HomeMy WebLinkAboutLat_13626DaisyCircle��.f. .., ,.�., r..—,p..,,q,.. . ..�.sr^^-+„��^*A•......-. Y T ...—T.�rr. 7^--a..--.,�- ."�'AF'1J4rti1; �'rf+�i'�'�FT"i"�.^.;s^r...-._....._.-.#,ten.
x �
WASHINGTON COUNTY SANITARY DISTRICT PERMIT NO. 1027
33 W. WASHINGTON STREET HAGERSTOWN, MARYLAND 21741-0571 (301) 791-3083/3084 DATE June 9 1989
P.O. BOX 571
SUBDISTRICT 15
PERMIT TO CONNECT TO PUBLIC SEWERAGE/WATER SYSTEM Maugans— v1 Tle/OH
Permission is hereby given to:
For Property Located at: Garden Spot, Daisy Circle Lot 5 Sec F
Owned by: T Address: Rt 4 Box 374 11agerstown, MD 21740
v ho w. , q q , the a � � •-•t
Type of Connection: To Service Connection xx To Main Line:
Type of Service: Residential xx ( 1) Units Other
Commercial Industrial
Meter Size Connection Fee $1112 0 •00 _Date Paid, ti' q
To connect to a public sewerage/water system (with proper abandonment of previous' private system). The installation
of the connection and the abandonment of the previous private system shall conform with the provisions of the
Laws of the State of Maryland and Washington County Sanitary District Specifications.
This permit does not supersede any local ordinance that is in effect with regards to road cutting, etc.
ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPOW
SIBILITY CONNECTED THEREWITH REMAINS WITH THE PROPERTY OWNER.
Secretary -Treasurer ZE
Building Permit No. 89-1123-0770
INSPECTION: At least 48 hours notice prior to requested date of inspection is required.
ON SITE INSPECTION will be made by: Washington County Plumbing Board
33 W: Washington Street
Hagerstown, Maryland 21740
Telephone: 791-3146
Permit Fee
Final Inspection Made BY: <F4 �Cu_� Date
Plumbing Inspector 7
OFF-SITE INSPECTION (in Public Rights -of -Way and Easements) and certain
ON-SITE INSPECTION in accordance with applicable approved construction drawings will be made by:
Washington County Sanitary District
33 W. Washington Street P.O
Hagerstown, Maryland 21741 - a
Final Inspection Made By:
DISTRIBUTION: Permittee Plumbing Board
Field Office �b ao"j ,,,
WASH INGTON COUNTY SAiNIT/` ,Y DISTRICT
WASHINGTON COUNTY, MD.
Project:
9e1 (or location):7- 45)
Contractor: iVj,L,Qi4�
Date Installed 13 /93:5
/YE SIZE - TYPE DEPTH
TYPE PIPE C.O. CO.
loPVC Co" pVC
8X(oK8 ,
S o ,i - zco acH
4<D #T S
TOTES :
— / 74,-
C_
4, '
L a 1.00 *I-
CLd
epth of Cleanout -7-,S at Flow Line
leanout i7 From
ayed at 1 620,1%
t4 A Basement Service
MH
141
10mi► SANITARY SEWER LATERAL
CONSTRUCTION REPORT
13 (.Q 2Ce Dai S i C1'1"C.l e.
MH % TO MH 93Z
Wye Sta. On Main /74 &3,e
cowk'ac.+ SDIS0- 1S1
TYPE EXCAVATION
LATERAL LENGTH LAYING LENGTH
STPD.
ILI
000
_1 TAUZ
Srzl. /><lo3,e
IHoriz. = Total
Slope t Hori
MH"
G3Z
O cua"J
our
•ts pertaining to work completed this period. reviewed and approved.
Y
WCSD INSPECTOR CON RACTORS REPRESENTATIVE
reE
4SHINGTON COUNTY SANITARY DISTRICT
JGUST 13, 1984 DIV.II 210-29 S' Zg
I
WrtSHINGTON COUNTY SANITh Y DISTRICT
WASHINGTON COUNTY, MD.
Project: �,q�prz.c5,�� Seo F
"let (or location) Z, lois 611100_
Contractor:
Date Installed /9?,533
SANITARY SEWER LATERAL
CONSTRUCTION REPORT
MH ill TO MH 9.3Z
Wye Sta. On Main // �3.e
/YE
SIZE -
TYPE PIPE
TYPE
C.O.
DEPTH
C, 0.
TYPE
LATERAL
EXCAVATION
LENGTH
LAYING LENGTH
Co" PvC.
Co" PVC
X 62 xg
,
Horiz. = Total
40
►-j. -� S
ST ' D.
TOTES :DR015
Slope t Hari Total
epth of Cleanout -7--1S at Flow Line
'eanout 7 From Mq%✓
dyed at 0%
-- N,I Basement Service
MH *
14-1
O lJ
I/vwoon
5,---7. //613.e
MHM
93z
n% 2 CL-�
ou r
is pertaining to work completed this period, reviewed and approved.
WCSD INSPECTOR CON RACTOWS REPRESENTATIVE
4SHINGTON COUNTY SANITARY DISTRICT ff
JGUST 13, 1984 DIV. TI 210-29