Loading...
HomeMy WebLinkAboutLat_17910DaisyDriveWASHINGTON COUNTY SANITARY DISTRICT PERMIT NO 33 W. WASHINGTON STREET HAGERSTOWN, MARYLAND 21741-0571 (301) 791-3083 1 3084 DATE Noy, 21, P.O. BOX 571 SUBDISTRICT 15 PERMIT TO CONNECT TO PUBLIC SEWERAGEIWATER SYSTEM_ , ;V- 12ei G Permission is hereby given to: R C. '3 L! 5, 1c !C' ,rE icy & RenPe--Ior^t) / q1 For Property Located at: IS Dai 5v Dr, � r rr ren Plpni- T ni ? ;;ec' F N� Owned by: Builders, Inc, -Address: Pt 6 BOX 35Z, xTa_erstcwn, r;sD 21740 Type of Connection: To Service Connection Type of Service: Residential Commercial Meter Size XX To Main Line: Units Other Industrial Connection Fee �lxq;_0•00 Date Paid To connect to a public sewerage/water system (with proper abandonment of previous private system). The installation of the connection and the abandonment of the previous private system shall conform with the provisions of the Laws of the State of Maryland and Washington County Sanitary District Specifications. This permit does not supersede any local ordinance that is in effect with regards to road cutting, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPOW SIBILITY CONNECTED THEREWITH REMAINS WITH THE PROPERTY OWNER. Secretary -Treasurer % Building Permit No. INSPECTION: At least 48 hours notice prior to requested date of inspection is required. ON SITE INSPECTION will be made by Permit Fee Final Inspection Made BY: Washington County Plumbing Board 33 W. Washington Street Hagerstown, Maryland 21740 Telephone: 791-3146 OFF-SITE INSPECTION (in Public Rights -of -Way and Easements) and certain ON-SITE INSPECTION in accordance with applicable approved construction drawings will be made by: Final Inspection Made By: DISTRIBUTION: Permi Plumbing Boa Field Off Washington County Sanitary District 33 W. Washington Street-P.O. Box 571 Hagerstown, Maryland 21741-0571 Date 13 Z WASHINGTON COUNTY SAUITP.. Y DISTRICT WASHINGTON COUNTY, MD. Project: �a�z�r✓uSPc� SQT►o�u r get (or l ocation) : C.41 sY t7a4vE- Contractor: (f. z-• L3y2...i Date Installed q1. MA -f lgyE3 SANITARY SEWER LATER CONSTRUCTION REPORT MH q33 TO MH q 35 Wye Sta. On Main !+-1 1 1z - /YE SIZE - TYPE PIPE TYPE C.O. DEPTH CO. TYPE LATERAL EXCAVATION LENGTH LAYING LENGTH Co" Pi/C- (o" Pvr ccvxP,Horiz. Sarz-Z(�, SCH 0 4 Z -S STPD. 3Q.cp,� = Total 3co.Co � TOTES: pgep j - Slope t Ho ' . - Total r wool;) STAK,tE epth of Cleanout Z . S at Flow Line leanout From MA,AJ dyed at r. anc) ^irQ Basement Service =. 14-11 a.. MH * q33 MH t1 gas' is pertaining to work completed this period, reviewed and approved. I y— \ • u ti E -T Tz--O ►J WCSD INSPECTOR CONTRACTORS REPRESENTATIVE >SHINGTON COUNTY SANITARY DISTRICT jGuST 13, 1964 DIV.II 210-29 S-29