Loading...
HomeMy WebLinkAboutLat_19708MarigoldDriveWASHINGTON COUNTY 3 WATER & SEWER DEPARTMENT 16232 Elliott Parkway Williamsport, MD 21795 ARYLnN (301) 791-3083 Permit to Connect to Public Water/Sewer System Type of Permit RE: SEWER Permit No. SCP 150-1376 Subdistrict Name eIA.U+;ANS "OH Issue Date 04/24/98 Mainline Contract No. 566 Void Date 04/24/99 Building Permit No. PRJ98-0497 Subdistrict No. 150 Permission is hereby given to Property Owner: JOHN R. OLIVER of address: 19733 LE I TERSBURCy P 1 XE 1ii-GERSTOWN MD ''114v For property located at: 1.9708 AMAR 1 GOLD DRIVE Street Address Lot No. Subdiv. NiORTHBROOK ESTATI NF Phase Sec. Owner's Agent: JOHN R OLIVER CO INC Agent's Address: i 97 3 3 LE I TERSBURG PIKE HAGER51C's Ij ki. Previous Owner: Fees Paid in Full? Z E S Lateral with Mainline? Date Fees Paid -.,4/24/93 Residential EDU's Fee $ Commercial EDU's WCWSD Alloc./Conn. Fee $ $2 , 050 Gal/Day Allocation WCWSD/Other Fee $ Building Number City of Hagerstown Fee $ $1 , 000 Misc. Number Total Fee $ $.3,05C - Remarks When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. Signed: Date: 7• v INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 Phone: (301) 791-3070 Q z/�� � Inspection Date: �� Plumbing Inspector. MAY 21 1y�� i Wp11N SEWER DEPT. WADER WASHINGTON COUNTY SANITOW DISTRICT WASHINGTON COUNTY, MO. A*k SANITARY SEWER LATERAL CONSTRUCTION REPORT Project: *of{Tti t3�o�/� L-STRT�s Ca//YJ�� SX1Te +K s _ilo -s 66 Street (or location): 1- l l pTQY C.O. Contractor: fa. yct7rodIf Co„Ti ac?,tl LENGTH Date Installed 3 y— q-2, MH �i>�Y TO MH //6 9 Wye Sta. On Main 0-90 GT WYE SIZE - TYPE DEPTH TYPE EXCAVATION TYPE PIPE C.O. CO. LATERAL LENGTH 4 y CayT Fv C. W "rg"a , S ST D. r L F NOTES: DROP I Depth of Cleanout at Flow Line Cleanout 3 a c F From 41 tic ►'N Layed at 7- O/o /V u Basement Service MH # /13-`/ LAYING LENGTH Horiz. = Total r{0( -C Slope + Horiz. = Tota. M H# i/6 q Amounts pertaining t work completed this period, reviewed and approved. BY P tv :. WCSD INSPECTOR CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1984 S-2