HomeMy WebLinkAboutLat_19634MarigoldDrive�T°N
o WASHINGTON COUNTY
3 = WATER & SEWER DEPARTMENT
16232 Elliott Parkway
' Williamsport, MD 21795
(301) 791-3083
Permit to Connect to Public Water/Sewer System 'v
Type of Permit RES SHEW EF
Subdistrict Name MAUGNAS 0H
Mainline Contract No.
Building Permit No, P2001-0237
Permit No. SCR 150-1503
Issue Date 02722701
Void Date 02122702
Subdistrict No.
Permission is hereby given to:
Property Owner: OLIVER HOMES
of address: 19733 LEITERSBUT7,3 PIKE
HAGERSTOWN MD 21140
For property located at: 19634 MARIGOLD JJX:VZStreet Address
Lot No. ` J Subdiv. Phase Sec.
Owner's Agent: OLIVER HOMES
Agent's Address: 1='7313 LEITERSRL IKE .. _Y... DWN Z1140
Previous Owner:
Fees Paid in Full? YES Lateral with Mainline? yESO
Date Fees Paid 0 2 ' 2 % ` `1 Residential EDU's
Fee $ Commercial EDU's
WCWSD Alloc./Conn. Fee $ Gal/Day Allocation ~
WCWSD/Other Fee $ Building Number
City of Hagerstown Fee $ ~ - ° Misc. Number
Total Fee $
Remarks Iz ) 1IS 0 KZL-1=1 1=0k-;,ft1i0N FEE .
When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall
conform with the provisions of Maryland State laws and County policy.
This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS,
STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE-
MAINS WITH THE PROPERTY OWNER. i
Date: 2 Z O
INSPECTION: At least 48 hours notice prior to requested date is required.
ON SITE INSPECTION will be made by: Washington County Plumbing Board
100 W. Washington Street, Room 304 /
Hagerstown, MD 217404727
`1 Phone: (301) 791-3070 ,
Inspection Date: �7 (9y� Plumbing Inspector: /
WASHINGTON COUNTY SANITLA,RY DISTRICT
WASHINGTON COUNTY, MD.
Project: A'/ -j, Driorg L'.STN**S callic-ri'h -syu t -m S-iro-i 66
Street (or location): Mari 6atJ Df fv-e
Contractor: f a. Y0/760i/lE C a-,Trsr.7'ars `3
Date Installed I - l i - q -L
SANITARY SEWER LATERAL
CONSTRUCTION REPORT
MH 1163 TO MH 6'y
Wye Sia. On Main 0' 47-
WYE
r
WYE
SIZE-
TYPE PIPE
TYPE
C.O.
DEPTH
C.O.
TYPE
LATERAL
EXCAVATION
LENGTH
LAYING LENGTH
y
c " r
Itq0„
'D.
Horiz. = Total
f
ST
t
gA ss
Zx. 3 L. -C
Slope + Horiz. = Tota
NOTES:
DROP
Depth of Cleanout at Flow Line
Cleanout /Z 3 From MWn 4i�✓�
Layed at °/o
/Vd Basement Service
1-1� -
MH # /i`3
v
MH# //6y
Amounts pertaining to workcompleted this period, reviewed and approved.
BY �/ awi t G�
WCSD INSPECTOR CONTRACTORS REPRESENTATIVE
WASHINGTON COUNTY SANITARY DISTRICT
AUGUST 13, 1984 FS - 2