HomeMy WebLinkAbout20040901`'o WASHINGTON COUNTY
HISTORIC DISTRICT COMMISSION
•d County Administrative Annex
80 West Baltimore Street
- J Hagerstown, Maryland 21740-6003
Telephone: 240-313-2430
FAX: 240-313-2431
NDeaf and Hard of Hearing call 7-1-1 for Maryland Relay
AGENDA
HISTORIC DISTRICT COMMISSION
FOR WASHINGTON COUNTY, MARYLAND
CONFERENCE ROOM 1A & B
WASHINGTON COUNTY ADMINISTRATIVE ANNEX
80 WEST BALTIMORE STREET
September 1, 2004
7:00PM
M
A. Call to Order
B. Roll Call
C. Minutes — June "g 2004
D. Communications & Bills
E. Unfinished Business
1. Draft Design Guidelines (distributed during meeting)
F. Budget
G. New Business
1. Interstate 81 widening
2. Reappointments or recommendations for new members
H. Other Business
I. Executive Session
J. Adjournment
* = written material enclosed
'IIDC\ASEPT4.DOC
NOTICE IS GIVEN THAT THE HISTORIC DISTRICT COMMISSION MAY MEET IN CLOSED SESSION PURSUANT TO SECTION 10.508, STATE GOVERNMENT
ARTICLE, ANNOTATED CODE OF MARYLAND.
INDIVIDUALS REQUIRING SPECIAL ACCOMMODATIONS ARE REQUESTED TO CONTACT THE WASHINGTON COUNTY PLANNING DEPARTMENT. CONTACT PERMITS
DEPARTMENT AT (301) 791-3065 VOICE/TDD TO MAKE ARRANGEMENTS NO LATER THAN TEN (10) WORKING DAYS PRIOR TO THE MEETING.
www.washco-md.net
RECYCLEDPAPER
MINUTES
HISTORIC DISTRICT COMMISSION
FOR WASHINGTON COUNTY
JUNE 2, 2004
A and B: CALL TO ORDER AND ROLL CALL
Due to the absence of Chairman Michael Gehr, the regular monthly meeting of the Historic District
Commission was called to order by staff member Steve Goodrich on Wednesday, June 2, 2004 at 7:00
p.m. in Conference Room 1 of the Washington County Administrative Annex Building. Members
present included Frank Artz, Don Corbett, Jane Hershey, Eleanor Lakin, Merry Stinson and Carla Viar.
Also present was Dori Nipps, County Commissioner and staff member Debra Eckard.
C. MINUTES
The minutes from the May 5, 2004 meeting were presented. A motion was made by Frank Artz to
approve the minutes as presented and seconded by Jane Hershey. The minutes were unanimously
approved without any corrections.
D. COMMUNICATION AND BILLS — None
E. UNFINISHED BUSINESS
1. Ordinary Maintenance and Definitions
Steve Goodrich asked for comments and suggestions for the Ordinary Maintenance and Definitions
articles that will be incorporated into the Washington County Historic District Guidelines. An outline
and glossary was distributed at the May 5`s meeting. No comments or suggestions were forthcoming at
this time. This item will be discussed again at the July 7a' meeting.
F. BUDGET
There are no budget items to discuss at this time.
G. NEW BUSINESS
1. Proposed Telecommunication Tower (Hagerstown Fairgrounds)
Steve Goodrich presented a letter, photographs and maps from BL Companies for a proposed
telecommunications tower to be constructed at the City of Hagerstown Fairgrounds Park which is
located within the Hagerstown City limits. BL Companies asked for comments regarding the project's
potential adverse effects on this and surrounding historic properties. After review and a discussion of
the documentation, Eleanor Lakin made a motion to recommend that the Historic District
Commission's comment is that this is an inappropriate site for a cell tower due to its location in the
middle of an historic community park and within the viewshed of three historic districts. The motion
was seconded by Merry Stinson. Motion was passed by unanimous vote.
County Commissioner Dori Nipps suggested that copies of the recommendation be sent to the
Hagerstown City Council and the Hagerstown Historic District Commission.
2. Demolition Permit #2004-04595
Steve Goodrich presented a demolition permit for property located at 17042 Castle Hill Road. A map
showing the location of the property, a house location survey and an Inventory Form for State Historic
Sites Survey from the Maryland Historical Trust were also presented. Owners of the property, Mr.
Brian Hamilton and Ms. Christi Geisbert were present at the meeting and presented photographs of the
structure (a 40'x 80' barn) proposed for demolition.
