Loading...
HomeMy WebLinkAboutLat_13518HalifaxDrive.�°,To NCoe, WASHINGTON COUNTY WATER & SEWER DEPARTMENT V 16232 Elliott Parkway Williamsport, MD 21795 /�/qq0C M-uLL,_� (301) 791-3083 Permit to Connect to Public Water/Sewer System Type of Permit RFR sRNFR Permit No. SCP 150-1460 Subdistrict Name MATIC-ANS l n14 Issue Date 08108/00 Mainline Contract No. X85 Void Date 08108/01 Building Permit No. P7000-7 S33 Subdistrict No. 1 50 Permission is hereby given to: Property Owner: NORTH VILLAGE of address: -� For property located at: I Street Address Lot No. Subdiv. NORTH VTL.L.A(;F Phase Sec. Owner's Agent: HT,,ur ARID HOMES Agent's Address: 1057 HAMILTON RT VI) HAC. _RSTOWN MT) 21740 Previous Owner: Fees Paid in Full? YFS Lateral with Mainline? YES Date Fees Paid 08/08/00 Residential EDU's 1 Fee $ Commercial EDU's 0 WCWSDAIIoc./Conn. Fee$ $2,300 Gal/Day Allocation 20C, WCWSD/Other Fee $ Building Number City of Hagerstown Fee $ $1 '200 Misc. Number Total Fee $ $3,500 Remarks When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 21740-4727 Phone: (301) 791-3070 Inspection Date: '2 DO Plumbing Inspector: WASHINGTON COUNTY SANITARY DISTRICT WASHINGTON COUNTY, MD. Project: 5b�!50-SRS Street (or location): El ��C--G Contractor: CuKGCr(A-i VAL14 Date Installed L5/93 SANITARY SEWER LATEF 'm* CONSTRUCTION REPORT MH 17k -b TO MH IZZo Wye Sta. On Main I to L / T #=..2 R WYE SIZE - TYPE PIPE TYPE C.O. DEPTH C.O. TYPE LATERAL EXCAVATION LENGTH LAYING LENGTI- Horiz. = Total ST D. ExyX16 5DR-ZbPUC- 4 " RA mrLA$ -rcr.P Z8, 4 Slope + Horiz. = To NOTES: DROP �..... 4 . N -- Depth of Cleanout of Flow Line Cleanout 2L' From(-Q—cw w\tc-: Layed at -2 °/o Basement Service MH # MH# IZIb I ZLO Amounts pertaining to work completed this period, revie nd pro BY S INSPECTOR CONT AC OR"'REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT AUGUST 13, 1984