HomeMy WebLinkAboutLat_19716MarigoldDrive.°N WASHINGTON CO JV
3 WATER & SEWER DEPNM71E-4b
16232 Elliott Parkway SEP 0 7 2001
Williamsport, MD 21795 y J��dy
�Ry�rN J
t (301) 791-3083
PERMITS AND
Permit to Connect to Public Water/Sewer System INSPECTIONS
Type of Permit RES SEWER Permit No. SCP 150-1626
Subdistrict Name MAUGANS/OH Issue Date 09/04/01
Mainline Contract No. Void Date 09/04/02
Building Permit No. Subdistrict No. 1
Permission is hereby given to: / G /
Property Owner: OLIVER HOMES f / / (4,,
of address: 19733 LEITESBURG PIKE
HAGERS` OWN Hu ZZ/4U
For property located at: MARIGOLD DRIVE Street Address
Lot No. 62 Subdiv. NORTHBROOK ESTATES Phase Sec. B
Owner's Agent: OLIVER HOMES
Agent's Address: 19733 LEITERSBURG PIKE HAGESTOWN MD 21740
Previous Owner:
Fees Paid in Full? YES Lateral with Mainline? YES
Date Fees Paid 09/04/01 Residential EDU's
Fee $ Commercial EDU's
WCWSD Alloc./Conn. Fee $ Gal/Day Allocation
WCWSD/Other Fee $ Building Number
City of Hagerstown Fee $ $1,200 Misc. Number
Total Fee $
Remarks A FEE DIFFERENTIAL WILL BE CHARGED
INCREASES IF PROPERTY IS NOT CONNECTED BY THE PERMIT VOID UATZ.
When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall
conform with the provisions of Maryland State laws and County policy.
This permit does not supersede any local ordinance that is in effect withregard to road excavationg, ptuhtbing permits, etc. ALL OTHER PERMITS,
STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE-
MAINS WITH TliF. PROPERTY OWNER.
Signed: Date: 0 c9
INSPECTION: At least 48 hours notice prior to requested date is required.
ON SITE INSPECTION will be made by: Washington County Plumbing Board
100 W. Washington Street, Room 304
Hagerstown, MD 21740-4727
Phone: (301) 791-3070
Inspection Date: "7./L�� Plumbing Inspector: '
WASHINGTON COUNTY SANITARY DISTRICT
WASHINGTON COUNTY, MD. ,.
Project:
Street (or location):—
Contractor:�,� �T�.�'►/�/!G �a.v/,�5
Date Installed S- d 2 - 256-'
WYE SIZE - TYPE DEPTH TYPE
TYPE PIPE c. 0. C.O. LATERAL
�x� S
SANITARY SEWER LATERA
CONSTRUCTION REPORT
MH ! l 70 TO MH / L�
Wye Sta. On Main Q *
EXCAVATION
LENGTH LAYING LENGTH
Horiz. - Total
06. '5' 1 31'd -
Slope
1.d
Slope + Horiz. 2 Tota
NOTES: I DROP
Depth of Cleonout 7 at Flow Line
Cleanout-� </= From
Layed at 2 �d
Basement Service
M H 4//T0 M H 11/1.71
Amounts pertaining to work completed this period, reviewed and approved.
BY
WCSD 14eoPEC R ONTRACTOR'S REPRESENTATIVE
WASHINGTON COUNTY SANITARY DISTRICT
AUGUST 13, 1984