Mr. Hamilton stated that he has several years of experience in the construction field and has worked on
many historical preservation projects in the City of Frederick. The owners purchased the property in
February with the intent of restoring the barn, which is dated 1904, to use for their horses. After
further inspection of the barn, Mr. Hamilton found that the 10' x 10' beams that hold up the peaks of
the roof are completely broken in half and the main supports to hold the rafters in place are completely
rotted. The owners are concerned with safety issues since the barn is located in close proximity to the
road and also because they have six children.
The owners are planning to keep the 40' x 40' wagon shed portion of the barn and intend to use lumber
from the existing barn in their restoration efforts to save some of the integrity and historical value of
the remaining barn.
Carla Viar made the motion not to oppose the demolition since neglect and damage to the structure is
beyond a reasonable effort to restore and because of the owner's attempts to document the historical
value of the structure and to reuse lumber to restore the remaining portion. The motion was seconded
by Jane Hershey. Those in favor of the motion were Frank Artz, Don Corbett, and Eleanor Lakin.
Merry Stinson was opposed to the motion. Motion carried. Steve Goodrich will forward the
recommendation to the Washington County Permits Department.
H. OTHER BUSINESS — None
I. EXECUTIVE SESSION
There were no items to discuss at this time.
J. ADJOURNMENT
On a motion made by Jane Hershey, seconded by Carla Viar and approved unanimously, the meeting
was adjourned at 7:50 p.m.
Respectfully submitted,
Stephen T. Goodrich
Chief Senior Planner
STG/dse
o6 BOARD OF COUNTY COMMISSIONERS
41 OF WASHINGTON COUNTY, MARYLAND Gregory I. Snook, President
° Washington County Administration Building William J. Wivell, Vice -President
100 West Washington Street, Room 226 James F, Kercheval
Hagerstown, Maryland 21740-4735 John C. Munson
Telephone: 240-313-2200 Doris J. Nipps
FAX: 240-313-2201
Deaf and Hard of Hearing call: 7-1-1 for Maryland Relay
August 2, 2004
Stephen Goodrich
Washington County Planning Department
80 West Baltimore Street
Hagerstown, MD 21740
Dear Mr. drich Q --
This is to remind you that the terms of Michael Gehr, Frank Artz, Merry Stinson, Carla Viar,
Eleanor Lakin, and Donald Corbett on the Historic District Commission are due to expire on
October 31, 2004.
Please advise me as soon as possible if they wish to be considered for reappointment to this
board. If they do not wish to be reappointed, or are not eligible for reappointment having
already served two consecutive terms, then the Commission may send recommendations to
the County Commissioners for their consideration.
Sincerely,
Joni L. Bittner, Clerk
BOARD OF COUNTY COMMISSIONERS
OF WASHINGTON COUNTY, MARYLAND
:jb
RECYCLED PAPER
www.washco-md.net
Robert L. Ehrlich, Jr., Governor
Michael S. Steele, U. Governor
Robert L. Flanagan, Secretary
Neil J. Pedersen, Administrator
Maryland Department of Transportation
Mr. J, Rodney Little
State Historic Preservation Officer
Maryland Historical Trust
100 Community Place
Crownsville MD 21032-2023
Dear Mr. Little:
July 8, 2004
Re: Project No. WA128B11
I-81: WV to PA State Lines
Washington County, MD
USGS Williamsport, Hagerstown
and Mason-Dixon 7,5" Quadrangles
RECEIVED
WASHINGTON COUNTY PLANNING DEPT.
Introduction and Project Description
This letter serves to inform the Maryland Historical Trust (MITT) of changes to the
proposed improvements to I-81 between the West Virginia and Pennsylvania state lines in
Washington County: This project was previously coordinated with the MET on September 10,
2001 regarding standing structures, and on September 29, 2003 regarding Phase I archeological
survey. Since that time, the project has been extended southward to include the inside -widening
of the 1965 State Highway Administration (SHA) Bridge No. 21078 over the Potomac River and
the potential construction of toll collection facilities. Furthermore, we request your concurrence
in SHA's determination that the project will have no adverse effects on historic properties.
Project plans for the proposed toll facilities and bridge widening are included as
Attachment 1. Major changes since our last correspondence include four options for toll facility
placement involving various combinations of four proposed potential Toll Areas A, B, C, and D
(Attachment 2). Toll Areas A and B occur to the east and west of I-81 between the C&O Canal
National Historical Park (C&O Canal) and the MD 68 interchange. Areas C and D occur east
and west of I-81 in the vicinity of the Hagerstown Airport. Currently, SHA is coordinating with
West Virginia on the construction staging area, as the SHA would prefer to stage the equipment
on the southern side of the Potomac River in West Virginia. Ownership of land under the
existing I-81 bridge in the area of the C&O Canal has not been clearly established to date,
although it is believed that SHA owns the land on which the existing bridge piers are located.
