HomeMy WebLinkAbout170822 AgendaTerry L. Baker, President
Jeffrey A. Cline, Vice
President
Washington County
MAR R YLAND M A Y L A N D
John F. Barr
Wayne K. Keefer
LeRoy E. Myers, Jr.
100 West Washington Street, Suite 1101 I Hagerstown, MD 21740-4735 P: 240.313.2200 I F: 240.313.2201
WWW.WASHCO-MD.NET
BOARD OF COUNTY COMMISSIONERS
August 22, 2017
Agenda
09:00 A.M. INVOCATION AND PLEDGE OF ALLEGIANCE
CALL TO ORDER, President Terry L. Baker
APPROVAL OF MINUTES —AUGUST 8, 2017
09:05 A.M. COMMISSIONERS' REPORTS AND COMMENTS
09:10 A.M. REPORTS FROM COUNTY STAFF
09:15 A.M. CITIZENS PARTICIPATION
09:20 A.M. DISABLED AMERICAN VETERANS ORGANIZATION - "FORGET-ME-NOT"
MONTH" PROCLAMATION (SEPTEMBER 2017) - Jr Arnold
09:25 A.M. PROGRAM OPEN SPACE LAND PRESERVATION EASEMENTS — Eric Seifarth,
Rural Preservation Administrator, Planning and Zoning
09:30 A.M. COMMUNITY ORGANIZATION FUNDING, SERVICE PRIORITY AREAS FOR
FISCAL YEAR 2019 — Jim Hovis, Director, Office of Community Grant Management
09:45 A.M. HOTEL RENTAL TAX REQUEST; WASHINGTON COUNTY MUSEUM OF FINE
ARTS, HVAC REPLACEMENT — Jim Hovis, Director, Office of Community Grant
Management
09:50 A.M. WASHINGTON COUNTY STRATEGIC HIGHWAY SAFETY PLAN - Sheriff Doug
Mullendore and Merle Saville, Traffic Engineering, Engineering Department
09:55 A.M. 2017 HOUSING BOND ALLOCATION TRANSFER — Stephen Goodrich, Director,
Department of Planning and Zoning
10:00 A.M. INTERGOVERNMENTAL COOPERATIVE PURCHASE (PUR-1358) FOR THE
HIGHWAY DEPARTMENT OF THREE (3) DUMP TRUCKS - Rick Curry, Director,
Purchasing Department and Ed Plank, Director, Highway Department
10:05 A.M. REQUEST TO CONVEY CERTAIN REAL PROPERTY - Susan Small, Real Property
Administrator, Engineering Department
Individuals requiring special accommodations are requested to contact the Office of the County Commissioners, 240.313.2200 Voice/TDD, to make
arrangements.
10:10 A.M. CLOSED SESSION
(To discuss the appointment, employment, assignment, promotion, discipline, demotion, compensation, removal, resignation,
or performance evaluation of appointees, employees, or officials over whom this public body has jurisdiction; or any other
personnel matter that affects one or more specific individuals; to consult with counsel to obtain legal advice on a legal
matter; and to consult with staff consultants, or other individuals about pending or potential litigation.)
11:00 A.M. Depart For 5 South Clifton Drive, Williamsport, MD
11:30 A.M. MICHAEL G. CALLAS MEMORIAL - NEW EDUCATOR'S RECEPTION AND
LUNCHEON
Location: Williamsport High School, 5 S. Clifton Drive, Williamsport, MD
Individuals requiring special accommodations are requested to contact the Office of the County Commissioners, 240.313.2200 Voice/TDD, to make
arrangements.
Board of County Commissioners of Washington County, Maryland
Agenda Report Form
Open Session Item
SUBJECT: Program Open Space (POS) Land Preservation Easement Projects
PRESENTATION DATE: August 22, 2017
PRESENTATION BY: Eric Seifarth, Rural Preservation Administrator
RECOMMENDED MOTION: Move to approve Washington County's participation in POS
acquisition of land preservation easements to be held jointly by the Department of Natural
Resources (DNR) and The Board of County Commissioners of Washington County, Maryland.
REPORT -IN -BRIEF: Funds for POS Land Preservation easements have been restored by the
Maryland General Assembly. The easements are funded 100% through DNR to be used for
permanent land preservation in counties willing to participate. Currently, Washington County
Land Preservation staff is working with DNR to evaluate and purchase easements on 3 properties
totaling 560 acres with an estimated easement value of approximately $1.5 million.
DISCUSSION: Even though all costs are being paid by DNR, in order for County property
owners to be eligible the Board of County Commissioners of Washington County, Maryland
must co -hold the easements. Land Preservation staff has met with the County Attorney to review
the County's responsibilities as an easement co -holder. The actual easements are very similar to
Rural Legacy projects protecting agricultural, environmental and historic features.
FISCAL IMPACT: There are recurring expenses for the inspections of the easement
properties by Land Preservation staff. Time required for inspections is 6 hours per year or
$225.00 per year and the cost is covered by the Department of Planning and Zoning budget.
CONCURRENCES: Department of Natural Resources.
ALTERNATIVES: Opt out of the POS easement purchase program.
ATTACHMENTS: None.
AUDIOVISUAL NEEDS: N/A
Board of County Commissioners of Washington County, Maryland
Agenda Report Form
Open Session Item
SUBJECT: Community Organization Funding- Service Priorities Areas for Fiscal Year 2019
PRESENTATION DATE: August 22, 2017
PRESENTATION BY: James B. Hovis, Director, Office of Community Grant Management
RECOMMENDED MOTION: Move to approve the Community Organization Funding
Service Priority Areas and their respective available funding amounts as presented (or amended).
REPORT -IN -BRIEF: The Community Organization Funding Committee is preparing for the
fiscal year 2019 application and review process. As agreed upon, the Board of County
Commissioners shall annually determine and approve the service priority areas eligible to receive
funding consideration. The Board shall also set or approve the total available funding that should
be dedicated to each established service priority area.
DISCUSSION: Historically the Board has funded six (6) service priority areas which are: Arts
& Culture, Domestic Violence, Families and Children, Recreation, Seniors and Other. These
service priority areas have encompassed and included all applications received and have not
excluded an organization from making application for funding.
For the purposes of the Committees fiscal year 2019 considerations, Washington County's Chief
Financial Officer has indicated $1,700,000 is available for distribution. This total is subject to
adjustment as the fiscal year 2019 budget is discussed.
It is the recommendation of the County's CFO and Director of the Office of Community Grant
Management that the amount of funding made available for each respective service priority be
set as indicated below:
Service Priority Area Funding Available Percent of Available Funds
Arts & Culture $227,810
Domestic Violence $306,900
Families & Children $255,380
Recreation $27,000
Seniors $873,110
Other $9,800
Total $1,700,000
13.4%
18.0%
15.0%
1.6%
51.4%
0.6%
100%
As agreed upon by the Board, the Committee does have the latitude to move ten (10) percent of
the approved amounts from one service priority to another, but every year the amount of funding
available for a specific service priority area will return to the approved base figure as set by the
Board.
FISCAL IMPACT: The fiscal impact of Community Organization Funding is dependent upon
funding decisions made by the Board during the annual budgetary process. Any decisions made
as a result of this discussion will have no immediate fiscal impact.
CONCURRENCES: Chief Financial Officer, Washington County, Maryland
ALTERNATIVES: The Board may amend service priorities and funding amounts as deemed
appropriate
ATTACHMENTS: N/A
AUDIO/VISUAL TO BE USED: N/A
Washington County
Board of County Commissioners of Washington County, Maryland
Agenda Report Form
Open Session Item
SUBJECT: Hotel Rental Tax Funding Request, Washington County Museum of Fine
Arts, HVAC Replacement
PRESENTATION DATE: August 22, 2017
PRESENTATION BY: James Hovis, Director, Office of Community Grant
Management, Rebecca Massie -Lane, Director WCMFA, Al Martin, President, WCMFA, John
Schnebly, Past -President, WCMFA
RECOMMENDED MOTION: Move to approve the request for Hotel Rental Tax funding
from the Washington County Museum of Fine Arts in the amount of $ , for direct
expenses associated with HVAC Energy Efficiency Improvements.
REPORT -IN -BRIEF: The Washington County Museum of Fine Arts (WCMFA) has
submitted a request for Hotel Rental Tax funding to support the facility's HVAC replacement.
The HVAC upgrades and replacement are projected to cost $1,096,575. The amount of funding
requested for this project is $350,000, paid in 5 -annual disbursements of $70,000.
DISCUSSION: The WCMFA is an economic driver for Hagerstown and
Washington County. The museum's zip code collecting reveals that 21.3% of visitors originate
beyond a 50 mile radius of the museum with a yearly $1,328,470 economic impact (State &
Local Tourism Statistics.) Over the past five years, the WCMFA has received visits from all 50
States, the District of Columbia, and 51 Foreign Countries; 52.0% of museum visitors are from
Washington County. Using the museum's average attendance of the last ten fiscal years (47,545),
the Museum predicts it will receive 494,460 County visitors during the next 20 years of the
newly installed HVAC system. The museum's goal is to increase visitors originating beyond 50
miles to 22% creating a yearly economic impact of $1,495,766 (+ $167,296) and totaling
$29,915,320 over the next 20 years.
The replacement of the HVAC system is the top capital priority for WCMFA. The expectation is
that the work will take place by May 2018. The current HVAC systems in the Washington
County Museum of Fine Arts are aging, failing, and provide inadequate controls. Problems
facing the WCMFA include HVAC failures in galleries, art storage, and office areas, lack of
redundancy, lack of humidity control, inability to maintain museum climate standards, and
concerns for the threat this poses to collections stewardship. The museum's national
accreditation rests upon its ability to meet Best Practices, including environmental conditions
affecting care of collections. During the past five years, the trustees and staff have raised a total
of $749,102 for Capital Projects. These have included two roof replacements, historic skylights
repair, refurbishing two major galleries, improving the North Entry Plaza and upgrading the
catering kitchen. The WCMFA has been accredited by the American Alliance of Museums since
1976, and was re -accredited in 2016; only 3.1% of American museums are accredited.
The Board of Trustees, as fiduciaries of the building, the collections, and the funds of the
museum, engaged an Energy & Systems Audit in 2015 from Kibart Engineering. As a result of
the audit recommendations, our independent subject matter experts are of the opinion that the
WCMFA can go from a whole -building heating efficiency of 68% to 90%; electric use is
expected to decrease by 54% as a result of the HVAC upgrade. In addition, natural gas
consumption is anticipated to be reduced by 20%. The Systems Audit Report is the basis for
prioritizing, budgeting, and planning for energy efficiency cost improvements, maintenance and
equipment replacement savings, improved conditions for the care and preservation of the
magnificent art collections, and better conditions for the public. This Audit Report was followed
by a detailed study and cost estimate outlining a comprehensive replacement of the HVAC
system.
The total HVAC replacement budget is projected at $1,096,575. The WCMFA has secured
funding from a Maryland Energy Administration grant in the amount of $120,413, is seeking
funding from Private Foundations in the amount of $412,335 and $213,827 from a combination
of sources including WCMFA self -funding, City of Hagerstown, in -kind and private donations.
The project budget includes $515,824 for equipment, $363,723 for labor and $217,028 for
materials, supplies, permits, sub -contracts and consultant fees.
This event meets all 7 of the Board of County Commissioner's goals and criteria for the use of
Hotel Rental Tax Funds. There are no issues of outstanding obligations to the County that would
prevent the WCMFA from receiving funding. It is the position of the Office of Community
Grant Management that this application may be approved in an amount determined to be
appropriate by the Board of County Commissioners.
FISCAL IMPACT: The Hotel Rental Tax Fund will be reduced by the amount of this
award. If annual distributions are awarded, the annual award would impact the fund in the same
fiscal year as the distribution.
CONCURRENCES: N/A
ALTERNATIVES: Deny the request for Hotel Rental Tax Funding.
ATTACHMENTS: Hotel Rental Tax Funding Application with attachments.
AUDIOVISUAL NEEDS: N/A
Washington County, Maryland
Hotel Rental Tax Funding
Grant Application
100 West Washington Street
Room 2200
Hagerstown, Maryland 21740
240-313-2040
Organization/Agency:
Address:
Contact Person:
Phone Number:
Tax ID/Federal ID#:
Project Classification:
Washington County Museum of Fine Arts
E-mail Address:
rmlane@wcmfa.org
IP.O. Box 423, 401 Museum Drive, Hagerstown, MD 21741
Rebecca Massie Lane
Title: Director
1(301) 739-5727 Fax Number: '(301) 745-3741
52-0607950 Co Capital Request C' Operating Request
C' Tourism/Attraction C' Economic Development Co Cultural C' Recreation
Project Name: 'Washington County Museum of Fine Arts (WCMFA) Building Energy Efficiency Improvements
Project Start Date: (October 2017
Project End Date: (June 2018
Project Justification and Economic Benefit/Impact to the Visitor Industry, if Applicable
The WCMFA respectfully requests support from the Washington County Hotel Motel tax in the amount of $350,000.00, in five annual
installments of $70,000.00 to assist with a major HVAC system upgrade. The replacement of the HVAC system is now the top capital
priority for WCMFA. The expectation is that the work will take place by May 2018. The current HVAC systems in the Washington
County Museum of Fine Arts are aging, failing, and provide inadequate controls. Problems facing the WCMFA include HVAC failures in
galleries, art storage, and office areas, lack of redundancy, lack of humidity control, inability to maintain museum climate standards,
and concerns for the threat this poses to collections stewardship. The museum's national accreditation rests upon its ability to meet
Best Practices, including environmental conditions affecting care of collections. During the past five years, the trustees and staff have
raised a total of $749,102 for Capital Projects. These have included two roof replacements, historic skylights repair, refurbishing two
major galleries, improving the North Entry Plaza and upgrading the catering kitchen. The WCMFA has been accredited by the
American Alliance of Museums since 1976, and was re -accredited in 2016; only 3.1% of American museums are accredited.
Anticipated Visitor Attendance and Impact on Hotel Rental Occupancy, if Applicable
The WCMFA is an economic driver for the region. The museum's zip code collecting reveals that 21.3% of visitors originate beyond a 50
mile radius of the museum with a yearly $1,328,470 economic impact (State & Local Tourism Statistics.) Over the past five years, the
WCMFA has received visits from all 50 States, the District of Columbia, and 51 Foreign Countries; 52.0% of museum visitors are from
Washington County. Using the museum's average attendance of the last ten fiscal years (47,545), the Museum predicts it will receive
494,460 County visitors during the next 20 years of the newly installed HVAC system. The museum's goal is to increase visitors
originating beyond 50 miles to 22% creating a yearly economic impact of $1,495,766 (+ $167,296) and totaling $29,915,320 over the next
20 years.
Narrative Description of Project: Include purpose of project, outline of project procedures, intended results of project or any additional
comments that support the need for project and/or merit as an event or activity designed to promote Washington County, Maryland.
The WCMFA has provided a vibrant place for the presentation and exploration of art of lasting quality for the benefit of a diverse public
for more than 85 years. Hagerstown native Anna Brugh Singer and her husband William H. Singer, Jr., established the WCMFA in 1931
with the proviso that the museum adhere to the highest standards of collecting, that admission be free in perpetuity, and that the
museum provide an active program of public art education. Their generosity, and that of subsequent collectors, has resulted in a
remarkable collection of some 6500 works, with particular strength in 18th -20th Century American Art. Over 80 specialized art classes
are offered yearly for Children and Adults. Tours, Educational Programming, Outreach, Bus Trips, Concerts & Community Programming
accounted for 33% of total Museum attendance. The 31,150 square foot building is on the Maryland Historic Trust. WCMFA requests
support for comprehensive modifications of its HVAC system. (Attachment B)
The Board of Trustees, as fiduciaries of the building, the collections, and the funds of the museum, engaged an Energy & Systems Audit
in 2015 from Kibart Engineering. (Attachment A) As a result of the audit recommendations, our independent subject matter experts are
of the opinion that the WCMFA can go from a whole -building heating efficiency of 68% to 90%; electric use is expected to decrease by
54% as a result of the HVAC upgrade. In addition, natural gas consumption is anticipated to be reduced by 20%. The Systems Audit
Report is the basis for prioritizing, budgeting, and planning for energy efficiency cost improvements, maintenance and equipment
replacement savings, improved conditions for the care and preservation of the magnificent art collections, and better conditions for the
public. This Audit Report was followed by a detailed study and cost estimate outlining a comprehensive replacement of the HVAC
system.
The current HVAC systems are aging, failing, and providing inadequate controls. Problems facing the WCMFA include HVAC outages in
galleries, art storage, and public areas, lack of redundancy, lack of humidity control, inability to maintain museum climate standards, and
concerns for the threat this poses to collections stewardship. The museum's national accreditation and its reputation rest upon its ability
to meet Best Practices, including environmental conditions affecting care of collections. The building is currently served by two air
handling units. The Carrier Unit serves the 1930/1949 buildings. The York Unit serves the 1994 building. Each unit is equipped with two
condensers; only one in each unit is functioning. As a result, there has been no redundancy in the York and Carrier systems, leaving
WCMFA vulnerable to unacceptable fluctuations in temperature and humidity. Heating, cooling and humidity spikes caused by outages
are damaging to the works of art. Such fluctuations cause expansion and contraction of works of art and increase chemical reactions
that gradually break down and damage the art. Higher humidity causes corrosion in metals and mold growth on organic materials.
The Carrier unit for the 1930/1940 buildings serves the greatest number of exhibition areas including the Museum's valuable art
collections in the Baer, Fulton, Mason, Schreiber, Singer, Smith, and Thieblaut Galleries, valuable loaned exhibitions in the Bowman
Gallery and the art collections storage vaults. During the long-term outage of summer 2015 (a week without the Carrier unit), these
galleries reached an unacceptable 80 degrees. The York unit serves the 1994 building which includes the Groh Gallery. In May 2016, the
York unit experienced an extended outage with similar high temperatures and humidity levels. The 2011 AAON unit serves the Atrium.
The Museum's reports from its recording hygro-thermographs recorded the fluctuations. The fluctuations in relative humidity were
particularly alarming in the painting storage vault. In both the 2015 and 2016 outages, the ordering of parts and repairs took multiple
days, causing the interior temperatures to reach 80 degrees, 10 degrees above the conservation standards for museums. In December
2016 and March 2017, the museum experienced boiler failures, resulting in repairs amounting to over $12,000. Mechanical contractors
assessed the situation and reported to the museum in called meetings in 2015 & 2016.
The Engineers and Mechanical Contractor who collaborated on the detailed HVAC replacement study have recommended modifying
the HVAC System into a Variable Air Volume (VAV) system with Reheat. This system is recommended because it will give the Museum a
more consistent and controllable HVAC System, stabilizing the humidification, establishing a level of redundancy, and resulting in
significant energy savings. There is a special design criteria for museums that requires indoor conditioned space of the public areas,
collections storage, and exhibition areas to have temperature, relative humidity, and airborne pollutant controls in compliance with
ASHRAE Chapter 23. Cost-effective energy, security and air/humidity controls are 24/7, 365 mission -critical factors for the Museum. The
General Scope of Work will include Demolition, Adaptation, and New Systems to be completed by end of spring 2018.
Over its long history, the WCMFA has developed numerous programmatic and financial realtionships with businesses, organizations,
and individuals throughout the four state region such as the Washington County Public Schools, City of Hagerstown and Washington
County Governments, CVB's (Washington & Frederick, MD, Franklin County, PA, Jefferson County, WV), Garden Clubs, Rotary, assisted
living communities, and service and civic groups. Local City and County governments support museum operations (15% of budget)
through a founding agreement with Anna & William Singer & Museum Trustees. The Maryland State Arts Council (MSAC) supports
operations (4%) through its operating grant program. Partnerships include MSAC Touring Artists, St. Mary Catholic School, ARC, The
Downtown Movement --Hagerstown, and the Hagerstown A&E District. The WCMFA partners with City events including: Blues Fest,
Holiday Tree Lighting, and Fall Fest. The Museum partners with local & regional artists for the Annual Juried CVA & CVP exhibitions and
art educators who teach museum art classes. WCMFA provides citizens of the region, museum members, volunteers, artists, area
collectors, educators, students, and scholars worldwide access to its remarkable collections, changing exhibitions, and programs.
Total Project Budget
A. Amount of Hotel Rental Tax Grant Funding Requested
B. List Other Funding Sources and Their Respective Amounts
Source: Maryland Energy Administration Grant
Source:
Private Foundations
Source: City of Hagerstown, WCMFA Funds, In -Kind, Private Donations
C. Total Project/Event Funding (A + B)
$350,000.00
$120,413.00
$412,335.00
$213,827.00
$1,096,575.00
Itemize your total project budget into the appropriate classifications:
A. Tourism Attraction (Be specific in expense break down):
B. Economic Development Enhancement (Be specific in expense breakdown):
C. Cultural Projects (Be specific in expense breakdown):
Salaries & Wages
$363,723.00
Equipment $515,824.00
Materials & Supplies, Documentation, Subcontracts, Contingency, Consultant
D. Recreational Projects (Be specific in expense breakdown):
Total Project Budget
$217,028.00
$1,096,575.00
Certification:
We certify the information contained in this application is complete, accurate and fully discloses the scope and intent
of our request for funding from the Hotel Rental Tax Fund. We agree to comply with the County's requests for
information regarding the use of awarded funds and to provide access to accounting records related to these funds.
We acknowledge that if expenditures of funds is approved, such approval will be for line -item -by -line -item
expenditures, which must be adhered to within the maximum 10% line item deviation.
We further acknowledge that any deviations beyond 10% allowable amount will require us to submit a program
amendment which will have to be approved by the Office of Community Grant Management prior to any further
expenditures.
By signing this application, I/we accept and agree to be bound by the terms and conditions of Hotel Rental Tax
Regulations as administered by the Washington County Commissioners in compliance with current State laws.
Signature:
Rebecca Massie Lane Digitally signed by Rebecca Massie Lane
Date: 2017.07.21 15:56:27 -04'00'
Applicant/Organization:! Washington County Museum of Fine Arts
Date:
Jul 21, 2017
Recommended by:
Comments:
dames Hovis Digitally signed by James Hovis
Date: 2017.07.25 09:57:12 -04'00'
Director, Office of Community Grant Management
Date:
Jul 25, 2017
(i Approve
C Denied
Approved By: I
County Administrator
Comments:
The requester is qualified to receive funding and has no outstanding obligations to the County. The project meets all 7
program goals. Estimates for work are included. Work will be competitively bid once funding for the project has been
identified. Funding requested - 5350K ($70,000 per year for 5 -years). Decision deferred to the County Commissioners.
