HomeMy WebLinkAboutLat_19708MarigoldDriveWASHINGTON COUNTY
3 WATER & SEWER DEPARTMENT
16232 Elliott Parkway
Williamsport, MD 21795
ARYLnN
(301) 791-3083
Permit to Connect to Public Water/Sewer System
Type of Permit RE: SEWER Permit No. SCP 150-1376
Subdistrict Name eIA.U+;ANS "OH Issue Date 04/24/98
Mainline Contract No. 566 Void Date 04/24/99
Building Permit No. PRJ98-0497 Subdistrict No. 150
Permission is hereby given to
Property Owner: JOHN R. OLIVER
of address: 19733 LE I TERSBURCy P 1 XE
1ii-GERSTOWN MD ''114v
For property located at: 1.9708 AMAR 1 GOLD DRIVE Street Address
Lot No. Subdiv. NiORTHBROOK ESTATI NF Phase Sec.
Owner's Agent:
JOHN R OLIVER CO
INC
Agent's Address:
i 97 3 3 LE I TERSBURG
PIKE HAGER51C's Ij ki.
Previous Owner:
Fees Paid in Full?
Z E S
Lateral with Mainline?
Date Fees Paid
-.,4/24/93
Residential EDU's
Fee $
Commercial EDU's
WCWSD Alloc./Conn.
Fee $
$2 , 050
Gal/Day Allocation
WCWSD/Other
Fee $
Building Number
City of Hagerstown
Fee $
$1 , 000
Misc. Number
Total Fee $
$.3,05C -
Remarks
When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall
conform with the provisions of Maryland State laws and County policy.
This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS,
STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE-
MAINS WITH THE PROPERTY OWNER.
Signed:
Date:
7• v
INSPECTION: At least 48 hours notice prior to requested date is required.
ON SITE INSPECTION will be made by: Washington County Plumbing Board
100 W. Washington Street, Room 304
Hagerstown, MD 21740-4727
Phone: (301) 791-3070
Q z/�� �
Inspection Date: �� Plumbing Inspector.
MAY 21 1y�� i
Wp11N SEWER DEPT.
WADER
WASHINGTON COUNTY SANITOW DISTRICT
WASHINGTON COUNTY, MO.
A*k SANITARY SEWER LATERAL
CONSTRUCTION REPORT
Project:
*of{Tti t3�o�/� L-STRT�s Ca//YJ��
SX1Te +K
s _ilo -s 66
Street (or
location):
1-
l l pTQY
C.O.
Contractor:
fa. yct7rodIf Co„Ti ac?,tl
LENGTH
Date Installed 3 y— q-2,
MH �i>�Y TO MH //6 9
Wye Sta. On Main 0-90 GT
WYE
SIZE -
TYPE
DEPTH
TYPE
EXCAVATION
TYPE PIPE
C.O.
CO.
LATERAL
LENGTH
4 y
CayT
Fv C.
W "rg"a ,
S
ST D.
r L F
NOTES:
DROP
I
Depth of Cleanout at Flow Line
Cleanout 3 a c F From 41 tic ►'N
Layed at 7- O/o
/V u Basement Service
MH # /13-`/
LAYING LENGTH
Horiz. = Total
r{0( -C
Slope + Horiz. = Tota.
M H# i/6 q
Amounts pertaining t work completed this period, reviewed and approved.
BY P tv :.
WCSD INSPECTOR CONTRACTORS REPRESENTATIVE
WASHINGTON COUNTY SANITARY DISTRICT
AUGUST 13, 1984
S-2