 114.51S Serer charge revenue C Connection charge revenue d Connection charge revenue D Front ft assessment revenue Front ft assessment revenue E Other revenue (caiplete schedule on page 2) 4,721 Other revenue (carplete schedule on pacie 2) F Total revenue 124,876 Total revenue (i Operation expense 34 314 Operation expense II Maintenance expense 0,421 Maintenance expense I Replacerent costs Replacement costs J Fees paid to other jurisdictions Fees paid to other jurisdictions K Total CM & R 84,735 Total CP1 & R L Interest expense 7,791 Interest expense ;•1 Depreciation expense 38,517 Depreciation expense N Total expense 131,043 Total expense 1) Increase (Decrease) Fund Balance (6,167) Increase (Decrease) Fund Balance P Debt principal 8,148 Debt principal () Total flat volume 29, 781, 000 Total flow .volume R Extraordinary repairs and maintenance are thosewhich are of such a nature as to be beyond those repairs anticipated in the annual budget. Exatples of "'extraordinary"' breakdans might include a blower breakdown in the aeration syste large ptup systen motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance problen for this seeerage system. OXIDATION DITCH AERATOR MOTOR S Appraxir;sate cost of this potential repair _______f 22O.000 (over) G-18 -2- v Describe the source of funds to cover this extraordinary itan (a bond, line of credit, escrow account, working capital, etc.) WORKING CAPITAL Additional cam-ents Detail of other revenue on Line E (if applicable): Year 1 Year 2 Description kount Arount PENALTIES & INTEREST ON DELINQUENT ACCTS $ 1,428 INTEREST INCOME 3,293 4,721 A Contact Person: ..apacity: .2 hGD Users: residential 26.2 FY91 caunercial 111.3 PATRICK NPM-E KL N & F ADoRSS 39 EAST WASHINGTONS;REET HAGERSTOWN..MD_ 21740-5Bc' - TELEPICNE # (301)7398733 G-19 SCHEDULE FS FIWT IAL M'►a^1, &7'IJ'If STATISTICS tWilY WATER & 513&R I'UWS County Nave Washington Systan NanTcwn of Williamsport Fiscal Year #1 1989 Fiscal Year #2 A FISCAL YEAR #1 07/01/88 -_06/30/89 COL FISCAL YEAR #2 COIJflI2 B Sewer charge revenue 135,868.14 Seeer charge revenue C Connection charge revenue 500.00 Connection charge revenue D Front ft assessnnt revenue Front ft assessment revenue E Other revenue (carplete schedule on ae2 .00 Other revenue (carplete schedule on ae2) F Total revenue 136,368.14 Total revenue G Operation expense 35,774.83 Operation expense N Maintenance expense 11,320.89 Maintenance expense I Replacerrnt costs Replacenent costs J Fees paid to other jurisdictions 92,238.88 Fees paid to other jurisdictions K Total CM & R 139 334.60 Total Qh & R L Interest expense 9,582.50 Interest expense M Depreciation expense 21,000.00 Depreciation expense N Total expense 169, 917.10 Total expense 0 Increase' (Decrease) Fund Balance (33,548.96) Increase (Decrease) Fund Balance P Debt principal 30,000.00 Debt principal Q Total flaw volune 82,300,000 Total flow volure R Extraordinary repairs and maintenance are those which are of such a nature as to be beyond those repairs anticipated in the annual budget. Exaiples of "extraordinary" breakdorins might include a blo+�er breakdo�n in the aeration systan, large purp systenimtor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the nest costly potential repair and maintenance problen for this senerage systen. S { lyrproximate cost of this potential repair (over) G-20 SQ-E(JLE Fs FIN +CIAL MWAMENC STAT1ST1(5 aANM WATER & 560 PLANS M County Nano w d System Nave Town of Williamsport Fiscal Year #1 1990 Fiscal Year #2 1991 it FISCAL YEAR #1 CULLMV 1 FISCAL YEAR #2 CULIJMII 2 07-01-89 - 06-30-90 07-01-90 - 06-30-91 B Sever charge revenue 131,475.92 Sewer cf iargc, revenue 143,209.50 C Connection charge revenue 1, 000.00 Connection charge revenue .' 