Date:
[k/lpproved
(' Denied
For Requests over $25,000
Approved By: Date 1
President, Board of County Commissioners
Return Application To:
Washington County Office of Community Grant Management
100 West Washington Street Room 2200
Hagerstown, Maryland 21740
240-313-2040
(' Approved
(' Denied
FINAL REPORT
Engineering Audit of the Existing
Mechanical/Plumbing/Electrical Systems
Washington County Museum of Fine Arts (WCMFA)
Prepared by:
i<' KIBART
CONSULTING ENGINEERS
901 Dulaney Valley Road, Suite 301
Towson, MD 21204
Phone 410-494-1111 Fax 410-494-1112
WO # 13043.01
May 27, 2015
TABLE OF CONTENTS
I. SCOPE OF WORK AND EXECUTIVE SUMMARY
A. SCOPE OF WORK
1. MECHANICAL AND PLUMBING
2. ELECTRICAL
B. EXECUTIVE SUMMARY
1. MECHANICAL
2. ELECTRICAL
II. MECHANICAL AND PLUMBING
A. RECORD DOCUMENTATION
B. HVAC DESIGN CONDITIONS
C. EXISTING CONDITIONS
D. RECOMMENDATIONS AND ASSOCIATED COSTS
III. ELECTRICAL
A. EXISTING CONDITIONS
B. RECOMMENDATIONS AND ASSOCIATED COSTS
I. SCOPE OF WORK AND EXECUTIVE SUMMARY
A. SCOPE OF WORK
1. MECHANICAL AND PLUMBING
a. The main purpose of the mechanical portion of this narrative
is to provide the Owner an evaluation of the existing heating,
ventilating and air conditioning (HVAC) and plumbing
systems in the building, including providing
recommendations and associated construction costs.
2. ELECTRICAL
a. The main purpose of the electrical portion of this narrative is
to provide the Owner an evaluation of the electrical systems
in the building. This evaluation will cover the fire alarm
system, life safety systems, electrical distribution systems
and lighting systems.
B. EXECUTIVE SUMMARY
1. MECHANICAL
a. In general, the mechanical systems appear to be in working
order with the exception of the system serving the Cushwa
Courtyard. Various systems would benefit from life cycle
replacement and/or upgrade as detailed below.
2. ELECTRICAL
a. Overall, the electrical systems appear to be well maintained
and in good condition.
1) The fire alarm system still has issues that have
not been resolved. The devices still function,
but the previous system issues remain and
need to be addressed.
2) The security system has several deficiencies
that need addressing.
3) The lighting system would benefit from a
system overhaul, as the existing system is a
combination of old lighting technologies, and
the controls systems do not meet current
energy codes.
2
II. MECHANICAL
A. RECORD DOCUMENTATION:
In general, the collected information and drawings are applicable for the
maintenance of the facility. The following pertinent information/material is
missing and should be replaced:
1. Submittal data for the Multi -Zone AHU installed in 1981.
2. Submittal data for the Electric Steam Humidifier installed in 1981.
3. Submittal data for the Heating Water Boiler.
4. Submittal data for the AHU and Return Fan installed in 1993.
5. Submittal data for the Electric Steam Humidifier installed in 1993.
6. Submittal data for the VAV terminal boxes and reheat coils installed
in 1993.
7. System balancing reports for air and water.
B. HVAC DESIGN CONDITIONS:
The mechanical systems serving Museums and Archive buildings must
meet the needs for both human occupancy (ASHRAE 55) and preserve
the health and safety of the collections. As recommended by ASHRAE -
Chapter 23, the indoor design conditions for a museum must have
provisions to control the temperature, relative humidity, and airborne
pollutants in spaces that collections are displayed or stored. The existing
HVAC system has the main components required to meet the
recommendations of ASRAE, however some improvements (described
below) could be made. In addition, the indoor conditions should be
maintained at all times in spaces that collections are displayed or stored.
The indoor design conditions for a museum located in Hagerstown, MD
such as WCMFA is as follows:
1. Outdoor Air Temperature(All Areas):
Summer: 95°F Dry Bulb/78°F Wet Bulb
Winter: 11°F Dry Bulb
3
2. Indoor Air Ternperatures(All Occupied Areas Requiring Heating and
Cooling):
Summer: 70°F Dry Bulb, with a maximum daily fluctuation of ±5°F
Winter: 70°F Dry Bulb, with a maximum daily fluctuation of ±5°F
3. Indoor Air Relative Humidity(All Occupied Areas Requiring Heating
and Cooling):
Summer: 50% RH, with a maximum daily fluctuation of ±5%
Winter: 40% RH, with a maximum daily fluctuation of ±5%
4. Based on scheduled outside air quantities as shown on as -built
drawings, the scheduled amounts are adequate to meet ventilation
rates required by ASHRAE 62.1. However, system operating
modifications made to the HVAC system serving the Cushwa
Courtyard will cause the space to be under ventilated and would
not meet required ventilation rates during high occupancy special
events such as wedding receptions
5. Based on the information found on the building's construction
drawings, the building's thermal envelope appears to meet the
energy efficiency requirements of the current code.
6. The existing HVAC system serving the building is equipped with the
primary components suitable for its intended function. The existing
system capacity appears to accommodate the thermal load
requirements. However, the space humidity appears to fluctuate
beyond the recommended tolerances noted above. Space humidity
fluctuations are caused by many contributing factors such as
system controllability, lack of a vapor barrier in the building
envelope, pedestrian traffic infiltration, etc.
7. The existing elevator machine room is currently exhausted.
Current code would require the installation of a dedicated cooling
unit to serve the EMR.
C. EXISTING CONDITIONS
1. WCMFA was primarily constructed in four (4) phases:
a. PHASE 1: The original building was constructed in 1930.
The current names of the areas included in the original
construction are as follows:
• Basement (Boiler Room, storage and miscellaneous
rooms)
4
• Ground Floor (Diana, Kerstein, Schreiber, Smith, Mason,
Thieblot, Rinehart and Baer Galleries)
b. PHASE 2: The building was expanded in 1949. The current
names of the areas included in the expansion are as follows:
• Basement (Mechanical Room, Vault, storage and
miscellaneous rooms)
• Ground Floor (Bowman, Fulton and Singer Memorial
Gallery)
c. PHASE 3: The building was further expanded in 1994. The
current names of the areas included in the expansion are as
follows:
• Ground Floor (Lobby and Gift Shop, Offices, Library,
American and Contemporary Art Corridors, Browne
Education Room and Groh Gallery)
• Penthouse (space to run ductwork and piping)
• Cushwa Courtyard
d. PHASE 4: The Cushwa Courtyard was enclosed with a glass
roof in 2011.
2. There are three existing HVAC systems that serve the building.
Each system is dedicated to serve one of the following areas of the
building.
a. Original 1930 building construction and 1949 building
expansion
b. 1994 building expansion
c. Cushwa Courtyard
3. ORIGINAL 1930 BUILDING CONSTRUCTION AND 1949
BUILDING EXPANSION
a. The area is served by an indoor air handling unit (AHU),
return air fan, and an outdoor air cooled condensing unit
(ACCU).
1) The AHU is a constant volume multi -zone (7 zones)
unit that has direct expansion (DX) cooling and hot
water heating coils.
2) The AHU and return air fan were manufactured in
1981 based on the serial numbers and installed soon
after, replacing the original HVAC equipment installed
in 1930 and 1949. The units are located in the Boiler
Room in the basement of the original 1930 portion of
the building. The ACCU is located on grade. There
5
were no record drawings of the installation available
to Kibart.
3) As part of the work done during the 1994 building
expansion, the associated ductwork was modified and
the AHU was rebalanced to 17,835 CFM supply air
(SA) and 2500 CFM OA.
4) Although the AHU, return air fan and the ACCU were
observed to be in good operating condition and
appear to have been well maintained, the units are
over 33 years old and have outlived its normal life
expectancy of 30 years.
b. An electric steam humidifier (45 kW) installed in 1981,
located next to the existing AHU provides humidification to
the seven AHU zones via duct mounted steam dispersion
tubes, valving and distribution piping. Space humidistats for
each zone provide control of humidity levels. Although the
unit seems to be in good operating condition based on
conversations with maintenance personnel and appears to
have been well maintained, the unit is over 33 years old and
has outlived its normal life expectancy of 15 years. The
distribution piping and valving have been maintained and
repaired as needed over the years.
4. 1994 BUILDING EXPANSION
a. The area is served by an indoor AHU, return fan and an
outdoor ACCU.
1) The AHU is a 12,000 CFM variable air volume (VAV)
unit that has a direct expansion (DX) cooling coil. The
unit has a supply fan with variable inlet guide vanes.
Return air is via an inline centrifugal return fan with
variable inlet guide vanes.
2) The AHU, return fan and ACCU were installed during
the 1994 building expansion. The AHU and return fan
are located in the Mechanical Room in the basement
of the building portion built during the 1947 building
expansion. The ACCU is located on grade.
3) The AHU, return fan and the ACCU were observed to
be in good operating condition and confirmed with
conversations with maintenance personnel. At this
time, since the units are only 21 years old with a
normal life expectancy of 30 years, replacement of
the units are not recommended at this time.
b. An electronic steam humidifier (3.8 kW) installed in 1994 and
located in the Mechanical Room provides humidification via
duct mounted steam dispersion tubes and distribution piping.
6
A humidity sensor mounted in the return air duct provides
control of the humidity levels. At the time of Kibart's site visit,
the unit was being repaired.
c. The associated supply and return air ductwork, variable air
volume (VAV) boxes with heating coils and heating water
piping are located in the mechanical penthouse. Although
the equipment are over 20 years old with a normal life
expectancy of 25 years, they were observed to be in good
operating condition.
5. CUSHWA COURTYARD
a. The area is served by an indoor AHU, an energy recovery
unit (ERU) and an outdoor ACCU.
1) The AHU is a 9445 CFM constant volume unit that
has direct expansion (DX) cooling and hot water
heating coils.
2) The ERU was originally designed to exhaust 3,450
CFM and provide 3,450 CFM of outside air.
3) An electric steam humidifier provides humidification
via duct mounted steam dispersion tubes and
distribution piping. A space mounted humidity sensor
provides control of the humidity levels. It was
mentioned by maintenance personnel that they have
never seen the unit operate. This may be due to the
ERV being able to transfer latent heat and the other
existing building humidifiers that are contributing
factors. .
4) The AHU, ERU and humidifier are located in the
penthouse of the 1994 building expansion. The ACCU
is located on grade.
5) Since 2011 when the system was originally installed
by Beaver Mechanical Contractors Inc (BMCI), there
have been numerous problems with the operation of
the system according to the building's maintenance
personnel. In May of 2013, Kibart performed a
commissioning field investigation and issued a report
that identified construction deficiencies for
conformance with the system design. In the Fall of
2013, BMCI was hired to incorporate Kibart's
recommendations. Based on BMCI's final report to
the Owner, which included Testing and Balancing, the
system was operating as designed.
6) According to Miller and Anderson, the outside HVAC
maintenance company contracted by WCMFA, there
was once again an issue with the system. In January,
2014, there was an issue with a freezestat tripping in
7
the AHU. The AHU was manually reset and in an
effort to prevent the freezestat from tripping again,
Miller and Anderson performed the following:
• ERU was shut-off.
• The AHU return air damper was locked open.
• The AHU outside air damper was locked shut.
• Minimal outdoor air (actual quantity unknown)
was being brought in thru the ERU.
The above modifications have reduced the quantity of
ventilation air provided by the system and further
investigation is recommended to properly resolve the
issue.
b. A hot water radiant floor heating system (RFHS) was
installed to heat the concrete floor slab and provide heat to
the courtyard.
1) The RFHS consists mainly of the following:
• Main heating water pumps serving AHU
• RFHS pump
• Piping and shut-off valves
• Space thermostat
2) When the RFHS was originally designed, the intention
was that the RFHS would operate automatically via
the space thermostat and be utilized as a primary
heat source throughout the heating season. As
currently installed, the RFHS is operated manually
and only utilized for specific weekly events.
3) The RFHS cannot function automatically as designed
for the following reasons:
• With the current piping layout, the main heating
water pumps serving the courtyard AHU provides
flow thru the RFHS even when the RFHS space
thermostat is satisfied and the radiant floor heating
pump is de -energized.
• There are no control valves to control flow to the
RFHS.
4) According to maintenance personnel, the RFHS when
energized can cause the AHU to go into cooling mode
therefore wasting energy. As mentioned above, once
the RFHS is manually energized, there are no means
to automatically control the RFHS based on space
temperature, therefore causing the space temperature
to rise above the AHU space thermostat setting and
trigger the AHU to go into cooling mode.
6. General Plumbing
a. Plumbing Fixtures: The plumbing fixtures in the public
restrooms seemed to be in good shape. The water closets
(1.6 GPF) and urinals (1.0 GPF) were of the low flush type.
b. Domestic hot water is provided by electric water heaters.
The existing hot water distribution system does not have a
recirculating pumps and piping as required by the current
code.
D. RECOMMENDATIONS AND ASSOCIATED COSTS
1. HVAC:
a. The facility would benefit from a full control system upgrade.
Some systems in the building are served by a pneumatic
control system that contributes to a higher maintenance cost
and can be difficult to acquire replacement parts. In
addition, a full building wide BMS would provide better
monitoring and alarm for temperature and humidity control.
Air filter pressure drops could be monitored and alarmed in
addition to trending of space temperature and humidity that
would be an improvement over the existing data loggers
located in the galleries. Budgetary construction: $100,000
b. Replace the multi -zone AHU, return air fan and ACCU
installed in 1981 that serves the original 1930 building and
1949 expansion within the next 5 years. The recommended
system would consist of a VAV AHU along with seven (7)
VAV boxes to serve the different zones and an ACCU. The
new system would be more energy efficient with an
estimated overall annual energy savings of 58% based on
manufacturer's comparison data. Budgetary construction
cost in 5 years: $120,000
c. Replace the electric steam humidifier installed in 1981 that
serves the multi -zone AHU as soon as possible. Budgetary
construction cost: $15,000
d. Replace the VAV AHU, return air fan and ACCU installed in
1994 that serves the building expansion within the next 5
years. In order to save energy, the new system would utilize
VFDs to control the supply and return fans in lieu of variable
inlet guide vanes. The overall annual energy savings is
9
estimated to be 21% based on manufacturer's comparison
data. Budgetary construction cost in 5 years: $85,000
e. For the HVAC system serving the Cushwa Courtyard,
reverse what was done in January of 2014 and restore the
operation of the system back to the original design intent.
Reduce the outside air to the system and if possible, convert
the ERU unit to a variable air volume unit and utilize CO2
sensor to save energy: Budgetary construction cost: $15,000
f. For the RFHS serving the Cushwa Courtyard, convert from
manual operation to automatic by modifying the piping and
pumping layout, adding three-way mixing valves, removing
the space thermostat and integrating with the AHU
thermostat and providing necessary controls. Budgetary
construction cost: $15,000
2. PLUMBING
a. Replace water heater: Budgetary construction cost: $2,500
b. Install hot water recirculation lines: Budgetary construction
cost: $5,000
c. The existing attic space (mechanical penthouse) houses the
existing water heater, domestic water distribution piping, and
hydronic piping routed throughout the space and is located
above the art gallery spaces. Given the proximity of the
water piping and the potential damage risk to the gallery
spaces/exhibits below should a leak occur, we recommend
the addition of drip pans and leak sensors for an added level
of protection. The added leak sensors could be incorporated
into the facility BMS upgrade noted above.
I. ELECTRICAL:
A. EXISTING CONDITIONS
1. Electrical Distribution
a. The existing electrical service originates from a utility -owned
(Hagerstown Light Department) pad mounted, oil filled
transformer with a secondary voltage of 120/208 volt, 3
phase, 4 wire. Although not labeled, the transformer size is
consistent with a 300 kVA unit, as indicated on original
design drawings.
b. The existing service enters the building's Electric Room
underground terminating in an electrical switchboard. The
switchboard is a Square D, QED type switchboard, rated for
120/208 Volts, 1600 Amps. It has a single main bolted
pressure switch, rated at 1600 Amps and fused at 1200
Amps. There is ground fault protection, although not required
on 208V systems by the NEC.
c. The main switchboard distribution section is manufactured
by Square D, and is rated for 120/208 volts, 1600 Amps.
The distribution section utilizes circuit breakers, and the
circuit breakers are well marked. There is room for
additional circuit breakers.
d. The main switchboard is located in a storage area in the
basement. There are crates and boxes stored in the same
room, but sufficient clearance in front of the switchboard is
maintained.
e. Electrical distribution is provided through additional
panelboards located throughout the building. Electrical
panels are typically rated from 100 Amps to 225 Amps, and
are located out of the main exhibition areas.
1) Panels located in finished areas are flush
mounted, in the basement and mezzanine they
are surface mounted.
f. Visible portions of the distribution system indicate feeders
consisting of EMT type of conduits, and branch circuits
consisting of a combination of EMT conduits and MC cables.
These appeared to be in generally good condition.
11
g.
The entire electrical distribution system was completely
upgraded as part of the 1994 building expansion. The
system appears to be well maintained, and in good
condition.
h. Maintenance staff did not report any problems with
equipment, breakers, nuisance trips, etc.
2. Fire Alarm
a. The existing fire alarm system is a fully addressable system,
with voice evacuation. The fire alarm control panel is by
Fire-Lite alarms, model number MS-96000DLS. The fire
alarm system was completely upgraded in 2011. Sticker on
FACP indicates installation or maintenance by Dynamark
Security Centers.
b. There is an LCD fire alarm annunciator and remote
microphone cabinet located in the foyer.
c. There is no HVAC shut down switch. Any HVAC upgrade
will require installation of an HVAC shut down, per NFPA
90A.
d. Fire alarm device coverage appears to be up to current
codes.
1) Duct detectors were visible on HVAC units.
We did not verify unit CFM ratings, which
precisely determines the need for duct
detectors.
2) Smoke detector coverage appeared to be
adequate by current Codes.
3) Strobe and speaker coverage appeared to be
adequate per current Codes.
4) Manual pull stations were located at all exit
points.
5) The devices were last tested in October, 2014,
and passed, based on documentation that
Kibart received.
e. Fire alarm wiring was typically run in EMT conduit, or as MC
cable.
f. During a service check of the fire alarm system performed in
December, 2013, there were several reported issues with
the fire alarm system. These included disabled ground fault
detection, miswired devices, devices out of synch, and use
of devices incompatible with the control panel/system.
12
These issues are not readily apparent, but prevent proper
monitoring of devices by the fire alarm system, and
jeopardize the reliability, safety, and confidence in this
critical life safety system. As of the time of this report, these
issues have not been resolved, to our knowledge. However,
Atlantic Security has been contracted to provide a proposal
to correct the issues.
3. Exit and Egress Lighting Systems
a. Emergency egress lighting is provided by battery -backed
lighting units. In back -of -house areas, the egress lights are
combination battery/light units. Throughout the exhibit
spaces, the egress lights are remote lights with a remote
battery.
b. Egress fixtures appear to be well maintained and in good
condition. A random sampling was tested during our visit,
and they operated properly when tested.
c. The egress lighting system is not currently backed up by an
emergency generator.
4. Lighting Systems
a. The lighting throughout the building is a combination of many
technologies and systems.
1) Lights in the back of house areas are typically
fluorescents, and are a combination of T12's
and T8s. Some areas still utilize incandescent
light fixtures.
2) Lights in the office and store areas are
fluorescent. Fixtures in the offices are T8's,
fixtures in the store are T5.
3) Lights in the exhibit area are a combination of
ceiling mounted globe fixtures and track lights.
The globe fixtures are fluorescent. The track
fixtures are incandescent, but many have had
LED lamps installed.
4) The lobby has a cold cathode cove light. The
entry vestibule's cold cathode cove was
replaced with an LED string light.
5) Exterior and site lighting fixtures are typically
metal halide fixtures.
a) Parking lot light fixtures are pole -
mounted, decorative acorn style fixtures.
b) Other site lighting utilizes a mixture of
flood lights, in -wall lights and pole lights.
13
c) Exterior lights are controlled by a
contactor and time clock.
b. All lighting systems are manually controlled, by a
combination of switches, contactors and relays.
1) Manual controls, as installed in this building, no
longer meet energy code.
5. IT/Telecom System
a. The IT/Telecom system is located in the basement. The
incoming telephone service terminates at a plywood
backboard. The backboard contains several punch blocks
and routers for low voltage cable distribution. The
backboard had ample space for additional equipment.
b. There were items piled up on the floor in front of the
backboard. They did not prevent proper operation of the
equipment, although it does interfere with access.
c. The phone system is an Avaya VoIP system.
d. A small self-contained UPS provides backup power for the
phone systems.
e. No problems were reported during our investigation.
6. Security Systems
a. The security system is located in the basement. The
security equipment is mounted to several plywood
backboards, and consists of several locking cabinets.
b. There were items piled up on the floor in front of the
backboard. They did not prevent proper operation of the
equipment, although it does interfere with access.
c. The security system utilizes Altronix and Dynamark Security
Centers equipment. The equipment is functional but is
outdated, and does not have features that will allow for
downloading of records.
d. Security coverage includes sensors and alarm contacts, and
covers all points of entry, including the roof.
e. Camera coverage is limited through the building. There are
cameras in the exhibit areas, the lobby, the classroom areas,
and there are several cameras outdoors.
14
f. Two exterior CCTV cameras have had their cable cut.
7. Lightning Protection System
a. The building currently does not have a lightning protection
system. There is no Code requirement for a lightning
protection system.
B. RECOMMENDATIONS AND ASSOCIATED COSTS
1. Electrical Distribution
a. The electrical distribution system is in good condition and
has been well maintained. We do recommend that Square
D, or a NETA certified electrical testing/maintenance
contractor be contacted about additional internal inspections
and preventative maintenance on the main bolted pressure
switch, and ground fault protection system, to ensure proper
operation. The testing of the electrical distribution system
and panels should be done every 2-3 years. Budgetary cost:
$5,000.
b. A whole -building generator could be added, to provide back-
up power in the event of a power outage. The whole -
building generator would cover the egress and life safety
needs of the museum, and would also provide additional
power to keep the HVAC systems running to maintain a
proper environment for the collections on display. The
generator would most likely be a diesel unit (approximately
300kW/375kVA), with a sub -base tank and weatherproof
enclosure, to be located outside, and would require the
addition of two automatic transfer switches. Budgetary cost:
$200,000.
2. Fire Alarm
a. The existing fire alarm system is a fully addressable system
with voice evacuation, and device layout is up to current
codes. We do not recommend any changes to this aspect of
the system.
b. Fire alarm systems required yearly inspection and
maintenance. The museum should insure that this system
receives these minimum inspections. Brewer presently has
15
the maintenance contract for the sprinkler system, smoke
detectors and fire extinguishers.
c. The underlying issues with the fire alarm system (ground
fault issues, mis-wired devices, etc.) need to be resolved. A
certified fire alarm company should be contacted to either
repair or completely replace the current control panel, NAC
panel and EVAC panel. Budgetary cost: $10,000-$20,000.
3. Exit and Egress Lighting Systems
a. The emergency egress lighting is well maintained and in
good condition. Some of the fixtures are older halogen
fixtures, but as long as the fixtures are functioning properly
there is no reason to replace them.
b. A regular, and documented, inspection and testing should be
performed annually, as weak batteries are often the most
common type of problem. They may initially light, but quickly
lose power, far short of the required 90 minute operation per
NFPA. Budgetary cost: $1,000.
c. An emergency generator could be added to provide power
for the life safety systems. The generator would most likely
be a diesel unit (approximately 50kW/63kVA), with a sub-
base tank and weatherproof enclosure, to be located
outside, and would require the addition of two automatic
transfer switches. The generator would provide power for
the egress lighting, fire alarm and security, and freeze
protection, and we recommend that it provide power for the
servers as well. Budgetary cost: $50,000.