SHA is currently investigating ownership issues with the National Park Service (NPS). We
anticipate that a Memorandum of Agreement (MOA) may be needed for this project.
My telephone number/toll-free number is
Maryland Relay Service for Impaired Hearing or Speech 1.800.735.2258 Statewide Toll Free
StreetAddress: 707 North Calvert Street • Baltimore, Maryland 21202 • Phone 410.545.0300 • www.marylandroads.com
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Two
Funding
Federal funds are anticipated for this project.
Alternates Description
The Alternates Retained for Detailed Study (ARDS) have remained constant since our
last coordination and are summarized below and more fully developed in the May 26, 2004
Informational Public Workshop brochure (Attachment 3):
Alternate 1, the No Build Alternate, involves no work in the I-81 corridor other than normal
maintenance activities.
Alternate 2, Interchange Improvements, involves upgrading the existing roadway and
interchanges. The mainline roadway would remain at four lanes with improvements made at the
various interchanges in the 12 mile corridor. Improvements to the I-81 at MD 68 interchange
would provide an acceleration lane for traffic coming from Concocheague Street to I-81
southbound.
Alternate 2A, Interchange Improvements with Shortened and Modified Collector -Distributor
Roads, involves the interchange improvements as described in Alternate 2. In addition, a two-
lane collector distributor road would be constructed from the I-70 interchange to the Halfway
Boulevard interchange.
Alternate 3, Inside Widening, involves widening of the I-81 corridor on the inside toward the
existing median to provide for three 12 -foot travel lanes.
Alternate 3A, Inside Widening with Collector -Distributor Roads Alternate consists of widening
1-81 on the inside toward the median along with the construction of a two-lane collector -
distributor road between the 1-70 and Halfway Boulevard interchanges.
Alternate 3B, Inside Widening with Collector -Distributor Roads, includes the same
improvements as in Alternate 3A with the exception that I-81 would not be widened to three
lanes between the I-70 and Halfway Boulevard interchanges.
In addition to Alternates 1, 2, 2A, 3, 3A, and 3B, there are four toll options which may be chosen
in conjunction with any of the Alternates. Each of the toll options would require the widening of
Bridge No. 21078 over the Potomac River.
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Three
Option 1 (Areas A and B) involves the construction of toll plazas in both directions along I-81
near the southern terminus of the project between the Potomac River and Conococheague Street.
Both high speed and cash toll lanes through the toll areas would be provided in each direction
along the mainline to accommodate the high traffic volumes. Under this option, drivers would
pay tolls as they enter and exit Maryland near the West Virginia state line.
Option 2 (Areas A and D) involves the construction of a toll plaza along southbound I-81
between Showalter Road and Mason Dixon Road, and along northbound I-81 between the
Potomac River and Conococheague Street. Both high speed and cash toll lanes would be
provided on I-81 through both toll areas, and only those drivers entering Maryland would pay
tolls.
Option 3 (Areas C and B) involves the construction of a toll plaza along northbound 1-81
between Showalter Road and Mason Dixon Road, and along southbound I-81 between the
Potomac River and Conococheague Street. Both high speed and cash toll lanes would be
provided on I-81 through both toll areas, and only those drivers exiting Maryland would pay
tolls.
Option 4 (Areas A, B, C and D) involves the construction of toll plazas in both directions along
I-81 between the Potomac River and Conococheague Street and between Showalter Road and
State Line Road. Through the toll areas, both high speed and cash toll lanes would be provided in
each direction along the mainline to accommodate the high traffic volumes. Under this option,
drivers would pay tolls as they enter and exit Maryland near both the West Virginia and
Pennsylvania state lines.
Bridge Widening: With the proposed construction of the Toll Options, Bridge No. 21078 on
I-81 would be widened. The 1965 steel girder dual bridge is 1,177 feet long and provides a
30 -foot clear roadway for both the northbound and southbound roadways. Based on the width of
the existing bridges, the addition of a third lane to each bridge will require significant widening
to bring the bridges up to current standards. The existing section provides for two lanes at 12
feet and 3 -foot wide shoulders on each side, which is substandard by present design standards.
The proposed typical section would be a 10 - 12 -foot outside shoulder, three lanes at 12 feet and
a 10 -foot median shoulder for a clear roadway width of 56 - 58 feet. Due to the age of the
bridge, the existing deck would need to be replaced and new piers and footings would be
required for the widening. Widening of the I-81 bridge over the Potomac River would occur to
the inside and would create three lanes in each direction and shoulders.
