Loading...
HomeMy WebLinkAboutLat_17923JenniferLaneWASHINGTON COUNTY 3 WATER & SEWER DEPARTMENT 16232 Elliott Parkway RYLHNO Williamsport, MD 21795 /MALk_j— (301) 791-3083 la�1 49 Permit to Connect to Public Water/Sewer System Type of Permit Pr^ SEWER, Subdistrict Name Permit No. Cp 15G-1406 ; , S tr I L i OH Mainline Contract No. 5 Issue Date _ ? / 1 g /g i 2 Building Permit No. Void Date 12 / 18/99 FR,I98-G5` Subdistrict No. 150 Permission is hereby given to: WCWSD Alloc./Conn. Property Owner: ELL. BROWN Fee $ of address: City of Hagerstown For property located at: ' '; 9, 2 3 JENNIFER LANE Lot No. Subdiv. MAUGANS MEADOWS Street Address Phase Sec. Owner's Agent: 7,7tM CONSTRUCTION COMPANY Agent's Address 55 FAIRP: ,Y ROAD BOONSBORC MD 21713 Previous Owner: Fees Paid in Full? I ES Lateral with Mainline? Date Fees Paid 12/17/ 98 Residential EDU's 1 Fee $ Fee $ Commercial EDU's 0 -S2 .050 Gal/Day Allocation 200 WCWSD Alloc./Conn. WCWSD/Other Fee $ Building Number City of Hagerstown Fee $ w i 000 M' N Isc. umber Total Fee $ $3,05.) Remarks When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. Signed: Date: INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 217404727 Phone: (301) 791-3070 Inspection Date: 1-12!- 9 9 Plumbing Inspector: b JAN 2 1 1999 WASHINGTON COUNTY WATER & SEWER DEPT. WASH INGTON COUNTY SANITARY DISTRICT WASHINGTON COUNTY, MD. Project: ,22�����dG�s, Sd /r Street (or location):�,o� Contractor:����� Date Installed Wye Sta. On Main TYPE WYEF-52)12- - TYPE DEPTH LAYING LENGTI- IPE C.O. r— 0. Horiz. = Total ST D. 714 J 8 ,9.t.ei/� DROP Slope + Horiz. = To NOTES 1e I Depth of Cleanout S D %o at Flow Line Cleanout 48• O From Layed at 2 `-1c Basement Service SANITARY SEWER LATEF .00*1. CONSTRUCTION REPORT MH /,// /? TO MH/Zd Wye Sta. On Main TYPE EXCAVATION LATERAL LENGTH LAYING LENGTI- Horiz. = Total ST D. So . zs DROP Slope + Horiz. = To Z- e v M H # 1•, V MH# wa Amounts taining to work completed this period, reviewed and approved. B Y� WCSD INSPECTOR CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1964 1"