4. Lighting Systems
a. The lighting throughout the building is a combination of many
technologies and systems, and represents a significant
opportunity for energy savings. The existing lighting and
controls also do not meet IECC 2012.
Estimated savings and payback periods are based on an
estimated 55 operating hours per week (10 hrs Tues-Sat, 5
hrs Sun) and $0.10/kWh electrical cost.
1) The back of house lights should be upgraded
to fluorescent, we'd recommend T8's or T5's.
These areas may not provide significant
energy savings, due to the limited use of these
lights, but they will need to be upgraded to
meet current energy code. Use of consistent
lamping and ballasts will assist maintenance
16
and reduce required inventory of spare parts
on hand. Budgetary cost: $5,000. Estimated
cost savings of $200/yr.
2) The office areas are generally over -lit, with
many areas showing far in excess of the
current IES recommended 40 fc. The
occupants have taken the lamps out of several
fixtures in some of the offices, but this does not
always reduce energy, as ballasts are often left
energized. This work is of a small scale, and
will not generate significant energy savings, but
could easily performed in-house.
3) The incandescent track lights in the exhibit
areas should be replaced with LED lamps.
These lights represent the greatest energy
usage in the museum, and replacing them with
high -efficiency LEDs would have a big impact.
Budgetary cost: $3,000, based on an estimated
50% of lights remaining to be replaced.
Estimated cost savings of $1500/yr.
4) The entry vestibule's LED cove light is
extremely dim, the string light that was used to
replace the cold cathode was likely not the best
fixture for that application. The string light
should be replaced with a proper LED cove
fixture, having higher lumen output, more
LED's per foot, etc. Budgetary cost: $2,000.
5) The exterior and site lighting fixtures are
primarily metal halide. These fixtures should
be replaced with LEDs, offering a large energy
saving potential, especially for fixtures used
dusk to dawn. Pole fixtures could possibly
retain poles, with new post -top fixtures.
Budgetary cost: $15,000. Another option
would be to retrofit the existing fixtures to LED,
at an estimated budgetary cost of $3,000. This
would require additional investigation, to verify
that the fixtures are capable of being upgraded.
Estimated cost savings of $400/yr.
6) The fluorescent fixtures should all be
standardized to the same technology — T8s or
T5s, to minimize maintenance and simplify
lamp stock.
7) LED lighting option. Replace all fluorescent
troffer fixtures with 2x4 LED troffers. LED
fixtures will reduce maintenance, and provide
increased controllability allowing for increased
17
energy savings. Budgetary cost: $25,000.
Estimated cost savings of $1450/yr.
b. All lighting systems are manually controlled, by a
combination of switches, contactors and relays.
Estimated savings and payback periods are based on an
estimated 55 operating hours per week (10 hrs Tues-Sat, 5
hrs Sun) and $0.10/kWh electrical cost. Savings for
occupancy sensors are estimated at 10-20%. Some
manufacturers claim as much as high as 50%, but based on
experience and the use of the space, we feel a more
conservative estimate is appropriate.
1) Manual controls no longer meet energy code.
There is no current requirement to upgrade
them, but any major lighting retrofit will likely
require a lighting controls upgrade.
2) Back of house areas (excepting mechanical
and electrical equipment rooms) should have
their switches replaced with vacancy sensors.
These switches will be manual on, and will
automatically shut off fixtures after the room is
unoccupied. Budgetary cost: $1,000.
Estimated cost savings of $75/yr.
3) Corridors through the main exhibition area
should remain on during museum operating
hours. Occupancy sensors or a time clock
should be installed to verify that lights are shut
off after closing. Budgetary cost: $500.
Estimated cost savings of $50/yr.
4) Offices and store areas should have their
switches replaced with vacancy sensors.
Budgetary cost: $1,500. Estimated cost
savings of $150/yr.
5) Public bathrooms should have their switches
replaced with occupancy sensors, which will
automatically turn the lights on and off.
Budgetary cost: $500. Estimated cost savings
of $50/yr.
6) Exhibition halls should have their switches
replaced with occupancy sensors. These
sensors should be located in the halls and in
the corridors, so that the lights are on before
visitors enter the exhibition halls. Budgetary
cost: $5,000. Estimated cost savings of
$300/yr.
7) The lights in the Diana gallery should be
controlled by a photo sensor, so that the lights
automatically turn on at night, and off in the
18
morning. Budgetary cost: $500. Estimated
cost savings of $20/yr.
8) The exterior and site lighting should be
controlled by a photo sensor in addition to the
time clock, to allow for more precise on/off
operation. Budgetary cost: $500. Estimated
cost savings of $75/yr.
5. IT/Telecom System
a. The IT/Telecom system appears to be adequate, with no
deficiencies or installation issues.
6. Security Systems
a. The security system should be upgraded to modern
equipment, with full reporting, documenting and alerting
functions. Budgetary cost: $10,000-15,000.
b. The two exterior CCTV cameras with cut cables shall be
reconnected. All exterior cabling shall be rerun in conduit.
Budgetary cost: $5,000.
7. Lightning Protection System
a. The building currently does not have a lightning protection
system. Per NFPA 780, based on the building's location,
construction and contents, it is recommended that a lightning
protection system be installed. Budgetary cost: $15,000-
$20,000.
ILLER & ANDERSON
INCORPORATED
Mechanical / Plumbing Contractors ('\
PO Box 128 / 3470 Martinsburg Pike
Clear Brook, VA 22624
Providing professional contracting services since 1911
Phone: 54O6674757 Fax: 54O6678O38
www. millerandanderson. com
Mrs. Rebecca Massie Lane
Director
Washington County Museum of Fine Arts
P.O. Box 423, 401 Museum Drive
Hagerstown, Maryland 21741
Dear Mrs. Lane,
Miller and Anderson, Inc. herewith submits it Proposal regarding the recommendation
for Modifying the HVAC System into a VAV system with Reheat. This proposal was done with
the intent to give the Museum a more consistent and controllable HVAC System stabilizing the
humidification and giving the system a level of redundancy to meet new requirements for the
future.
Attached is a Scope of Work for what would be a Design- Build concept in agreement
with the direction and engineering review performed by John McClain of Kibart Consulting
Engineers.
Principles for this work will be:
John D. McClain, P.E. Kibart Engineering 410-494-4111
901 Dulaney Valley Rd., Suite 301
Towson, Md. 21204
Ken Lloyd, V.P. Engineering/ Mechanical Contracting.
Miller and Anderson, Inc.
P.O. Box 128, 3970 Martinsburg Pike
Clear Brook, Va. 22624
540-667-4757
John M. Dick President/ Senior Engineering
Miller and Anderson, Inc.
Thomas J. Dick. Exec. V.P.
Miller and Anderson, Inc.
Bill Nalley, Project Engineering
Miller and Anderson, Inc.
Thank for the opportunity to quote this work. if any questions please call meat 540-667-4757.
Sincerely,
John M. Dick
President
Miller and Anderson, Inc.
GENERAL SCOPE OF WORK
DEMOLITION: The existing York Air Conditioning unit and ductwork will be demolished and
removed from the site. This will include the reclaiming of the R-22 Refrigerant, decoupling the
refrigerant piping, insulation, and specialties to the Air Handling Unit. Removing the Electrical
starters, motor and ductwork from the unit to the shaft where the ductwork goes up to the
attic. An appropriate amount of the ductwork will be removed from the attic ductwork system.
New ductwork will be connected at that point. The old York Condenser will be disconnected
and removed from the site. Appropriate fire alarmequipment to the air handling unit will be
disconnected and reserved for future use. The existing Humidification Unit will be restored and
reserved for possible future use as back up to the existing system. The existing ERV unit in the
attic space will be demolished and removed from site. Ductwork will be demolished as
necessary and removed.
The AAON Unit in the attic space will have the Refrigerant system reclaimed for
future use. The Condensing unit will be removed as well as much of the piping and insulation.
The Air handling Unit will be reconfigured with a Chilled Water coil and the ductwork will be
modified to tie into the existing duct system feeding the offices and the 1994 and 2011
additions. Reheat valves presently controlled with pneumatic controls will be replaced with
new electronic control valves.
The old steam boiler for humidification will be demolished and removed from
the site. The existing Hot Water Boiler will be demolished and new high efficiency boilers
installed in the new mechanical room (York AHU room). Piping modifications will be done in
various places around the boilers and radiant heat.
NEW WORK Miller and Anderson, Inc. will furnish and install modifications to the AAON and
Carrier Air Handling Units by adding new chilled water and reheat coils. A new control system
to operate these units will be installed as well. Unit will employ a VAV concept with "demand
control" ventilation thru CO2 sensors. in place of the old system we will install a new VRF
energy recovery system with chilled water hydronic modules and heating hot water hydronic
modules as manufactured by Mitsubishi. The condensing units will be coupled together and be
located in the same area as the existing condensing units. The existing heating water system
will be reused where possible and a new VFD controlled pump system will be installed in the
new mechanical room. The chilled water system will have two new VFD controlled pumps.
Starters and specialties for flow control will be included with the pumps. A modulating supply
duct damper and flow monitor will be installed for the Atrium room with new controls
integrating the radiant system with the cooling system. Zone air flow will be monitored with an
airflow monitoring station in the existing ductwork. Piping with insulation will be routed up
through the existing ductwork to the attic space. Heating insulation will be h" thick and chilled
water insulation will be 1-1/2" thick. Refrigerant piping will be insulated per manufacture
recommendation.
LIST OF EQUIPMENT AND SKETCHES AND SPECIFICATION SHEETS
SK- EQUIPMENT LAYOUT
SK- 2 HEATING PIPING CONCEPT WITH 3 -WAY VALVE
SK- 3 CHILLED WATER PIPING CONCEPT TYPICAL HOOKUP
SK- 4 REFRIGERANT PIPING/ CONDENSER ARRANGEMENT
MITSUIBISHI EQUIPMENT
2- PUNY -288 TSLMU-A R410A OUTDOOR CONDENSER
1PURY - HPI92TSKMU-A-H R410A OUTDOOR CONDENSER
1-CMB-PIO8NU-GA BC CONTROLLER (HEATING SYSTEM)
2-CMRY-RIGOC-J TWINNING REFRIGERANT PIPING KIT
9-PWFY-P72NMU-E-AU REFRIGERANT TO COOLING WATER MODULES
3-PWFYP36NMU-E-AU REFRIGERANT TO HEATING WATER MODULES
2CMV-V3O2S-G2
6-CMV-VIO2LS-G2
2-CMY-Y300CBK2
18-PAR-W2IMAA-J RETURN AIR CONTROLLERS (VAV)
1 -REVISED WATTMASTER CONTROLS SYSTEM
3 -HIGH EFFICIENCY CONDENSING NATURAL GAS FIRED BOILERS- 399M
LOT- AIRFLOW MONITORS PER KIBART SPEC.
1 -CHILLED WATER COIL FOR AAON UNIT
1 -CHILLED WATER COIL FOR CARRIER UNIT
7 -HEATING HOT WATER COIL FOR VAV REHEAT
2-B&G INLINE PUMPS 1.5X1.5X9.5, 3HP 50 GPM 70 FT. HW
2-B&G INLINE PUMPS 3X3X7.375, 5 HP 150 GPM 50 FT. CW
LOT SPECIALTIES, AIRTROLS, EXPANSION TANKS, SUCTION DIFFUSERS, PRV, RELIEF VALVES
1-3 WAY CONTROL VALVE WITH RESET CONTROLLER HEATING SYSTEM
ATMOSAIR PURIFICATION SYSTEM (2) Units.
DETAILED SCOPE OF WORK
1. Demolition of the following systems:
A. Existing Steam Humidification Boiler, removal from State Inspections
B. Existing York Split System AHU and Condensers with refrigerant reclaim and piping
C. Removal of Carrier DX Coil and refrigerant and piping and condenser
D. Removal of Ductwork at Mechanical Room and Attic space as required
E. Removal of the existing Hot Water Boiler, controls, piping, pumps and insulation
F. Relocation of useable equipment, valves and hydronic specialties such as tanks
G. Demolition of controls not needed
H. Modifications to Radiant Heat in Atrium
I. Demolition of the ERV Unit in entirety
2. installation of new Mitsubishi Condensers, Cooling/ Heating Equipment Modules
3. Support racking for modules
4. Refrigerant piping per Sk. 1-4 in copper piping with insulation and valves
5. Supports, anchors, hangars
6. Chilled Water and Hot Water pumps, specialties, Airtrol, Expansion Tanks pump
supports
7. Chilled water, hot water piping modifications with specialties, flow setters
8. VFD Starters, testing, and balancing flows
9. Reheat Coils to zoning on Carrier unit, piping modifications to coils
10. Reheat coil and VAV modifications to AAON atrium unit, with piping modifications
11. Vibration Isolation at all equipment
12. Ductwork modifications at:
A. VAV duct system in attic and at AAON Unit
B. VAV ductwork at atrium duct system with Airflow Monitor
C. VAV ductwork Coil modifications and Airflow Monitor at Carrier Unit
D. Ductwork modifications at the shaft feeding the attic
E. Ductwork demo of existing ductwork in Mechanical room and basement
F. Firestop all penetrations or modification
13. Relocation of Heating Piping and installation of new boilers
14. Installation of 3 Condensing Boilers with Gas Piping modifications
15. Installation of 3 AL29C Stainless Steel flue vents to outside
16. Installation of control modifications to VAV boxes with new Hot Water control valve
17. Installation of controls to AAON and Carrier AHU with Fresh air controls and CO2
Demand monitoring
18. Controls on the VAV units, refrigerant modules, condensers, boilers and pumps
19. Control wiring for above
20. Insulation for piping, ductwork, outside air ductwork modification and refrigerant
p
P
ing
21. Testing and Balancing, Startup of new Equipment with Manufacturer Assistance
22. Lift equipment and rigging of all equipment
23. Labor, Supervision, Project Management, coordination with other trades
24. Taxes and Insurance
25. Cleaning up and removal of all demo material
TABLE OF VALUES
MITSUBISHI EQUIPMENT
CONTROLS
CONDENSING BOILERS (3)
FLUE VENTING
WIRING
AHU COILS
7 REHEAT DUCT COILS
AIRFLOW MONITORS
ARCHIVE STORAGE HTR.
CW PUMPS
HW PUMPS
SPECIALTIES
VFD'S
DEMO
PIPING, VALVES, FITTINGS:
VALVES
HYDRONIC /REFRIGERANT VALVES
CW PIPING
HW PVF
REHEAT COIL PIPING
RADIANT MODIFICATION
REFRIGERANT PIPING
VIBRATION ISOLATION
DUCTWORK MODIFICATIONS:
AAON
VAV, AIRFLOW MONITOR
CARRIER
REHEAT, AIR MONITORS
CAP, SEAL, FIRESTOP
ATMOSAIR PUFIFIER
$ 249,412
$ 46,746
$ 39,893
$ 3, 303
$ 9,353
$ 9, 353
$ 6, 547
$ 19,541
$ 966
$ 4,931
$ 4,789
$ 7,458
$ 4,988
$ 12,243
$ 9,416
$ 6,996
$ 12,876
$ 3,554
$ 1,71d
$ 935
$ 11,582
$ 1,870
$ 8,660
$ 2,282
$ 4,676
$ 5,456
$ 66Q
$ 30,980
SUBTOTAL MATERIAL & TAX $ 515,824
SUBS:
INSULATION
TESTING/ BALANCING
LIFT, CRANE
DEMO CONT. REMOVAL
MOTORIZED ADD'L CONTROLS
SUBCONTRACT SUBTOTAL
LABOR, PROD. MGMT., SUPERVISION
SUBTOTAL CONTRACT
SALES & Gen. Adman, 1096
SUBTOTAL
PROFIT 1096
TOTAL
$ 11,412
$ 7,389
$ 6,824
$ 2,485
$ 3,058
$ 31,168
$ 145,200
$ 692,192.
$ 69,219
$ 761,411
$ 76,141
$ 837,552.
Funding Plan
Members of the Museum Trustees' Executive Committee have developed a funding plan, detailed below, to support the
anticipated replacement cost of $1,142,725.00.
EXPENSES
Complete Replacement of Heating/Air Conditioning/Humidification/Air Purification System compliant with the
State of Maryland Energy Code. Work includes demolition of outdated, failing boiler and compressor system,
modification of reusable equipment, addition of new energy efficient Mitsubishi condensers, modifications to
ductwork with addition of new controls and redundancy, and an air purification system.
Equipment and Materials
Subcontractors, Supervision & Labor
Sales, General Admin (10%)
Profit (10%)
Electrical Contractor HVAC Install (estimate)
Haz-Mat Remediation (estimate)
Contingency — (unknown circumstances) (7%)
Subtotal
Engineering Design Fees
Design Development $ 21,385.00
95% Engr. Construction Documents $ 16,888.00
100% Engr. Construction Documents $ 2,811.00
Engr. Construction Administration $ 8,240.00
TOTAL
Commissioning Services Fee:
Construction Document Phase $ 1,428
Construction/Acceptance Phase $11,242
TOTAL COMMISSIONING FEE
Subtotal
Fees to prepare bid documents + construction admin (BFM Architects)
TOTAL HVAC
REVENUES
Maryland Energy Administration Grant (confirmed)
One Donor @ $100k (pending)
Other Public Funding
Two Donors @ $200k each
Three Donors @ $20k each
Museum's Mathias Fund
Donors under $20k
In -kind donation of services by BFM Architects (secured)
Total Revenue
$ 515,824.00
$ 176,368.00
$ 69,219.00
$ 76,141.00
$ 100,000.00
$ 20,000.00
$ 67,029.00
$1,024,581.00
$ 49,324.00
$ 12,670.00
$1,086,575.00
$ 10,000.00
$1,096,575.00
$ 120,413.00
$ 100,000.00
$ 350,000.00
$ 400,000.00
$ 60,000.00
$ 42,512.00
$ 13,650.00
$ 10,000.00
$1,096,575.00
Board of County Commissioners of Washington County, Maryland
Agenda Report Form
Open Session Item
SUBJECT: Washington County Strategic Highway Safety Plan
PRESENTATION DATE: August 22, 2018
PRESENTATION BY: Sheriff Doug Mullendore/Merle Saville
RECOMMENDED MOTION: Adoption of the Plan for Washington County
REPORT -IN -BRIEF: The Washington County Traffic Advisory Council approved the
Washington County Strategic Highway Safety Plan to be presented to the County and municipal
governments.
DISCUSSION: There has been a significant number of fatal and serious injury crashes over the
past six years. As part of a statewide initiative to reduce the number of deaths and serious injuries
in the County, the Traffic Advisory Council established a sub -committee to prepare a Strategic
Highway Safety Plan for Washington County. The sub -committee presented the plan to the TAC
on August 9, 2017 and the TAC voted to approve the plan for presentation to the various
governmental entities. The approval by County and municipal governments will sanction the plan
for implementation in the effort to reduce deaths and serious injuries.
FISCAL IMPACT: None
CONCURRENCES: Transportation Advisory Council
ALTERNATIVES: N/A
ATTACHMENTS: Washington County Strategic Highway Safety Plan and Appendix
AUDIOVISUAL NEEDS:
Appendix A
Overview of Action Plan:
• Reduce the number of fatalities by two fatalities each year of the plan.
1. Increased enforcement emphasis in the Plan Focus Areas.
2. Conduct Educational and Awareness Programs to change the behavior of the
motoring public.
• Reduce the number of personal injuries of occupants in vehicle crashes by 80 persons
injured each year of the plan.
1. Increased enforcement emphasis in the Plan Focus Areas.
2. Conduct Educational and Awareness Programs to change the behavior of the
motoring public.
• Work toward accomplishing zero deaths as a result of crashes in Washington County.
1. Adoption and implementation of the Strategic Highway Safety Plan.
• Significantly reducing the number of personal injuries as a result of crashes in
Washington County.
• Targeted traffic enforcement in high crash locations.
1. Determine the high crash roadways in the County, particularly those with a high rate
of fatalities and personal injuries.
2. Conduct heavy traffic enforcement on the high crash roadways, particularly during
the historic days and times that these crashes are occurring.
3. Implementation of School Zone Speed Cameras to change driver behavior in these
areas.
4. Work with the State Highway Administration to install cameras, both northbound and
southbound, in the area of the Potomac River Bridge on Interstate 81 to monitor
traffic conditions for the safety of Public Safety personnel and citizens.
• Work with the State Highway Administration and Governmental entities to implement the
Dual Highway Pedestrian Safety Improvements Study.
1. Work with SHA, the Hagerstown Mayor & Council, and the County Government to
find funding to implement the Dual Highway Pedestrian Safety Improvement Study.
• Channel bicyclists to the approved bicycle routes as stated in the City of Hagerstown
Bicycle Master Plan and the Regional Bicycle Plan prepared by the Metropolitan
Planning Organization.
1. Provide the Plans to patrol officers so they can become familiar with the plan.
2. Conduct education and awareness of the Plan for the bicycling public.
3. Enforcement of violators who ride their bicycles in violation of the laws of the State
and municipal ordinances.
• Partner with Washington County Emergency Management Group and Citizens Corp. for
community outreach regarding public awareness and education, training, and media
campaigns.
The Goals and Objectives will be accomplished through public education, public awareness,
engineering improvements and enforcement efforts.
Appendix B
Distracted Driving Action Plan:
• Reduce the number of fatalities caused by distracted driving by one each year.
1. Educate officers on the benefits of enforcing distracted driving laws.
2. Conduct increased enforcement of the distracted driving laws.
3. Conduct an aggressive media campaign that informs the public on the disastrous
results that can occur by being distracted during the time they are driving.
• Reduce the number of injuries caused by distracted driving by 54 each year.
1. Follow the same strategies as for reducing fatalities caused by distracted driving.
• Conduct public awareness outreach on the laws for use of cell phones, texting, and
emails while driving.
1. Do Public Service Announcements demonstrating the results of distracted driving.
2. Do presentations to Civic Organizations on the results of distracted driving.
3. Create Posters about the Laws pertaining to the use of Electronic Devices while
driving.
4. Conduct awareness programs at the High Schools and College Campuses.
5. Conduct awareness programs for the general public through various types of
planned events.
• Conduct more traffic enforcement of distracted driving laws.
1. Impress upon officers the need to stop motorists who are violating the distracted
driving laws.
2. Use strict enforcement
• Integrate and foster the use of technologies and engineering applications to address
distracted driving infrastructure.
1. Conduct Assistance Training on connecting cellphones to Bluetooth in their vehicle.
2. Partner with local vendors to provide Bluetooth headsets that can be used as give
aways.
3. Advocate for the use of apps that prevent the use of cell phones while driving.
• Propose legislation that requires individuals who have been convicted of using electronic
devices while driving to attend a Distracted Driving Improvement Class.
• Modify Behaviors related to distracted driving.
1. Strict enforcement of distracted driving laws.
2. Education and awareness of how distracted driving affects the brain's ability to
process and the reduction in reaction time.
• Partner with Washington County Emergency Management Group and Citizens Corp. for
community outreach regarding public awareness and education, training, and media
campaigns.
Appendix C
Bicyclist and Pedestrians Action Plan:
• Reduce the number of pedestrians killed in crashes by one each year.
1. Have Officers make personal contact with those pedestrians who are crossing or
walking on roadways unsafely.
• Reduce the number of pedestrians injured in crashes by four each year.
