Loading...
HomeMy WebLinkAboutLat_13625DaisyCircleWASHINGTON 33 W. WASHINGTON STREET P.O. BOX 571 COUNTY SANITARY DISTRICT HAGERSTOWN, MARYLAND 21741-0571 (301) 791-3083/3084 PERMIT TO CONNECT TO PUBLIC SEWERAGE/WATER SYSTEM Permission is hereby given to: Mike & Dawn Mongan For Property Located at: Daisy Circle Garden So Owned by: _ Mika & Dawn Monger n Address: ^4ype of Connection: To Service Connection W DLJ Lot 6 Sec F 9,0 PERMIT NO. 1049 DATE Dec 20, 1939 SUBDISTRICT 15 MAUG�N�II Lam/ 809 Penn. Avenue Hagerstown, MD 21740 To Main Line: Type of Service: Residential ( I) Units Other Commercial Industrial Meter Size _ Connection Fee $1,920.00 _ Date PaidC1►`�" T�-qO To connect to a public sewerage/water system (with proper abandonment of previous private sytem). The installation of the connection and the abandonment of the previous private system shall conform with the provisions of the Laws of the State of Maryland and Washington County Sanitary District Specifications. This permit does not supersede any local ordinance that is in effect with regards to road cutting, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPON- SIBILITY CONNECTED THEREWITH REMAINS WITH THE PROPERTY OWNER. No connection is to be made to the public sewer system unfil final inspection and completion has been made. Secretary -Treasurer y�E Building Permit No. 899244190[718 INSPECTION: At least 48 hours notice prior to requested date of inspection is required. ON SITE INSPECTION will be made by Permit Fee Washington County Plumbing Board 33 W. Washington Street Hagerstown, Maryland 21740 Telephone: 791-3146 Final Inspection Made BY: Date Plumbing Inspector OFF-SITE INSPECTION (in Public Rights -of -Way and Easements) and certairw ON-SITE INSPECTION in accordance with tap liic(aable approved construction drawings will be made'ty: 6 ! (� Washington County Sanitary District 33 W. Washington Street-P.O. Box 571 Hagerstown, Maryland 21741-0571a:..x.{s i {���'•� ��; � R it 'aiy ., - Final Inspection Made By: _ Date'*��� DISTRIBUTION: Permittee Plumbing Boa Fie Nmrs. F WASHINGTON COUNTY SANITOAoiY DISTRICT WASHINGTON COUNTY, MD. �► SANITARY SEWER LATERAL CONSTRUCTION REPORT Project: (�,�.e �l5,�i S'5CTt0'/ F -5o 1 ;-get (or location): DAISu (2u9 ,_e (-'0_r_& 3�a�J �Q.i Gr'Lle Contractor: Date Installed 13 AP2.I�_ IQ8g M H TO MH 9J O Wye Sto. On Main /YE SIZE - TYPE PIPE TYPE C.O. DEPTH GO. TYPE LATERAL -'-•��I EXCAVATION LENGTH vv•.. V f.J 1 LAYING LENGTH 3x��cg (.011 PVC � PVC , Horiz. = Total SDi?--z� SeN 4c� Co.Sv ST'D. Z8 LF Z S c.F IOTES: D Slope t Hari otaI epth of Cleanout G•S , at Flow Line leanout ZSR From MAi✓ ayed at /oo °/ ,d1�A Basement Service ori COT oN M H # i4► MHO C) 3z. is pertaining to work completed this period. reviewed and approved. WCSD INSPECTOR CONTRACTOR'S REPRESENTATIVE 4SHINGTON COUNTY SANITARY DISTRICT JGUST 13, 1984 DIV.II 210-29 S' 29 WASHINGTON COUNTY SAUITA Y DISTRICT WASHINGTON COUNTY, MD. Project: C�A��Sr�7T �E�TTo F -get (or location): Contractor: Date Installed 13 AP21(-- IQSR SANITARY SEWER LATERAL CONSTRUCTION REPORT M H /�/ TO MH 9-32 Wye Sta. On Main /Y,6,9_' - AYE SIZE - TYPE DEPTH TYPE EXCAVATION TYPE PIPE C.O. CO. LATERAL LENGTH LAYING LENGTH PVC PVC 8xco�8 Horiz. Total S l72 - zco Scti q� Co .Sv ST 'D. zBLF TOTES Slope t Hori ota1 /IjCc.E=f1� our I w+oop I z J7�►ic,t Z- ��. PLLC epth of Cleanout Cc S at Flow Line 'eanout ZSR From dyed at /oo 111. --NI/A Basement Service CL&^AJ y oVT M H >k 14-1 MH 11 C) 3Z is pertaining to work completed this period, reviewed and approved. WCSD INSPECTOR CONTRACTORS `REPRESENTATIVE %SHINGTON COUNTY SANITARY DISTRICT GUST 13, 1984DIV, I I 210-29 S' 29