Area of Potential Effects
The Area of Potential Effects (APE) for this project remains at 200 feet to either side of
the I-81 corridor between the Potomac River at the southern limit north to State Line Road at the
northern project limit and is indicated on the attached State Highway Administration quadrangle
maps for Williamsport, Hagerstown, and Mason Dixon. (Attachment 4).
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Four
The study area for archeological purposes consists of the worst case limits of disturbance
(LOD) for Alternate 3A Modified which encompasses the LOD for all other alternates, as well as
all four Toll Options, and construction easements and staging areas on both sides of the Potomac
River and in the river bed.
Identification Methods and Results
Potentially significant architectural and archeological resources were both researched as
part of the historic investigation instigated by the proposed improvements to I-81 in Maryland.
Architecture: SHA Architectural Historian Becky Kermes consulted previous project
correspondence, the SHA-GIS Cultural Resources Database, and made a field trip to the project
corridor on June 17, 2004.
The APE for this project is the I-81 corridor plus 200 feet to either side to accommodate
the various Alternates and Options and interchange improvements. This APE has not changed
significantly since SHA's initial correspondence in 2001.
Within the APE, SHA has identified one new resource, the Mylin Horst property. The
Horst farmstead is considered not eligible for the National Register of Historic Places (NRHP).
The Determination of Eligibility (DOE) Form cites a lack of integrity by loss of original building
materials, feeling and association (Attachment 5). Two other previously identified eligible
and/or listed resources within the APE include the Garden of Eden (WA -I-377) and the C&O
Canal.
SHA is also submitting a revised DOE Form for the Garden of Eden. During research for
this phase of the project, it was noted that a large cargo container and truck facility is located
immediately behind the main house and barn of the Garden of Eden. Even though this facility
was in service in 2001 when the original DOE was submitted, that submission did not discuss
this intrusion on the property, nor was it visible on the SHA-GIS aerial view of the property.
Visually, this cargo container facility is somewhat screened, yet the screening, as well as the
facility itself actually serve as a barrier between the house and barn from the woods located to
the rear of the property. SHA is proposing that the NRHP boundary be revised to a visual
boundary which would include the house, the barn, and associated fields on the north side of the
property (Attachment 6).
Alternate 1, the No Build Alternate, would not impact the Garden of Eden or the C&O
Canal.
Alternate 2, Interchange Improvements, involves upgrading the existing roadway and
interchanges. The mainline roadway would remain as four lanes with improvements made at the
various interchanges in the 12 mile corridor. Improvements to the I-81 at MD 68 interchange
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Five
would provide an acceleration lane for traffic coming from Concocheague Street to I-81
southbound. This improvement mainly takes place on Concocheague Street and is not in close
proximity to the Garden of Eden or C&O Canal; therefore, neither resource would be impacted
by this alternate.
Alternate 2A, Interchange Improvements with Shortened and Modified Collector -
Distributor Roads, involves the interchange improvement $ as described in Alternate 2. In
addition, a two-lane collector distributor road would be constructed from the I-70 interchange to
the Halfway Boulevard interchange. Since this collector -distributor road is located farther north
of the Garden of Eden and C&O Canal, neither would be impacted by Alternate 2A.
Alternate 3, Inside Widening, involves the widening of the I-81 corridor on the inside
toward the existing median to provide for three 12 -foot travel lanes. Since these improvements
are within existing right-of-way and do not involve substantial visual changes, the Garden of
Eden and C&O Canal would not be impacted by Alternate 3.
Alternate 3A, Inside Widening with Collector -Distributor Roads, consists of widening I-
81 on the inside toward the median along with the construction of a two-lane collector -distributor
road between the I-70 and the Halfway Boulevard interchanges. Since the widening is within the
existing right-of-way, and proposed improvements to the corridor are far to the north of the
resources, the Garden of Eden and the C&O Canal would not be impacted by Alternate 3A.
Alternate 3B, Inside Widening with Collector -Distributor Roads, includes the same
improvements as in Alternate 3A with the exception that I-81 would not be widened to three
lanes between the I-70 and Halfway Boulevard interchanges. Since the widening is within the
existing right-of-way and the proposed collector -distributor roads are located far to the north of
the Garden of Eden and C&O Canal, neither resource would be impacted by Alternate 3B.
