Loading...
HomeMy WebLinkAboutLat_19703MarigoldDrivey.�CIT °N c°2 WASHINGTON COUNTY WATER & SEWER DEPARTMENT 16232 Elliott Parkway / J Williamsport, MD 21795 / '�RYLwN (301) 791-3083 Permit to Connect to Public Water/Sewer System Type of Permit Subdistrict Name _ Mainline Contract No. Building Permit No. Permission is hereby given to: Property Owner: of address: Permit No. _ Issue Date _ Void Date _ Subdistrict No. For property located at: ART -GOLD DRIVE Street Address Lot No. Subdiv. N1DRThBF.0-,_;: ESTATES Phase Sec. Owner's Agent: 7L i V ER iu Agent's Address: i:,;F ` ' R ✓nUR r i 'HAC=ERSTO WN MD 17 q Previous Owner: Fees Paid in Full? Date Fees Paid Fee $ WCWSD Alloc./Conn. Fee $ WCWSD/Other Fee $ City of Hagerstown Fee $ Total Fee $ Remarks Lateral with Mainline? Residential EDU's J_ Commercial EDU's Gal/Day Allocation Building Number Misc. Number When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. -A,j,,_ Date: INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Boats 100 W. Washington Street, Room 3 Hagerstown, MD 21 740-4 72 7 Phone: (301) 791-3070 Inspection Date: `' -% Plumbing Inspector: WASHINGTON COUNTY SANITARY DISTRICT WASHINGTON COUNTY, M- AL Project: Neffrh lS,tiik Ac 574Qr.s G//�cTroa y YsT+�,-s'—rio-6 Gb Street (or location): Contractor: Date Installed SANITARY SEWER LATE= CONSTRUCTION REPORT MH//S �_ TO MH /,/6 `l Wye Sta. On Main of"y WYE SIZE - TYPE DEPTH TYPE EXCAVATION TYPE PIPE C.O. C.O. LATERAL LENGTH 410-1 c acs r PUG rxoV, s , 8�x IV At 5�,�-� 6 oxtss ST D. 3 0 LF NOTES 13 M Depth of Cleanout at Flow Line Cleanout 15 L.F. From `ria;, 4/;VE Loyed at 2. 1/0 IVO Basement Service 0+/447- M +/4RTM H LF LAYING LENGTF Horiz. = Total q5- LF Slope + Horiz. = To MHS //6y Amounts ��rttaining t ork completed this period. reviewed and approved. B Y / IF �✓ WCSD INSPECTOR CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1984 IT