Loading...
HomeMy WebLinkAboutLat_17914DaisyDriveWASHINGTON COUNTY SANITARY DISTRICT PERMIT NO. 102x_ y � 33 W. WASHINGTON STREET HAGERSTOWN, MARYLAND 21741-0571 (301) 791-3083/3084 DATE JtJ1Y 13, 1989 P.O. BOX 571 \� SUBDISTRICT _-_ate_ PERMIT TO CONNECT TO PUBLIC SEWERAGE/WATER SYSTEM n MdUgdnSV l l le Permission is hereby given to: DeClnl$ Weaver For Property Located at: NIS Daisy Drive garden SP-tLot� Sec -F Owned by: —nenni s Suver Address: P 0 Box 167 Mau ganvi l la, MD 21767 Type of Connection: To Service Connection xxx To Main Line: Type of Service: Residential XX (1) Units Other Commercial Industrial Meter Size __. Connection Fee_ $1,920.00- _ Date Paid `1-3L71 9 To connect to a public sewerage/water system (with proper abandonment of previous private system). The installation of the connection and the abandonment of the previous private system shall conform with the provisions of the Laws of the State of Maryland and Washington County Sanitary District Specifications. This permit does not supersede any local ordinance that is in effect with regards to road cutting, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPON- SIBILITY CONNECTED THEREWITH REMAINS WITH THE PROPERTY OWNER. Secretary -Treasurer O Building Permit No. 89-1406-0927 INSPECTION: At least 48 hours notice prior to requested date of inspection is required. ON SITE INSPECTION will be made by Washington County Plumbing Board 33 W. Washington Street Hagerstown, Maryland 21740 Telephone: 791-3146 Permit Fee Final Inspection Made BY: A\ Date Plumbing Inspec or OFF-SITE INSPECTION (in Public Rights -of -Way and Easements) and certain ON-SITE INSPECTION in accordance with applicable approved construction drawings will be made by: Final Inspection Made By: DISTRIBUTION: Permit Washington County Sanitary District 33 W.Washington Street r� Hagerstown, Maryland 2174741 rwnv 2 U lgpq Plumbing Board_ Field Off WASHINGTON CO. SANITARY DIST. WASHINGTON COUNTY SANITARY DISTRICT WASHINGTON COUNTY, Aft SANITARY SEWER LATERi CONSTRUCTION REPORT Project:�.�120�USPo'r7- G� R r ✓E get (or location) : ,q I y Contractor: CL, K4,,L8Ug_Q Date Installed o?/ AP2iL egXK AYE SIZE- TYPE TYPE PIPE a0 8xcox� �� PvC (0It euC, 5 t7 2 - Zco sc N 4-0 TOTES: I (p" pu c a I . cs- c--' CLO MH y'.3Z TO MH `J33 Wye Sta. On Main DEPTH CO. TYPE LATERAL ST 'D. EXCAVATION LENGTH 44. s DR epth of Cleanout ;5 at Flow Line leanout 4 I. SL -F From V�1 d I til ayed at I.®poio Basement Service MH * 5u Z o„ - Z uXoon ST'>•k� :57M./f/0 V - LAYING LENGTH Horiz. = Total 4(.S LF Slope t Ho � . = Totc MHM 933 w —z C_�, T is pertaining to work completed this period, reviewed and approved. WCSD INSPECTOR CONTRACTORS REPRESENTATIVE %SHINGTON COUNTY SANITARY DISTRICT JGUST 13, 198♦ DIV.II 210-29