Loading...
HomeMy WebLinkAboutLat_13540HalifaxDrive�a"TON WASHINGTON COUNTY 3 WATER & SEWER DEPARTMENT iA 16232 Elliott Parkway Williamsport, MD 21795 (301) 791-3083 Permit to Connect to Public Water/Sewer System Type of Permit )EWER Subdistrict Name (-". Mainline Contract No. Building Permit No. F2000-7184 Permission is hereby N en to Property Owner: 1V of address: VILLAGE BEVEL. Permit No. SCF 150`1449 Issue Date 05722700 Void Date Subdistrict No. For property located at: `'' ` u HREIP71X DRIVE Street Address Lot No. Subdiv. • j Phase Sec. Owner's Agent: `: ` ,HLAND HOMES Agent's Address: HAMILTUN BLVD. HAGERSTOV'7: Previous Owner: Fees Paid in Full? YES Lateral with Mainline? YLS Date Fees Paid OV,22YOCResidential EDU's Fee $ Commercial EDU' WCWSD Alloc./Conn. WCWSD/Other City of Hagerstown Remarks Fee $ Fee $ Fee $ Total Fee $ 050 Gal/Day Allocation Building Number Misc. Number When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. Signed: '1t ate: l ®�► INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 �? Hagerstown, MD 21740-4727 Phone: (301) 791-3070 Inspection Date: P C)0 Plumbing Inspector: /4 WASHINGTON COUNTY SANITARY DISTRICT SANITARY SEWER LATERAL WASHINGTON COUNTY, MD. CONSTRUCTION REPORT Project: 6D6o-505 Street (or location) : /eAi- FA), f7Rwt.-:- Contractor: MH IZZ1 TO MH 201 Date Installed 510g3 Wye Sta. On Main 0+L4 �T Lt;—i5 WYE SIZE - TYPE DEPTH TYPE EXCAVATION TYPE PIPE C. 0. C.O. LATERAL LENGTH LAYING LENGTH Horiz. = Total ST D. Slope + Horiz. = Total NOTES: DROP I ti�a Depth of Cleanout at Flow Line Cleanout 14 From �--- cf-u,,y Layed at 290 °Ute Basement Service O-r(4y L`i M H # Izz'A Amounts pertaining to work completed this period, re BY ':::�WC46 INSPECTOR WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1984 �-, 0 MH# 17 l4 DIV IV 400-58 C.