0 0 !) Front ft assessment revenue , 00 Front ft. assessment revenue . 00 E Other revenue (co plete schedule Other. revenue (coxrplete schedule on paae2) .00 on ae2) F Total revenue Total revenue 143,209.50 (; Operation expense 36,265.74 Operation expense 61,390.39 II Maintenance expense 27 951.58 Maintenance expense T 33,956.05 1 Replacement costs Replaceuent costs 3 Fees paid to other jurisdictions 65 034.31 Fees paid to other jurisdictions 133,145.84 Total CM & R 129,251.63 Total C14 & It 228,492.28 L Interest expense 15,745.00 Interest expense 14,377.50 M Depreciation expense 22,092.03 Depreciation expense 22, 666.03 N Total expense 08 Total expense 265,535.81 0 Increase (Decrease) Fund Balance (34,612.74) Increase (Decrease) Fund Balance (122,326.31) P Debt principal Debt principal 5,000.00 5,000.00 () Total flow voluue 70 658,083 Total flow volume 100,544,800 RJ Extraordinary repairs and maintenance are those Mich are of such a nature as to be beyond those repairs anticipate in the annual budget. Exaiples of "extraordinary" breakda�rs might include a bl(x%er breakdown in the aeration syst large purp system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance problem for this sewerage system. Large pump system motor and control Approximate cost of this potential repair $25,000 (over) G-21 -2- 0 T Describe the source of funds to cover this extraordinary iten (a bond, line of credit, escrow account:, ridng capital, etc.) Working capital and borrowing from the town's general fund. Additional cannents THE TCWN OF WILLIAMSPCRT OPERATES AND MAINTAINS A SEWER COLLECTION SYSTEM. THE WASTE IS PUMPED TO AND TREATED BY THE WASHINGTON COUNTY SANITARY DISTRICT. Detail of other revenue on Line E (if applicable): Description Year 1 Year 2 AlDunt Pmamt 4 Cc itact Person: Capacity: PM DONNA K . SP ICKLER IVPWE Users: residential 700 TOWN OF WILLIAMSPORT ADi1RESS camercial 50 P. O. BOX 307, 2 N. CONOCOCHEAGUE ST. WILLIAMSPORT, MD 21795 TELEPHJN # (301) 223-7711. G-22 SGINLE FS F•RIAiwIAL 4 WG T STATISTICS awry WATER & SEER PUNS County Name systen Name R4C— rrc_ r <— Fiscal Year R1 Fiscal Year T2 FISCAL YEAR 41 CCU.N 1 FISCAL YEAR 42 cow 2 Seer cname revenue Seger charge revenue C Connection charge revenue Connection charge revenue D Front ft assessment revenue Front ft assessire revenue E Other revenue (carplete schedule on aoe 2) j 7f Other revenue (carplete schedule on aae 2) F Total revenue Total revenue G Operation expense � Operation expense It Maintenance expense Maintenance expense I Replacerent costs Replacement costs Fees paid to other jurisdictions Fees paid to other jurisdictions K Total.C14& R Total CM&R L Interest expense Interest expense M Depreciation expense Depreciation expense t'1 Total expense Y. Total expense 0 Increase (Decrease) Fund Balance -U- Increase (Decrease) Fund Balance P DLbt principal Debt principal Q Total flow volume Total flow volume R I Extraordinary repairs and