HomeMy WebLinkAboutEMAC Sub-Committee Minutes 09.09.2020ENVIRONMENTAL MANAGEMENT
ADVISORY COMMITTEE – Sub-Committee
MINUTES
DATE: 09/09/2020
ATTENDING:
Rebecca Beecroft Lisa Reigh Brock Shriver Randall Morin
Lisa Horn Joe Moss Austin Abraham Russ Weaver
Terry Schlotterbeck Jeremy Mose Davina Yutzy Sara Greaves
Lacey Capshaw
I. CALL TO ORDER:
Brock opened the meeting at 1705 hours.
II. APPROVAL OF AGENDA:
Becky moved to approve the agenda. Austin seconded the motion. Agenda passed
unanimously.
III. NEW BUSINESS:
a. Introductions (EMAC & Staff)
Austin Abraham – Appointed by Commissioner Keefer
Joe Moss – Appointed by Commissioner Meinelschmidt
Terry Schlotterbeck – Appointed by Commissioner Wagner
Russ Weaver – Appointed by Commissioner Cline
b. Brief of Current Situation
i. Sara Greaves
Here because County staff continues to recommend rate increases to the
Commissioners annually. Explained some historical information pertaining
to taking over the Sanitary District. The understanding we have is that the
rates that were in place at that time, were not sufficient to cover the costs.
Through the years, rates have been raised more often at lower increases,
rather than higher increases, less often. This was to try to help the rate
payers absorb costs reasonably over a period of time instead of all at once.
The County invested millions of dollars from the general fund, into the
sewer fund, back in 2010, 2011, and 2012. This increased fund balance and
cash reserves in order for those smaller rate increases to continue. This way,
the cash reserves could be drawn down in the fund over the next 6-8 years.
The idea was that as those cash reserves were drawn down, the rates would
simultaneously increase by 3-4% per year. The hope was that those
increases would increase revenues enough to the point where when the time
came for cash reserves to run out, revenues would be sufficient to cover
expenditures. With the costs covered, there would be no need for the
continued draw down in reserves as part of the annual budget. Certain
assumptions were made in the rate model that were not realized. Therefore,
when cash reserves ran out, revenues were not sufficient to cover
expenditures. From a budgetary perspective, even in FY21, the budgets
have been reduced by approximately $2.5M overall, which is very
significant, but we are still in a position where we cannot cover the costs.
That $2.5M in reductions is made up of $2M in 96A bonds that we paid off
and that created significant savings, the other $500,000 in savings came
from a plan that Jeremy and Sara had worked together on in an attempt to
reduce expenditures related to personnel. That is where you generally can
realize the most savings, through reductions in personnel costs. We can’t
stop maintaining the plant, we can’t stop ordering chemicals, so we were
trying to find savings where we were able. We do understand the impact
that this has on our citizens. We are very aware, we are sensitive to it, and
we don’t want to raise rates either. We are doing what we can, what is
reasonable, to keep these plants running, but to also reduce expenditures in
hopes that in the future, we can have lower rate increases. As far as the
model goes, we’ve made changes to assumptions based on current and
projected economic activity. The Model takes into account current
expenditures and projections, and those projections and assumptions can
change. I believe they’re very reasonable at this time. The model is a
budgetary tool, please keep that in mind when we have these discussions
about the Water and Sewer Rate Model. Last year, the general fund
contributed about $3M to the sewer fund because there was a serious deficit,
and the sewer fund did not have any cash reserves to cover that. This is after
that 3.5% rate increase that we had last year, $3M was still needed to
provide for that gap. We are in a position now, where for FY21, we haven’t
used any general fund money to balance the budget. We do have reserves
from some project savings that we have, so we can use those for our cash
reserves, but we do expect for FY21 to use those reserves up. Then we
expect to need about $1M in loans from the general fund to get us through
FY22, even while proposing a 3.5% rate increase for that year. After this
point, we expect to be closer to a position where we are not in an annual
deficit. Keep in mind that if we have a loan from the general fund, we have
to pay that back. If revenues sufficiently cover expenditures, it does not
mean that we won’t require a rate increase, it’s possible that a rate increase
may not be as high. 3.5% equates to approximately $350,000-$400,000 in
the sewer fund. The impact to our customer base equates to about $2 a
month for the average customer, or $6 a quarter. The water and sewer fund
shares employee costs, so the employee savings is spread between these two
funds. Jeremy has also been trying to implement some operational cost
savings as well, but we think the largest impact is within the wages and
benefits of positions that have been put on hold. Again, the plan that was in
place for many years is that we would draw down the cash reserves and
incrementally increase rates. That has stayed the same over the years, it’s
what the County chose to do. Unfortunately it just did not align the way that
they thought it would. They thought that once the 96A bond was paid off
that revenues would be sufficient enough to cover expenditures, and they
aren’t. We can clearly see that our expenditures exceed our revenues. The
model we use is 20 years old, so it would probably be beneficial to have an
updated model. Would having a new rate model change the rate increases
that are necessary to provide for the funds? Probably not, in my opinion.