1. Have Officers make personal contact with those pedestrians who are crossing or
walking on roadways unsafely.
• Identify and target pedestrian and bicycle safety issues, populations, and locations of
concern through the collection, analysis and evaluation of data and information.
1. Officers should monitor areas of concern for unsafe pedestrian and bicyclists and
conduct some education and enforcement.
• Work with the State Highway Administration and Governmental entities to implement
the Dual Highway Pedestrian Safety Improvements Study.
1. Advocate for funding for the major portions of this plan through local, county and
state governments.
• Promote safe behaviors of all road users by partnering with Emergency Services for
community outreach regarding public education, training, and media campaigns.
• Create and improve roadway environments for safe walking and bicycling through
implementation of engineering treatments, land use planning, and system -wide
countermeasures.
1. Work with in the Traffic Advisory Council to improve roadways to support safety
amongst pedestrians and bicyclists.
• Channel bicyclists to the approved bicycle routes as stated in the City of Hagerstown
Bicycle Master Plan and the Regional Bicycle Plan prepared by the Metropolitan
Planning Organization.
1. Work with Bicycle clubs and organizations to insure they are riding on approved
bicycle routes.
2. Conduct awareness campaigns on the location of approved bicycle routes.
• Develop, apply, and promote technological approaches, including those in vehicles
and emergency response equipment, in order to better prevent and reduce the
severity of collisions involving pedestrians and bicyclists.
1. Conduct training of emergency services personnel on safe driving and pedestrian
and bicyclist awareness.
2. Look for ways that technology can be used to help prevent crashes involving
pedestrians and bicyclists.
• Identify and promote safe driving and pedestrian behaviors for all motorists and
public safety professional at the scene of emergency events.
• Train all personnel who respond to crashes in the Traffic Incident Management
System.
Appendix D
Aggressive
•
Driving Action Plan:
Reduce the number of persons killed in aggressive driving crashes by one each
year.
1. Law Enforcement needs to be more aggressive in the enforcement of
aggressive driving laws.
2. Encourage the motoring public to report aggressive drivers and have law
enforcement provide a more timely response to those reports.
• Reduce the number of persons injured in aggressive driving crashes by six each
year.
1. Law Enforcement needs to be more aggressive in the enforcement of
aggressive driving laws.
2. Encourage the motoring public to report aggressive drivers and have law
enforcement provide a more timely response to those reports.
• Use data -driven approaches to identify driver behaviors and target audiences to
focus on aggressive and speed -related enforcement, education, engineering, and
emergency services.
1. Law enforcement should conduct more enforcement on the Interstate
highways in the County.
2. Use speed trailers and other techniques to slow down the motoring public as
encouragement to obey speed limits and unsafe driving.
• Develop and implement aggressive driving enforcement practices.
1. Law enforcement should conduct more traffic enforcement, particularly in
historic areas of high crashes.
2. Use covert means to conduct enforcement that will identify unsafe driving
more readily.
3. More law enforcement visibility on Interstate highways and other prominent
roadways were significant numbers of crashes occur.
• Identify and implement effective engineering and technological solutions to
reduce aggressive driving.
1. Identify highways and roadways where the engineering of the roadway has
contributed to the increase in unsafe driving resulting in crashes. The work
within the Traffic Advisory Council to find engineering solutions to correct
these roadway defects.
• Conduct public awareness, training, and media programs aimed at reducing
aggressive driving by partnering with Emergency Services for community
outreach.
1. Provide posters and billboards with messages aimed at awareness of
aggressive driving and that law enforcement will be conducted strict
enforcement.
• Promote and support legislation and adjudication to reduce aggressive driving.
Appendix E
Occupant Protection Action Plan:
• Reduce occupant protection crash fatalities by two each year.
1. Law Enforcement to conduct seatbelt and safety seat enforcement.
• Conduct meaningful surveys on the level of seatbelt and safety seat use in
Washington County.
• Community Outreach by partnering with Washington County Emergency
Management Group and Citizens Corp.
1. Do community outreach on occupant protection laws and why they are so
important to the protection of the motoring public.
2. Conduct outreach for the proper installation of child safety seats through
event planning and information on trained personnel and locations to conduct
the installations.
Impaired Driving Action Plan:
• Reduce fatalities in crashes involving impaired driving by one per year.
1. Law enforcement conducts Sobriety Checkpoints and/or roving patrols in high
crash areas.
• Reduce the number of serious injuries in crashes involving impaired driving by ten
per year.
1. Law enforcement conducts Sobriety Checkpoints and/or roving patrols in high
crash areas.
• Enhance and improve the enforcement of impaired driving laws.
1. Increase the number of Sobriety Checkpoints conducted.
• Conduct outreach initiatives including, but not limited to, education, training, and
media programs to reduce impaired driving.
1. Provide brochures on alcohol related crashes to motorists on traffic stops and
during Sobriety Checkpoints.
2. Give presentations to students at high schools and colleges.
3. Give presentations to civic groups and organizations.
Highway Infrastructure Action Plan
1. Identify intersections where the Crash Severity Index is high and implement safety
improvements.
a. Receive target locations from MD SHA OOTS and review intersections.
b. Receive target locations from local law enforcement agencies based on call
volumes.
2. Identify and target safety improvements along corridors where the Crash Severity Index
is high and address roadway elements that contribute to crashes.
a. Review target CSI locations on yearly basis to determine any improvements.
b. Address pedestrian safety concerns throughout the City and along Dual Highway
by including recommendations from the MPO and SHA Pedestrian Studies.
c. Improve bicycle mobility throughout the County in coordination with the
Washington County Bicycle Master Plan.
3. Identify, develop and implement system -wide improvements that address the safety of
vulnerable user groups (e.g., bicyclists, pedestrians, motorcyclists, older and younger
drivers, etc.)
a. Gather thoughts and ideas from the public during public meetings to improve
overall safety across all modes of transportation.
b. Use programs such as "Car -Fit" to educate specific target groups of
demographic.
4. Partner with Washington County Emergency Management Group and Citizens Corp. for
community outreach regarding public awareness and education, training, and media
campaigns.
•
y -•
-
Page 1 of 26
TABLE OF CONTENTS:
Traffic Safety Overview Page 3 - 7
Distracted Driving Page 7 - 9
Pedestrians and Bicyclists Page 10 - 12
Aggressive Driving Page 13 - 15
Occupant Protection Page 16 - 18
Impaired Driving Page 19 - 21
Highway Infrastructure Page 22 - 25
Implementation and Evaluation Page 26
Washington County Strategic Highway Plan
Committee Members Page 26
Page 2 of 26
Traffic Safety Overview: Moving Towards Zero Deaths
Washington County has three major Interstate Highways that go through the County, Interstate 70,
Interstate 81 and Interstate 68. Washington County has also experienced an increase in vehicular,
pedestrian and bicycle traffic over the last decade as the population increased and additional
businesses moved into the area. As a result, the number of serious and fatal crashes also increased
over time. Serious injury is defined as any injury, other than a fatal injury, which prevents the injured
person from walking, driving or normally continuing activities he/she was capable of performing
before the injury occurred.
Law enforcement resources have been limited as the request for other services have increased and
so the amount of time spent on traffic enforcement has decreased. Washington County implemented
the Data Driven Approach to Crime and Traffic Safety in 2012. The result was that crime decreased,
but traffic fatalities increased. This Strategic Highway Safety Plan will address the shortcomings
addressed above so that the goals and objectives of the Plan can be accomplished through
partnerships in the community.
Over the past three years (2013 - 2015), Washington County has accounted for approximately 5% of
all traffic fatalities in Maryland. That portion has fluctuated from 4.5% to 5.7% to 3.3% over that time,
while the County has maintained approximately 2.5% of the State's population and 3.5% of the
State's vehicle miles traveled. This means that Washington County is slightly overrepresented in
fatalities. However, the proportion of serious injuries (defined as KABCO=4 on the police crash report)
has only fluctuated from 2.7% to 2.4% to 1.7%. This means that the County is underrepresented with
regards to serious injuries as it related to vehicle miles traveled.
When analyzing traffic citations issued across the State and adjudicated in Maryland District Courts,
there are over one million violations each year. From 2013 through 2015, Washington County has
accounted for approximately 20,000 (1.6%) of all citations issued each year. This means the citations
are issued within the boundaries of Washington County.
V � TOWARD ZERO DEATHS
MARYLAND
Page 3 of 26
2017 - 2022 Strategic Highway Safety Plan:
The Washington County 2017 — 2022 Strategic Highway Safety Plan focuses on the specific
emphasis areas of Distracted Driving, Pedestrians & Bicyclists, Aggressive Driving, Impaired
Driving, Occupant Protection and Highway Infrastructure, which have been the major factors in
causing serious injury and fatalities involving crashes in Washington County. A Strategic Highway
Safety Plan Committee, which is a sub -committee of the Traffic Advisory Council, convened to
review, strategize and formulate this Plan. All partner agencies of the Traffic Advisory Council have
adopted this Plan and are a part of its implementation.
The Plan Committee reviewed historical crash data for the last five years and devised this plan to
address the causation of serious and fatal crashes as well as targeting specific roadways where a
high number of these crashes have historically occurred.
- +
I��►
-r
run nIiTnmATr' nennUC
U Uhj I nbu l i.I) limy leu
BUCKLE
\UP
Page 4 of 26
MARYLAND DEPARTMENT OF TRANSPORTATION
Maryland Motor Vehicle Administration
Maryland Highway Safety Office
Washington County
Crash Summary
2011
2012
2013
2014
2015
Fatal Crashes
12
24
20
22
15
Injury Crashes
847
910
781
760
721
Property Damage Crashes
1,207
1,264
1,193
1,318
1,508
Total Crashes
2,066
2,198
1,994
2,100
2,244
Total of All Fatalities
12
25
21
25
17
Total Number Injured
1,274
1,314
1,076
1,062
1,013
5
Year
AVG.
%
19
0.9
804
37.9
1298
61.2
2120
100.0
20
1,148
Number of Crashes
2,300
2,250
2,200
2,150
2,100
2,050
2,000
1,950
1,900
1,850
Crashes
2.198
2 p66 2.100
1.994
■
2.244
2011
2012
2013
Year
2014
2015
Page 5 of 26
2015 is subject to change. Data is based on reports provided by the Maryland State Police Central Records Division (CRD). 2015 crash reports
submitted to CRD during calendar year 2016 (up to December 31, 2016) will be accepted in the database; however, based on an analysis of previous
reporting years, nearly all crash reports completed by local agencies have been submitted and processed by this time of year. Revised summary reports
may be produced after an analysis is completed on crash reports submitted, or revised, between the run date of this report and December 31, 2016.
Total Vehicle Related Fatalities
1.2
1
0.8
0.6
0.4
0.2
0
00
o%
tir' ��i PI'
c �Oy1 �oyL ti�1� �OyA �Otih
API ���
0.74
0.72
0.7
0.68
0.66
0.64
0.62
0.6
0.58
0.56
Targeted Fatality Goal
0.7
0.67
64
0.62
2016 2017 2018 2019 2020
Page 6 of 26
tf atalit ies
tGoal
The Strategic Highway Safety Plan is established in support of the State of Maryland's Highway
Safety Office goal of zero deaths in crashes in Maryland. As you can see by the Fatal Crash Trend
chart above, Washington County has begun to trend lower in the last two years in large part due to
the increased enforcement efforts of law enforcement. This Plan will incorporate a number of
initiatives other than just enforcement and should have a more significant impact toward zero deaths.
Distracted Driving:
U DRIVE. U TEXT.
A distracted driving crash occurs when a driver shifts attention away from the driving task to do other
things such as texting, cell phone use, adjusting the radio, attending to a child, and a number of other
things.
Historically, there has been an average of ten distracted driving fatalities in Washington County, with
nine occurring in 2015. Over the past three years, Washington County has accounted for 7.5% of the
State's distracted driving fatalities. There has been a significant decline in serious injuries resulting
from such crashes in the county as well, from a high of
52 in 2013 (2.7% of all distracted driving serious
injuries) to a low in 2015 (1.7% of all). However, those
figures also mean that in 2015, 52.9% of all fatalities
and 43.2% of all serious injuries in Washington County
resulted from distracted driving crashes.
Correspondingly, distracted driving crashes resulted in
23.0% of all fatalities and 37.2% of all serious injuries in
2015 statewide. This illustrates the significance of the
distracted driving problem in Washington County.
Distracted driving violations include the use of handheld
cell phone to participate in calls and texting. The
issuance of such citations increased dramatically in
Maryland in the past three years through increasing
restrictions in the laws, from 14,192 in 2013 to 41,277 in 2014, to 42,744 in 2015. As the State saw
this increase, Washington County had a slight decrease from a high of 1,232 in 2014 to 706 in 2015
which accounted for 1.6% of the State distracted driving citations. Also, 3.5% of all citations issues in
Washington County in 2015 were for distracted driving violations.
Take the pledge
The fight to end distracted driving starts
with you. Make the commitment to drive
phone -free today.
• Protect lives by never texting or talking on the phone
while driving.
• Be a good passenger and speak out if the driver in my
car is distracted.
• Encourage my friends and family to drive phone -free.
#justdrive
Page 7 of 26
MARYLAND DEPARTMENT OF TRANSPORTATION
Maryland Motor Vehicle Administration
Maryland Highway Safety Office
Washington Co. - Distracted Driver Involved
Crash Summary
2011
2012
2013
2014
2015
5
Year
AVG.
%
Fatal Crashes
9
17
11
10
7
11
0.8
Injury Crashes
599
616
550
501
424
538
39.7
Property Damage Crashes
804
832
772
818
798
805
59.5
Total Crashes
1,412
1,465
1,333
1,329
1,229
1354
100.0
Total of All Fatalities
9
17
12
11
9
12
Total Number Injured
927
921
771
730
616
793
Crashes
Number of Crashes
1.500
1.450
1.400
1.350
1.300
1.250
1.200
1.150
1,100
1,412
1,333 1,329
.229
2011
2012
2013
Year
2014
2015
Page 8 of 26
000
900
800
700
600
500
400
300
200
100
0
2015 is subject to change. Data is based on reports provided by the Maryland State Police Central Records Division (CRD). 2015 crash reports
submitted to CRD during calendar year 2016 (up to December 31, 2016) will be accepted in the database; however, based on an analysis of previous
reporting years, nearly all crash reports completed by local agencies have been submitted and processed by this time of year. Revised summary reports
may be produced after an analysis is completed on crash reports submitted, or revised, between the run date of this report and December 31, 2016.
140
120
100
80
60
40
20
0
Actual Distracted Driving
Fatalities and Serious Injury
4. 124
1
60
Fatality and Serious Injury
eee000eo
ti ti
N.
66
64
62
60
58
56
54
52
50
Distracted Driving Targeted
Fatalities and Serious Injury Goal
55
2016 2017 2018 )019 2020
-0-Goal
Distracted Driving Strategies
1. Evaluate and improve data quality for problem identification and program evaluation purposes.
2. Enhance and improve enforcement of distracted driving laws.
3. Integrate and foster the use of technologies and engineering application to address distracted
driving infrastructure.
4. Conduct outreach initiatives including, but not limited to, education, training, and media programs
to reduce distracted driving.
5. Evaluate and recommend legislation and/or regulations that address distractive behavior while
driving.
Page 9 of 26
Pedestrians and Bicyclists:
Pedestrian crashes are defined as crashes involving a person reported as a pedestrian on foot,
including a motorist who has exited a vehicle.
Bicyclist crashes are defined as crashes involving a person reported as a bicyclist or pedal cyclist.
With regards to pedestrian and bicycle safety in Washington County, very few fatalities or serious
injuries happen among those populations. Pedestrian fatalities have fluctuated over the past three
years, from four in 2013, to six in 2014, to a low of two in 2015. Serious injuries have remained
fairly constant with five in 2013, six in 2014, and five in 2015. Bicyclist fatalities have occurred very
rarely over the past three years, from zero in 2013, zero in 2014, and one in 2015.
WALK SMART!
STAY ALERT LJJE CROSSWALKS. FOLLOW SIGNALS.
C
Sraik
1!
t IS A
VA* ktiE
expect respECt fOAOS, ARYLAND.GOV
Page 10 of 26
MARYLAND MOTOR VEHICLE ADMINISTRATION
Maryland Highway Safety Office
Washington Co. - Pedestrian On Foot Involved
Crash Summary
L
2011
2012
2013
2014
2015
5
Year
AVG.
%
Fatal Crashes
0
1
4
6
2
3
5.1
Injury Crashes
47
41
35
46
49
44
85.5
Property Damage Crashes
6
5
7
3
3
5
9.4
Total Crashes
53
47
46
55
54
51
100.0
Total of All Fatalities
0
1
4
6
2
3
Total Number Injured
52
45
40
50
54
48
* Averages for all pages are 5 year averages. % is percent of 5 yr total.
Crashes
56
55
54
54
53
u,
of Crashe
A CO CO
Co O N
d7
46
d 46
a
44
E
Z 42
40
2011 2012 2013 2014 2015
Year
Page 11 of 26
2015 is subject to change. Data is based on reports provided by the Maryland State Police Central Records Division (CRD). 2015 crash reports
submitted to CRD during calendar year 2016 (up to December 31, 2016) will be accepted in the database; however, based on an analysis of previous
reporting years, nearly all crash reports completed by local agencies have been submitted and processed by this time of year. Revised summary reports
may be produced after an analysis is completed on crash reports submitted, or revised, between the run date of this report and December 31, 2016.
12
10
8
6
4
2
0
Actual Pedestrian
Targeted Pedestrian
Fatalities and Serious Injury Fatality and Serious Injury Goal
tie tia'� tie ti�'� tie
—e—Pedestrian Fatality and
Serious Injury
Pedestrian and Bicycle Strategies
7.2
7
6.8
6.6
6.4
6.2
6
5.8
5.6
5.4
6 • 6 6
2016 1011 1018 1019 1010
1. Identify and target pedestrian and bicycle safety issues, populations, and locations of activity
and concern through the collection, analysis, and evaluation of data and information.
2. Promote safe behaviors of all road users appropriate for the environment through education
and enforcement initiatives.
3. Create and improve roadway environments for safe walking and bicycling through
implementation of engineering treatments, land use planning, and system -wide
countermeasures.
4. Develop, apply, and promote technological approaches, including those in vehicles and
emergency response equipment, in order to better prevent and reduce the severity of collisions
involving pedestrians and bicyclist.
5. Identify and promote safe driving and pedestrian behavior for all motorist and public
safety professionals at the scene of emergency events.
(Goal
Page 12 of 26
Aggressive Driving:
AGGRESSIVE DRIVERS ARE PUBLIC THREATS
An aggressive driving crash occurs when at least one driver in the crash was reported to be
driving aggressively, defined by having one of the following values in the first two Contributing
Circumstance fields from the standard crash report form.
Failed to yield the right-of-way
Failed to obey traffic signal
Failed to keep right of center
Wrong way on a one way street
Too fast for conditions
Improper lane change
Failed to obey stop sign
Failed to obey other traffic control
Failed to stop for a school bus
Exceeded speed limit
Followed too closely
Improper passing
Historically, there have been very few aggressive driving fatalities in Washington County, with
zero occurring in 2015. Minimal serious injuries resulted from such crashes in the County as well,
from a high of seven in 2013 (2.4% of all aggressive driving serious injuries) to just three in 2015
(1.6% of all). Those figures mean that in 2015, 7% of all serious injuries in Washington County
resulted from aggressive driving crashes. Aggressive driving citations are rarely issued in
Maryland because a driver must be observed committing three
or more specific violations to qualify under the aggressive
driving statute. In Maryland, only 797 aggressive driving
citations were issued in 2015 and 15 (1.9%) of those were
issued in Washington County.
There has been an average of less than ten speed related
fatalities in Washington County, with five occurring in 2015.
Over the past three years, Washington County has accounted
for an average of 8.3% of the State's speeding related
fatalities. There has been a significant decline in serious
injuries resulting from such crashes in the County as well, from
a high of 15 in 2014 (3.3% of all serious injuries in 2015) to a
low of five in 2015 (1.7% of all). However, those figures also mean that in 2015, 29.4% of all
fatalities and 11.4% of all serious injuries in Washington County resulted from speed related
crashes. This illustrates the significance of the speed related fatalities in Washington County.
Speeding violations are very common and those adjudicated through the District Court do not
include automated speed enforcement. The State has seen an average of 244,588 speed citations
issued over the past three years, with 2.0% of those citations being issued in Washington County.
Conversely, close to one -quarter (24.1%) of all Washington County citations in 2015 were issued
for speeding.
Page 13 of 26
MARYLAND DEPARTMENT OF TRANSPORTATION
Maryland Motor Vehicle Administration
Maryland Highway Safety Office
Washington Co. - Aggressive Driver Involved
Crash Summary
2011
2012
2013
2014
2015
Fatal Crashes
2
7
0
1
0
Injury Crashes
75
70
66
49
36
Property Damage Crashes
90
71
64
57
45
Total Crashes
167
148
130
107
81
Total of All Fatalities
2
8
0
2
0
Total Number Injured
128
109
114
73
69
5
Year
AVG. %
2 1.6
59 46.8
65 51.7
127 100.0
2
99
Page 14 of 26
2015 is subject to change. Data is based on reports provided by the Maryland State Police Central Records Division (CRD). 2015 crash reports
submitted to CRD during calendar year 2016 (up to December 31, 2016) will be accepted in the database; however, based on an analysis of previous
reporting years, nearly all crash reports completed by local agencies have been submitted and processed by this time of year. Revised summary reports
may be produced after an analysis is completed on crash reports submitted, or revised, between the run date of this report and December 31, 2016.
16 _
14 -
12
10
8
6
4
2 _
0 _
Aggressive Driving
Fatality and Serious Injury
4
10
9
7
cSb
I. tidy ti�� tip^ ti�� ry�� ti°tip ti°1~
Aggressive Driving Strategies
8.5
8
Aggressive Driving Fatality 7.5
and Serious Injury
7
6.5
Targeted Aggressive Driving
Fatality and Serious Injury Goal
f • 7 • 7
2016 2017 2018 2019 2020
—M—Goal
1. Use data -driven approaches to identify driver behaviors and target audiences to focus on
aggressive and speed -related enforcement, education, engineering, and emergency services.
2. Develop and implement aggressive driving enforcement practices.
3. Identify and implement effective engineering and technological solutions to reduce aggressive
driving.
4. Conduct public awareness, training, and media programs aimed at reducing aggressive driving.
5. Promote and support legislation and adjudication to reduce aggressive driving such as ADOPT.
Page 15 of 26
Occupant Protection:
The lack of use of personal restraints or protective
equipment is typically not a contributing factor to a crash
occurring, but when a crash does occur, the severity of
personal injury is greatly affected by the lack of use of this
occupant protection equipment.
An unrestrained occupant crash is defined as including a
passenger vehicle (automobile, station wagon, van, SUV
or pickup truck) occupant:
• Less than 8 years of age recorded as not using
a Child/Youth Restraint.
• Eight years of age or older recorded as not
using a Lap and Shoulder Belt or Air Bag and
Belt, or
• Whose restraint use was recorded as using
None or Air Bag Only.
