HomeMy WebLinkAboutLat_17905JenniferLaneWASHINGTON COUNTY
WATER & SEWER DEPARTMENT
16232 Elliott Parkway
Williamsport, MD 21795
(301) 791-3083
J 5/a3 /° a
�IaoS 07VJ-A-
Permit to Connect to Public Water/Sewer System 1 S
Type of Permit RES SEWER Permit No. SCF 150-1652
Subdistrict Name MAUGANS/OH Issue Date 11/27/01
Mainline Contract No. Void Date 11/27/02
Building Permit No. P2001- Subdistrict No. 150
Permission is hereby given to:
Property Owner: OL
of address: I q
217
For property located at:
Lot No. Subdiv.
Street Address
Phase Sec.
Owner's Agent: OLIVER HOMES
Agent's Address: 19733 LEITERSBURG PIKE HAGERSTOWN MD 21740
Previous Owner:
Fees Paid in Full? YES Lateral with Mainline? YES
Date Fees Paid 11/27/01 Residential EDU's
Fee $ Commercial EDU's
WCWSD Alloc./Conn. Fee $ Gal/Day Allocation
WCWSD/Other Fee $ Building Number
City of Hagerstown Fee $ 1 , 200Misc. Number
Total Fee $ 3, 300
Remarks A FEE DIFFERENTIAL WILL BE CHARGED TO REFLECT
INCREASE IF PROPERTY IS NOT CONNECTED BY THE PERMIT VOID DATE.
When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall
conform with the provisions of Maryland State laws and County policy.
This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS,
STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNFCTFn THFRFwITH RF -
INSPECTION: At least 48 hours notice prior to requested date is required.
ON SITE INSPECTION will be made by: Washington County Plumbing Board
100 W. Washington Street, Room 304
Hagerstown, MD 21740-4727
Phone: (301) 791-3070
c
Inspection Date: ` oz- Plumbing Inspector:
WASH INGTON COUNTY SANITARY DISTRICT SANITARY SEWER LATEF
WASHINGTON COUNTY, MD. A"k CONSTRUCTION REPORT
Project. �y��qq,� �ZC�4elo �J-5
SD /-5--- .S//
Street (or location) : /
c e 17`10
` FE'��
L�yr�
Contractor:
Date Installed % 1.9
MH /// z TO MH
Wye Sta. On Main 6-11- T
WYE SIZE - TYPE DEPTH TYPE EXCAVATION
TYPE PIPE C. 0. C.O. LATERAL LENGTH LAYING LENGTI-
-5b ,e- 0 G
/e)O Horiz. = Total
--ziyP
ST'D. 35S O
NOTES
4.
2-'0
Depth of Cleanout 16.0 at Flow Line
Cleanout -TJ,O From q InL
Layed at Z' / /a
4-x//3' Basement Service
�1�
Slope t Horiz. = To
110-///9
MH
o � MHt#i//3
r N
�ko
41
Amou aining to work completed this period, reviewed and approved.
WCSD INSPECTOR CONTRACTORS REPRESENTATIVE
WASHINGTON COUNTY SANITARY DISTRICT
AUGUST 13, 1984 Fs -