HomeMy WebLinkAboutLat_18506OldColonyLane1VYASHINGTON COUNTY SANITARY DISTRICT
33 W. WASHINGTON STREET HAGERSTOWN, MARYLAND 21741-0571 (301) 791-3083/3084
P.O. BOX 571
PERMIT TO CONNECT TO PUBLIC SEWERAGE/WATER SYSTEM
Permission is hereby given to: uE t` a •1 U il� - L u
PERMIT NO.
DATE
SUBDISTRICT i`0 16
Maugansvi l le/orchard Hills
For Property Located at: 1308 O l d C 0 l 0 oy !_ l
Owned by: He'r'ald P oomey Address: 1308 Old Cq,p-,iy Lane. -iugers .�jin
Type of Connection: To Service Connection To Main Line:
Type of Service: Residential
Commercial
Meter Size
) Units Other
Industrial
Connection Fee c ) s J Date Paid
To connect to a public sewerage/WXtt4r system (with proper abandonment of previous private system). The installation
of the connection and the abandonment of the previous private system shall conform with the provisions of the
Laws of the State of Maryland and Washington County Sanitary District Specifications.
This permit does not supersede any local ordinance that is in effect with regards to road cutting, etc.
ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPON-
SIBILITY CONNECTED THEREWITH REMAINS WITH THE PROPERTY OWNER.
dater, Account Not Known
6d il
Secretary -Treasurer
Building Permit No. 12�vl J✓�
INSPECTION: At least 48 hours notice prior to requested date of inspection is required.
ON SITE INSPECTION will be made by: Washington County Plumbing Board
Permit Fee
Final Inspection Made BY
33 W. Washington Street
Hagerstown, Maryland 21740
Telephone: 791-3146
Date
Plumbing In ector
OFF-SITE INSPECTION (in Public Rights -of -Way and Easements) and certain
ON-SITE INSPECTION in accordance with applicable approved construction drawings will be made by:
Washington County Sanitary District
33 W. Washington Street-P.O. Box 571
Hagerstown, Maryland 21741-0571
Final Inspection Made By:
DISTRIBUTION: Permittee i Plumbing Board 3
Date
Field ) Office 1 City of Hag 1
WASHINGTON COUNTY SANITAR'. ISTRICT SANITARY SEWER LATU
WASHINGTON COUNTYr MO. CONSTRUCTION REC(►it1,
Project: Mauganeville/0rchard Hills Sanitary Sewerage Collection Systgm
Street (or location): ,- o4,o 7o
Contractor:_ Lisbon Contractors. Inc.
Date Installed 6 2 -7 SO -1
MH 5 TO MH 5-Z 7
Wye Ste. On Main „"- `IE. 7 l-�t-
WYE
SIZE
—_EXCAV.
TYPE PIPE
.0 .O.
coos
LATERAL
LENGTH
LAYING
LENGTH
$xCc x�^
C "snr� z;
1�V
_
*Horz.• To .al
v c
t
St' d.
!'
i
Slope ♦ oft-
Drop
•Z0 �F
a,?Z4 i'l7s =
NOTES:
/ 7, (0 -r I-F,
2'5ruA
Depth of Cleanout 6, Vlow Line .`
Cleanouti= _ From of r,1�1•v4„v
Layed 0 2, 9�
Basement Service
MHS
Amounts pertaining to work completed this
9 Y
_v
WCSD
Inspector
5ra MN# s z
per.&od, reviewed and approved.
;;�-7; ZeL41�,-
ontrac or• Rep.
C,
Washington County Sanitary District
pool, SEWER SERVICE LOCATION
Subdistrict No. SD#15
Contract No. SD15- 3-S
Property Address: 1 8 Old Colony Lane
ISH 526 to MH 527_ DWG. #601-320
Place an 'X' in the sketch below to indicate where the property
owner wants the service connection (lateral) to enter the
property. Place a wooden stake in the ground at that location.
Ob
O
` � t
1 �J
707 6
(1308)
(
/W _-1 •�
DMH SD15-52 3
_ 7 SAN MH SD15 :
cc?
R//
The undersigned agrees that the Sanitary District may
excavate an additional five (5) feet inside the property
line so as to facilitate, and make less expensive, the owner's
connection to the lateral and to prevent damage to the cleanout
which will be installed by the District at or near the property
line.
Date: 4ZqZ83
Attest:
Wash. Co. Sanitary Di_str
(Form WCSC-1)
Replaces Form WCSC-56