Loading...
HomeMy WebLinkAboutLat_13324HighlaneStreetdASHINGTON COUNTY SANITARY DISTRICT PERMIT NO. 633 33'W. WASHINGTON STREET HAGERSTOWN, MARYLAND 21741-0571 (301) 791-3083/3084 P.O. BOX 571 DATE 5/3+/85 PERMIT TO CONNECT TO PUBLIC SEWERAGE/WATER SYSTEP Permission is hereby given to: Terry Burkholde For Property Located at: �337 High Stree- Owned by: Terry Burkholde " Address Type of Connection: To Service Connection Type of Service: Residential Commercial Meter Size SUBDISTRICT No • 15 Maugans,__Ie/Orchard Hills r 2337 High Street, Hagerstown, MD ( ) Units To Main Line: Other Industrial Connection Fee __ 'SU2u.00 _ Date Paid 5/3/85 To connect to a public sewerage/water system (with proper abandonment of previous private system). The installation of the connection and the abandonment of the previous private system shall conform with the provisions of the Laws of the State of Maryland and Washington County Sanitary District Specifications. This permit does not supersede any local ordinance that is in effect with regards to road cutting, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPON- SIBILITY CONNECTED THEREWITH REMAINS WITH THE PROPERTY OWNER. .0 Secretary -Treasurer Building Permit No. INSPECTION: At least 48 hours notice prior to requested date of inspection is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 33 W. Washington Street Hagerstown, Maryland 21740 Telephone: 791-3146 Permit Fee Final Inspection Made BY: Date Plumbing Ins ctor OFF-SITE INSPECTION (in Public Rights -of -Way and Easements) and certain ON-SITE INSPECTION in accordance with applicable approved construction drawings will be made by: Washington County Sanitary District 33 W. Washington Street-P.O. Box 571 Hagerstown, Maryland 21741-0571 Final Inspection Made By: Date DISTRIBUTION: Permitt Plumbing Board j Field Office City of Hag. i WASHINGTON COUNTY SANIT,MA-Y DISTRICT WASHINGTON COUNTY, MO. Project: �► SANITARY SEWER LATERAL CONSTRUCTION RECORD CCWTRACT 5045-3-5 Street133�.N ti�hlahc (or location): CA_ I{rrca lark6,Qlder Contractor: LiseoN ;0"TRACTOR2 .r' MH loz4- TO MH loL�-A Date Installed Jam- is -, Wye Ste. On Main f�37LT. WYE SIZE SIZE— TYPE PIPE TYPE C.O. DEPTH C.O. TYPE--EXCAU. LATERAL LENGTH LAYIR LENGTH g"x�';cF,"„soez6rz�c. sD.e�� _9V.F *Hort.= Total St ' d. 2F� L.F 2.3.-771— r Ope t noF;;=-TotJ Drop },J�� NOTES: i 2':ax Depth of Cleanout 5.Q9v. 4'. ®Flow Line Cleanout_ From:Z-Iaikj Layed ® 9 ;� z' STVgCAP c.o . Basement Service -- MH# ioZ4 Amounts partaA ag to k complets.d this 9Y 'f -)y UCSD Inspector (Form WCSC-4) �"N t o� �"R7 ML MH# ooze -Q period, revie d and approved. Contractors Rep. xM% Washingtc,_, County Sanitary District SEWER SERVICE LOCATION All - Subdistrict No. SD#15 Contract No. SD15-1S Property Address: -t /332'/ MH 1024 to ISH 1024-4 QWG. #601-366 Place an 'X' in the sketch below to indicate where the property owner wants the service connection (lateral) to enter the property. Place a wooden stake in the ground at that location. I 1 , p W d OD nn� N qz i The undersigned agrees that the Sanitary District may excavate an additional five (5) feet inside the property line so as to facilitate, and make less expensive, the owner's connection to the lateral and to prevent damage to the cleanout which will be ipstalled by the District at or near the property line. Date: �9-1y-F3 Owner-' Owner Attest: Was Co. Sanitary strict (Form WCSC-1) Replaces Form WCSC-56