The model is currently in Excel, but it was not created in Excel. Not sure
that it was created at the same time that the County took over the Sanitary
District. People often want to know when the rate increases will stop. There
will always be additional regulations from the State that we must comply
with related to our capital improvements. Conococheague WwTP ENR
Upgrade was a $30M plant, (18M was grant funded). Smithsburg WwTP
Upgrade is currently in the CIP budget as a $7M project. This project could
potentially be reduced to $5M due to some cost saving measures that the
Department of Water Quality found, so we’re looking into that. These plants
continue to cost us millions of dollars, and a lot of these upgrades are
required by MDE. Even when revenues are sufficient to cover expenditures,
it’s probably wise moving forward to have a small (1% to 1.5%) rate
increase to try to buffer that fund balance and those cash reserves, just until
we get these funds into a good financial position. Another good thing about
the model is that it takes into account debt service. Whatever projects that
we have in our 10 year CIP plan, the model takes those projects and it
estimates what the debt service will be.
Russ Weaver advised the model was created in 1992 or so. He advised that
it doesn’t capture any of the Sanitary District’s history. Russ said that it was
his understanding that at that time the reserves were good, although he
wouldn’t characterize the Sanitary District as something that was being run
very efficiently. Another thing is, sometime between 1992-2000 the
Commissioners committed to putting $2.3M into the water and sewer. Then
in 2009-2010, I think Greg Murray was there, we did away with that. The
projection was that we were going to be okay in a few years and so we did
away with that $2.3M. Then there was something called ENR and that hit
us really hard and we had to borrow money. Russ said that his understanding
is that the size of this expenditure is based on the size of that system, so
some piece of that was driven by that economic development. Advised that
he believes some of the expenditures today are still being driven by the
Hopewell project, and that he’s hopeful that this Committee will prove him
wrong.
Brock asked, if we were going to do one rate increase, what would that need
to look like? To answer Brock’s question, Sara advised we have to look at
it from a couple of different perspectives #1- Are we going to have a surplus
or a deficiency? We’re going to try to get that close to “0.” We also have to
start building our reserve level. The County has a policy in our enterprise
funds to maintain 25% cash reserves. 25% cash reserves is probably close
to $2.5M for sewer. We aren’t there yet, but when Sara put a 10% rate
increase into the model for FY22 (which would be next year), no rate
increases were put in for FY23 & FY24, had to put a 1% rate increase for
FY25 annually ongoing, to get to where we only have a small deficiency in
annual revenues for FY22. With these assumptions, there is an
approximately $300,000 deficiency. Sara advised 10% rate increase would
generate $1.4M in revenue. 10% rate increase would be approximately $6 a
month, or $20 quarterly for the average customer.
Sara advised that the sewer fund, with continued rate increases, could
become self -supporting. The water fund, without some significant change,
won’t be self-supported. The water fund has a significantly smaller
customer base that pay the cost of the fund. Approximately 1,000 water
customers verses 11,000 customers in the sewer fund. Austin asked if the
$3M would have to be repaid. Sara advised it was not a loan, it was an
appropriation. A loan does have to be repaid, an appropriation does not. A
bond agency looks at loans and the condition of an enterprise fund, whether
self-supported or not, to establish our bond rating. The longer it takes to
repay a loan (even though it is internal from the general fund), it reflects to
a bond agency as the enterprise fund not being fully supported, and that does
have an impact on our bond rating. We aren’t necessarily at risk right now
of having a reduced bond rating, we don’t want to give that impression, but
it is something that we are aware of. If we had a loan, we would want to pay
that loan back as soon as possible.
ii. Jeremy Mose
Jeremy advised that within the water fund, Sharpsburg WTP is our biggest
expense. That’s mostly due to the fact that it’s surface water, and that costs
more to treat than well water or spring water. All of our other plants are
either well fed or spring fed. Sharpsburg WTP is surface water from the
Potomac River. In the past, they looked at drilling wells in Sharpsburg, the
costs were very high since they were on Federal property. The Battlefield
and the Federal Government didn’t really want to go the route of
buying/selling land and easements. We’re actually looking into using a
property in Sharpsburg that the County owns, drilling a supplemental well.
This isn’t to replace the surface water, but just to supplement the surface
water so that we can reduce costs. We have approval from MDE to proceed
with researching this, so we will start that research within the next couple
of months. If we are able to drill that supplemental well, we are hopeful that
we can reduce costs by approximately half, so we are very hopeful for that.