maintenance are those which are of such a nature as to be beyond those repairs antici in the annual budget. Examples of "extraordinary" breakdowns might include a blower breakdohn in the aeration large purp system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance problem for this se�erage system. S I A{rprox imate cost,of I this' potential repair. G-23 (over) -2 - Describe the source of funds to cover this extraordinary iten (a bond, line of credit, escrow account, rking \ capital, etc.) i Additional comments Detail of other revenue on Line E (if applicable): Year 1 Year 2 Description mamt Amami 1 Contact Person: jaci ty: t WE .rs: residential crmmrci al G-24 t SGEJULE FS FIN ICTAL MST STATISTICS COfTY WTEl & SE1 R PLI4 S Couity rlarre .WA^.':ti Systan dame G>~cu j r Fiscal Year *1 Fiscal Year #2 A FISCAL YEIR #1 COLON I. FISCAL YEAR #2 COL&V 2 B seer charge revenue Sewer charge revenue C Connection charge revenue Connection charge revenue D Front ft assessment revenue Fart ft assessment revenue E - Other revenue (carplete schedule on paae 2) =° Other revenue (complete schedule on Dace 2) F Total revenue Total revenue G Operation expense Operation expense It Maintenance expense Maintenance expense I Replacerent costs Replacement costs Fees paid to other jurisdictions Fees paid to other jurisdictions K Total Ct4 & R ��, Total CM & R L Interest expense Interest expense M Depreciation expense Depreciation expense rl total expense Total expense O increase (Decrease) Fund Balance .. Increase (Decrease) Fund Balance P Di.�t principal Debt principal (1 Total flow volume Total floc volume R E'ctraordinary repairs and maintenance are those Mich are of such a nature as to be beyond those repairs antic in the annual budget. Examples of "extraordinary" breakdotins might include a blower breakdown in the aeration large purp system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the west costly potential repair and maintenance problem for this severage system. S Approximate cost of this pate tial r air G-25 (over) -2- 9 Describe the source of funds to cover this extraordinary item (a bond, line of credit, escrow account, working capital, etc.) 1 Additional comlent5 Detail of other revenue on Line E (if applicable): Year 1- Year 2 Description Amount Antxmt Far Servi c Contact Person: )acity: =rs: residential ADDRESS camercial G-26 SOEXJLE FS FINPJVCIfIL M4NPC8ETf SIATISTTCS COUNTY WATER & Sift PLANS County Narrtr Systen Natrle V:I dir=t rw,�' Fiscal Year #1 c//5 Fiscal Year #2 FISCAL YE?R .#1 COLLt0 1 FISCAL YEAR #2 COL" 2 [i Suer charge revenue Sever charge revenue C Connection charge revenue Catnecti at charge revenue D Front ft assessment revenue Front ft assessment revenue E Other revenue (complete schedule on aae 2) 5'73, O`7l Other revenue (crnplete schedule on pa a 2) F Total revenue Total revenue G Operation expense �-7 Operation expense II Maintenance expense —7- Maintenance expense I Replacenent costs Replacement costs Fees paid to other jurisdictions Fees paid to other jurisdictions K L Total CM & R Interest expense S��? �-7 Total C1&R R Interest expense .1 Depreciation expense Depreciation expense t Total expense S77 Total expense 0 Increase (Decrease) Fund Balance ' Increase (Decrease) Fund Balance P [kttt principal Debt principal f) Total flow volume Total flow volume R Extraordinary