Very few fatalities or serious injuries have occurred as a result of occupant protection over the last
three years in Washington County. Fatalities in Washington County resulting from lack of occupant
protection decreased from eight in 2013, to seven in 2014, to three in 2015. Serious injuries went
from nine in 2013 to six in 2015. These figures account for 4.2% of the State's unrestrained fatalities
and 2.1% of the State's serious injuries in 2015.
MARYLAND DEPARTMENT OF
TRANSPORTATION
MARYLAND MOTOR VEHICLE
ADMINISTRATION
Maryland Highway
Safety Office
Washington County Driver or Passenger - Safety Equipment Use
Safety
Equipment
200
6
200
7
200
8
200
9
201
0
201
1
201
2
201
3
201
4
201
5
TOTA
L
AVG
.
%
In Use
15
9
8
10
5
4
14
5
6
2
78
8
53.8
Not In Use
9
7
3
2
4
3
6
8
7
4
53
5
36.6
NS,Other
1
1
1
2
5
1
3.4
Unknown
1
1
2
2
3
9
1
6.2
Dri/Passeng
er Fatalities
25
17
11
12
9
9
22
13
16
11
145
15
100.
0
Safety Equipment Not in Use - Air Bag Only or None. Excludes motorcycles, mopeds and
ATV's.
Page 16 of 26
Washington County - Driver/Passenger Fatalities - Safety Equipment Use
16
14
12
10
8
6
4
2
15
14
10
9 9
8
-
8
7
-
5
6
5
6-
3
4 4
3I.
4
'
2 2
2-
1
1
2
n
n
I
■
n
n
2006
2007
2008
2009
2010 2011
Year
2012
2013
2014
2015
■ In Use
ONot In
Use
■ NS,0ther
❑Unknown
Safety
Equipment
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
TOTAL
AVG.
%
In Use
1,161
1,074
1,051
975
915
944
1,022
851
788
771
9,552
955
85.5
Not In Use
121
107
86
69
72
75
71
56
77
54
788
79
7.1
NS,Other
32
40
24
50
47
51
38
29
46
18
375
38
3.4
Unknown
35
59
76
37
64
37
39
30
40
38
455
46
4.1
Dri/Passenger
Injuries
1,349
1,280
1,237
1,131
1,098
1,107
1,170
966
951
881
11,170
1,117
100.0
Safety Equipment Not in Use - Air Bag Only or None. Excludes motorcycles, mopeds and
ATV's.
1,400
1,200
1,000
800
600
400
200
Washington County - Driver or Passenger Injuries
5 �V 0
.9 �1
7
TD
7
O
I I_ _
n,,
n_n
nn n
nnn
nnn
nnn
n
nn,
I-l-ri
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Year
• In Use
ONot In
Use
• NS,0ther
❑Unknown
Page 17 of 26
Actual Unrestrained
Fatality and Serious Injury
25
20
15
10
5
0
18
16
13
15 14
ti63 ti° 7 63' ti63' tie ti45• ti0 Q.->
'V
ti
12.2
12
11.8
11.6
11.4
11.2
11
10.8
10.6
10.4
tUnrestrained Fatality and
Serious Injury
Targeted Unrestrained
Fatality and Serious Injury Goal
IL 12
12 12
11-
2016 2017 2018 2019 2020
Occupant Protection Strategies
—M—Goal
1. Improve the timeliness, accuracy, completeness, uniformity, accessibility, and integration of
occupant protection -related data.
2. Enhance and improve enforcement of adult and child occupant protection laws.
3. Implement adult and child occupant protection public awareness and education, training, and
media campaigns.
4. Evaluate and recommend legislation and/or regulations to advance occupant protection for all
ages.
Page 18 of 26
Impaired Driving:
The National Highway Traffic Safety Administration (NHTSA) defines
alcohol impairment as any fatal vehicle crashes involving a driver with
a blood alcohol concentration (BAC) of 0.08 grams per deciliter (g/dl)
or higher.
Over the past three years, fewer than ten impaired driving fatalities
occurred in Washington County, with just six occurring in 2015. During
that time, Washington County has accounted for an average of 4.3% of
the State's distracted driving fatalities. There has been a significant
decline in serious injuries resulting from such crashes in the county as
well, from a high of 20 in 2013 (5.2% of all impaired driving serious injuries) to a low of seven in 2015
(2.0% of all). However, those figures also mean that, in 2015, 35.3% of all fatalities and 15.9% of all
serious injuries in Washington County resulted from impaired driving crashes. Correspondingly,
impaired driving crashes resulted in 31.1% of all fatalities and 13.2% of all serious injuries in 2015.
This shows that Washington County is tracking with the State totals, so impaired driving is a concern
but the county is not the worst in the State. Impaired driving arrests relate to driving while impaired
by alcohol and/or drugs and several citations are issued at the point of a single arrest. Therefore, all
judicial figures related to impaired driving will quantify arrests, not individual citations. Impaired
driving arrests have remained fairly steady in Maryland over
the past three years, from 23,326 in 2013 to 22,777 in 2014,
to 22,051 in 2015. Of those arrests, an average of 1.8%
was of older drivers (ages 65+) and 3.9% were of younger
drivers (ages 16-20). Washington County had a slight
increase from 550 in 2013 to 510 in 2014 to 607 in 2015
which accounted for 2.8% of the State impaired driving
arrests in 2015. Of the impaired arrests in the County, an average of 2.0% was of older drivers (ages
65+) and 4.0% were of younger drivers (ages 16-20).
mess
DRIVE SOBER OR
CET PULLED OVER
BUZZED. BUSTED.
BROIfE
BUZZED DRIVING IS DRUNK DRIVING
MARYLAND DEPARTMENT OF TRANSPORTATION
Maryland Motor Vehicle Administration
Maryland Highway Safety Office
Washington Co. Driver Involved Alcohol or Drug Impaired
Crash Summary
2011
2012
2013
2014
2015
Fatal Crashes
7
11
7
6
5
Injury Crashes
81
107
75
74
59
Property Damage Crashes
111
147
109
112
133
Total Crashes
199
265
191
192
197
Total of All Fatalities
7
11
7
6
6
Total Number Injured
116
154
103
89
77
5
Year
AVG.
%
7
3.4
79
37.9
122
58.6
209
100.00
7
108
Page 19 of 26
2015 is subject to change. Data is based on reports provided by the Maryland State Police Central Records Division (CRD). 2015 crash reports
submitted to CRD during calendar year 2016 (up to December 31, 2016) will be accepted in the database; however, based on an analysis of previous
reporting years, nearly all crash reports completed by local agencies have been submitted and processed by this time of year. Revised summary reports
may be produced after an analysis is completed on crash reports submitted, or revised, between the run date of this report and December 31, 2016
Page 20 of 26
Actual Impaired Driving
Fatality and Serious Injury
40
35
30
25
20
15
10
5
0
36
32
2s
24
2s
24
ti� ti°� ti°~° ti°~~ ti~� ti
�a ��h �e ���•o
f��� �? tier tip
21
20
19
18
17
16
15
3
t Impaired Driving Fataity an
Serious Injury
Targeted Impaired Driving Fatality
and Serious Injury Goal
a -to
20
19
13
17
2016 2017
Impaired Driving Strategies
1. Improve the availability, quality, collections, and use of data to support impaired driving
enforcement, adjudication, programs, and initiatives.
2. Enhance and improve enforcement of impaired driving laws.
3. Enhance and improve the prosecution and adjudication of impaired driving cases.
4. Investigate and foster the use of technologies and best practices to support impaired driving
countermeasures.
5. Conduct outreach initiatives including, but not limited to, education, training, and media programs
to reduced impaired driving.
Page 21 of 26
Highway Infrastructure:
An average of 10 fatalities and 754 serious injuries occurred in crashes involving infrastructure
related issues. While work zone crashes are minimal, run-off the roadway and intersection crashes
leave an opportunity to improve.
DISTRIBUTION OF FIXED OBJECTS STUCK IN RUN OFF THE ROAD
CRASHES IN WASHINGTON COUNTY
[VALUE]
10.0%
10.2%
• Tree/Shrubbery
• Guardrail/Barrier
• Curb -Wall
• Other/Unknown
0.3%
22.6%
9.9%
32.9%
• Signs, light, and Other Poles
Embankment
• Culvert -Ditch
Page 22 of 26
A Run -Off -the -Road Crash is defined as a crash where the first event was recorded as striking a
fixed object or running off the road, or the location of the crash was reported as off -road or in the
median. An average of 8 fatalities and 290 serious injuries per year resulted from run -off -the -road
crashes between 2006 and 2015
Intersection Crashes are those crashes reported as occurring in an intersection or being
intersection -related (i.e., in a traffic situation resulting from an intersection). An average of 2 fatalities
and 443 serious injuries per year resulted from intersection -related crashes between 2006 and 2015.
Work Zone Crashes are those crashes reported as occurring in a work zone in the standard crash
report. They can include construction, maintenance, and utility work zones. Although Washington
County has no fatalities resulting from work zone crashes, an average of 20 serious injuries have
occurred each year between 2006 and 2015.
WORK BONE SNFETY
1 ISINYUUN mos
I IL AA 4=
- i Fr.i FC CLPAFP`+LVT
SLOW DOWN.
STAY ALERTV
MARYLAND DEPARTMENT OF TRANSPORTATION
Maryland Motor Vehicle Administration
Maryland Highway Safety Office
IS81
Crash Summary
2012
2013
2014
2015
2016
5 Year
AVG.
%
Fatal Crashes
2
2
2
0
1
1
1.2
Injury Crashes
38
40
44
40
34
39
34.7
Property Damage
Crashes
63
49
70
85
95
72
64.1
Total Crashes
103
91
116
125
130
113
100.0
Total of All Fatalities
2
2
3
0
1
2
Total Number Injured
62
53
61
64
62
60
Page 23 of 26
2015 is subject to change. Data is based on reports provided by the Maryland State Police Central Records Division (CRD). 2015 crash reports
submitted to CRD during calendar year 2016 (up to December 31,2016) will be accepted in the database; however, based on an analysis of previous
reporting years, nearly all crash reports completed by local agencies have been submitted and processed by this time of year. Revised summary reports
may be produced after an analysis is completed on crash reports submitted, or revised, between the run date of this report and December 31, 2016.
Page 24 of 26
Actual Highway Infrastructure
Fatality and Serious Injury
120
100
80
60
40
20
0
50
48
4(
44
42
40
Oe O,O O O.y'L O4P O.yh
55
t Highway Infrastructure
Fatality and Serious Injury
Targeted Highway Infrastructure
Fatality and Serious Injury Goal
55
53
50
48
46
2016 201/ ?(lH )()1H Jn?O
Highway Infrastructure Strategies
1. Identify intersections where the Crash Severity Index is high and implement safety
improvements.
2. Identify and target safety improvements along corridors where the Crash Severity Index is high
and address roadway elements that contribute to crashes.
3. Identify, develop and implement system -wide improvements that address the safety of
vulnerable user groups (e.g., bicyclists, pedestrians, motorcyclists, older and younger drivers,
etc.
Page 25 of 26
Implementation and Evaluation:
Each law enforcement agency in Washington County has adopted this Washington County Strategic
Highway Safety Plan and will conduct increased traffic enforcement and implement public
awareness strategies according to the specific focus areas identified in this Plan.
The Washington County Strategic Highway Safety Plan Committee will work with other State and
local partners to conduct public awareness campaigns and identify infrastructure deficiencies that
will reduce crashes in the specific focus areas identified in this Plan.
The Washington County Traffic Advisory Council has also adopted this Washington County Strategic
Highway Safety Plan. The Washington County Commissioners and other municipal governments
have adopted the Washington County Strategic Highway Safety Plan. This Plan will be taken into
consideration as there is discussion and actions taken to improve highway safety in Washington
County.
Washington County Strategic Highway Safety Plan
Committee Members:
• Sheriff Doug Mullendore, Washington County Sheriff's Office
• Chief Victor Brito, Hagerstown Police Department
• Captain Tom Langston, Hagerstown Police Department
• Lt. Joe George, Maryland State Police, Barrick "O"
• Major Pete Lazich, Patrol Commander, Washington County Sheriff's Office
• Sgt. John Martin, Washington County Sheriff's Office
• Merle Saville, Washington County Engineering and Construction (Traffic Advisory
Council Chairman)
• Karie Braniff, Analyst, Washington County Sheriff's Office
• Michael Bible, Law Enforcement Liaison Program Manager at the Maryland
Department of Transportation Highway Safety Office
• Chris Perkins, State Highway Administration
• Chief Chuck Stanford, Boonsboro Police Department
• Chief T J Buskirk, Hancock Police Department
• Chief George Knight, Smithsburg Police Department
• Charles Summers, Deputy Director Emergency Management for Washington County.
Page 26 of 26
Board of County Commissioners of Washington County, Maryland
Agenda Report Form
Open Session Item
SUBJECT: 2017 Housing Bond Allocation Transfer
PRESENTATION DATE: August 22, 2017
PRESENTATION BY: Stephen T. Goodrich, Director, Department of Planning and Zoning
RECOMMENDED MOTION: Move to approve the transfer of Washington County's 2017 Housing
Bond Allocation in the amount of $ 5,078,411.00 to the Community Development Administration for use
in issuing housing bonds on behalf of Washington County.
REPORT -IN -BRIEF: Each year the State of Maryland invites local governments to partner in a
statewide bond pool for first time homebuyers. The pool allows counties to transfer their housing bond
allocation to the State to issue bonds to fund housing programs. Washington County has traditionally
used this allocation to participate in the Maryland Mortgage program.
DISCUSSION: Washington County has been transferring its housing bond allocation to the Community
Development Administration (CDA) annually since at least 2007. Generally bond allocation amounts
have increased since 2007 but this year's amount is slightly less than 2016. Maximum allowable
acquisition costs have been decreased for 2017 by less than 1%. Income limits for participants have been
increased for 2017 in both target and non -target areas. The MD DHCD reports purchasing activity in
Washington County as 89 units in 2014 ($11,801,595), 76 units in 2015 ($10,360,540), 146 units in 2016
($20,265,928), and 96 units in 2017 ($13,051,467). Targeted areas in Washington County are within
Hagerstown city limits.
FISCAL IMPACT: No cost to Washington County
CONCURRENCES: N/A
ALTERNATIVES: If there is no transfer there will be less money available to make housing loans to
Washington County applicants from the Maryland Mortgage Program
ATTACHMENTS: DHCD invitation to transfer allocation
Income limits and maximum acquisition costs
AUDIOVISUAL NEEDS: N/A
DHCD
Maryland Department of Housing
and Community Development
The Honorable Terry L. Baker
President
Board of Commissioners
Washington County
100 West Wahington Street
Hagerstown, MD 21740
Dear President Baker:
LARRY HOGAN
Governor
BOYD K. RUTHERFORD
Lt. Governor
KENNETH C. HOLT
Secretary
TONY REED
Assistant Secretary
July 26, 2017
The Department of Housing and Community Development ("The Department") invites
Washington County to transfer its 2017 housing bond allocation to the Department. By doing
this, the Department utilizes local government housing bond allocations to issue bonds to fund
housing programs or to issue mortgage credit certificates. (Please note that a mortgage credit
certificate may not be used in conjunction with a loan funded with the proceeds from the sale of
a tax-exempt mortgage revenue bond issue). The allocation represents the amount of volume cap
authority that would have been available to the local government should it choose to issue the
bonds itself in order to raise capital for mortgage loans. In prior years, the annual housing bond
allocation has been an extremely powerful and successful tool in creating affordable housing
opportunities.
In order for the Department to utilize your housing bond allocation, a participating local
government must transfer its allocation to the Department in writing on or before Friday, August
18, 2017. The housing bond allocation for your jurisdiction is $5,078,411. Enclosed are two
forms for your use in effecting the transfer. The first (Attachment I) is a form letter to be
prepared on your letterhead authorizing the transfer of bond allocation to the Department's
Community Development Administration (CDA). The second form (Attachment II) should also
be completed on your letterhead to indicate how the funds are to be allocated.
We ask your cooperation in transferring your 2017 bond authority to the Department.
Attachments I and II must be prepared on your letterhead and be returned no later than Friday,
August 18, 2017 to the following address:
MARYLAND DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT
7800 Harkins Road • Lanham, MD 20706 . dhcd.maryland.gov
301-429-7400 • 1-800-756-0119 • TTY/RELAY 711 or 1-800-735-2258
LARRY HOGAN
Governor
BOYD K. RUTHERFORD
Lt. Governor
DHCD
Maryrd Department of Housing
and Community Development
Maryland Department of Housing and Community Development
7800 Harkins Road,
Lanham, Maryland 20706
Attn: Karl Metzgar, CDA/Single Family Housing
KENNETH C. HOLT
Secretary
TONY REED
Assistant Secretary
Attached, for informational purposes only, are Attachment III — Federal Income Limits;
Attachment IV — Program Maximum Acquisition Costs; Attachment V — Targeted Areas and
Attachment VI - Maryland Mortgage Program Purchase Activity for FY 2014, 2015, 2016 and
2017, as of June 30, 2017. We look forward to your continued support of home ownership
opportunities for residents of your County. Should you have any questions or need additional
information, please contact Karl Metzgar at 301-429-7826 or by email at
karl.metzgar &,maryland.gov.
Thank you.
Sincerely,
Maddy Ciulu, Director
Single Family Housing
Enclosures: Attachment I Form Letter for Transfer of Allocation
Attachment II Statement of Conditions for Participation in CDA's Programs
Attachment III Federal Income Limits
Attachment IV Program Maximum Acquisition Costs
Attachment V Targeted Areas
Attachment VI Maryland Mortgage Program Purchase Activity for FY 2014,
2015, 2016 and 2017, as of June 30, 2017.
CC: Kristen Musallam, Deputy Director, Community Development Administration
ta
MARYLAND DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT
7800 Harkins Road ■ Lanham, MD 20706 • dhcd.maryland.gov
301-429-7400 • 1-800-756-0119 • TTY/RELAY 711 or 1-800-735-2258
FEDERAL INCOME LIMITS 2017 ATTACHMENT III
HOUSEHOLD
SIZE
NON -TARGETED
AREA
TARGETED
AREA
1 OR 2 MEMBERS
Baltimore -Columbia-
Towson MD MSA'
$109 320
(120% of Area Median)
Baltimore -Columbia -
Towson MD MSA
$111,000
(120% of Statewide
Median)
Washington, D.C. HMFA2
$132,360
(120% of Area Median)
Washington, D.C. HMFA
$132,360
(120% of Area Median)
St. Mary's County
$99,600
(100% of Area Median)
%
/A
3 OR MORE MEMBERS
All other areas of State
$92,500
(100% of Statewide
All other areas of State
$111,000
(120% of Statewide
Median)
Median)
Baltimore -Columbia-
Towson MD MSA
$127 540
(140% of Area Median)
Baltimore -Columbia -
Towson MD MSA
$129,500
(140% of Statewide
Median)
Washington, D.C. HMFA
$154,420
(140% of Area Median)
Washington, D.C. HMFA
$154,420
(140% of Area Median)
St. Mary's County
$114,540
(115% of Area Median)
%
///
All other areas of the State
$106,375
(115% of Statewide
All other areas of the State
$129,500
(140% of Statewide
Median)
Median
' Counties of Anne Arundel, Baltimore, Carroll, Harford, Howard and Queen Anne's and Baltimore City
2 Counties of Calvert, Charles, Frederick, Montgomery and Prince George's
ATTACHMENT IV
PROGRAM MAXIMUM ACQUISITION COSTS
JURISDICTION
Allegany Countyi
Anne Arundel County
Baltimore Cityi
Baltimore County2
Calvert County
Caroline Countyi
Carroll County
Cecil County
Charles County
Dorchester Countyi
Frederick County
Garrett Countyi
Harford County
Howard County
Kent Countyi
Montgomery County
Prince George's County2
Newly Constructed
Existing Homes
Non-
Targeted
Targeted
$476,471
$310,211
$582,383
$476,471
$585,714
$476,471
$349,412
$585,714
$582,383
$310,211
$310,211
$585,714
$310,211
$476,471
$476,471
$327,412
$585,714
$585,714
$715,872
continued on next page
ATTACHMENT IV
Queen Anne's County
$476,471
St. Mary's County
$319,765
Somerset Countyi
$355,882
Talbot County
$352,589
Washington County2
$253,809
$310,211
Wicomico County2
$291,176
$355,882
Worcester County
$291,17
1 Entire jurisdiction is targeted — buyers do not have to be first-time
home buyers
2 Jurisdiction contains certain targeted census tracts (refer to
Targeted Areas attachment) in which buyers to not have to be first-
time home buyers
ATTACHMENT VI
MARYLAND MORTGAGE PROGRAM
PURCHASE ACTIVITY
FOR
WASHINGTON COUNTY
Regular MMP
Bond portion of HIDPi loan
Fiscal Year
#
Loan Amount
#
Loan Amount
2014
89
$11,801,595
0
$0
2015
76
$10,360,540
0
$0
2016
146
$20,265,928
0
$0
20171
96
$13,051,467
0
$0
1 The Homeownership for Individuals with Disabilities Program (HIDP) blends bond
funds with State Funds
Attachment VI 2017 OBO 063017
Board of County Commissioners of Washington County, Maryland
Agenda Report Form
Open Session Item
SUBJECT: Intergovernmental Cooperative Purchase (PUR-1358) for the
Highway Department of Three (3) Dump Trucks
PRESENTATION DATE: August 22, 2017
PRESENTATION BY: Rick Curry, CPPO, Director - Purchasing Department and
Ed Plank, Director — Highway Department
RECOMMENDED MOTION: Move to authorize by Resolution, the Highway Department
to purchase three (3) 4x2 Mack dumps from Potomac Truck Center, Inc. of Bladensburg, MD.
The cost of each truck is $183,500.00 (extended warranty $3,200.00) for a total amount of
$560,100.00 and to utilize another jurisdiction's contract (#4400003267) that was awarded by
Howard County, Maryland - Office of Purchasing.
REPORT -IN -BRIEF: The Highway Department is requesting to purchase three (3) dump
trucks to replace vehicles that are between fourteen (14) to sixteen (16) years old and exceed the
County's Vehicle and Equipment Types and Usage Guidelines. The County's replacement
guidelines for vehicles greater than 33,000 lbs. GVWR is recommended at a ten (10) year
economic life cycle. The replaced vehicles will be advertised on GovDeals.com for auctioning.
The Code of Public Laws of Washington County, Maryland (the Public Local Laws) §1-106.3
provides that the Board of County Commissioners may procure goods and services through a
contract entered into by another governmental entity, in accordance with the terms of the
contract, regardless of whether the County was a party to the original contract. The government
of Howard County, Maryland - Office of Purchasing took the lead in soliciting the resulting
agreement. If the Board of County Commissioners determines that participation by Washington
County would result in cost benefits or administrative efficiencies, it could approve the purchase
of this service in accordance with the Public Local Laws referenced above by resolving that
participation would result in cost benefits or in administrative efficiencies.
The County will benefit with direct cost savings in the purchase of this service because of the
economies of scale this buying group leveraged. I am confident that any bid received as a result
of an independent County solicitation would exceed the spend savings that Howard County,
Maryland - Office of Purchasing provides through this agreement. Additionally, the County will
realize savings through administrative efficiencies as a result of not preparing, soliciting and
evaluating a bid. This savings/cost avoidance would, I believe, be significant.