In addition to Alternates 1, 2, 2A, 3, 3A, and 3B, there are four toll options which may be
paired with any of the alternates. With the proposed construction of the toll options, SHA Bridge
No. 21078 on I-81 over the Potomac River would be widened on the inside. The steel girder
bridge was constructed in 1965 and is not eligible for the NRHP.
Toll Option 1 consists of tolling both directions of I-81 between the Potomac River and
Conococheague Street. Bridge No. 21078 would be widened on the same alignment with
approach lanes to the toll facility fanning out to a total of 8 lanes at the facility, then tapering off
to two or three lanes (depending on which Alternate is chosen). An administration building
would be constructed on the each side of I-81, just north of the C&O Canal. The C&O Canal
would incur some visual impacts associated with the widening of the bridge, and construction of
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Six
the widened highway, toll facility, and administration buildings. Since bridge plans have not
been completely formulated at this time, the exact extent of any physical and visual impacts to
the C&O Canal is uncertain. At this time, it is believed that the proposed widening would occur
in existing right-of-way with staging to occur from the up -slope portions near the existing bridge.
The widening of the I-81 corridor, construction of the toll facility, and construction of the
administration facility on each side of I-81 would add to the audible and visual landscape. The
noise impacts are expected to increase by 3 dBA at the C&O Canal, but this small increase does
not qualify for the further consideration of noise barriers. Additionally, this small increase in
noise level does not diminish the contributing characteristics of the C&O Canal as a NRHP
property. Visually, the construction of the administration buildings on each side of I-81 would
add new visual elements into the landscape. However, since the C&O Canal lies approximately
20 feet below the I-81 corridor, this new construction would not adversely impact the character
defining features of the C&O Canal.
Therefore, SHA has determined that no adverse impacts would occur to the C&O Canal
from Toll Option 1 as long as the C&O Canal is not physically impacted by the bridge widening
and the amount of vegetation removal required for the bridge work is strictly limited.
Toll Option 1 would also visually impact the Garden of Eden. Currently, the Garden of
Eden is located just south of the I-81 and MD 63 interchange and is screened from 1-81 through
vegetation. The required widening to accommodate the needed lanes for the toll booths occurs
south of the proposed revised NRHP boundary. The construction of the administration building
would introduce a new visual element into the landscape. However, this new visual addition
would not adversely impact the character defining features of the Garden of Eden.
Toll Option 2 consists of tolling southbound I-81 between Showalter Road and State Line
Road and northbound I-81 between the Potomac River and Conococheague Street. Toll Option 2
would require the widening of Bridge No. 21078, and like Toll Option 1, would have the same
impacts to the C&O Canal. The I-81 corridor would be widened to eight lanes in the northbound
direction only to accommodate the toll facility and one administration building would be
constructed east of northbound I-81. These work items would introduce new visual elements in
the area of the C&O Canal, but this visual change would not adversely impact the C&O Canal
for the same reasons as Toll Option 1.
Toll Option 2 would have the same impacts to the Garden of Eden as Toll Option 1, in
that the required widening and construction of the toll facility and administration building would
not adversely impact the character defining features of the Garden of Eden.
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Seven
Toll Option 3 consists of tolling northbound I-81 between Showalter Road and State Line
Road and southbound 1-81 between the Potomac River and Concocheague Street. Toll Option 3
would require the widening of Bridge No. 21078, widening of the 1-81 approach lanes to the toll
facility and construction of the administration facility, all on the west side of I-81. Toll Option 3
would have the same impacts to the C&O Canal as Toll Option 1.
Toll Option 3 would have the same impacts to the Garden of Eden as Toll Options 1 and
2, in that the required widening and construction of the toll facility and administration building
would not adversely impact the character defining features of the Garden of Eden with the
revised historic boundary.
Toll Option 4 consists of tolling both directions of I-81 between Showalter Road and
State Line Road, as well as both directions between the Potomac River and Concocheague Street.
Toll Option 4 consists of the same scope and work items to the southern limit of the project as
Toll Option 1 and the impacts to the C&O Canal and the Garden of Eden would be the same as
in Toll Option 1.
As currently designed, the proposed project would have no adverse impact on historic
structures. Once more exact information is known about the proposed bridge widening, the
conditional no adverse impact finding may be revised in consultation within the MHT.
Archeology: SHA Archeologist Carol A. Ebright assessed the archeological potential of the
various project areas for proposed toll facilities and construction staging locations for the
Potomac River bridge widening, through consultation of the SHA-GIS Cultural Resource
Database, site forms from West Virginia and Maryland, historic mapping and aerial photographs,
various secondary sources, and various field visits. A team meeting with the NPS was held on
June 22, 2004 to discuss potential impacts to the C&O Canal.
