Loading...
HomeMy WebLinkAboutLat_17910JenniferLane�a C" ON CoG WASHINGTON COUNTY 3 WATER & SEWER DEPARTMENT 16232 Elliott Parkway Williamsport, MD 21795 ��7RYL NNS Y IO/p!3/ (301) 791-3083 Permit to Connect to Public Water/Sewer System Type of Permit RES SEWER Permit No. SCP 150-1458 Subdistrict Name MAUL Issue Date 0 57U VV Mainline Contract No. Void Date Building Permit No. - Subdistrict No. 1 Permission is hereby given to: Property Owner: R i C1iARD WILLIS of address: For property located at: - - Lot No.Street Address Subdiv. Phase Sec. Owner's Agent: PRESTIGOUS HOMES if i Agent's Address: C MROAD Previous Owner: Fees Paid in Full? Lateral with Ma' I• ') YES Date Fees Paid WCWSD Alloc./Conn. WCWSD/Other City of Hagerstown Remarks Fee Fee Fee Fee Total Fee In Residential EDU's _ Commercial EDU's _ ' Gal/Day Allocation _ Building Number Misc. Number Y � When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITWjHE PROPERTY OWNER. Signe J Date: INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 Phone: (301) 791-3070 i Inspection Date: _(D • / F Plumbing Inspector: r WASHINGTON COUNTY SANITARY DISTRICT SANITARY SEWER LATERAL WASHINGTON COUNTY, MD. A""- Alk CONSTI'' IrTION REPORT Project: /YJ,9 gw,(aj /�Ztq�o�vS Street (or location):\�:« Contractor:2 T ,,�✓��cfs i 7 �1 Date Installed 7- //- % 41 WYE g/4 4.? NOTES: SIZE - TYPE TYPE PIPE C.O. MH ,111J TO MH ///7 Wye Sta. On Main 2141 �T DEPTH I TYPE I EXCAVATION C.O. LATERAL LENGTH ST D. Z g• O ` IDROP Depth of Cleanout ZZ, e0 -r- -� at Flow Line Cleanout -j . From ge r-I.-n,L Layed at _ a?• / /� Basement Service LAYING LENGTH ; Horiz. • Total i Slope + Hdriz. = Total � N � Z Olt) MH #///,I MH#/// 7 Amounts aining to work completed this period. reviewed and approved. j BY WCSD INSPECTOR CONTRACTORS REPRESENTATIVE I WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13. 1984