repairs and maintenance are those , tich are of such a nature as to be beyond those repairs antici- in the annual budget. Examples of "extraordinary" breakdoms might include a bloNer breakdorit in the aeration large pump systen motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the frost costly potential repair and maintenance problenn for this seAerage systen. S I Approximate cost of this potential repair G-27 (over) -2 - Describe the source of funds to cover this extraordinary item (a bond, line of credit, escrow account, working capital, etc.) i Additional torments Detail of other revenue on Line E (if applicable): Year 1 Year 2 Description Amount Pimcmt r f Contact Person: )aci ty: MD ME ?rs: residential ADDRESS camerci ai G-28 SOE1J.E FS FINANCIAL M4t'BiT STATISTICS UMrY WATER & SI3 Ply County Name Systen Name t'1 '"~? Fiscal Year i#1 ( - Fiscal Year #2 FISCAL YE, #1 COI,.fl1 1 FTSL YEAR 2 I5U" 2 Serer charge revenue Serer charge revenue C Ccnnecticn charge revenue Connection charge revenue D Frcnt ft assessrnt revenue Frazt ft assessment revenue E Other revenue (carplete schedule on aae 2) � y , `"� Other revenue (carplete schedule cn pace 2) ° 8i LC F Total revenue Total revenue G Operation expense Operation expense Ii Paintenance expense Maintenance expense -o 0L; I Replacerent costs Rep lacemelt costs i Fees paid to other jurisdictions Fees paid to other jurisdictions K Totalal _. Total CM&R --Q c L F1 Interest expense Depreciation expense Interest expense Depreciation expense ti Total expense — Total expense 0 Increase (Decrease) Fund Balance Increase (Decrease) Fund Balance _ G P Debt principal Dent principal Q Total flow volume Total flow volume R Extraordinary repairs and maintenance are those 1iich are of such a nature as to be beyond those repairs antic in the annual budget. Exarples of "extraordinary" breakdomis might include a blower breakdom in the aeration large puip system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance prcblen for this sererage systen. S I Approximate cost of this potential repair G-29 (over) _2_ Describe the source of funds to cover this extraordinary item (a bond, line of credit, escrow account, rkina capital, etc.) Additional comments Detail of other revenue an Line E (if applicable): Year 1 Year 2 Description pma,utt Hunt Curtact Person: pacity: N® ers: residential ______ camErcial WE / M 6r%/ C.nvtr<)r me. r1 f ______ nci c,Ls r r a( Dr. A n ca, 11r)( MQ G-30 SCUJ(II.F FS FTNPI CIAL W4 E tT STATISTICS CUM WATER & S&iER FtAtt5 County N31e Systen Nano ^,.C:? Fiscal Year #I (- 3- Fiscal Year #2 (-2.-- F ISC?1. YEAR Ri COLLM'! I , ISCAL YEAR #2 COLLMV 2 [i ieeer charge revenue Serer charge revenue C Connection charge revenue Connection charge revenue D Front ft assessamt revenue Fruit ft assessner t revenue E - Other revenue (caiplete schedule on age 2) IG J Other revenue (camplete schedule on page 2) F Total revenue Total revenue G Operation expense _ Operation expense .. Ii Pkiintenance expense , _ Maintenance expense Replacement costs Replace !nt costs Fees paid to other jurisdictions Fees paid to other jurisdictions K Total Ct'l & R '-� Total CTI & R (c c� L Interest expense Interest expense h1 Depreciation expense Depreciation expense N Total expense �o Total expense O Increase (Decrease) Fund Balance ,� Increase (Decrease) Fund Balance _� y P Dcbt principal Debt principal Q Total flaw volume Total flaw volume R Extraordinary repairs and maintenance are those + hieh are of such a nature as to be beyond those repairs antic - in the annual budget. Examples of "extraordinary" breakdonns might include a bla+,er breakdown in the aeration large pump system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance problem for this seeerage system. S ly)proximate cost of this potential repair G— 31 (over) -2- v Describe the source of finds to cover this extraordinary iten (a bond, line of credit, escrow account, rkinq capital, etc.) Additional come is Detail of other reve ue on Line E (if applicable): • Description cz/)4 lL 4r ri-' i j Year! Year 2 pmt Amunt Contact person: achy: i , nn Hap \f•n ice N _. ors: residential cam�erci al �_ _ _ iVPhE � r %/I a r' 1V l c. 2i�{Q rE # 3Q1 99L(... G-32 SCILUI.E FS FINANCIAL MPNPCi STATISTICS COUNTY WATER & SE FR PIR'LS County Name . 4`_kS_ ___ Fiscal Year #1 (_-?c-."> Systen Fiscal Year 2 F I SCA YErR T 1 COLUITI 1 FISCAL YEAR ,i:2 coati 2 a Se.,er cnarce revenue Sewer charge revenue C Connection charge revenue Connection charge revenue D Front ft assessment revenue Frait ft assessment revenue E Other revenue (complete schedule on oaae 2) Other revenue (crnpleteesschedule lea 2) F Total revenue Total revenue G Operation expense Operation expense, Ii Pkiintenance expense Maintenance expense I Replacement costs Replacement costs .J Fees paid to other jurisdictions Fees paid to other jurisdictions Total Ci4 & R ,�: Total CM & R "3 I L Interest expense interest expense M Depreciation expense Depreciation expense N Total expense _ Total expense ? �3 0 Increase (Decrease) Fund Balance Increase (Decrease) Fund Balance P Debt principal Debt principal {) Total flaw volume Total flew volume R Extraordinary repairs and maintenance are those which are of such a nature. as to be beyond those repairs antici in line annuai budget. Examples of "extraordinary" breakaomis mmgnt incruce a otoAer 4reaxaaNn in uze derdLILMi large purp system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the it st costly potential repair and maintenance problen for this sewerage systen. pproxiinrate cost of this potential repair (over) G-33 -2 - Describe the source of funds to'cover this extraordinary item (a bond, line of credit, escr i acct, working capital, etc.) Additional cuumnts Detail of other revenue on Line E (if applicable): Year Year 2 Description Awmt Pmxmt A G-34 SQUAD FS FIW4 IAL ? W'GF34 NT STATISTICS COUNTY WATER & SEWER P%fi11S "County Na»e raGh;nat�n .Fiscal Year #1 ,o a� Fiscal Year #2 A FISCAL Y #1 1989 COLU41 1 FISCAL YEAR #2 COLUMN 2 Server diarge revenue 99,333 SeAer charge revenue C Connection charge revenue 9 , 950 Connection diarge revenue D Front ft assessment revenue Front ft assessment revenue E Other revenue (carplete schedule on page 2) 19 ,177 Other revenue (crnplete schedule on pace 2) F Total revenue 128,460 Total revenue G Operation expense 63,592 Operation expense .' H Maintenance expense 16,050 Maintenance expense I Replacement costs 5,231 Replacement costs J Fees paid to other jurisdictions --_---. Fees paid tp_othgr jurisdictions K Total CM & R 84,873 Total CM & R L. Interest expense 8,641 Interest expense M Depreciation expense 44,011 Depreciation expense N