Construction Staging Areas in West Virginia: The proposed construction staging areas in West
Virginia were restricted to 300 feet north and south of the existing bridge, extending 350 feet
back from the edge of the Potomac River. The 300 by 350 foot rectangle south of the bridge is
largely intact, aside from disturbance caused the construction of the bridge abutment. The
southern rectangle occupies a section of essentially level, relatively wide floodplain, adjacent to
the confluence of a Potomac River tributary. These settings have high potential for
multicomponent prehistoric sites that may be both deeply buried and stratified. Early historic
sites may also occur in these settings, which contain arable lands easily accessed from the river.
On April 13, 2004, the West Virginia SHPO also noted via email that the area on the south side
of the bridge had a high probability for archeological sites, based on the presence of recorded
sites in nearby, similar settings (Attachment 7).
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Eight
In contrast, the 300 foot by 350 foot rectangle north of the bridge has been substantially
disturbed by both the original construction of the bridge abutment and by the construction of
adjacent large industrial waste ponds (Attachment 8). The northern staging area has very low
archeological potential, and could be used without requiring any additional archeological work.
Consequently, SHA will conduct all staging on the West Virginia side from the north side of the
I-81 bridge; provided that appropriate agreements with Allegheny Power Company are obtained.
Construction Staging Areas in Maryland: A previously recorded fish weir in the Potomac River
bed is located near the I-81 bridge (18WA196). There is contradictory information on file about
the exact location of this feature, placing it both in the project area or slightly upstream from it
(cf. MHT site form, MD site location mylars, SHA GIS aerial photograph, Guzy 1999, Stewart
1997). This site appears to be the same as the weir documented by West Virginia as 46BY157,
whose location is also noted to be imprecisely recorded. Fortunately, a 1989 USGS aerial
photograph clearly shows the fish weir during a low-water period further upstream from both
recorded locations in the Maryland and West Virginia files. A labeled version of the photograph
is enclosed (Attachment 8). The weir is well outside the worst case limits of disturbance and
will not be impacted by this project.
A field visit to the C&O Canal on June 14, 2004 indicated that the towpath is directly
adjacent to, and substantially above, the Potomac River bed in the project vicinity. There is no
intervening floodplain. The canal prism lies adjacent to steep slopes which terminate in a high
terrace above the Potomac River. Only the terrace tops have archeological potential, primarily
for prehistoric resources. There are no recorded archeological sites in this area, nor has it been
previously surveyed. However, Sharf (1881) specifically noted American Indian antiquities,
including mounds, in similar settings along the Potomac River.
Existing bridge abutments for each bridge occur high up on the slope and in the river bed
adjacent to the towpath (Attachment 9). Neither the existing piers nor the proposed widened
piers would directly impact the canal prism or towpath. Due to topographic limitations below
the bridge, construction staging on the Maryland side of the river would occur from the terrace
top, solely from the I-81 median. Since none of the adjoining intact terrace tops will be
impacted, no further archeological work is warranted inside the C&O Canal. However, should
any access to the C&O Canal underneath the bridge be required, this would occur via the
towpath, with access gained from an Allegheny Power Company road. With the exception of a
waste weir on the towpath between the access road and the I-81 bridge, no ancillary canal -related
features are present. Both the canal prism and towpath are being treated as elements of the
historic built environment rather than as archeological sites. Any archeological work that would
become necessary as a result of the further development of design plans would be covered by a
stipulation in a MOA.
Mr. J, Rodney Little
I-81: WV to PA State Lines
Page Nine
Proposed Toll Facilities: None of the proposed Toll Areas contain previously recorded
archeological sites, nor were they covered in the recently completed Phase I archeological survey
for improvements to I-81 in Maryland (Millis 2003). All four areas are characterized by karst
topography characteristic of the Great Valley, and have fertile soils. A field visit was made on
October 28, 2003.
Area A is located adjacent to the revised boundary of the Garden of Eden (WA -I-377), a
NRHP property eligible under Criteria A and C. The former plantation is north of the C&O
Canal. As presently defined, Area A is wooded, containing deep, well -drained soils. Area B is
likewise wooded and located on the high terrace above the Potomac River. Historic maps from
1859 (Taggart), maps from the Civil War period, and 15 minute topographic maps from 1912
and 1944 show no evidence of prior structures in Areas A and B. In 1859 and in the early 1860's
both Areas A and B are owned by "O. Williams," descendant of Otho Williams, the founder of
Williamsport. The 1912 topographic map suggests that presently wooded tracts in both areas
were at least partly in agricultural use in the early 20th century. Given the location on the
terraces above the Potomac River, both Areas A and B are considered to have high potential for
both prehistoric and historic archeological resources.
