Loading...
HomeMy WebLinkAboutLat_17918JenniferLaneC, -TON WASHINGTON COUNTY WATER & SEWER DEPARTMENT 16232 Elliott Parkway Williamsport, MD 21795 / (301) 791-3083 V 3 a1 /O I Permit to Connect to Public Water/Sewer System Type of Permit S Permit No. Subdistrict Name MATICANS OH Issue Date 130/ 97 Mainline Contract No. 511 Void Date 10/30/98 Building Permit No. PR307• I)051 Subdistrict No. 150 Permission is hereby given to Property Owner: OMES of address: 7 911 OAK R T DDE DRIVE - M0 21740 For property located at: ` 791-A JENN I FEF 4 LANE Street Address Lot No. Subdiv. MAUGAN MEADOWS Phase Sec. � Owner's Agent: &1 CUSTOM HUMESIN ` Agent's Address: 17911 oAK R:. nGE pa., HA<YER TOWN , NIL` Previous Owner: Fees Paid in Full? Date Fees Paid WCWSD Alloc./Conn. WCWSD/Other City of Hagerstown Remarks Fee $ Fee $ Fee $ Fee $ Total Fee $ When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. Signed: Date: INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 Phone: (301) 791-3070 Inspection Date: Plumbing Inspector: ' l Lateral with Mainline? YES Residential EDLI's i Commercial EDU's $2,050 Gal/Day Allocation Building Number $1 Misc. Number When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. Signed: Date: INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 Phone: (301) 791-3070 Inspection Date: Plumbing Inspector: ' l T°N WASHINGTON COUNTY o00 � °O� WATER & SEWER DEPAR'' 16232 Elliott Parkway Williamsport, MD 21795 NOV 43 1997 RYLNN' (301) 791-3083 �10199ln PERMITS AND Permit to Connect to Public Water/Sewer System INSPECTIONS ( Type of Permit RES SEWEv, Permit No. 150•-1365 Subdistrict Name MAUL n. ­ S / OH Issue Date 97 Mainline Contract No. 511 Void Date --I '� ()/98 Building Permit No. PP.197-2051 Subdistrict No. 150 Permission is hereby given to: Property Owner: I CUSTOM HOMES of address: ' "7911 OAK RIDGE DRIVE 'IERSTOWN MD 21740 For property located at: 17 918 JENNIFER LANE Street Address Lot No. Subdiv. MAUGANS MEADOWS Phase Sec. Owner's Agent: j&J CUSTOM HOMES INC Agent's Address: 17911 OAK RIDGE DR HAGERSTOWN , MD 21744 Previous Owner: Fees Paid in Full? Date Fees Paid WCWSD Alloc./Conn. WCWSD/Other City of Hagerstown_ Remarks 10/30' Fee Fee Fee Fee Total Fee YES When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. 3 ` Signed: 3c '� 5d�:1 \ Date: INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 2 Phone: (301) 791-3070 Inspection Date: Plumbing Inspector: Lateral with Mainline? Residential EDU's _ Commercial EDU's _ $2 , 050 Gal/Day Allocation _ Building Number 1 , 000 Misc. Number ,.i , 050 YES When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. 3 ` Signed: 3c '� 5d�:1 \ Date: INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 2 Phone: (301) 791-3070 Inspection Date: Plumbing Inspector: WASHINGTON COUNTY SANITY DISTRICT WASHINGTON COUNTY, MD. Project: Street (or location): ^ v Contractor: Date Installed 2—/2`24 SANIIARY SEWER LATERAL ••k CONSTI ' ICTION REPORT M H Z� TO MH Wye Sta. On Main of9ZL� WYE SIZE - TYPE DEPTH TYPE EXCAVATION TYPE PIPE C.O. CO. LATERAL LENGTH /4- S T D. Z NOTES: I DROP Depth of Cleanout 2-0 at Flow Line Cleanout/.Tz1 '_ From aaGiW e- Loyed at 2 2 — y/9 - Basement Service MH LAYING LENGTH Horiz. ' Total Slope + Hdriz. = TOM v MHtt Amou s aining to work completed this period. reviewed and approved. 8Y WCSO I SPECTOR CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13. 1984 O