On the water side, if we’re going to save money, it will have to be at the
Sharpsburg WTP. The other WTPs are fairly inexpensive to run. The
Sharpsburg WTP is the major expense within the water fund. “ENR” stands
for Enhanced Nutrient Removal. ENR is in partnership with the State to
meet goals for the Chesapeake Bay for nutrient removal and nutrient
reduction. This is to help lower total nitrogen and total phosphorous going
into the Bay. The County currently operates two ENR plants,
Conococheague WwTP and Winebrenner WwTP. As Sara touched on, our
next ENR upgrade will be at the Smithsburg WwTP. That could cost us
around $7M – we’ve been exploring some different processes that would
reduce this down to $5M. We’re pretty optimistic about that. On the Sewer
side, Conococheague WwTP is our largest plant and largest expenditure.
We are currently permitted for 4.5M gallons per day at Conococheague
WwTP. Russ wanted to know what capacity we were running at the
Conococheague WwTP. Jeremy advised that we are currently running at
approximately 50% capacity. Russ advised that’s the Town of Sharpsburg’s
frustration, they built a $4.7M plant, for an idea, which was a big pipe, and
a few big customers, manufacturers would be pumping to the
Conococheague WwTP, but it’s never occurred and we’re at 50% capacity.
Russ asked when the Conococheague WwTP had the ENR upgrade, do you
have to permit it for what’s currently running through there or the 4.5M
gallons per day? Jeremy advised there was a lot of grant money involved
with Conococheague WwTP ENR Upgrade because when you go to ENR
standards, that opens up a lot of grant funding. Russ requested documents
showing those numbers. Russ wants to understand how much of the upgrade
capacity is driving our costs, as it’s not operating at full capacity. We also
have a Superstation project that will redirect customers that went into
Hagerstown’s system, that will come to our Conococheague WwTP after
that project is completed. Russ advised that until he’s proven different, he
thinks it’s driving costs up. It’s not fair that Sharpsburg residents have to
pay for economic development decisions. What Russ advised he wanted to
be sure of, is when we’re done with this exercise, we can say that a 4.5M
gallon capacity plant isn’t driving costs just from an economic development
perspective from the previous investment. Jeremy advised that we’d send
out how much the Conococheague WwTP ENR upgrade cost us as well as
how much was grant funded. Russ encouraged Jeremy to also consider
completely replacing the Sharpsburg WTP. Russ advised that out of those
1000 water customers that Sara spoke about, 650-700 of them are on the
Sharpsburg Water System. Russ advised that they are that system, and that
they sit on top of a lake, so we have tons of water under the Town of
Sharpsburg. Russ advised he would like to join in and put the political
pressure on to replace the entire Sharpsburg water system. Jeremy advised
that to go with the supplemental well water, it would significantly reduce
the costs in Sharpsburg. We are definitely exploring that. Randall asked
what our costs are in comparison to other areas. Are we cheaper, more, or
about the same as our surrounding areas? On the sewer/wastewater side, we
are pretty in line with other jurisdictions. Water rates, we were high
compared to other jurisdictions. Attributed a lot of that to a lower customer
base. Austin asked for local comparisons on rates. Russ Weaver wanted
local rates, stated that our sewer is significantly higher than Williamsport,
Smithsburg, Hancock, and Boonsboro, as per their websites. Randall asked
if there were specific areas where we could possibly expand our water
service? Jeremy advised that Fort Ritchie is an area we are very hopeful to
expand our water customer-base with the development of Fort Ritchie.
Brock asked how we got to such a deficiency. Jeremy was explaining
historically the County took over these water systems, absorbing these
plants, as well as contract operations, they’re all small water systems. Russ
added that the County had to create a water system for health concerns and
reasons associated and that’s exactly what happened in Sharpsburg.
Sharpsburg was on wells. Russ further advised that he thought it was
Hopkins that did a study that the people shouldn’t be drinking the water. It
was surface water, a lot of it was hand-dug wells, so the EPA, environmental
people, and everybody else came in and said the we needed to fix this. We
got a lot of grants to put the system in, but what we didn’t realize is that
Sharpsburg is land-locked. How do you get more customers when the
surrounding area is land-locked, and how do you get help to these
communities that have since been land-locked that need this water system,
for health reasons? I think Sharpsburg needs to go to the Federal
Government and say we need their help. Brock asked if there was any
potential to streamline the amount of plants we run. Jeremy explained that
operators don’t spend the entire day at each of these small plants. We would
spend approximately an hour a day for someone to go to these small areas
and work. Randall asked, the rate that people pay for water, is different
around the County? Jeremy clarified that if they are a County water
customer, they pay the same rate across the entire County. Russ then asked
about bringing Maugansville on? Jeremy advised that is the Superstation
Project. Right now, that flow from Maugansville goes to the City of
Hagerstown. We maintain the lines, and the City of Hagerstown treats the
wastewater. It’s a joint service area (JSA) for us. Russ then asked, when you
bring in a thing like that, is there a business case study done? Or is it
politically driven? Russ advised that his thing is, for the advisory committee
and everything, general principle should be that you don’t bring on any
more customers and run any more lines and build any more plants unless
there’s a good solid business case for bringing it in. Sara advised that she
has an estimate in the rate model of approximately $1M in additional annual
revenue once it’s online. Russ advised he was asking if it was a general
practice to do a business case study before bringing on other customers.