DISCUSSION: N/A
FISCAL IMPACT: Funds are budgeted in the Highway Department's Capital Improvement
Plan (CIP) account (EQP042) in the amount of $1,020,000.00.
CONCURRENCES: N/A
ALTERNATIVES:
1. Process a formal bid and the County could possibly incur a higher cost for the purchase, or
2. Do not award the purchase of the dump trucks.
ATTACHMENTS: Potomac Mack Sales and Services, Inc. quote.
AUDIOVISUAL NEEDS: N/A
LJi J�t[I/1\ 1i.[.
0 Mack 0
Quantity: 1
Quotation Reference: 0
Prepared for: Washington County
PRICING SUMMARY
Base Selling Price
F. R. E. T.
Title Tax 0%
Title Fee
Lien Fee
Tag Fee
Sub -Total
Extended Warranties
Total Sale Price
$183,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$183,500.00
$3,200.00
$186,700.00
Total Price 1 Vehicles
$186,700.00
Minus Trade Value(s)
Minus Customer Deposit
$0.00
$0.00
Total Due at Signing
$186,700.00
Notes:
Please note that price INCLUDES the Howard County Invoice
Plus amount required to ride on the contract. This is total
price for contract ride on.
Prepared by: 0
U
O
1-
O
0
TRUCK CENTER
January 0, 1900
Extended Warranties Included:
Engine Warranty
EATS
Starter
0
0
Options Included in Price:
0
J&J Body and Equipment
0
Howard County Contract invoice 4$42(
0
0
0
0
0
0
0
0
0
Potomac Truck Centers Inc.
3371 Kenilworth Ave, Bladensburg, MD 20710
Phone; (301) 864-2000
Fax: (301) 277-7211
Web: www.BPTRUCKCENTERS.COM
VIN:
Chassis ID:
Modal:
Reg. Number:
1 M2AX04C4HM033698
M748 33698
GU
1Vork Order Number: 54624
Printed: 7/14/2017 9:07 AM
Fault tracing : ECM - P24A0 - 00
Start time: End Time:
7/14/2017 9:06:26 AM
Status;
Session ID:
M748033698140830245
Work Order:
54624
User ID;
XW18622
Partner ID:
US5278
DTC Readout:
Start time:
7/14/2017 9:04:40 AM
Session ID: Work Order:
M748033698140830245 54624
User ID:
XW18622
Partner ID:
US5278
Vehicle/Machine Time:
Control Unit
Engine hours:
709.7662
DTC
Status
Count
First Occurrence
Last Occurrence
Engine Control Module
(EMS)
P050700: Idle Control System - RPM Higher Than
Expected, No additional information
Inactive
1
6/28/2017 12:04:22 AM
6/28/2017 12:04:50 AM
Engine Control Module
(EMS)
P24A000: Closed Loop OPF Regeneration Control At
Limit - Temperature Too Low, No additional information
Active
1
6/30/2017 3:50:08 AM
6/30/2017 6:38:36 AM
Engine ECU (MID 128)
SPN 0: , FMI 0: Data valid but above normal
operational range
Active
0
Vehicle ECU (MID 144)
PSID 200: Data Link, MID128, FMI 9: Abnormal
update rate
Inactive
1
6/19/2017 3:24:00 AM
6/19/2017 3:24:00 AM
Control Unit Information :
Start time:
7/14/2017 8:30:24 AM
Session ID: Work Order:
M748033698140830245 54624
User ID:
XW18622
Partner ID:
US5278
LVD Readout: Automatic
Start time:
7/14/2017 8:30:24 AM
Session ID: Work Order:
M748033698140830245 54624
User ID:
XW18622
Partner ID:
US5278
DTC Readout:
Start time:
7/14/2017 8:29:44 AM
Session 113: Work Order:
M748033698140830245 54624
User ID:
XW 18822
Partner ID:
US5278
User ID: XW18622
Partner ID: US5278
User name: NICHOLAS TESI Partner name: POTOMAC TRUCK CENTER, INC.
Page 1 of 1
I®
Vehicle Summary
CUSTOMERNEHICLE INFO Description
A19039 VEHICLE MODEL YEAR 2018 MODEL YEAR
S PB1081 PRICE BOOK LEVEL 2018B Pricebook
S 002BR2 CHASSIS (BASE GU712 R - 4x2 DAYCAB
MODEL)
S MP2001 CUSTOMER FLEET SIZE DEALER FLEET WITH LESS THAN 25 VEHICLES IN OWN FLEET OF ANY VEHICLE BRAND
S 013001 TYPE OF SERVICE COMMERCIAL
S 505015 INITIAL REGISTRATION ALL 50 STATES, CARB ENGINE EMISSION (US17)
LOCATION
S 534014 LANGUAGE- ENGLISH
PUBS/DECAL/SIGNS
S DHX1OX ROAD CONDITION WELL MAINTAINED SURFACED ROADS >95% DRIVING DISTANCE
0050L5 VEHICLE USE & DUMP TRUCK
BODY/TRAILER TYPE
DKXG2X GROSS COMBINATION 80,000 LB (36 TONNES) GROSS COMBINATION WEIGHT
WEIGHT
QCXB1X TOPOGRAPHY GRADES <6% GREATER THAN 98% OF DRIVING DISTANCE MAX GRADE 16%
S El BD1X AMBIENT TEMP UPPER AMBIENT TEMPERATURE HOT. WARMER THAN 104 F (40 C) ALLOWED UP TO 25 HOURS PER
LIMIT (GTA) YEAR
032A89 TERRAIN GRADE ON -OFF HIGHWAY, STARTING GRADES<18%
033A10 LOADING SURFACE CONCRETE LOADING AND / OR UNLOADING SURFACE
0342A2 VEHICLE VOCATION CONSTRUCTION SERVICE
APPLICATION PACKAGES Description
S MPRODR MACK PACKAGE WITHOUT MACK RAWHIDE PACKAGE
RAWHIDE
S PK7001 GRANITE AF CONFIG. W/O GRANITE AF CONFIG. PKG.
PKG.
S 023AB3 APPLICATION WITHOUT SPECIAL SALES PACKAGE
RECOMMENDATIONS
S 022001 PILOT INSPECTION NO PILOT REQUESTED
ENGINE/TRANSMISSIONS Description
1000V0 ENGINE PACKAGE MP7-375M MACK 375HP @ 1500-1900 RPM (PEAK) 2100 RPM (GOV) 1360 LB -FT, US'17
S Q1CA1X GEAR SELECTION BASIC, GEAR -SELECTION TUNING
TUNING
136AS6 TRANSMISSION 4500 RDS 6 SP -ALLISON RUGGED DUTY SERIES GEN 5 W/PROGNOSTICS
RSXWCX TRANSMISSION
ELECTRONICS
S U6AA1X ENGINE GOVERNOR ENGINE GOVERNOR TYPE MIN -MAX
TYPE
ALLISON VOC PKG# 223 RDS ON -OFF HIGHWAY (2ND REVERSE CAPABLE), PBAN, AFRI
EXHAUST/EMISSIONS Description
S CIRAA4 GARB 2008 IDLE IDLE. EMISSION CERTIFICATION - CARB 08 (WITH DECAL LOCATED ON LOWER LH CORNER OF
REGULATION DRIVER DOOR
Price Level:02/12/2017
C:k 1'ation:P,ARK20? 7000152A345
Page: 1
Date:07/14/2017
Deeler Name POTOMAC TRi h,K CENTFR INC
S DPFO4F DPF DIESEL CLEARTECH ONE BOX E.A.T.S. RH SIDE UNDER CAB US17
PARTICULATE FILTER
8NAA1X DPF COVER
130AD7 EXHAUST
S 5BAAAX EXHAUST HEAT SHIELD
'TYPE
KRXAPX EXHAUST STACK
HEIGHT
QOAC1X EXHAUST SYSTEM
MATERIAL FINISH
DF10M1 DEF TANK
U6BA1X DEF TANK COVER PAINTED FINISH DEF TANK COVER
DPF COVER, PAINTED STEEL
SINGLE VERTICAL RIGHT SIDE CAB MOUNTED, LOWER VENTURI DIFFUSER, TURNED END
EXHAUST HEAT SHIELD TYPE, BASIC
9' 6" FROM GROUND
SINGLE, BRIGHT FINISH HEAT SHIELD, STACK AND SCR COVER (IF EQUIPPED)
11.8 GALLON (45 L) 22" LEFT SIDE FRAME MTD
S 78AC5X EMISSION ON BOARD EMISSION OBD, DISPLAY ONLY, USA2016
DIAG CON1 ROL
ENGINE EQUIPMENT
Description
S 125AA4 AIR CLEANER
1VAADX AIR INTAKE SOURCE
S 121AA5 BUG SCREEN
S 113AA6 AIR COMPRESSOR
S MBXA1X PRIMARY FUEL FILTER
POSITION (CA)
132AB6 ALTERNATOR
S
S
S
S
S
S
316AA7 BATTERIES
508AA4 COOLING
PERFORMANCE
119AC9 COOLANT PROTECTION TO -34 DEGREES F (-37 DEGREES C)
11" x 30" (279 mm x 762 mm) UNDER HOOD SINGLE ELEMENT DRY TYPE W/AIR INTAKE FROM
BOTH SIDES OF HOOD
INSIDE/OUTSIDE AIR INTAKE W/IN-CAB CONTROL FOR SNOWPLOWS
BLACK ALUMINUM MOUNTED BEHIND GRILLE, WITHOUT WINTER FRONT COVER
MERITOR/WABCO 318 18.7 CFM
STANDARD FUEL FILTER POSITION
HWXA1X COOLANT FILTER /
CONDITIONER
118AA5 FAN DRIVE
110AA5 ENGINE BRAKE
293AA2 FUEL -WATER
SEPARATOR
J7XZ1X AUX. FUEL SYSTEM WITHOUT AUXILLIARY FUEL HEATING
EQUIPMENT
E8XZ1X FUEL EQUIPMENT W/O FUEL HEATER
WATER HEATER (CA)
318AA3 BATTERY DISCONNECT FLAMING RIVER BIG SWITCH WIRED TO POSITIVE SIDE
SWITCH
393AB0 BATTERY BOX - RIGHT HAND BEHIND SCR
MOUNTING
S L5XA1X BATTERY BOX COVER MOLDED PLASTIC
S LLXZ1X
5 124AA3
S NCXA5X
S QHXC1X OIL PAN
S 36AZ1X
5NXA1X
S EFXZIX
S NDXZ1X
5 H7XCZ1X ENGINE OIL DRAIN KIT W/O OIL CHANGE SYSTEM
DELCO 12V 165A (3651) BRUSHLESS
(3) MACK 12V 1000/3000 CCA THREADED STUD TYPE
930 SQUARE INCH RADIATOR
MACK COOLANT CONDITIONER
EMERGENCY START
STUDS
HOSES -
RADIATOR/HEATER
STARTER
TETHER DEV PKG,
CAPS & COVERS
ENGINE BLOCK
HEATER
ENGINE OIL PAN
HEATER
ENGINE STARTING AID
BEHR FAN WITH BEHR ELECTRONICALLY MODULATED FAN DRIVE
MACK MP7 POWERLEASH
MACK W/MANUAL DRAIN VALVE (INTEGRAL W/PRIMARY FUEL FILTER)
WIG EMERGENCY STARTING RECEPT.
MACK BRAND EPDM RADIATOR & HEATER HOSES
12 VOLT DELCO 39MT-MXT
OIL PAN
W/O TETHER DEVICE
120V 1500 WATT ENGINE BLOCK HEATER
W/O OIL PAN HEATER OPTIONW/O OIL PAN HEATER
W/O ENGINE COLD START AID
Price Level:02/12/2017
Q uotation: PAR K2017000152A34 3
Page: 2
Date:07/14/2017
Dealer Name'POTOMAC TRUCK CENTER INC
S 2BAZ1X ALCOHOL W/O ALCOHOL EVAPORATOR
EVAPORATOR (CA)
MOXAAX BATTERY SHOCK PADS SHOCK PADS UNDER BATTERIES
CLUTCH/TRANS EQUIPMENT
Description
492007 GEAR SHIFTER
133AA1 CLUTCH
195AB0 DRIVELINE - MAIN
S IUXZ1X CLUTCH ACTUATION
SYSTEM
7RXAEX LUBRICANTS,
TRANSMISSION
S
S
S
S
S
S
S N1DZ1X PRE -VIEW
TOPOGRAPHY
2XAZ1X CLUTCH PEDAL PAD
139AA7 TRANSMISSION OIL
COOLER
5DAZ1X TRANSMISSION DUST
PROOFING
83AA1X PROP SHAFT BEARING
GUARD
76AA1X PROPELLR SHAFT
MAIN, UNVSL JNT
3IAZIX HILL START ASSIST
RCXB1X BELL HOUSING
RGXZ1X CLUTCH BRAKE
RBXZ1X CLUTCH LUBE LINE
442022 TRANSMISSION
TORQUE CONVERTER
D3BA1X TRANSMISSION
ADAPTATION RING
6VAZ1X ENGINE START
CONDITION
M05015 TRANS SHIFT MODE
POINTS
U7AZIX TRANSMISSION
PROTECTION
M08038 ECONO ROLL
6SAZIX TRANSMISSION KICK-
DOWN MODE
FRONT AXLE EQUIPMENT
ALLISON DASH MTD SHIFTER W/NEUTRAL TO RANGE INHIBIT (HD SERIES)
OMIT CLUTCH
MERITOR 18 MXL "XTENDED LUBE"
W/O AIR ASSIST
TRANSYND SYNTHETIC LUBE FOR ALLISON TRANS
W/O CLUTCH PEDAL
FURNISH FOR ALLISON TRANSMISSION W/DIRECT MOUNT COOLER
W/O TRANSMISSION DUSTPROOFING
DRIVESHAFT GUARD FOR CENTER BEARING
PROPELLER SHAFT MAIN, UNIVERSAL JOINT HALF -ROUND TYPE
W/O GRADE GRIPPER
ALUMINUM
W/O CLUTCH BRAKE
W/O LUBRICATION FITTING OPTION
FURNISH TC541 FOR USE W/ALLISON (HD) SERIES WORLD TRANSMISSION
TRANSMISSION ADAPTATION RING
W/O CLUTCH STARTING SWITCH OPTION
W/O TRANSMISSION SHIFT SETTINGS
WITHOUT TRANSMISSION PROTECTION
ECONO ROLL DISABLE mDRIVE (REQUIRED FOR ALL OTHER TRANSMISSIONS)
MACKCELLERATOR DISABLE
WITHOUT MACK PREDICTIVE CRUISE
Description
240M3 FRONT AXLE
244AB5 SPRINGS - FRONT
S 7OBB1X BRAKE REGULATION
241081 FRONT AXLE BRAKES
U3XA1X BRAKE, FRONT
LOXABX BRAKE LINING
MATERIAL FRONT
UDXA1X FRONT AXLE BRAKE
DUST SHIELD
S V7AD1X FRONT BRAKE
CHAMBER MFG.
S U0AA1X FRONT BRAKE ADJ.
MANUFACTURE
O5BD1X FRONT BRAKE
CHAMBER SIZE
20000# (9072kg) MACK FXL20 WIDE PIVOT CENTER STRAIGHT SPINDLE/UNITIZED BEARINGS
MACK TAPERLEAF HD 20000# (9072kg) GROUND LOAD RATING
BRAKE REGULATION, STOPPING DISTANCE 94M (310FT)
MERITOR "S" CAM TYPE 16.5" x 6" Q+
CAST IRON BRAKEDRUM, FRONT AXLE
MERITOR R403 BRAKE LINING.
FURNISH
FRONT BRAKE CHAMBER MANUFACTURER, MGM
HALDEX - AUTOMATIC
FRONT BRAKE CHAMBER 24SQ INCHES (SERVICE)
Price Level:02/12/2017
Ouotatioir'PARK2c0170031 52/O43
Page; 3
Date:07/14/2017
Cie;ale: Nairie_POTO MACTRI Ii;K ("ENTER Ili::
S YHXZ1X FRONT SPRING BIAS WITHOUT FRONT SPRING BIAS (EQUAL STIFFNESS L/R)
0KXA1X HUB MATERIAL, FRONT FERROUS
1BXBDX HUB OIL SEAL, FRONT FAG SCHAEFFLER, FRONT GREASE SEAL
S K4AAAX SPINDLE NUTS, FRONT STANDARD F.A. SPINDLE NUTS
S 1KAA1X SHOCK ABSORBER, DOUBLE ACTING TYPE
FRONT
245AB0 STEERING SHEPPARD SD110 + HD94
7VXC1X LUBRICANTS, FRONT PETROLEUM/SYNTHETIC (50/50) OIL FRONT AXLE
AXLE
REAR AXLE EQUIPMENT Description
S 252AA5 REAR AXLE - SINGLE RA23R 23000 LB -MACK 10400 KG
S 6MAA1X REAR AXLE CASING W/O WIDE TRACK AXLE OPTION
WIDTH
S R4XZ1X LUBE PUMP, REAR W/O LUBE PUMP AND FILTER
AXLE
S 018AA4 CARRIER - REAR AXLE CRD151 (FOR RA23R AXLE)
TAXAXX REAR AXLE RATIO 5.66 RATIO
260AK0 REAR SUSPENSION - 23000# MULTILEAF SPRINGS, STANDARD SPRING THICKNESS
SINGLE
S 5MAZ1X BREATHER FILTER WITHOUT BREATHER FILTER RELOCATION
(rear axle)
S ZAX99X SUSPENSION W/O AIR SUSP HEIGHT CONTROL
LEVELLING DEVICE
J6DZ1X AIR SUSPENSION DUMP WITHOUT AIR SUSPENSION DUMP WARNING
WARNING
YVXZ1X REAR SHOCK W/O REAR SHOCK ABSORBERS
ABSORBER
XYXZ1X TRANSVERSE TORQUE WITHOUT TRANSVERSE TORQUE RODS
RODS, R SUSP
S 253AA4 BRAKES - REAR MERITOR "S" CAM 16.5"x7" (419x178 mm) Q+
S U4XA1X BRAKE CAST IRON BRAKE DRUMS
DRUMS/ROTORS -
REAR
S U1AA1X REAR BRAKE ADJ HALDEX-AUTOMATIC
MANUFACTURE
S VIAB1X REAR BRAKE REAR SPRING BRAKE CHAMBERS 30/30 TYPE
CHAMBER SIZE
UEXA1X DRIVE AXLE BRAKE FURNISH
DUST SHIELD
MAXCAX BRAKE LINING ABEX 931-162 (MERITOR R301) (REAR EACH AXLE 23,000LBS MAX)
MATERIAL DRIVE
OLXI5X HUB MATERIAL, DRIVE IRON PRESET REAR HUB W/INTEGRATED SPINDLE NUT
1CXI2X HUB OIL SEAL, DRIVE PREMIUM HUB OIL REAR SEAL
S N2AE1X SPINDLE NUTS, MAIN SPINDLE NUTS, MAIN AXLE, INTERGRATED
AXLE
S 3LAZ1X POWER DIVIDER WITHOUT POWER DIVIDER
LOCKOUT
7WXB1X LUBRICANTS, REAR 75W - 90 (SYNTHETIC LUBRICANT)
AXLE(s)
S 300AD0 SPRING BRAKE MGM MODEL TR-T; TAMPER -RESISTANT BRAKE CHAMBERS
CHAMBERS -VENDOR
254AB4 TRACTION DRIVER CONTROLLED INTER WHEEL DIFFERENTIAL LOCK FRT RR AXLE, MANUAL AIR VALVE
DIFFERENTIAL WANARNING LIGHT.
S 9GAAAX ABS SENSOR & 4S/4M SYSTEM REAR WHEEL END SENSORS
MODULATOR
S 698AA5 ANTI -LOCK BRAKE BENDIX WITH TRACTION CONTROL
SYSTEM
S URXD1X BRAKE VALVE BENDIX SWITCHES AND VAL VES WHERE POSSIBLE
VERSION
S H9CZ1X TRACTION CONTROL W/O AUTOMATIC TRACTION CONTROL (ATC) DISABLE SWITCH
Price Level:02/12/2017
Page: 4
Date:07/14/2017
Quotation:PARK2017000152A343
Dealer Name:POTOMAC TRUCK CENTER, INC
DISABLE
PUSHER/TAG AXLE EQUIPMENT
Description
MAC01C AUXILIARY AXLE
CONTROLS
S UFXZ1X TRAIL. AXLE BRAKE
DUST SHIELD
S 9GDZ1X AUX AXLE CTRL VALVE
LOCATION
FRAME EQUIPMENT/FUEL TANKS
WITHOUT AUXILIARY AXLE CONTROLS
TRAILING BRAKES WITHOUT DUST SHIELDS
WITHOUT AUXILIARY AXLE CONTROL VALVE LOCATION
Description
271180 WHEELBASE 180"
374057 AF (OVERHANG) 57"
274AA8 FRAME RAILS ST EEL - 300MM X 90MM X 11.1 MM -- (11.81" X 3.54" X 0.437" )
S 7TXZ1X RUST PROTECTION (for W/O RUST PREVENTATIVE OPTION
frame), ADDITIONAL
(CA)
Z9XZ1X FRAME INNER LINER WITHOUT FRAME REINFORCEMENT - INSIDE
S 6CBZIX
5CAZ1X
A0XF3X
S
S
S
S
S
S
S
S
S
S
S
FRAME OUTER LINER
(CA)
FRONT FRAME EXT.
