Loading...
HomeMy WebLinkAboutLat_13010OrchidDrive�.a ON c° 2 WASHINGTON CO v 3 WATER & SEWER DEP RTA�D 16232 Elliott Parkway Williamsport, MD 21795 SEP 0 7 2001 1/5)09 qRr�°N (301) 791-3083 Permit to Connect to Public Water/Sewer System PERMITS ANDINSPECTIONS Type of Permit RES SEWER Permit No. SCP 150-1588 Subdistrict Name MAUGAN S / OH Issue Date 09/04/0 Mainline Contract No. Void Date 09/04/02 Building Permit No. Subdistrict No. 150 Permission is hereby given to: Property Owner: OLIVER HOMES of address: For property located at: _ Lot No. 4S MD 21740 r Street Address IBROOK _ESTATES Phase pec. Owner's Agent: OLIVER HOMES Agent's Address: 19733 LEITERSBURG PIKE HAGERSTOWN MD 21740 Previous Owner: Fees Paid in Full? YES Lateral with Mainline? YES Date Fees Paid 09/04/01 Residential EDU's Fee $ Commercial EDU's WCWSD Alloc./Conn. Fee $ $2,1 Gal/Day Allocation 200 WCWSD/Other Fee $ Building Number City of Hagerstown Fee $ $1, 200Misc. Number Total Fee $ $3,300 Remarks A FEE DIFFERENTIAL WILL BE CHARGED TO REELECT INCREASES IF PROPERTY IS NOT CONNECTED BY THE PERMIT VOID DATE. When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supersede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WIT J3,THE PROPERTY OWNER. Date: INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W as W h' t St t R 304 V on ree , oom Hagerstown, MD 21740-4727 Phone: (301) 791-3070 Inspection Date: ��^p /V Plumbing Inspector: WASHINGTON COUNTY SANITD 4Y DISTRICT WASHINGTON COUNTY, MD. Project: Nofifb C-ST•r-1s Colltei�of+ $ YsT• s -��0 `6"66 Street (or location): GRCNip yd?;VG poi yS �3c,1�� Contractor: r a- rc trru I C o� 7 y. dry s Date Installed 3 - i- I -L SANITARY SEWER LATERAL CONSTRUCTION REPORT MH IIS -r TO MH 11 t6 Wye Sta. On Main WYE SIZE- TYPE PIPE TYPE CO. DEPTH C. 0. TYPE LATERAL EXCAVATION LENGTH LAYING LENGTH q" py e- CQiT Horiz. s Total ' Qx xp" SSR --x 6 -ff15 ST D. S`5 Slope + Horiz. = Tota NOTES: DROP Depth of Cleanout at Flow Line Cleanout 4 e (-t From Mu i -n LiNp Layed at 2 016 IN o Basement Service MH # ors, v M H # i i s-6 Amounts pertaining to work completed this period. reviewed and approved. By WCSD INSPECTOR CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1984 S-2