Loading...
HomeMy WebLinkAboutLat_19665MarigoldDriveWASHINGTON COUNTY 3_ WATER & SEWER DEPARTMENT 16232 Elliott Parkway �1RY rN� Williamsport, MD 21795 (301) 791-3083 Permit to Connect to Public Water/Sewer System Type of Permit Subdistrict Name _ Mainline Contract No. Building Permit No. t� Permission is hereby given to: Property Owner: of address: For property located at: Lot No. — Subdiv J Permit No. _ Issue Date _ Void Date _ Subdistrict No. SQ --1292 Street Address Phase Sec. r Owner's Agent: _= N P OLIVER ^nmtAmv' Agent's Address: TEE FS£L." Previous Owner: Fees Paid in Full? Lateral with Mainline? Date Fees Paid Residential EDU's Fee $ Fee $ �' Commercial EDU's WCWSD Alloc./Conn. WCWSD/Other Fee $ Gal/Day Allocation City of Hagerstown Fee $ Building Number Misc. Number Total Fee $ 77 . .7_ Remarks - i - . r L � . ., J When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. Signed: INSPECTION: At least 48 hours notice prior to requested date is required ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 Phone: (301) 791-3070 `a Inspection Date: O%/f �j Plumbing Inspector: EJUN 1996 WASHINGTON COUNTY SANITJJW DISTRICT WASHINGTON COUNTY, MD. ..*, SANITARY SEWER LATERAL CONSTRUCTION REPORT Project: /VegT,� IIr,a/� C-sT,,T,s Co//{cTiS-iso-s-d� Street (or location): AfRff1G01-y 9 Contractor: �� )Lt/Evi//£ GTra cT.r j / �66S Date Installed Z - -L u- aZ WYE SIZE- TYPE DEPTH TYPE PIPE C.O. CO. 1111 casr fav c z'�a 5 NOTES: MH //c ? TO MH //d s Wye Sta. On Main o --re 4 r - TYPEI EXCAVATION LATERAL LENGTH ST 'D. 3z CJC DROP Depth of Cleanout at Flow Line Cleanout /7 4 4 From Ma Layed at Z °/o Nb Basement Service MH #P /!67 LAYING LENGTH Horiz. = Total 27 LF Slope + Horiz. = Tota MH ## //a f Amounts pertaining to work completed this period, reviewed and approved. BYE �i�w WCSD INSPECTOR CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1984 S-2