HomeMy WebLinkAboutLat_17818JenniferLaneON � WASHINGTON COUNTY
3 WATER & SEWER DEPART r'
16232 Elliott Parkway /
Williamsport, MD 21795 Y 1 J 5 10
�gRy�rc'�(301) 791-3083 APR 0 12003 rw>s
Permit to Connect to Public Water/sewer System PERMITS AND
IN§PF,.�fONS
Type of Permit RES SEWER Permit No. SCP '--'
Subdistrict Name MAUGAN S / OH Issue Date 03/25/03
Mainline Contract Wo- Date 03/25/04
Building Permit No. P2003-0404 Subdistrict No. 150
Permission is hereby given to:
Property Owner: JL I VER HOMES
of address:
For property located at: 17 818 JENNIFER LANE Street Address
Lot No. 97 Subdiv. MAUGANS MEADOWS Phase Sec.
Owner's Agent: OLIVER HOMES
Agent's Address: 19733 LE I TERSBURG PIKE HAGERSTOWN MD 21740
Previous Owner:
Fees Paid in Full?
YES
Lateral with Mainline?
YES
Date Fees Paid
03/25/03
Residential EDU's
1
Fee $
Commercial EDU's
0
WCWSD Alloc./Conn.
Fee $
$'),800
Gal/Day Allocation
WCWSD/Other
Fee $
Building Number
City of Hagerstown
Fee $
$1,200
Misc. Number
Total Fee $
$4,000
Remarks A
FEE DIFFERENTIAL
WILL BE CHARGED TO REFLECT
ALLOCATION FEE
TWr1VWMg7
TP PPnPF:RTY IS NOT CONNECTED
BY THE PERMIT
VOID DATE.
When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall
conform with the provisions of Maryland State laws and County policy.
This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS,
STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE-
MAINS W211�FHE PROPERTY OWNER.
. I1
Date: � / -C �/ _0
INSPECTION: At least 48 hours notice prior to requested date is required.
ON SITE INSPECTION will be made by: Washington County Plumbing Board
100 W. Washington Street, Room 304
Hagerstown, MD 217404727
Phone: (301) 791-3070
tai
Inspection Date: q. 2 Plumbing Inspector:
WASHINGTON COUNTY SANITARY DISTRICT
WASHINGTON COUNTY, MO.
Project: nI5 MAa a w S 5 DJ S b I/
)
Street (or location
7Y1� �� /t F2� %,� 01 a 9 7
Contractor: je:t
�' o tq 7'i4 t7`irf
Date Installed -1" Te -91
WYE
V(/c
5042-35
$„)(UuX $
NOTES:
S IZE - TYPE
TYPE PI PE
(C 0.
&
Sv�2-2 &
f�yass
SANITARY SEWER LATERAL
CONSTRUCTION REPORT
MH,j i�— TO MH 5��/2
Wye Sta. On Main °' `'S �T
DEPTH TYPE EXCAVATION
CC LATERAL LENGTH
ST'D. I -� q L.r
RM
Depth of Cleanout 6 v% 7r�df' at Flow Line
Cleanout 2J. r From �- A-7 A 1 y CjN'P
Layed at -1
Basement Service
MH 4 Sal -F-111-5
LAYING LENGTH
Horiz. s Total
-2 y Lr-,
Slope + Horiz. = TWO
MH#
Amounts pertaining rtainin to work completed this period, reviewed and approved.
BYWCSD INSPECTOR CONTRACTOR'S REPRESENTATIVE
WASHINGTON COUNTY SANITARY DISTRICT 7S-2
AUGUST 13, 1984