Total expense 137,525 Total expense 0 Increase' (Decrease) Fund Balance (9,065) Increase (Decrease) Fund Balance P Debt principal 36,022 Debt principal Q Total flow volume 75,697,000 Total flow volume R Extraordinary repairs and maintenance are those which are of such a nature as to be beyond those repairs anticipat in the annual budget. Examples of "extraordinary" breakdorvns„might include a blamer breakdorvrr in the aeration sys large pump system motor and control, clarifier sludge scraper arm and bearings, Vora'fl'oat' d aerater.'.'Please identify the most costly potential repair and maintenance problem for this sewerage system. Gas detection eoujpment- 51,951 25 Repaired puma on chlorinator- S325.17,, Sewer svtrn f1ushin-. S5.132.00 Ladon motor reo1r- l.083.17 ' Lagoon Gearmotor repair- .$858.78 ., r•x.,� S Approximate cost of this potential repair $9,550,37 " (over) Mau r � • 2 - Describe the source of funds to cover this extraordinary item (a bond, line of credit, escrtw account, working capital, etc.) "i, Working capital i U Additional cats V Detail of other revenue on Line E (if applicable): Year I. Year 2 Description pm unt mamt Rental and. Other Income . $2,357 Ttex't` .Income.:....._ .. 16, 820 JY w ... W..., :......., w.. _, ..•.__ _.... ..1.9•l.177 . ��• � .. .. .. 1. i , t � � ` yr .. .rr m.. ... .w . .... .. . . . • . . .. .. _.. ...................... , _r . .... •� •-.r,.. • Vrr .i• ..•'$ 7f'. .:.. ^.. .�'' !':' .1C rr. .i r!i' `?t '�l i[ Q tact Person: Capacity: 0.46 y,,< _., '�' . Fay,,.1,e ,Smith, Town Manager NAND Users: residentla1Paul Street 785............__ ....,.................... Town of Boonsboro, 11 St....... camiercial Eoonsboro, IMD 217 65....................• ... .�.._...._� ....:.. .......::....:...:... _ /M....... _ 301-432-5141 t. ;. I ...mr,:. , ,._,,...w_.:.N.,.. ,. _ ....a ......... .:. .,.w F,ax .301-432-4050 _ G-36' SG1EI LE FS FIN/ ZCIAL PGMiT STATISTICS COUNTY WATER & SEWER Pl.PM County Nance Washington Systen NanBoonsboro Lagoon �:,-'r .'.�i::';t•: 1'991 _ , Fiscal Year #1 (Fiscal Year #21990 K FISCAL YEAR #1 COLI.P'N 1 FISCAL YEAR #2 q COLUMN 2 n Serer charge revenue 125,110 Sr c arge revenue loo . 930 C Connection charge revenue 5,600 Connection charge revenue 8,110 0 Front ft assessment revenue Front ft as'��v�nue E Other revenue (carplete schedule on e2 , 25,216 Other. revenue _(caiplete schedule on page 2) _ "127,065 F Total revenue 155,926 Tota revenue -... F..,., 105 G Operation expense 7 R Operation expense 6.1.344 Ii Maintenance expense Maintenance expense I Replacerent costs ' ... Replacerent costs J Fees paid to other jurisdictions -Fees.. paid to other jurisdictions .... . .. ...-. ... :i .. A:. - K. Total C1&R R 103,313 Total C1&R R 177,582 L Interest expense 6,316 Interest expense 7,483 M Depreciation expense 42,339 Depreciation expense 44,7.84 Pl Total expense 151,968 Total expense 229,849 0 Increase• (Decrease) Fund Balance 3,958 Increase (Decrease) Fund Balance 6,256 P Debt principal 42,417 Debt principal 36,805 Total flaw volume 71,275,000 Total flaw volume - 67,615,000' R Extraordinary repairs and maintenance are those r4iich are of such a nature as to be beyond tfrose�repa 'rs aiticipate< in the annual budget. Exarples -of "extraordinary" breakda�ns might include a blower breakdown in the aeration systE large pulp systen motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance:.plen for this se+�erage �S+stn.n��' 1990 -Aerator repairs- S864.45 --Lagoon motor repair- S1,335.45 m_ R r......l: x; Mixer motor repair- $1,030.26 ~' 1991- Lagoon repair- $2,685.85 'Motor.Krepa,.r- $297.28 Lagoon motor repair- $1,845.63 South end pump station repair- $ 1,710.00 Filters & Scale- 51,029.50 Lagoon .,£ow meter repair- $272.00 Time indicator- $396.00 Lagoon chlorine heads- $1,690.95 Approximate cost of this potential repair 1990-, $3,230.16 1991- $9,927.21 (over) G-37 1' :t Describe the source of funds to cover this extraordinary item (a bald, line of credit, escrv• -.o: capital, ettr.):- Working capital Additional ,caRne:ts tail of other revenue on..Line.E (if applicable): ::......... ' Description _ • ...•_... y.....'• ; .; . Rental and other income Interest income ........... .......•,... EPA' Gratis _•. Year 1 Amamt S4,344 18,032 2,840 25,216 • . Y 1 ..' t. _Y .m Vs.twc.vn.,vi', ��. ,.n .i i...1I. ...wv.. .,...��. '.... . • . w.. ... ...ar ... Year 2 Amamt ., w. .$:2,564 `'18,775 105;726 117,065 Jk. t(..•.(:' r: '.ir . .,..w. �..w..•er••r. 4.. v .rn.. .. „w '...su.,, .r,.. u.. r. .n.•r .... ..... .0 .n ....n. m..v . .. .' ' • K't2 f . ' u`r .ar• .... Contact Person: C apa"' Fay L Smith, Town Manager cIty.1.: p:6...: ..�� _._ ....- . ;_.• Users, residential 785 Town of Boonsboro, 1'1 Srpain Street ......,_.�...,- _ .� ...� ......., ...��...... ,.. ...... _ : ADDRESS . .. ...... . camiercial 65 Boonsboro, Mr) 21713 432-5141 T # Fax- 301-432-4050 G-38 SO1l:DU1 E FS FINAN2IAi_ i STATIS I{3 CUUNTY RATER & €ER PL County Plane Washington Fisa71Yearr`I ' 1989/90 Systen Naue.See "U" Washington County Sanitary District Fiscal Year 2 1990/91 A FISCAL YF?R r 1 COLill 1 FISCAL YEIR i2 .. CDt.LrT 2 Sever charge revenue 1,710,496 SeNer charge revenue 1,716,347 C Connection charge revenue 717 ,56 i Connection charge revenue 269 , 617 D Fruit ft assessment revenue -- Front ft assessmentre `. even... n ue -- E Other revenue (corpiete schedule on oaae 2) 122,321 Other revenue (c*Tetthedule on oaoe 2) 212 700 ' F Total revenue 2,550,378 Total revenue "" 2,198,664 G Operatic i expense 881 ,205 Operation expense 1,573,403 H Maintenance expense 18,379 Maintenance expense ,,' 28,667 I Rep l ace er t costs Replace :t.• costs : _ J Fees paid to other jurisdictions Fees paid to other jurisdictions Total `CM & R 899,584 Total CM & R 1,602,070 Interest expense 418,753 Interest expense 508,687 Depreciation expense 301, 969 Depreciation expense , 413,203 N Total expense 1,620,306 Total ewe 2,523,960 0 Increase (Decrease) Fund Balance 930,072 Increase (Decrease) Fund Balance (325,296) P Debt principal 1,577,250 Debt principal 2,481,582 Q Total flaw volume 455,120,369 Total flaw volute 633,573,300 R I Extraordinary and maintenance are those +rich are of s airs rep � udi a nature as to"-be"beyond those repairs anticipa in the annual budget. Exarples of "extraordinary" breakdatins might include a blower breakdcon in the aeration sy large puro system motor and control, clarifier sludge scraper arm and bearings, or a floating aerator. Please identify the most costly potential repair and maintenance problen for this seNerage sy�tu=m, . i .. .... .. n.,u . s... .m -w ...... „Y.: ��;.. L ��1 i Aid V,Y•wr•.. Generator S} Approxiurrate cost of this potential repair 77,000 hover} G-39 l —2- I Describe the scurce.of furls tom: :carer this extraordinary item (a bcnd, line of credit, escrow account, working capital , etc.) Cr1t} Pr U Mdjja1 coniien s N i cad�mus WWTP i i, H h I a nd Manor , WWTP nt r WWTP (' hie -!