Loading...
HomeMy WebLinkAboutLat_13532HalifaxDriveWASHINGTON COUNTY 3 WATER & SEWER DEPA� 16232 Elliott Parkway Williamsport, MD 21795 ''gMAY 12 2003 (301) 791-3083 Permit to Connect to Public Water/Sewer System PERMITS AND INSP CTIQNS Type of Permit HES SEWER Permit No.., SCI' ' .1. Subdistrict Name Issue Date Mainline Contract No. Void Date 0570-5704 Building Permit No.- Subdistrict No.150 Permission is hereby given to: Property Owner: NORTH of address: VILLAGE DEVEL. When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE - INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 / Phone: (301) 791-3070 Inspection Date: G f��Q-F Plumbing Inspector: For property located at: Street Address Lot No. `- = Subdiv. NUhTtl V11j1jAUE Phase Sec. Owner's Agent: ADMAR CUSTOM HOMES Agent's Address: 5705 iNVUSTRY LANE FREDERICK MD 21/U4 Previous Owner: Fees Paid in Full? YES Lateral with Mainline? YES Date Fees Paid 05102103 Residential EDLI's Fee $ Commercial EDU's WCWSD Alloc./Conn. WCWSD/Other Fee $ Fee $ Gal/Day Allocation Building Number City of Hagerstown Fee $ Misc. Number Remarks Total Fee $ FERENTIAL I CREASE 1F PROPERTY is Nul CODINEC_ . When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE - INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 / Phone: (301) 791-3070 Inspection Date: G f��Q-F Plumbing Inspector: WASHINGTON COUNTY SANIT DISTRICT WASHINGTON COUNTY, MD. Proj ect: Street (or location) Contractor: Cu►t� Adv Date Installed 5 ►43 WYE SIZE - TYPE PIPE 5 pn,-Z6-Pu� TYPE DEPTH C. O C.O. TYPE LATERAL STPD. m IA at Flow Line Depth of Cleanout From Cleanout �`'�A Layed at �11 _ easement Service Crt44 LT SANITARY SEWER LATE"I" CONSTRUCTION REPORT � I 122 -qt TO MH 1214 MH p -t Lp4 Lr Wye Sta. On Main EXCAVATION LAYING LENGTH LENGTH Horiz. = Total 16, z► i Slope t Horiz• = Total 9 M H # Iztq MH �ZZg pertaining to work completed this period, nevtd an roved. mounts pe REPRESENTATIVE CON R ACTOR S SD INSPECTOR DIV. IV 400-58 4GTON COUNTY SANITARY DISTRICT cad WASHINGTON COUNTY SA'-TARY DISTRICT WASHINGTON COUNTY, K Project: 5p 15c)-5,35 Street (or location): _ PA6a4g Cont ractor: Cv K8,3Z «-16. U R u Cy SANITARY SEWER LATERAL CONSTRUCTION REPORT M H /Z l �'% TO MH 1—a`c Date Installed _ Ylyl43 Wye Sta. On Main 0-f 14 Cr WYE SIZE- TYPE DEPTH TYPE EXCAVATION TYPE PIPE C. 0. C.O. LATERAL LENGTH LAYING LENGTH Horiz. Total „ L{ 5 D2 -Z6 Pum 4� PA" ,,Lk 7 T(jNP STPD. Slope t Horiz. = Totai NOTES: DROP Depth of Cleanout — at Flow Line Cleanout — From Layed at z 9'o Basement Service MH # Amounts pertaining to work completed this period. nevi BY W D INSPECTOR C CONTRACT L MH# Izkg REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1984 S- 2 WASHINGTON COUNTY SANITARY DISTRICT WASHINGTON COUNTY, M�Wr ..a Project: Street (or location): 14A6t: g D2wd Contractor: CQ K6az «•-6. Up, u 44 SANITARY SEWER LATERAL CONSTRUCTION REPORT MH /Z1 b TO MH FAV Date Installed Y10,143 Wye Sta. On Main b+t4 Cr loT VP WYE SIZE - TYPE DEPTH TYPE EXCAVATION TYPE PIPE C. 0. CO. LATERAL LENGTH LAYING LENGTH Horiz. s Total L4"-5 D2 -Z6 Pum 41< PANmLA 7 -rat,P ST D. I \ r1 ! NOTES: DROP Slope + Horiz. = Total Depth of Cleanout at Flow Line Cleanout IS' FromLc--o.FwyC- Loyed at -Z9'o —' Basement Service U+e14 (-r MH # Amounts pertaining to work completed this period, revie d W D INSPECTOR CON WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1984 d. MHS Vz %I REPRESENTATIVE