HomeMy WebLinkAboutLat_13010OrchidDrive�.a ON c° 2 WASHINGTON CO v
3 WATER & SEWER DEP RTA�D
16232 Elliott Parkway
Williamsport, MD 21795 SEP 0 7 2001 1/5)09
qRr�°N (301) 791-3083
Permit to Connect to Public Water/Sewer System PERMITS ANDINSPECTIONS
Type of Permit RES SEWER
Permit No.
SCP 150-1588
Subdistrict Name MAUGAN S / OH
Issue Date
09/04/0
Mainline Contract No.
Void Date
09/04/02
Building Permit No.
Subdistrict No.
150
Permission is hereby given to:
Property Owner: OLIVER HOMES
of address:
For property located at: _
Lot No. 4S
MD 21740
r Street Address
IBROOK _ESTATES Phase pec.
Owner's Agent: OLIVER HOMES
Agent's Address: 19733 LEITERSBURG PIKE HAGERSTOWN MD 21740
Previous Owner:
Fees Paid in Full? YES Lateral with Mainline? YES
Date Fees Paid 09/04/01 Residential EDU's
Fee $ Commercial EDU's
WCWSD Alloc./Conn. Fee $ $2,1 Gal/Day Allocation 200
WCWSD/Other Fee $ Building Number
City of Hagerstown Fee $ $1, 200Misc. Number
Total Fee $ $3,300
Remarks A FEE DIFFERENTIAL WILL BE CHARGED TO REELECT
INCREASES IF PROPERTY IS NOT CONNECTED BY THE PERMIT VOID DATE.
When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall
conform with the provisions of Maryland State laws and County policy.
This permit does not supersede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS,
STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE-
MAINS WIT
J3,THE PROPERTY OWNER.
Date:
INSPECTION: At least 48 hours notice prior to requested date is required.
ON SITE INSPECTION will be made by: Washington County Plumbing Board
100 W as W h' t St t R 304
V on ree , oom
Hagerstown, MD 21740-4727
Phone: (301) 791-3070
Inspection Date: ��^p /V Plumbing Inspector:
WASHINGTON COUNTY SANITD 4Y DISTRICT
WASHINGTON COUNTY, MD.
Project: Nofifb C-ST•r-1s Colltei�of+ $ YsT• s -��0 `6"66
Street (or location): GRCNip yd?;VG poi yS �3c,1��
Contractor: r a- rc trru I C o� 7 y. dry s
Date Installed 3 - i- I -L
SANITARY SEWER LATERAL
CONSTRUCTION REPORT
MH IIS -r TO MH 11 t6
Wye Sta. On Main
WYE
SIZE-
TYPE PIPE
TYPE
CO.
DEPTH
C. 0.
TYPE
LATERAL
EXCAVATION
LENGTH
LAYING LENGTH
q"
py e-
CQiT
Horiz. s Total
'
Qx xp"
SSR --x 6
-ff15
ST D.
S`5
Slope + Horiz. = Tota
NOTES:
DROP
Depth of Cleanout at Flow Line
Cleanout 4 e (-t From Mu i -n LiNp
Layed at 2 016
IN o Basement Service
MH # ors,
v
M H # i i s-6
Amounts pertaining to work completed this period. reviewed and approved.
By
WCSD INSPECTOR CONTRACTORS REPRESENTATIVE
WASHINGTON COUNTY SANITARY DISTRICT
AUGUST 13, 1984
S-2