(BOLTED ON)
FRONT FRAME LENGTH
281AA5 CROSSMEMBERS
Q9AZ1X FRAME RAIL FREE
SPACE
R0AZ1X FUEL TANK POLISH
OPTION
Q5AA1X REAR CROSSMEMBER
OPTIONS
X6XA1X REAR FRAME
TREATMENT
69XZ1X MUDFLAP HANGERS,
REAR AXLE
67XZ1X MUDFLAP TYPE, REAR
AXLE
2HXA1X MUDFLAP, FRONT
AXLE
4DXM9X FRONT BUMPER
5FXZ1X CAB GUARD, FRONT
5EXZ1X GUARD, UNDER
ENGINE BAYT
AXXZ1X
4EXG1X
S 6NXZ1 X
AUX CROSSM. IN REAR
OVERHANG
TOWING DEVICE,
FRONT
TOWING COUPLING
6PXD1X TOWING DEVICE,REAR
288AO8 FUEL TANK - LH
S 2RAA1X FUEL LEVEL SENDER
UNIT, LIQUID
S 290AA1 FUEL TANK - RH
S 7HX99X TOOLBOX CHASSIS
S JHXBIX FUEL HOSES, LIQUID
S 852062 FILLER NECK SCREENS
12AA1X FUEL LINE OPTIONS,
LIQUID
WITHOUT FRAME REINFORCEMENT - OUTSIDE
W/O FRONT FRAME EXTENSION
Bumper Position Extended 20" (snow)
BOC AND INTERMEDIATE(S) STEEL HD BACK-TO-BACK CHANNEL
W/O FRAME RAIL CLEARANCE
W/O BRIGHT FINISH FUEL TANKS
FURNISH STANDARD STEEL CLOSING REAR CROSSMEMBER
WITHOUT TAPERED FRAME RAIL ENDS
W/O REAR MUD FLAP HANGER BRKTS
W/O REAR MUD FLAPS
BLACK POLYARMOUR (NO NAME TO APPEAR ON FLAP) (NOT ANTI -SPRAY TYPE)
EXTENDED -SWEPT BACK -STEEL
W/O RADIATOR GUARD
WITHOUT GUARD
W/O OPTIONAL CROSSMEMBERS BEHIND REAR AXLE/BOGIE
HOOKS
W/O REAR TOWING DEVICE
HOOKS - FRAME MOUNTED
88 GALLON (333 L) 22" ALUMINUM D -SHAPE
BASIC FUEL LEVEL SENDER MOUNTED ON L.H TANK
OMIT RH STANDARD
W/O TOOL BOX
BRAIDED HOSE
W/O FILLER NECK SCREEN OPTION
W/O FUEL LINE OPTION
Price Level:02/12/2017
Quotation:PARK2017000152'A343
Page: 5
Date:07/14/2017
Dealer Name.PCTOMAC TRUCK CENTER. INC
S KFXA1X FUEL TANK CAP NON -LOCKABLE FUEL TANK CAP
S 223AA1 STEPS (BRIGHT) - FUEL W/O BRIGHT FINISH STEPS AND STRAPS PACKAGE
TANK
S 464AA1 QUARTER FENDERS W/O QUARTER FENDERS
S I7XZ1X ISOLATE TANK FROM W/O ISOLATED TANK(S)
FUEL SYSTEM
AIR/BRAKE Description
S VHXEDX AIR DRYER - WABCO AIR DR, 12000P W/ T CUT OFF VALVE, W COALESC OIL FILTER, HEATED
MANUFACTURER
UWXE1X AIRTANK DRAIN VALVE AUTOMATIC DRAIN VALVE, HEATED, ON SUPPLY TANK, W/LANYARDS ON ALL OTHER TANKS
U2XA1X AIRTANK MATERIAL ALUMINUM, STANDARD FINISH
S KOXA1X AIR DRYER POSITION W/O RELOCATION OPTION
(CA)
S 3MBZ1X PARK BRAKE ALARM W/O PARK BRAKE ALARM
(CA)
1JAABX PARKING BRAKE TWO (2) VALVE DUAL BRAKE SYSTEM - TRAILER SUPPLY AND TRACTOR -TRAILER PARK
VALVE
141AD7 RELOCATE AIR MANUAL SOLUTION FOR IN -FRAME AIR RESERVOIR LOCATION- UNDER BATT.BOX & BETWEEN
RESERVOIRS FRAME RAILS
VSXZ1X AUXILLIARY AIRTANK W/O INCREASED AIR RESERVOIR CAPACITY
ELECTRICAL Description
S Q8CH1X CHASSIS WIRING CHASSIS & POWER HARNESS WITH HEAVY DUTY CASING
HARNESS CASING
S N4AZ1X AUXILIARY SPOTLIGHT W/O SPOTLIGHT
(CA)
S 4GAZ1X PARKING BRAKE WITHOUT PARKING BRAKE LIGHTING
LIGHTING
5 5RXZ1X BACK-UP ALARM Window HOU1 BACK-UP ALARM
S NGXZ1X AUX. FOG LAMP WITHOUT FOG LIGHTS
9FCZ1X FOG LAMP WITHOUT FOG LAMP TECHNOLOGY
TECHNOLOGY
NJXA3X AUXILIARY LAMPS DASH CTRUPWR SUPPLY/LOCAL INST PLOW LAMPS W/LEAD FURN@ GRILL W/2W/3W WEATHER
PACK CON
NEXD2X TAIL LAMPS LED TYPE TAIL LAMP MODULE MTD BELOW REAR CROSSMEMBER
S 5FBB1X MARKER/DIRECTIONAL W/O MARKER/DIR SIGNAL OPTION
SIGNAL
S LSXHIX DAYTIME RUNNING PARK BRAKE AND ENGINE RUNNING ACTIVATED
LIGHTS
S N7XZ1X WARNING LAMP WITHOUT WARNING LIGHTS
TRAILER CONNECTIONS Description
5 LIXZIX FIFTH WHEEL ANGLE WITHOUT FIFTH WHEEL ANGLES
MATERIAL (CA)
5 9DAZ1X 5TH WHEEL ANGLE WITHOUT 5TH WHEEL ANGLE THICKNESS
THICKNESS
53XBAX TRAILER GLAD HAND GLAD HAND COUPLINGS - NORTH AMERICAN STD
COUPLINGS
WGXC1X TRAILER BRAKE VALVE HAND CONTROL VALVE FOR TRAILER OR REAR SERVICE BRAKES - DUAL FUNCTION
WHXQ2X TRAILER CONNECTION TRAILER AIR BRAKE CONNECTIONS, END OF FRAME
POSITION
S MIXZ1X ELECTRICAL RECEPT, W/O HEAVY-DUTY POWER CIRCUIT
AUX POWER
321031 TRAILER ELECTRICAL SINGLE 7 PINS STD SAE TYPE, END OF FRAME
RECEPT
CA 3220C2 TRAILER HOOKUP SINGLE TRUCKLITE SUPER -44 LED, RECESSED LHS BOG W/RUBBER GROMMET (TLR HOOK-UP
LIGHT
Price Level:02/12/2017
Cs€crta°ior,a-ARK2017G'30 52A74?
Page: 6
Date:07/14/2017
Ntaler N<ame:POTOMAC TRUCK CENTER INC.
PTO/SPECIALTY EQUIPMENT
Description
S 826016 HYDRAULIC PUMP
WITHOUT HYDRAULIC PUMP
S
S
S
S 015025
S 997AA2
S V9BZ1X
S 416AA1
S 2WAZIX
S TYXZ1X
S B83083
183AA2
S 3FAZ1X
S D5XZ1X
S 3BAZ1X
S 189AA1
CAB (A THRU G)
FRAME
MODIFICATIONS
CERTIFIED WEIGHT
AUX TRANSMISSION
COOLER (CA)
REAR ENGINE PTO
PTO TRANS NEUTRAL
CONTRL CHECK
POWER TAKE OFF
CONTROL
BODY BUILDER
INTERFACE
CRANKSHAFT
ADAPTER
BULK UNLOADING
ADAPTATION
UNIQUE DECALS
MACHINE DIRECTIV
(CA)
PTO TRANS SIDE, FREE
SPACE
PTO - REAR MOUNTED
NO FRAME MODIFICATIONS PROVIDED
CERTIFIED WEIGHT
WIO OIL COOLER AUX TRANS OPTION
WITHOUT REAR ENGINE POWER TAKE OFF
W/O NEUTRAL CONTROL
WITHOUT PTO CONTROL
BODY LINK III W/CAB PASS-THRU
1350 SERIES FLANGE (DOES NOT INCLUDE FRONT FRAME EX1 ENSION)
WITHOUT AIR UNLOAD SYSTEM
W/O SPECIAL DECALS
WITHOUT PTO TRANSMISSION SIDE, FREE SPACE
W/O REAR MTD PTO
Description
S I6AZ1X
S 173AA4
0EAA1X AIR INTAKE GRILLE,
FINISH
S
S
S OIAAAX
S OLAZ1X
5 5CXAEX
S Q2AA1X
S 3CAZ1X
145AA5
S O4XADX
S BHXAAX
S 3XAZ1X
S IOXAHX
S 1ZAZ1X
2KXBIX
786066
184AA2
PFXZIX
PVXZ1X AIR RESTRICTION
INDICATOR
19AZ1X ANTENNA - SATELLITE
ASHTRAY
AUDIO SHUTOFF
AUDIO SPEAKER
LOCATION
CAB INSTEP VERSION
CAB AUXILIARY FAN
CAB GLASS
CAB PEEP WINDOW
CIGARLIGHTER
DASH INDICATOR -
LAMP BODY OUT OF
POS
DOME LAMP, INTERIOR
DOOR STORAGE
COMPARTMENT
FRONT WHEEL
OPENING
FIRE EXTINGUISHER
FLOOR COVERING
GAUGE - AMBIENT
TEMPERATURE
Z8XZ1X TIME COUNTER (CA)
AUXILIARY PNEUMATIC WITHOUT CAB CLEANOUT
OUTLET CAB
AIR MACK (BERGSTROM) INTEGRAL W/HEATER COMBINATION HEATER/DEFROSTER AND AIR
CONDITIONING/HEATER CONDITIONER
BRIGHT FINISH GRILLE
W/O AIR RESTRICTION MONITOR (displayed in CO -Pilot only)
W/O SATELLITE RADIO ANTENNA
ASHTRAY
W/O AUTO RADIO SHUTOFF OPTION
SPEAKER LOCATION, BEHIND DOORS, MIDDLE HIGH SIDE PANEL
FURNISH STANDARD (2) STEP CAB ACCESS OPTION
W/O CAB FAN, AUX AIR CIRC OPTION
HEATED TINTED WINDSHIELD ONLY, TINTED SIDE AND REAR WINDOW
PEEP WINDOW ON RIGHT SIDE NON STG WHL POS. DEPEND
CIGAR LIGHTER
W/O OPTIONAL DASH MID. LIGHT
(4) DOME LAMPS - DOOR AND SWITCH ACTIVATED
W/O POUCH
FENDER EXTENSIONS
5LB (ABC RATED/AMEREX) MOUNTED BETWEEN LH SEAT BASE AND DOOR WITH VALVE AIMED
REARWARD
POLYURETHANE FLOOR MAT
W/O INSIDE/OUTSIDE TEMP GAUGE OPTION
W/O INDEPENDENT ENGINE HOURMETER
Price Level:02/12/2017
Page: 7
Date:07/14/2017
Quota lion:PARK2017000152A343
Dealer Name:POTOMAC TRUCK CENTER, INC
EIAAAX GAUGE - REAR AXLE
OIL TEMP
S N6XR2X GAUGE -PACKAGES
S 198048 GAUGES - UNIT OF
MEASURE
5870D7 GRAB HANDLES
S 400AA4 GRILLE
CAB (H THRU R)
WITH REAR AXLE OIL TEMPERATURE GAUGE
STD PKG + ENG OIL TEMP, TRANSM OIL TEMP & EXH PYROMETER
U.S. UNITS (PREDOMINENT)
BF EXT CAB GRAB HANDLES, BLK HANDLE RH INTERIOR WS POST, BLK GRAB HANDLE
DIAGONAL INSIDE LH DOOR
SILVER PAINTED W/O GRILLE SURROUND
Description
S 0MAA1X HEADLINER MATERIAL
26XA1X HOOD HATCH
S 89AA1X
S 4UAAIX
154AC2
LXXD1X
UQXZ1X
S
S
INSULATION - ENGINE
COMPARTMENT
HOOD LATCH FINISH
HORN - AIR
HORN -ELECTRICAL
DASH PANEL BOX
C0J02J INSTRUMENT CLUSTER
DISPLAY
DBXA1X DASHBOARD
004AA2 INTERIOR TRIM LEVELS
160AA6 KEYED ALIKE CHASSIS
S 13AA1X DOOR OPENING
OPTIONS
153AA1 MIRRORS - CONVEX
TYPE CAB DOORS
S 15H01 H MIRROR - CONVEX
HOOD & FENDER
152AC4 MIRRORS - EXTERIOR
Y6CB1X MIRRORSHEATED
TIMEOUT (CA)
S 43X50X MIRRORS - PROXIMITY
S E3XD1X
S 0GAZ1X
S 17400N
S MAS01S
S 73AC1X
FORWARD OVERHEAD
STORAGE
PERSONALIZED NAME
PLATE
AUDIO
ACCOMMODATION
INFOTAINMENT
SERVICES / FEATURES
ANTENNA - RADIO
5BXC3X ANTENNA - CB RADIO
S 1WAB1X POWER LEADS
S 3JAZ1X COMMUNICATION
RADIO
S 5JXAIX COM.RADIO PREP KIT
(CB)
S 2DX90X REAR CAB
SUSPENSION
S 21XA1X AUXILIARY REAR
WINDOW
S 784014 REFLECTOR KIT
S 2YXZ1X ROOF HATCH OR
COOLER
312AB5 ROOF MARKER LIGHT
VINYL COVERED FOAM PADDED HEADLINER
WITH INSPECTION HATCH FOR SNOWPLOW HOOD
HOOD INSULATION
PAINTED HOOD LATCHES
(1) MACK RECTANGULAR SINGLE TRUMPET, CHROME PLATED STEEL W/SNOW SHIELD
DUAL TONE
WIO UPPER STORAGE OPTION
CO-PILOT DRIVER DISPLAY, ENHANCED 4.5" DIAGONAL LCD DISPLAY W/4 -BUTTON STALK
CONTROL
CHARCOAL GRAY
PUREBRED SLATE GRAY
ALL CHASSIS KEYED ALIKE-4KEYS (M153) (H676)
WIG ELECTRONIC KEYLESS ENTRY
WITH AERO MIRRORS
WITHOUT CONVEX TYPE
BULLDOG STYLIZED MIRRORS - LH & RH I IEATED & MOTORIZED W/INTEGRAL CONVEX MIRROR
HEATED MIRROR TIME-OUT, 60 MIN
W/O OPTIONAL VISIBILITY MIRROR
(2) STORAGE COMPARTMENTS AND NET RETAINERS W/CENTER MOUNTING FOR CB
PROVISIONS
WIG PERSONALIZED OPTION
AM/FM PREMIUM STEREO, CD -PLAYER, MP3, WEATHERBAND, HANDSFREE INTERFACE,
BLUETOOTH
WITHOUT INFOTAINMENT SERVICES / FEATURES
RADIO ANTENNA, CAB MOUNTED BEHIND LH DOOR
PREP KIT FOR MOUNTING ON LT SIDE MIRROR (W/O ANTENNA)
POWER LEADS (5 -WAY BINDING POSTS FOR CB RADIO) IN HEADER CONSOLE
W/O CB RADIO
CB RADIO MOUNTING REINFORCEMENT IN HEADER CONSOLE
REAR CAB SUSPENSION, AIR
REAR WINDOW (FIXED TYPE)
W/O REFLECTOR KIT OPTION
WIG ROOF VENT VENTILATION
(5) GROTE LED LAMPS
Price Level:02/12/2017
QuoIaIion:PARK2017000152A343
Page: 8
Date:07/14/2017
Dealer Name -POTOMAC TRUCK CENTER. INC.
IFXZ1X REAR WALL STORAGE W/O REAR STORAGE POUCH
COMPARTMENT
CAB (S THRU Z)
Description
1960H6 SEAT - DRIVER'S BOSTROM TALLADEGA 915 (HI -BACK) AIR SUSPENSION
1970E7 SEAT - PASSENGER'S MACK FIXED (HI -BACK) NON -SUSPENSION
3PXA1X SEAT ARMREST
5920E2 SEAT BELT(S)
S D8XZ1X
S 485015
S
S
SEAT BELT REMINDER
(CA)
SEAT COVERING
0HAA1X SEAT SUPPORT, DUST
COVER
2QAA1X IGNITION TYPE
161005 STEERING WHEEL
INBOARD MOUNTED ARM REST, DRIVER'S SEAT ONLY
SEAT BELTS (ORANGE)/RETRACTORS, LAP AND SHOULDER FOR DRIVER AND RIDER SEAT
W/O IND.
ALL VINYL, CAB INTERIOR DEPENDENT COLOR DRIVER & RIDER SEATS
SEAT, DUST COVER FOR DRIVER'S SEAT
KEY TYPE
2 SPOKE URETHANE GRIP, CHARCOAL. SPOKES, W/O SWITCHES
S U7XB1X SUN VISOR - INTERIOR, SUN VISOR - BOTH SIDES
FRONT
157027 SUN VISOR - EXTERIOR SUN VISOR, EXTERIOR, FIBERGLASS (PAINTED)
S NPXB1X TURN SIGNALS
JQXABX WASHER RESERVOIR
POSITION
146AA3 WINDOW CONTROLS
S WSXBAX WINDSHIELD TYPE
148AA5 WINDSHIELD WIPERS
S 05AZIX WORK LIGHTS -
CHASSIS MOUNTED
CAB -SLEEPER BOX
SELF CANCELLING TURN SIGNALS
WINDSHIELD WASHER RESERVOIR INSTALLED BOC
POWER WINDOW LIFT WITH ELECTRIC DOOR LOCK, LH & RH
2 -PIECE WINDSHIELD
TWO SPEED ELECTRIC MOTOR W/INTERMITTENT FEATURE & ARCTIC WIPER BLADES
W/O WORK LIGHTS
Description
S 4UXZ1X STORAGE OVERHEAD Without rear wall cabinet / shelf
BUNK
AERODYNAMIC DEVICES
Description
S 159AA1 ROOF FAIRING/SIDE
SHIELDS
WHEELS & TIRES
WITHOUT AERO AIDS
Description
S 4WCC1X GHG STEER TIRE
CATEGORY
900AC0 TIRES BRAND/TYPE -
FRONT
S H8CBIX TIRE SPEED LIMIT
531AE3 WHEELS - FRONT
49AZIX WHEEL FINISHING,
FRONT
S FWT002 FRONT AXLE TIRE &
WHEEL QUANTITY
4XCG1X GHG DRIVE TIRE
CATEGORY
901AJ8 TIRES BRAND/TYPE -
REAR
346AE3 WHEELS - REAR
S 2YAZ1X REAR WHEEL RIM
CLAMP
235085 REAR DISC
LOW ROLLING RESISTANCE, BETTER FUEL ECONOMY
315/80R22.5 L BRIDGESTONE M860A (ALL POSITIONS) (Total for QTY = 2)
TIRE SPEED LIMIT BASIC
22.5x9 0 HAYES LEMMERZ STEEL DISC 10 -HOLE HUB PILOTED, FIVE HAND HOLES (11 1/4'/286mm
BC) 5.25" INSE (Total for QTY = 2)
W/O FRONT DISC WHEEL BRIGHT FINISH
TWO FRONT TIRES & WHEELS
OTHER (NON -SPECIFIED), VERY POOR FUEL ECONOMY
11 R22.5 H BRIDGESTONE M770 (DRIVE ONLY) (Total for QTY = 4)
22.5x8.25 ACCURIDE ACCU-LITE STEEL DISC 10 -HOLE HUB PILOTED, FIVE HAND HOLES (11 1/4"
BOLT CIRCLE) (Total for QTY = 4)
WITHOUT REAR WHEEL RIM CLAMP
W/O REAR DISC WHEEL BRIGHT FINISH
Price Level:02/12/2017
Page: 9
Date:07/14/2017
Quotatio n: PARK2017000152A 343
Dealer Name:POTOMAC TRUCK CENTER INC
WHEEL:POLISH
S RWT0D4 REAR AXLE TIRE &
WHEEL QUANTITY
S BDXAMX WHEEL STUDS (CA)
S FIXZ1X HUB/WHEEL ISOLATOR
FRONT
S FMXZ1X HUB/WHEEL ISOLATOR
DRIVE
S 80AA1X WHEEL NUT & FINISH,
FRONT
S 3PBA1X WHEEL NUT FINISH,
REAR (CA)
S 15XABX TIRE INFLATION VALVE
S 6VXZ1X SPARE WHEEL
S 6SXZIX SPARE WHEEL
CARRIER, POS
S 1SBZ1X WHEEL FINISHING,
TRAILING
S 282012 HYDRAULIC JACK
COMMUNICATION SYSTEMS
FOUR REAR AXLE TIRES & WHEELS
WHEEL STUDS BASIC LENGTH
W/O FRONT WHEEL GUARD OPTION
W/O PROTECTIVE NYLON SPACER BETWEEN DISCS WHEEL TO DRUM
W/O FRONT WHEEL NUT OPTION
WHEEL NUT BASIC FINISH, REAR
PROVIDE STANDARD VALVE STEMS AND CAPS
W/O SPARE WHEEL W/TIRE
W/O SPARE TIRE CARRIER
WITHOUT WHEEL FINISHING TRAILING
W/O HYDRAULIC JACK
Description
S 9XDZ1X
S 9YDZ1X
S 3YAA1X
S 3RAZIX
S M30060
U5CZIX REMOTE SOFTWARE
UPGRADE
SOFTWARE
DOWNLOAD
PASSWORD
SOFTWARE
DOWNLOAD
NOTIFICAQTION
CO-PILOT - DISPLAY
FEATURES ACCESS
LEVEL
FLEET TRIP
MANAGEMENT
TELEMATIC GATEWAY
VEHICLE ELECTRONICS
WITHOUT SOFTWARE DOWNLOAD PASSWORD
WITHOUT SOFTWARE DOWNLOAD NOTICICATION
DISPLAY FEATURES, LIMITED, NO DRIVER ACCESS LEVEL 1
WITHOUT FLEET TRIP MANAGEMENT DRIVER CONTROL
GUARDDOG CONNECT WITH 4G/LTE AND WLAN SYSTEM WITH DIAGNOSTIC SERVICES
WITHOUT REMOTE SOFTWARE UPGRADE
Description
S X3CB1X DRIVER ID FUNCTION
S X5CZ1X
S X4CZ1X
S C7CZ1X
S E7AZIX
S E8AZ1X
S E9AZ1X
S 4IAZ1X
S 4JAZ1X
S 4KAZ1X
S G5AAHX
S G2AAGX
DRIVER ID, RESET
TIMER
DRIVER ID, ALERT
TIMER
CUSTOMER UNIQUE
VEHICLE PARAM (CA)
FUEL ECONOMY
INCENTIVE PROGRAM
FUEL ECON RWRD, SPD
LMT INCRS
FUEL ECON PNLTY,
SPD LMT DCRS
FUEL ECONOMY
REWARD TARGET
FUEL ECONOMY
PENALITY TARGET
FUEL ECON CALC
DISTANCE INTER
ENGINE
OVERSPEED,ALL
COND, LOG
ENGINE
OVERSPEED,FUELED,
LOG
S G4AAUX VEHICLE
DRIVER ID FUNCTION, DISABLED
WITHOUT RESET DRIVER ID TIMER
WITHOUT DRIVER ID ALERT TIMER
WITHOUT CUSTOMER UNIQUE VEHICLE PARAMETERS
WITHOUT FUEL ECONOMY INCENTIVE PROGRAM
WITHOUT FUEL ECONOMY REWARD, SPEED LIMIT INCREASE
WITHOUT FUEL ECONOMY PENALTY, SPEED LIMIT DECREASE
WITHOUT FUEL ECONOMY REWARD TARGET
WITHOUT FUEL ECONOMY PENALTY TARGET
WITHOUT FUEL ECONOMY CALCULATION DISTANCE INTERVAL
ENGINE OVERSPEED, ALL CONDITIONS, TIME LOG IF ABOVE 2200 RPM
ENGINE OVERSPEED, FUELED, TIME LOG IF ABOVE 2100 RPM
VEHICLE OVERSPEED,ALL COND, TIME LOG IF ABOVE 75MPH (121KMH)
Price Level:02/12/2017
Quotation: PARK2017000152A343
Page: 10
Dale:07/14/2017
Dealer Name:POTOMAC TRUCK CENTER, INC
S G3AAPX
S GIAABX
S W7AZ1X
S W8AZ1X
S W9A01X
CA R4BEIX
S X5AZ1X
S WBBAAX
S P6X99X
S W5AZ1X
S WOXAIX
S WIXZ1X
S WMXA1X
S K5XA2X
S D0AZ1X
S C9AZ1X
S D1AZ1X
S CBAZIX
S C7AZ1X
S A4BAAX
S 8RXAEX
S X8CZTX
S A3BZ1X
S Z2CZ1X
S Z3CZIX
S F2AZ1X
5 F3AAEX
S F5AABX
S F6AABX
S F7AAPX
S FBAAGX
S X3AZ1X
S F9AABX
OVERSPEED,ALL
COND,LOG
VEHICLE OVERSPEED, VEHICLE OVERSPEED, FUELED, TIME LOG IF ABOVE 70MPH (113KMH)
FUELED, LOG
ENGINE IDLE DELAY TO
LOG
PERIODIC TRIP LOG
HOUR OF DAY
PERIODIC TRIP LOG
DAY OF WEEK
PERIODIC TRIP LOG
DAY OF MONTH
PRE -TRIP DIAGNOSTIC
INSPECTION (CA)
VEHICLE APP SERVICE
INTERVALS
SERVICE ALERT
SERVICE ALERT
SYSTEM
MAINTENANCE DUE
ALERT %
OIL PRESSURE,
ENGINE SHUTDOWN
COOLANT LEVEL,
ENGINE SHUTDOWN
COOLANT TEMP,
ENGINE SHUTDOWN
ENGINE PROTECTION
SYSTEM
ENG FAN CNTL, STAT
VEHICLE
ENG FAN
CONTROL,MOVING
VEHICLE
ENG.FAN CNTL MVO
VHC.TIME SET
FAN ENGAGEMENT
DUE TO PTO
ENG FAN CNTL, NC ON,
TIME SET
DETECTION SPEED
SENSR TMPRNG
ENG TORQUE
LIMIT,SPEED SENSOR
HIGH IDLE SPEED-UPR
GRS FEATUR
HIGH IDLE SPEED -
UPPER GRS RPM
1ST RATIO FOR
REDUCD HIGH IDLE
LAST RATIO FOR FULL
HIGH IDLE
PTO 1ST, SINGLE
SPEED CONTROL
PTO1 SINGLE SPEED
CONTROL RPM.
