HomeMy WebLinkAboutLat_19117LongmeadowRoadWashington County Sanitaryo*A strict
Washington County, Md.
L
,.� SANITARY SEWER LATERAL
CONSTRUCTION RECORD
Project: SD6-1-S Fountainhead
Street (or location): � _ L0N6) MEADOW ffoA> MH p72- to MH 873
Contractor: Corson and Gruman Company
P. L,. EN(sLG , Inspector
Depth of Cleanout -7.0 @ Flow Line
Cleanout 37' From —r MAIN
Layed @ �a
qeS Basement Service
MH # d? 2
op. Amounts pertaining to work completed this period, reviewed a roved.
By ..�CQM,,..w.�
WCSD nspec or Orson & ruman uper7nte en
(Form WCSC - 4)
MH # 07g
ell, i (SSTM.bG)
MUMWashington County Sanitary District
SEWER SERVICE LOCATION
APR I919 SD -6
Subdistrict No.
WA51 �VzI TCN CO. Contract: SD6-1S
SANITARY DIST. ►
Property Address: 4 onameadow Road /Pi -H 069 awe 1 of 70
X072 07Z_-07_2) A
Place an 'X' in the sketch below to indicate where the property
Plnera
wants the service connection (lateral) to enter the property.
wooden stake in the ground at that location.
�, i }f�4�• 4-
i ' ` m 12" C,M
ao
, V)
Mac.
ID
�2 t91 C! P'4Ex. 8" %Va+e.r - 11
CJ0
072 j
The undersigned agree that the Sanitary District may excavate for
the lateral a total of ten (10) feet inside -the property line at the
location indicated above, said ten (10) feet to include five (5) feet of
lateral installation beyond the cleanout, plus an additional five (5) feet
of excavation beyond the terminus of the lateral to facilitate, andmake
less expensive, the owner's connection to the lateral and to prevent
damage to the lateral installed by the District in those areas where
rock is encountered. q
Date:
ner
n Owner
Attest:
Wash. Co. Sanitary District
(Form WCSC-56) NOTE: A side entry from Keener Road would mean that we would (110878)
have to dig our line through the two laterals on our present
Gpnm n gvgtPm. we must make entry from Long Meadow Road to the front.