-Hal' uax t =- w.as re -name d-�'N codem�ss WwfiP L. --- .• , f! .' l"� � Z � I I Y�I Y I:/YDrr�l:4�• V Detafl :of other revenue as Line .5. f `' akTe .; ... _ ... 5,w �....,w. ,.. .....:... n...a.rrwrw-+.... v{ Year z: Oescr�ytiort _. , .. �.:N.,. , ... , Arr�mt Penalty iiarge, -,'. -` ,_-, _..,,w,.. _ ti.r,,, w, .,..�_.,. , 6,206 interest 109,424 •..- — 122,321 : {...D..., `.....,. ,,_:.... ♦w.. .-i....,• ..,'lmti Iww.t„sx .rn. ...... r4r: .... •,. Mu ,. .,vu, c,wr... .ru. •....hr+.:ww :t ,. r ., � S �! n :wr+.+MF. wrw w ,: •:.. +e» u. -a:.. ,r �� t+r�,+w�n�,� ,rr. • ,m N „rn,.,. w. .w rn=r. ,. ,.aan a ,n a,rn +x1•w . x.,xl.w.t'wwv'., rr ,yn:r.., ... n,,.'.. n.. Dnxnr w.:s.� .-.seau xn r:rwo. , •.r: ":.. M :.. .. Il. _, f +•,.. ".. a,x. rW:.. w -.,w_ .wr ..,... ,w,+.w+ •r •• „e..rw wzw:,a ani••ar.wxD ., .: „ierl"i.;rvNnr.4.-wa `at'r:'' '-• ,-.*1 �'.M �V "'wr.+„ r, .. t. r . . �'�� �.�': ....-,. !'r.. w ,n. ,..r.,-Na'c.M a,w. ,..n.ar ee,w:w-.. a.,:n,n..na .n. .,: .e.r. n•. .. .....,,. .. Iry lyl° .: x.�.: f S'!"�' De'{'en' •e-.VM �� a K:�.. �_z710 NG0 ditiar ray ......:R MIh l.,:W69 .... '.,.:.:W?Iliams2grt M (301) 791-3083 21795 G-40 "' , SG!DIIL£ FS - FINP CIAL WL0GD NT STATISTIC WJ{1Y WATER & SCR P1 6 County Nave Washinaton h i naton . ea v #1 88/89 Systen Nave See "U". Washington County Sanitary District-•".. . Fiscal Year 42 (1' A FISG?L YEAR i1 COLLMV I FISCAL__YEt!i3 3Z COLfi 2 ...�96 8 Serer charge revenue 1,162,003 Seae��...t�rge, revenue . 1 710 C Connection charge revenue 489.215 _ Ccnnecttcn charge tense , D Front ft assessment revenue _:f .,Wks ent� ,enue : E Other revenue (caTplete schedule 716 960 r. newer e.. (calr fete schedule on ace 2) , an pads"2�.- 321 F Tota i revenue .. .. • ° -" "- 2,37x,178 w. Tea _rev. G Operation expense. 959,842 is `' se .; ...' ' ,,:T' ,. 881i5 H Maintenance expense 3247.x ,'='' Maintenance expense Q I Replacement costs . Replaceint costs " J Fees paid to other' jurisdictions .a. Fees paid to other jurisdictions K Total CM & R i 992,OiL_ Total CM & R `. 899,584 Interest expense 448,gfi5 Interest expense 418,753 M Depreciation expense 386 490 , Depreciation expense .301,969 N Total expense 1,827471 Total expense 1,620,306 0 Increase' (Decrease) Fund Balance 550,707 Increase (Decrease) Fund Balance . 930,072 D Debt principal 3,721,172 Debt principal 1,577,250 Q Total flay volume 463,982,700'S Total flow volume 455,120,369 RI Extraordinary repairs and maintenance are tfio'se�v�hich•are-of.•sr _a,.rnatuM,as to be beyond those repairs: anticipat in the annual budget. ExaTples of "extraordinary" br akdawns sight include a B aver area 6dw, in-the••aer ticn syE large pulp system mstor and control, clarifier sludgecraper arm and bearings, or a floating aerator.. Please identify ttne nose costly potential ra1rar1dmapitenance problei for this sewerage system. i rpF S 1 approximate cost of this potential repair 71,000 (over) G-41 -2- Year 2 Aunt 53,246. 64 ,387.1 387 . :. ' .:.. . 83,492 . 36,54q t rsont Cpacity��,..,...�..,. 301-223-941:6 .6,206 109p424 6,691: ter^ 122,32.1`: G-42