PTO 1ST, MAX ROAD
SPEED
PTO 1ST, SPEED RAMP
RATE
PTO 1ST, MAX ENGINE
SPEED
PTO 1ST, ROAD SPEED
LIMIT
PTO 1ST,JUMP TO MIN
ENG SPEED
PTO 1ST, MINIMUM
ENGINE SPEED
ENGINE IDLE DELAY TO START LOG, 2 MIN
WITHOUT PERIODIC TRIP LOG, HOUR
WITHOUT PERIODIC TRIP LOG, DAY OF WEEK
PERIODIC TRIP LOG, DAY 1 OF THE MONTH
ALL LIGHTS
WITHOUT SERVICE INTERVALS (USER ENTERED)
WITH SERVICE ALERT
WITHOUT SERVICE ALERT SYSTEM
WITHOUT MAINTENANCE DUE ALERT PERCENTAGE
OIL PRESSURE, ENGINE SHUTDOWN
WITHOUT COOLANT LEVEL ENGINE SHUTDOWN
COOLANT TEMP, ENGINE SHUTDOWN
ENGINE PROTECTION (SHUTDOWN)
WITHOUT ENG FAN CONTROL, STATIONARY VEHICLE
WITHOUT ENG FAN CONTROL, MOVING VEHICLE
WI I HOUI ENG FAN CONTROL, MOVING VEHICLE, TIME SETTING
WITHOUT FAN ENGAGEMENT DUE TO PTO
WITHOUT ENG FAN CONTROL, A/C ON, TIME SETTING
DETECTION OF SPEED SENSOR TAMPERING, ENABLE
ENG TORQUE LIMITED TO 50%, IF SPEED SENSOR TAMPER DETECTED
ENGINE HIGH IDLE SPEED IN UPPER GEARS, DISABLED
WITHOUT ENGINE HIGH IDLE SPEED IN UPPER GEARS
WITHOUT 1ST RATIO FOR REDUCED HIGH IDLE
WITHOUT LAST RATIO FOR FULL HIGH IDLE
WITHOUT PTO 1ST, SINGLE SPEED CONTROL
PTO 1ST, SINGLE SPEED SETTING, 1000 RPM
1ST PTO, MAX ROAD SPEED, 10 MPH (16 KPH)
PTO 1ST, SPEED RAMP RATE 100 RPM/SEC
PTO 1ST, MAX ENGINE SPEED, 2100 RPM
PTO 1ST, ROAD SPEED LIMIT, 97 KMH (60 MPH)
WITHOUT PTO 1ST, JUMP TO MINIMUM ENGINE SPEED
PTO 1ST, MINIMUM ENGINE SPEED, 600 RPM
Price Level:02/12/2017
Quota lior3:PAR1;'20170(0ISr,A5d2.
Page: 11
Dale:07/14/2017
1 -)for I.tannP•PnTnk1AC Tpl Inv (-srnrrr- P I Mr,
5 GOAZ1X
S H2AZ1X
S H6AAEX
S HOAABX
S G9AABX
S H7AANX
S H5AAGX
S X4AZ1X
S GBAABX
S H4AZ1X
Y9CZ1X
Z1CZ1X
S W5BJ2X
S 01AZ1X
S JCXE6X
S Y3CC5X
S U4AZ1X
S U5AZ1X
S X2BZ1X
S L1CZ1X
S L2CA1X
S JFXLLX
S E3AACX
E4AZ1 X
S E5AACX
S JDXAIX CRUISE CONTROL
PTO 1ST,AUTO SET
SINGLE SPEED
PTO 2ND, SINGLE
SPEED CONTROL
PTO 2ND, SINGLE
SPEED SETTING
PTO 2ND, MAX ROAD
SPEED
PTO 2ND, SPEED RAMP
RATE
PTO 2ND, MAX ENGINE
SPEED
PTO 2ND, ROAD SPEED
LIMIT
PTO 2ND,JUMP TO MIN
ENG SPEED
PTO 2ND, MINIMUM
ENGINE SPEED
PTO 2ND,AUTO SET
SINGLE SPEED
TRANS PT01 SPLITTER
RANGE
TRANS PT02 SPLITTER
RANGE
MAXIMUM ENG SPEED
AT0MPH
ACCELERATOR
LIMITER
ROAD SPEED LIMITER
SETTING
PEDAL RSL SETTING
LOW GEAR LIMITING
FEATURE
LOW GEAR LIMITING
SPEED
ROAD SPEED LIMIT
CONTROL TYPE
POLO ENGAGE VLS
FEATURE
PDLO ENGAGED VLS
S L6CZ1X
S L7CZ1X
S LBCZ1X
S L3CZ1X
S L4CZ1X
S L5CZ1X
S K7XH3X
CRUISE CONTROL, MAX
SPEED
CRUISE CONTROL MIN
SPEED
CRUISE RESUME WITH
CLUTCH
ENG BRK ENGAGE IN
CRUISE
PT01 HOLD TO
NEAREST RPM
PT01 ACCEL BUMP -UP
RPM
PT01 DECEL BUMP -
DOWN RPM
PT02 HOLD TO
NEAREST RPM
PT02 ACCEL BUMP -UP
RPM
PTO2 DECEL BUMP -
DOWN RPM
ENGINE IDLE CONTROL
S I1AZ1X LOW IDLE RPM
ADJUSTEMENT
S M6AZ1X ENGINE IDLE ADJUST
PTO 1ST, AUTO SET SINGLE SPEED, DISABLE
WITHOUT 2ND PTO, SINGLE SPEED CONTROL
PT02 SINGLE SPEED SETTING, 1000 RPM
2ND PTO, MAX ROAD SPEED, 10 MPI-I (16 KPH)
PTO 2ND, SPEED RAMP RATE 100 RPM/SEC
PTO 2ND, MAX ENGINE SPEED, 2100 RPM
PTO 2ND, ROAD SPEED LIMIT, 9/ KMH (60 MPI I)
WITHOUT PTO 2ND, JUMP TO MINIMUM ENGINE SPEED
PTO 2ND, MINIMUM ENGINE SPEED, 600 RPM
PTO 2ND, AUTO SET SINGLE SPEED, DISABLE
W/O PT01 FOR SPLITTER RANGE
W/O PTO2 SPLITTER RANGE
1950 MAXIMUM ENGINE SPEED AT 0 MPH
WITHOUT ACCELERATOR LIMITER
105 KMIHOUR ROAD SPEED LIMITER(65 MILES/HOUR)
105 KM/H PEDAL ROAD SPEED LIMITER (65MPH)
WITHOUT LOWER GEAR VEHICLE LIMITING FEATURE
WITHOUT LOW GEAR VEHICLE LIMITING SPEED
WITHOUT WITH RSL CONTROL TYPE
DISABLE POWER DIVIDER LOCK OUT (POLO) ROAD SPEED LIMIT
POWER DIVIDER LOCK OUT (POLO) ROAD SPEED LIMIT 8KMH (5MPH)
MAX CRUISE, 105 KPH (65 MPH)
MIN CRUISE, 32 KPH (20 MPH)
WITHOUT CRUISE RESUME WITH CLUTCH
ENG BRK ENGAGE IN CRUISE, 3 MPH, ABOVE SET SPEED
WITH CRUISE CONTROL
WITHOUT PT01 HOLD
WITHOUT PT01 ACCEL "BUMP -UP"
WITHOUT PT01 DECEL "BUMP -DOWN"
WITHOUT PT02 HOLD
WITHOUT PT02 ACCEL "BUMP -UP"
WITHOUT PT02 DECEL "BUMP -DOWN"
IDLE CONTROL, 650 RPM
WITHOUT LOW IDLE RPM ADJUSTMENT
WITHOUT ENGINE IDLE ADJUST
Price Level:02/12/2017
Quotation :PARK2017000152A343
Page: 12
Date:07/14/2017
Dcoler Name•POTOMAC TRUCK CENTFR INC
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
PAINT
XOABOX SMART IDLE ELEVATED
IDLE RPM TIME
M3CA1X IDLE S/D ABS TAMPER
CHECK
B2AZ1X ENGINE IDLE
COOLDOWN
A3AZ1X IDLE SHUTDOWN
EOXGAX ENGINE IDLE
SHUTDOWN TIME
B1ACAX IDLE S/D WARNING
TIME
ABAALX IDLE SID IF WARM-UP
TEMP
A4AAEX IDLE SID WARM-UP
TIMER
A7AZ1X IDLE S/D IF EHT
ACTIVE
A6AABX IDLE S/D IF PTO ACTIVE
BOAAAX IDLE SHUTDOWN IF
POWER> LIMIT
M4CB1X IDLE SID OVERIDE
%ENGINE LOAD
A9AZ1X IDLE SHUTDOWN
CONTROL
D2AAFX AMBIENT TEMP MIN
TRESHOLD
D3AAEX AMBIENT TEMP MAX
TRESHOLD
EL HD THROTTLE,MAX
ROAD SPEED
EL HAN❑
THROTTLE,MAX ENG
SPEED
B4ADAX EL HAND
THROTTLE,MIN ENG
SPEED
B9AABX EL HD
THROTTLE,SPEED
RAMP RATE
B3ABAX
B6ACEX
B7AZ1X EL HD THROTTLE,SGL
SPEED CNTRL
B8AZ1X EL HAND
THROTTLE,SGL SPEED
SET
COAZ1X EHT, JUMP TO MIN ENG
SPEED
L9CZ1X EHT HOLD TO
NEAREST RPM
M1CZ1X EHT ACCEL BUMP -UP
RPM
M2CZ1X EHT DECEL BUMP -
DOWN RPM
X1AZ1X DRL OVERRIDE SW
TIMED
X2AZ1X DRL OVERRIDE SPEED
THRESHOLD
INCREASE 10 MINUTE MAXIMUM TIME
IDLE SHUTDOWN ABS TAMPER CHECK, ENABLED
ENGINE IDLE COOLDOWN, DISABLE
ENGINE IDLE SHUTDOWN, DISABLE
IDLE SHUTDOWN TIME 10 MIN.
30 SEC IDLE S/D WARNING TIME
38C DEG (100F), WARM UP TEMP DELAY
5 MIN. WARM UP TIME DELAY
WITHOUT ENGINE IDLE SHUTDOWN TIME OVERRIDE IF EHT ACTIVE
ENGINE IDLE SHUTDOWN TIME OVERRIDDEN IF PTO ACTIVE
ENG IDLE SHUTDOWN TIME OVERRIDDEN IF TORQUE > THAN LIMIT
IDLE SHUTDOWN OVERIDE UPTO 20% ENGINE LOAD THRESHOLD
WITHOUT IDLE SHUTDOWN CONTROL
AMBIENT TEMP MIN TRESHOLD, 16 DEG C, (60 DEG F)
AMBIENT TEMP MAX TRESHOLD, 27 DEG C, (80 DEG F)
ELECTRONIC HAND THROTTLE, MAX ROAD SPEED, 16 KMH (10 MPH)
ELECTRONIC HAND THROTTLE, MAX ENGINE SPEED, 2100 RPM
ELECTRONIC HAND THROTTLE, MIN ENGINE SPEED, 700 RPM
ELECTRONIC HAND THROTTLE, SPEED RAMP RATE, 100 RPM/SEC
WITHOUT ELECTRONIC HAND THROTTLE, SINGLE SPEED CONTROL
WITHOUT ELECTRONIC HAND THROTTLE, SINGLE SPEED SETTING
WITHOUT ELECTRONIC HAND THROTTLE, JUMP TO MIN. ENGINE SPEED
WITHOUT ELECTRONIC HAND THROTTLE HOLD
WITHOUT ELECTRONIC HAND THROTTLE ACCEL "BUMP -UP"
WITHOUT ELECTRONIC HAND THROTTLE DECEL "BUMP -DOWN"
WITHOUT DAYTIME RUNNING LAMP OVERRIDE SW
WITHOUT DRL OVERRIDE SPEED THRESHOLD
Description
S 950AD0 PAINTNINYL STRIPING
- CAB EXTERIOR
S 924014 PAINT TYPE
S
S
S
944AA7 PAINT COLOR - FIRST
COLOR
945998 PAINT COLOR -
SECOND COLOR
946998 PAINT COLOR - THIRD
COLOR
SINGLE COLOR
SOLID PAINT
MACK WHITE (HIGH GLOSS)
NO SECOND TRUCK COLOR PROVIDED; NO COLOR
NO THIRD TRUCK COLOR PROVIDED; NO COLOR
Price Level:02/12/2017
Page: 13
Quotalion:PARK2O17000152A343 Dealer Name:POTOMAC TRUCK CENTER. INC.
Dale:07/14/2017
S 996M3 PAINT - CAB PAINT
SYSTEM
S MPB944 CAB COLOR
S MPD944 PAINT: HOOD COLOR
S MPC998
S 943998
S MPA998
966944
S 951M6 PAINT - CHASSIS
RUNNING GEAR
S 940998 MIRROR COVER COLOR
S 958018 PAINT:BUMPER
S 959019 PAINT:FUEL TANK
7HBZ1X FUEL TANK PAINT
PROCESS CODE
07XC1X FRONT WHEEL PAINT
08XC1X DRIVE WHEEL PAINT
S 954M1 PAINT:DISC WHEELS -
FRONT
S 955M1 PAINT:DISC WHEELS -
REAR
S 956016 PAINT:DEMOUNT.RIMS-
FRONT
S 957027 PAINT:DEMOUNT.RIMS-
REAR
S 952AA1 PAINT:SPOKE WHEELS -
FRONT
S 953AA1 PAINT:SPOKE WHEELS -
REAR
S 962032 PAINT:HUBS & DRUMS -
FRONT
S 963033 PAINT:HUBS & DRUMS -
REAR
PAINT - CAB, URETHANE CLEAR COAT
SAME AS FIRST COLOR - CAB
SAME AS FIRST COLOR- HOOD
PAINT: SLEEPER ROOF WITHOUT SI EEPER ROOF COLOR
COLOR
CHASSIS FAIRING
COLOR
PAINT: ROOF FAIRING
COLOR
SUN VISOR COLOR
CALCULATED CODES - KAX
WITHOUT CHASSIS FAIRINGS
WITHOUT ROOF FAIRING
SAME AS FIRST COLOR
MACK BLACK (URETHANE)
WITHOUT MIRROR COVER PAINT
PAINT BUMPER SAME COLOR AS CHASSIS RUNNING GEAR
W/O OPTIONAL FUEL TANK PAINT
W/O PAINT FOR FUEL TANK (7HB-Z1X)
PRE -FINISHED POWDER COAT WHITE
PRE -FINISHED POWDER COAT WHITE
WITHOUT PAINT
WITHOUT PAINT
WITHOUT PAINT
WITHOUT PAINT
WITHOUT OPTIONAL SPOKE WHEEL PAINT
WITHOUT OPTIONAL SPOKE WHEEL PAINT
SAME AS CHASSIS RUNNUNG GEAR
SAME AS CHASSIS RUNNING GEAR
Description
S 9JXA1X PROPCALC SELECTION YES, THE ORDER MUST BE CALCULATED
S D5EA1X AUTO ROUTING &
CLIPPING, CENTER
BASE WARRANTY & PURCHASED
COVERAGES
AUTOMATIC ROUTING & CLIPPING PLACEMENT, CENTER SECTION
Description
S M98018
898003
S M50030
S M51021
S M52022
S M53Z1X
M540B4
S M710J1
WARRANTY
REGISTRATION
LOCATION
VEHICLE WARRANTY
TYPE
BASIC CHASSIS
COVERAGE
ENGINE WARRANTY
EMISSION COMPONENT
COVERAGE
MACK ENGINE
EXHAUST AFTER
TREATMENT
COVERAGE
TRANSMISSION
WARRANTY
mDrive CLUTCH
US - WARRANTY REGISTRATION LOCATION
HEAVY DUTY WARRANTY CLASSIFICATION
HEAVY DUTY STANDARD BASE COVERAGE 12 MONTHS/100,000 MILES (161,000 KM)
MACK MP7/MP8 BASE ENGINE COVERAGE 24 MONTHS / 250,000 MILES (402,000KM)
US and CANADA EQUIPPED VEHICLE EMISSION COMPONENTS COVERAGE 60 MONTHS/100,000
MILES (161,000 KM)
W/O MACK ENGINE EXHAUST AFT ERTREATMENT TREATMENT PROTECTION PLAN
ALLISON TRANSMISSIONS (Contact Allison Transmission for standard warranty and extended coverage
data
WITHOUT mDRIVE CLUTCH PROTECTION PLAN
Price Level:02/12/2017
Page: 14
Ouothtion PARK20170TC157A342 N,aler Name POTOMAC TRUCK CENTER IrC
Date:07/14/2017
PROTECTION PLAN
S M55035
S M56026
S M57027
S M58028
S MG1Z1X
S M59Z1X
S M60Z1X
S M690F9
S M72Z1X
S M70080
S M68Z1X
S M65Z1X
S M6GZ1X
S M67017
S M99000
CARRIER & AXLE
HOUSING WARRANTY
AIR CONDITIONING
WARRANTY
CHASSIS TOWING
WARRANTY
ENGINE TOWING
WARRANTY
ALTERNATOR &
STARTER WARRANTY
STARTER WARRANTY
ALTERNATOR
WARRANTY
GUARDDOG CONNECT
BUNDLE
OMNITRACS FOR MACK
TRUCKS
MACK ONECALL
BUNDLE
PARTNERED SERVICES
PREMIUM
MAINTENANCE PLAN 1
& PLAN 2
PREMIUM
MAINTENANCE
AFTERTREATMENT
PLAN
PREMIUM
MAINTENANCE -
CHASSIS LUBE AND
INSPECTION
CUSTOM/BUNDLED
PURCHASE COVERAGE
OPTIONS
ADDITIONAL OPTIONS
(AnswerApproved)
STANDARD MACK HEAVY DUTY COVERAGE 36 MONTHS / 350,000 (563,000 KM)
AIR CONDITIONING STANDARD COVERAGE (Sealed System Only) 12 MONTHS UNLIMITED
MILEAGE
STANDARD NORMAL / HEAVY DUTY CHASSIS TOWING 90 DAYS OR 5,000 MILES
STANDARD MACK ENGINE TOWING COVERAGE 24 MONTHS/250,000 MILES (402,000 KM)
W/O ALTERNATOR and STARTER EXTENDED WARRANTY COVERAGE
W/O STARTER PURCHASED COVERAGE
W/O ALTERNATOR PURCHASED COVERAGE
24 MNTH - GUARDDOG CONNECT WITH MACK OTA
WITHOUT OMNITRACS FOR MACK TRUCKS
24 MNTH - ASIST AND MACK ONECALL
W/O TELOGIS PACKAGE
W/0 PREMIUM MAINTENANCE PLAN
W/O AFTERTREATMENT PREMIUM MAINTENANCE PLAN
W/OUT PREMIUM MAINTENANCE - CHASSIS LUBE AND INSPECTION COVERAGE
W/O CUSTOM/BUNDLED PURCHASE COVERAGE OPTION
Description
CA b83 BODY BUILDER
INTERFACE
CA 1419138 RELOCATE AIR
RESERVOIRS
ADDITIONAL ENGINEERING
(AnswerApproved)
Per phone conversation between Scott,Marc M & Keith L, Scott wants both standard BOC body builder
cable & cable under rider seat for the 4 switches.
AIR TANKS UNDER BATT BOX & RH RAIL, REMAINING IN FRAME cpak0122 This code selected per
review with Lehman/Hassan Give this order to Keith
Description
CA 1
Price Level:02/12/2.017
Duntatior,TARK2017000152A3'13
Page: 15
Date:07/14/2017
Pe.iiier Nam :'POTOMAC TRUCK CENTER INC,
Board of County Commissioners of Washington County, Maryland
Agenda Report Form
Open Session Item
SUBJECT: Request to Convey Certain Real Property
PRESENTATION DATE: August 22, 2017
PRESENTATION BY: Susan Small, Real Property Administrator, Engineering Department
RECOMMENDED MOTION: Move to authorize the advertising of the County's intent to
convey 2,636.55+/- linear feet (31,638.6 SF) to adjacent property owners at Valley Meadow
Farms, LLC.
REPORT -IN -BRIEF: In February of this year, property owners from Valley Meadow Farms,
LLC in Hancock requested that staff look into closing and conveyance of approximately 0.7
miles of Bottenfield Road ending at the Pennsylvania border. The road currently dead ends
between two Valley Meadow Farms parcels. The road bed in to Pennsylvania is wooded, gated,
and leads to a private driveway. The closed portion would serve as the driveway to their parcels
and they would assume all maintenance of the road.
DISCUSSION: On February 28, staff presented the proposed closure of that portion of
Bottenfield Road with a future conveyance to Valley Meadow Farms, LLC. The Commissioners
were in concurrence to move forward with the process and installation of a turnaround for school
buses at the last private property on Bottenfield Road. County staff has installed the turnaround.
The fair market value of the road bed has been determined to be $2,400.00 using comparable
properties and sales in the area.
FISCAL IMPACT:
CONCURRENCES:
ALTERNATIVES:
ATTACHMENTS:
$2,400 in revenue from the sale of the property
Director of Engineering
N/A
Aerial map
AUDIO/VISUAL NEEDS: N/A
Marylan,
Valley Meadow Farms LLC
2205016525