Loading...
HomeMy WebLinkAboutLat_19329LongmeadowRoadWASHINGTON COUNTY SANITARY DISTRICT PERMIT NO. __U! 33 W. WASHINGTON STREET HAGERSTOWN, MARYLAND 21741-0571 (301) 791-3083/3084 DATE P.O. BOX 571 SUBDISTRICT!vO. ? =�u�i�anstril7_e�� PERMIT TO CONNECT TO PUBLIC SEWERAGEX111iAR SYST�(� -T ; Permission is hereby given to: For Property Located at: 1 WeSt -Long{ meadow Road Owned by: ReynoldS Address: 4 ''IGi1gmeadOW Road, )iary `.'"5'lo'd11, +1)? Type of Connection: To Service Connection Type of Service: Residential Commercial Meter Size Connection Fee Units To Main Line: Other Industrial Date Paid To connect to a public seweragelw/XDer system (with proper abandonment of previous private system). The installation of the connection and the abandonment of the previous private system shall conform with the provisions of the Laws of the State of Maryland and Washington County San itary,District Specifications. This permit does not supersede any local ordinance that is in effect with regards to road cutting, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPON- SIBILITY CONNECTED THEREWITH REMAINS WITH THE PROPERTY OWNER. Secretary -Treasurer f 1� Building Permit No. INSPECTION: At least 48 hours notice prior to requested date of inspection is required. ON SITE INSPECTION will be made by Washington County Plumbing Board 33 W. Washington Street Hagerstown, Maryland 21740 Telephone: 791-3146 Permit Fee �•�% Final Inspection Made BY: Date Plumbing In ector OFF-SITE INSPECTION (in Public Rights -of -Way and Easements) and certain ON-SITE INSPECTION in accordance with applicable approved construction drawings will be made by: Washington County Sanitary District 33 W. Washington Street-P.O. Box 571 Hagerstown, Maryland 21741-0571 Final Inspection Made By: DISTRIBUTION: Permittee 1 Plumbing Board 4 Field Offic Date WASHINGTON COUNTY SANITARY DISTRICTSANITARY SEWER 1. la 1 t ="nNSTRUCTION RICK-` WASHINGTON COUNTY, MO. Project: Maugsnsville/Orchard Hills Sanitary Sewerage Collection System ,g3Aci Street (or location) : a - 1��0 L0AJ&MCA QLA. ��•-^�} ? Contractor: Lisbon Contractors Inc. MH_ � TO MH �D 2 Date Installed 20Wye Ste. On Main �f V f-ir. _-----TYPE-- DEPTH YP EXAU. LAYIUG SIZE TYPE PIPE C.O. C.O. LATERAL LENGTH LENGTH 0".5©mZGpvc. cAsr *Harz.= Tota -L IAOAJ 5.70 V, 9. S t' d . / lus�x�" ;Slope+ Harz=Iota Drop37 4 �• �• NOTES: -f3o,33=3�.3� L.F• 1 u) L (o "5i7R 'L (o PRIG. '1 45� t3eRd� Depth of Cleanout 5 -70v -on:. ®Flow Line Cleanout 33.4' F ram ( "Ai&j L a y e d Q --az— S—% A J=7'e5g" E) A -Z 0 Basement Service MH# r.'Curb•--- q.5'cOINK- .s w. • 2 " S'rur� MH# i ?3 Amounts p ;staining to work completed this period, reviewed and approved. By UCSO Insp ctor Contractors Rep. (c--.— i.ircr_n 1 FAICE Washington County Sanitary District SEWER SERVICE LOCATION Subdistrict No. SD#15 Contract No. SD15- 3-S Property Address: A- I n0qMin=rjntj Road ISH 1031 to MH 1032 DWG. #601-368 Place an 'X' in the sketch below to indicate where the property owner wants the service connection (lateral) to enter the property. Place a wooden stake in the ground at that location. The undersigned agrees that the Sanitary District may excavate an additional five (5) feet inside the property line so as to facilitate, and make less expensive, the owner's connection to the lateral and to prevent damage to the cleanout which will be installed by the District at or near the property line. Date:%�/���3�/�ia.•�J,r.�o/(P�i�c+ w r y/ w r Attest: Wash. Co. Sanita District (Form WCSC-1) Replaces Form WCSC-56 6AT 4 1000 WASHINGTON COUNTY SANITARY DISTRICT 33 West Washington Street, Hagerstown, Maryland 21740 ■ (301) 791.3083 To: Lisbon Contractors, Inc. I hereby request the contractor to install the lateral in accordance with the following conditions: 4 FE ' A-- (- lr OR�WTV Address_ 2cp q Signed. czV(L4!1:Q2`X oper y e Date iZ— Washington County Sanitary District 33 West Washington Street Hagerstown, Maryland 21740 Re: Maugansville/Orchard Hills Sewers Contract No. SD15-3-S Gentlemen: We hereby request permission to install the house lateral of greater than two (2) percent and/or in accordance with the above conditions at no change in contract price at the following location: Requested by Lisbon Contractors, Inc. Approved by W.C.S.D. Inspector tpeyue Ctf.Em%�6 Date lZ 4—&e= WASHINGTON COUNTY SANITARY DISTRICT WASHINGTON COUNTY, MO. SANITARY SEWER Llai t INSTRUCTION REC(ii,'' Project: Maugsnsville/Orchard Hills Sanitary Sewerage Collection System i�3ael Li L -A Street (or location) . • Contractor: Lisbon Contractors, nc Date Installed /9 N4A - 64 MH 1031 TO MH y032 Wye Ste. On Mein 7__2R• PE DEPTH i TFL L.^%.ri V . SIZE TYPE PIPE C.0 C.O. LATERAL LENGTH LENGTH *Hort.= Total ope + Horz=j Drop NOTES: i HAW •. cna 7/ R,/G- • 'STUB f; CLIA' Depth of Cleanout 7..3ZZ v.9 ®Flow Line Cleanout 2t,5' f ram- HA1N L a y a d 0 :'•5 °� poss./ice 8asoment Service MH# 1031 �•• O IF, r'A/L MH# /c230- -, & C uR8 L G O 2'STUSLCAI3 - Amounts p• ining to work completed this period, reviewed and approved. 8Y D Insp ctor Contractors Rep.