Loading...
HomeMy WebLinkAboutLat_19669MarigoldDriveM ' PERMIT 1283 completed WASHINGTON COUNTY ENGINEERING DEPT. County Administration Building OOW 100 W. Washington Street, Room 334 Hagerstown, Maryland 21740-4727 (301) 791-3133 PERMIT TO CONNECT TO PUBLIC WATER/SEWER SYSTEM PRJ95-2007 Permit Type: SANITARY SEWER HOOK-UP Permit No: SAN95-0165 Application Date: 10/18/1995 Expiration Date: 10/12/1996 Sanitary No: Subdistrict No: 15 Sanitary Name: MAUGANSVILLE ORCHARD HILLS Permission is hereby given to: Property Owner: OLIVER JOHN R CO INC 19733 LEITERSBURG PIKE HAGERSTOWN , MD 21742 For property located: 19669 MARIGOLD DRIVE HN Lot No: 20 Subd: NORTHBROOK ESTATES Phase: Sect: WCSD Dist/Coll System: $ 2,050.00 Lateral W/Mainline (Y/N): Y WCSD Ready to Serve: $ .00 Residential EDU's: 1 WCSD $ .00 Commercial EDU's: City of $ .00 Gal/Day Allocation: 0011, TOTAL FEE DUE: $ 2,050.00 Utility No: TOTAL PAYMENTS: $ 2,050.00 BALANCE DUE: $ .00 Comments: CITY READY TO SERVE FEE PRE -PAID 9-31-91 $420. PROPERTY OWNER/PLUMBER MUST CONTACT D. ENGLE AT 223-9416 TO SCHEDULE THE SEWER SERVICE INSTALLATION. ************************************************************************* When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and the Washington County Sanitary District. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND SaONS;BILITY C011TNECTEp THEREWITH REMAINS WITH THE PROPERTY OWNER. Signature Date o INSPECTION: AT LEAST 48 HOURS NOTICE IS REQUESTED PRIOR TOEOON� ON-SITE spection will be made by Washington Co. Plumbing e C Phone .._ art 1 1• tIlU I.b Plumbing Inspe or Inspection Dai'?'"Bila SITE INSPECTION (In Public Rights of Way & Easements) by Washington Cc,unty Sanitary District. Phone: (301) 223-9416 WCSD Inspector (Lateral) Inspection Date WCSD Inspector (Connection) Inspection Date Pc�-iect No: PRJ95-2007 Status: AcL ity No: 95-6782 Applied: Permit Type: RES -NEW Approved: Job Address: 19669 MARIGOLD DRIVE HN Location: S-91-54 19669 MARIGOLD DRIVE Parcel No.. 038-02-0860-00020 Zoning Dist: RS RESIDENTIAL SUBURBAN Applicant: OLIVER JOHN R CO INC Phone Number: 19733 LEITERSBURG PIKE HAGERSTOWN , MD 21742 Owner: OLIVER JOHN R CO INC 30 Contractor: OLIVER JOHN R CO INC Description: 1 STORY DWELLING, FULL BASEMENT, 1 -CAR GARAGE, FRONT PORCH, NO CHIMNEY NORTH BROOK ESTATES, LOT #2 PENDING Oct 05, 1995 To: Initial Copy Va_ tion: S81,000.00 Construction Type: STIC Foundation Size: 26 X 44 Exterior Finish.: VINYL SIDING Air Conditioning: Y Type of Heat...: HEAT PUMP Septic........... Public Sewer.... Y Time Existed.. Public Water.... Y Well.............D Gas ............. Time Existed..: --- Electric........ Y &b6 ""S New Baths: 1 New Bedrooms: 002 P�A . New Units: �� SETBACKS Proposed Minimum by Ordinance � 0, Lot Tract Area .304 ACRES 10,000 SQ FT Lot Area Per Family 304 ACRES 10,000 SQ FT Front Yard Setback 52.00 25.00 L,�) rY►�� Rear Yard Setback 55.00 40.00 Left Side Setback 12.00 8.00 Right Side Setback 15.00 8.00 Lot Width .00 .00 The signature below by the reviewer is an indication that the applicant has signed the permit application signature sheet and thereby agrees to perform the work in accordance with the conditions of this permit. REVIEWED �D co D C'v � O /' �-•_ O o✓ c/4/ \G • • x\42. SO. �4j gg• 38• � . �/' u, /•_ Jy.+�'(;.' :)'1p.r; 'fEr:i:•.v ♦�y ';�J' �� •..;= ., s VL:.el, •y'•.� �• �+.µ.l• 1141 �'���, ...►t,�..:•�'i� i�.S-T�;W���1x��Y��•;i;�i�•ri�'i�'�'.4:r.!'�.'.. Y=" - `r• •j• WASHINGTON COUNTY SANITA#W DISTRICT WASHINGTON COUNTY. MD. INWW SANITARY SEWER LATERAL CONSTRUCTION REPORT Project: NosTh f3/tO4X ES TafCs C.11.2.2"Sys r--,-s-.sem-s-� G Street (or location) : s -n aR�Go�D 0�4«� 'L°rte 20 Uzi Contractor: A.Y6r'arc•;//�7`3 Date Installed MH 114-7 TO MH //j Wye Sta. On Main o1 z Z -7 - WYE SIZE - TYPE PIPE TYPE C.O. DEPTH C.0. TYPE LATERAL EXCAVATION LENGTH LAYING LENGTH 6" y 34Pae--24 casr ST 0. Horiz. ' Total Slope t Horiz. = Tota. NOTES. DROP Depth of Cleanout at Flow Line Cleanout 17 1-,' From A -M A;" 6/ V'C Layed at '--°/d NO—Basement Service Lar tI Ler azo J Orr. LT MH # // 67 Amounts pertaining to work completed this BY `'•wrfz� WCS O INSPECTOR V MH# period, reviewed and approved. CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13. 1984 FS -2