Area C is a rectangular tract consisting of agricultural land now surrounded by airport
facilities. Area D is a triangular cultivated tract bounded by I-81 and Maughansville Road. Soils
in both Areas C and D appear to be intact and are mapped as deep, and moderately drained to
well -drained. An unnamed watercourse lies a short distance north of both areas, and is a
headwater tributary of Toms Run. A headwater of a tributary to Rush Run lies just to the south.
Both streams ultimately join Conococheague Creek. In 1859, both Areas C and D appear to have
been located within a parcel that was traversed by Maughansville Road, and that was owned by
"L. T. Brien" (Taggart 1859). No structures are shown in either Area C or D in 1859, or on
subsequent 15 minute USGS topographic maps from 1912 and 1941. Maughansville Road is
shown on Griffith's 1795 Map of Maryland, and early historic sites are likely along its corridor.
Prehistoric potential is considered high in both areas.
Phase I Archeological Survey: SHA contracted with TRC Garrow Associates to conduct Phase I
archeological survey of potential Toll Areas A, B, C, and D. Shovel testing at a 20 m interval
located two flakes in adjacent test pits at the south end of Area A, one from the A horizon and
the other from the B horizon. Additional radial shovel tests yielded no additional artifacts. An
isolated fmd number, 18WAXI10, was assigned.
In addition, the consultant was requested to conduct follow-up deed research on
properties in the vicinity of a potential cemetery site in the vicinity of the Showalter Road
interchange, that was reported by a private citizen in a detailed interview (Millis 2003). This
supplementary research yielded no evidence that a cemetery is located within SHA right-of-way
for this project. Prior shovel testing also yielded no evidence of burials.
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Ten
Enclosed for your review and comment is one copy of the draft report Phase I Intensive
Archeological Survey for Proposed Toll Facilities Along I-81, Washington County, Maryland
by Heather Millis and Deborah Joy (Attachment 10). We have only very minor editorial
comments on the report and agree with the consultant that no further archeological work is
warranted for any of the proposed toll facilities.
Summary: Phase I archeological survey of the proposed toll facilities yielded only two flakes,
recorded as isolated find 18WAX110, at the southern end of Area A. No other archeological
resources were located in Areas A, B, C or D. Aerial photographs demonstrate that the fish weir
in the bed of Potomac River (18WA196 and 46BY157) is a sufficient distance upstream from the
I-81 bridge that it will not be impacted by this project. Currently proposed construction staging
areas on the West Virginia side of the Potomac will be confined to the north side of the bridge, in
an area heavily disturbed by the original construction of the bridge and adjacent industrial waste
ponds. No further archeological work is warranted for this area. If any construction staging
areas in the C&O Canal are proposed, they will not impact any areas with high archeological
potential.
Review Request
Please examine the attached maps, plans, photographs, and the Eligibility and Effects
Table (Attachment 11). We request your concurrence by August 2, 2004 that there would be no
adverse effects on historic properties by the proposed widening and toll options in the I-81
corridor between the Potomac River and State Line Road. By carbon copy, we invite the
Washington County Historic District Commission, Washington County Historical Trust, and the
National Park Service at the C&O Canal National Historical Park to provide comments and
participate in the Section 106 process. Pursuant to the requirements of the implementing
regulations found at 36 CFR Part 800, SHA seeks their assistance in identifying historic
preservation issues as they relate to this specific project (see 36 CFR 800.2 (c) (4) and (6), and
800.3 (f) for information regarding the identification and participation of consulting parties, and
800.4, and 800.5 regarding the identification of historic properties and assessment of effects).
For additional information regarding the Section 106 regulations, see the Advisory Council on
Historic Preservation's website, www.achp.¢ov, or contact the Maryland State Highway
Administration or the Maryland Historical Trust.) If no response is received by August 2, 2004,
we will assume that these offices" decline to participate. Please call Ms. Becky Kermes at
410-545-2884 or email at bkermes(a)e,sha.state.md.us with questions regarding standing structures
for this project. Ms. Carol Ebright may be reached at 410-545-2879 or email at
cebright@sha.state.md.us with concerns regarding archeology.
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Eleven
Very truly yours,
Cynthia D. Simpson
Deputy Director
Office of Planning and
Preliminary Engineering
by: /t -J
Bru M. Grey
Deputy Division Chief
Project Planning Division
Attachments: 1)
Project Plans
2)
Summary of Toll Facility Options
3)
Informational Packet for the Information Public Workshop
4)
Map of the APE
5)
Determinations of Eligibility (DOEs)
6)
West Virginia SHPO Comments.