Jeremy advised he would get the information from Engineering Services on
what the planning process on something like the Superstation Project and
bring that information back. Russ advised that we are a political entity, so
he wasn’t sure if there was a practice in place and recognized that sometimes
there are pressures to do things that are not business-justified. Austin asked
about hook-up charges for various utilities in the area as well.
c. OBJECTIVES:
i. What are we tasked with achieving?
Brock advised that he’s reliant upon the sub -committee members to advise
everyone what their understanding from the Commissioners is that we are tasked
with. Asked the sub-committee members to chime in on what they were tasked
with.
Russ advised that as far as the Town of Sharpsburg, #1- Is there anything as far as
the water that we can do to help with the water rates, they’re extremely high and no
way to get them under control that we can see at the current moment. Then on the
water/sewer side of things, we’re hoping to establish the fact that the County
Commissioners committed many years ago to provide assistance to the sewer fund
to cover the economic development impact, whatever that may be. Many sets of
Commissioners have committed to that over the years. It’s our contention still that
a significant portion of the cost of the sewer system is being driven by the Hopewell
Road Project, which is a very large “build it and they will come” development. As
you heard from Jeremy the Conococheague WwTP is running at 50% capacity after
all of these years. The fair thing to do is for the County to continue to contribute to
the sewer fund to keep the rates down. I’ll let Sara tell the customers that they’ll be
getting a 10% rate increase next year. Sara advised she definitely would not be
recommending 10%, she’ll be recommending 3.5% next FY. Russ advised the
expenditure that was made on the Hopewell Road Project was very large and it was
a debt that did not pay off and we’re still paying the price for it. Russ advised that
he thinks when we compare our rates to other area rates, we’re higher, and there’s
a reason we’re higher.
Austin advised that his understanding for what we are tasked with was the repetitive
annual rate increases were a cause of concern.
Joe advised that he didn’t have any idea what exactly the objectives were going to
be. I can give an opinion from the City’s standpoint. Jeremy and I work together a
lot on water and sewer issues. As far as the rates, I don’t know that I’ll be able to
add valuable information to that. It sounds like that’s the main goal of this
committee, the rates every year. If you don’t have increased customer base, your
costs will continue to go up. If you’ve got some potential economic development
coming along, then you might be able to make some headway at reducing the rate
increases. It’s tough when the County is spread out so far between your systems.
It’s not easy, without putting infrastructure in.
Terry advised that it would be a good idea to get a better idea from the
Commissioners. I spoke with some people that were involved in the rate model
back in the day. It’s like Joe said, I don’t think we’re going to make too many
adjustments. What I’m being told is that they want to look at the structure, how it’s
being run, and things along those lines. I think it’s a good idea to get something
from the Commissioners in writing, knowing where they want to go with this, and
not let it get real political.
Rebecca added that she thinks it’s very important to have a specific charge from
the Commissioners. Everyone has very valid points of view. Otherwise, we’re
going to be hashing and re-hashing those points of view without getting to the crux
of what we’re supposed to be doing together. Brock advised he will put together an
e-mail asking the Commissioners to clarify in writing the task(s) at-hand. Brock
reiterated that we have 3 months as per the Commissioners. Lisa Horn was askin g
what the cost per facility is. Jeremy advised we can send that out as well. Russ
asked about contract operations such as Clear Spring.
ii. What do we need to achieve these tasks?
Becky moved to table this topic until we have the clear objectives in writing
from the Commissioners. Lisa Horn seconded the motion. Motion passed
unanimously.
d. Discussion:
N/A
e. Schedule Moving Forward:
Brock will send an email to the Commissioners. We will schedule a meeting for
09/23/2020 if that’s alright for everyone. There ended up being a conflict with an
existing agenda for the EMAC. Meeting moved to Wednesday, 09/30/2020 at 5:00
pm. Confirmed that everyone is okay with via ZOOM.
IV. AGENDA FOR NEXT MEETING:
V. ADJOURNMENT
Austin moved to adjourn; Russ seconded. Meeting adjourned at 1829 hours.
The next meeting will be held September 30, 2020 at 5:00 pm. The location of this meeting
will be via Zoom.