HomeMy WebLinkAboutLat_13625DaisyCircleWASHINGTON
33 W. WASHINGTON STREET
P.O. BOX 571
COUNTY SANITARY DISTRICT
HAGERSTOWN, MARYLAND 21741-0571 (301) 791-3083/3084
PERMIT TO CONNECT TO PUBLIC SEWERAGE/WATER SYSTEM
Permission is hereby given to: Mike & Dawn Mongan
For Property Located at:
Daisy Circle Garden So
Owned by: _ Mika & Dawn Monger n Address:
^4ype of Connection: To Service Connection
W DLJ
Lot 6 Sec F
9,0
PERMIT NO. 1049
DATE Dec 20, 1939
SUBDISTRICT 15
MAUG�N�II Lam/
809 Penn. Avenue Hagerstown, MD 21740
To Main Line:
Type of Service: Residential ( I) Units Other
Commercial Industrial
Meter Size _ Connection Fee $1,920.00 _ Date PaidC1►`�" T�-qO
To connect to a public sewerage/water system (with proper abandonment of previous private sytem). The installation
of the connection and the abandonment of the previous private system shall conform with the provisions of the
Laws of the State of Maryland and Washington County Sanitary District Specifications.
This permit does not supersede any local ordinance that is in effect with regards to road cutting, etc.
ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPON-
SIBILITY CONNECTED THEREWITH REMAINS WITH THE PROPERTY OWNER.
No connection is to be made to the public sewer system unfil final
inspection and completion has been made.
Secretary -Treasurer y�E
Building Permit No. 899244190[718
INSPECTION: At least 48 hours notice prior to requested date of inspection is required.
ON SITE INSPECTION will be made by
Permit Fee
Washington County Plumbing Board
33 W. Washington Street
Hagerstown, Maryland 21740
Telephone: 791-3146
Final Inspection Made BY: Date
Plumbing Inspector
OFF-SITE INSPECTION (in Public Rights -of -Way and Easements) and certairw
ON-SITE INSPECTION in accordance with tap liic(aable approved construction drawings will be made'ty:
6 ! (� Washington County Sanitary District
33 W. Washington Street-P.O. Box 571
Hagerstown, Maryland 21741-0571a:..x.{s
i {���'•� ��; � R it 'aiy ., -
Final Inspection Made By: _ Date'*���
DISTRIBUTION: Permittee Plumbing Boa
Fie
Nmrs.
F
WASHINGTON COUNTY SANITOAoiY DISTRICT
WASHINGTON COUNTY, MD.
�► SANITARY SEWER LATERAL
CONSTRUCTION REPORT
Project: (�,�.e �l5,�i S'5CTt0'/ F -5o 1
;-get (or location): DAISu (2u9 ,_e (-'0_r_& 3�a�J �Q.i Gr'Lle
Contractor:
Date Installed 13 AP2.I�_ IQ8g
M H TO MH 9J O
Wye Sto. On Main
/YE
SIZE -
TYPE PIPE
TYPE
C.O.
DEPTH
GO.
TYPE
LATERAL
-'-•��I
EXCAVATION
LENGTH
vv•.. V f.J 1
LAYING LENGTH
3x��cg
(.011 PVC
� PVC
,
Horiz. = Total
SDi?--z�
SeN 4c�
Co.Sv
ST'D.
Z8 LF
Z S c.F
IOTES:
D
Slope t Hari otaI
epth of Cleanout G•S , at Flow Line
leanout ZSR From MAi✓
ayed at /oo °/
,d1�A Basement Service
ori COT
oN
M H #
i4►
MHO
C) 3z.
is pertaining to work completed this period. reviewed and approved.
WCSD INSPECTOR CONTRACTOR'S REPRESENTATIVE
4SHINGTON COUNTY SANITARY DISTRICT
JGUST 13, 1984 DIV.II 210-29 S' 29
WASHINGTON COUNTY SAUITA Y DISTRICT
WASHINGTON COUNTY, MD.
Project: C�A��Sr�7T �E�TTo F
-get (or location):
Contractor:
Date Installed 13 AP21(-- IQSR
SANITARY SEWER LATERAL
CONSTRUCTION REPORT
M H /�/ TO MH 9-32
Wye Sta. On Main /Y,6,9_' -
AYE SIZE - TYPE DEPTH TYPE EXCAVATION
TYPE PIPE C.O. CO. LATERAL LENGTH LAYING LENGTH
PVC PVC
8xco�8 Horiz. Total
S l72 - zco Scti q� Co .Sv ST 'D.
zBLF
TOTES
Slope t Hori ota1
/IjCc.E=f1� our
I
w+oop I z
J7�►ic,t Z- ��. PLLC
epth of Cleanout Cc S at Flow Line
'eanout ZSR From
dyed at /oo 111.
--NI/A Basement Service
CL&^AJ
y oVT
M H >k
14-1
MH 11
C) 3Z
is pertaining to work completed this period, reviewed and approved.
WCSD INSPECTOR CONTRACTORS `REPRESENTATIVE
%SHINGTON COUNTY SANITARY DISTRICT
GUST 13, 1984DIV, I I 210-29 S' 29