7)
Aerial Photograph of Fish Weir
8)
Canal, Towpath; and Setting under Bridge No. 21078
9)
Phase 1 Intensive Archeological Survey
10)
Eligibility and Effects Table
cc: Ms. Mary F. Barse, SHA—PPD
Mr. Don Brinser, Washington County Historical Trust, Inc (w/Attachments)
Ms. Carol Ebright, SHA-PPD (w/Attachments)
Mr. Steven Goodrich, Washington County Historic District Commission (w/Attachments)
Ms. Becky Kermes, SHA-PPD (w/Attachments 5 and 10)
Ms. Cynthia D. Simpson, SHA-OPPE
Mr. Donald H. Sparklin, SHA-PPD
Ms. Lorraine Strow, SHA-PPD
Ms. Nicole Washington, SHA-PPD
Ms. Lynn WigfieId, C&O Canal National Historical Park (w/Attachments)
Mr. J. Rodney Little
I-81: WV to PA State Lines
Page Twelve
Concurrence with the MID State Highway Administration's
Determination(sl of Eligibility and/or Effects
Project Number: WA128B11 MHTLog No.__
Project Name: I-81 from West Virigina Line to Pennsylvania State Line
County: Washington County, MD
Letter Date: July 8, 2004
The Maryland Historical Trust has reviewed the documentation attached to the referenced
letter and concurs with the MD State Highway Administration's determinations as follows:
Eligibility (as noted in the Eligibility Table [Attachment 11]):
[] Concur
[] Do Not Concur
Effect (as noted in the Effect Table [Attachment 11]):
[] No Properties Affected
[] No Adverse Effect
[] Conditioned upon the following action(s) (see comments below)
[ ] Adverse Effect
Agreement with FHWA's Section 4(f) criteria of temporary use (as detailed in the
referenced letter, if applicable):
[] Agree
Comments:
By:
MD State Historic Preservation Office/
Maryland Historical Trust
Date
Return by U.S. Mail or Facsimile to:
Mr. Bruce M. Grey, Deputy Division Chiet Project Planning Division,
MD State ffighway Administration, P.O. Box 717, Baltimore, MD 21203-0717
Telephone: 410-545-8540 and Facsimile: 410-209-5004
1111111111
iuiimiu
1LVE14EIlIII!U
it 'I
{i Il]""ll rJ IElIflU'�
H1llIIIIIII
r r �wc'ir'1
±i1iillhIII
�rrJ�
tilillilli
ciiiw
UllllII
ticK r l �
a
o- ��I7" V1lllW
r-�
:21liIIIr
t1
t1 1111111
iUiiiiii. r .
1DIIIIIi
Attachment 11
Hybrid Eligibility/Effects Table
Project Name: I-81 West Virginia State Lin
T
Resource-
Type
SHA
Dot
SHP0,
Opinion
Impact
SHPO
Concur..
Impact
SHPO
Concur__
Impact =
-
SHPA
Concur
Impact
t7P0
Concur _
act '
Impact
..
=`S PO .-
Concur
Impact `_ SHPO
PNR _ :' Concur
Impact --
P
Sii$0.-
Conch
Impact
j
S >'9
Concur
Attach-
mutt=
Remarks
Mylin Horst House
S
X
Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004 .
None
Requested
07/2004
None Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004
5
C&O Canal Historical
Park
nD
NRL
None
Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004
No Adverse Requested
07/2004
No Adverse
Requested
07/2004
No Adverse
Requested
07/2004
Garden of Eden
WA -1-377
S
NR
Requested
07/2004 (B)
None
Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004
None
Requested
07/2004
None
Requested
07/ 2004
No Adverse Requested
07/2004
No Adverse
Requested
07/2004
No Adverse
Requested
07/2004
5
Revised NRHP
Boundary'
Effect
NPA
07/2004
NPA
07/2004
NPA
07/2004
NPA
07/2004
NPA
07/2004
NAE 07/2004
NAE
07/2004
NAE
07/2004
NR Determination: ND (Not Determined), X (Not Eligible), NR (Eligible), NRL (Listed), NHL (Landmark)
SHPO Opinion: (B) designates opinion regarding boundary, Code following date signifies SHPO opinion
Impact: None, No Adverse, Adverse
Effect: NPA (No Properties Affected), NAE (No Adverse Effect), AE (Adverse Effect)
Bold rows indicate review action requested