Loading...
HomeMy WebLinkAboutLat_13534WellspringDriveWASHINGTON COUNTY WATER & SEWER DEPARTMENT 16232 Elliott Parkway, Williamsport, MD 21795 �Rr�rN (301) 791-3083 SEP 1 3 1996 Permit to Connect to Public Water/Sewer System AR 41TS AND C� Type of PermitPermit No. SCP 150-1323 Subdistrict Name Issue Date 09/11/96 Mainline Contract No. 5 y 1 Void Date 09/11/97 Building Permit No. nu,� 11; 47 Subdistrict No. 150 Permission is hereby given to: Property Owner: A --A. - of address: t_t 7 2 Q 151nn T14 v a T, T.A(1F WN For property located at:, <r, -A3 WFT T MDfiFRTNf DRTV Street Address Lot No. — Subdlv._N: U ANIS MFAMWA Phase Sec. Owner's Agent: Agent's Address: Previous Owner: t-1 Fees Paid in Full? ,: i ..; Lateral with Mainline? YE::, Date Fees Paid, , 0 r. Fee $ WCWSD Alloc./Conn. Fee $ $21050 WCWSD/Other Fee $ City of Hagerstown Fee $ $ -,.,0 Total Fee $ rn 1 Remarks Residential EDLI's Commercial EDLI's _ Gal/Day Allocation _ Building Number _ Misc. Number MIA When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. Aligned: �,k� / �� 1'5r'! A/ 1 St'�_ Date: , INSPECTION: At least 48 hours notice prior to requested date is required ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 Phone (301) 791 3070 Inspection Date: J" /�9- �� Plumbing Inspector- ON nspector RECEiV APR 2 4 1997 WASHINGTON COUNTY WATER & SEWER DEPT 0 1 4/ /; Y 3-13.97 WASHINGTON COUNTY SANITAR,�;,DISTRICT WASHINGTON COUNTY, MD. Project:- - /-3-5 -3 Street (or location): Loi" 1"5 Contractor: Springfield Contractors, Inc. Date Installed to"Z-9-9t SANITARY SEWER LATERAL AM* CONSTRUCTION REPORT MH/�ZS --- TO MH /"Z Wye Sta. On Main o -foo WYE SIZE- TYPE DEPTH TYPE EXCAVATION LAYING LENGTH TYPE PIPE C. 0. C.O. LATERAL LENGTH -1 Horiz. = Total 8x4 4" SDR -26 STD . STPD. 30 25 Slope t Horiz. = Total DROP NOTES-. ScK 40 FACE OF MJ" ilib Depth of Cleanout ' 71emv' Sat Flow Line Cleanout 2 From M/k its Layed at 2•1 4?0 Basement Service M H tt //&7 MH # iizb unts pertaining to work completed this period, reviewed and approved BY � G/►GC Sr�"� WCSD INSPECTOR CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT DIV. IV 400-58 Fs -5