HomeMy WebLinkAboutLat_13519ChadsTerraceCIT °" C,
06 WASHINGTON COUNTY
" WATER & SEWER DEPARTMENT
16232 Elliott Parkway
RYLr"0 Williamsport, MD 21795
(301) 791-3083
Permit to Connect to Public Water/Sewer System
Type of Permit
RES SEWER
Permit No.
SCP 150-1666
Subdistrict Name
MAUGANS OH
Issue Date
Mainline Contract No.
Void Date
03
Building Permit No.
P2002-0408
Subdistrict No.
150
Permission is hereby given
to:
Property Owner:
OLIVER HOMES INC.
of address:
19733 LEITERSBURG
PIKE
HAGERSTOWN
MD 21740
For property located at:
13 519
CHAD'S TERRACE
Lot No. 103
Subdiv. MANUGANS MEADOWS
Street Address
Phase Sec.
Owner's Agent: _
Agent's Address:
Previous Owner:
)LIVER HOMES INC.
19733 LEITERSBURG PIKE HAGERSTOWN MD
Fees Paid in Full? YES Lateral with Mainline? YES
Date Fees Paid 03/13/02 Residential EDU's
Fee $ Commercial EDU's
WCWSD Alloc./Conn. Fee $ Gal/Day Allocation zUU
WCWSD/Other Fee $ Building Number
City of Hagerstown Fee $ Misc. Number
Total Fee $
Remarks A FEE DIFFERENTIA
INCREASE IF PROPERTY IS NOT CONNECTED B
When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall
conform with the provisions of Maryland State laws and County policy.
This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS,
STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE-
MAINS WITH E PRO RTY O (NER.
Signe e:
INSPECTION: At least 48 hours notice prior to requested date is required. _
ON SITE INSPECTION will be made by:
Washington County Plumbing Board
100 W. Washington Street, Room 304
Hagerstown, MD 21740-4727
Phone: (301) 791-3070
Inspection Date: Plumbing Inspector:
P� 'u ITZ� Af � 0:
�� polis
WASHINGTON COUNTY SANITARY DISTRICT SANITARY SEWER LATERAL
WASHINGTON COUNTY, CONSTRUCTION REPORT
Project: 317.6--
Street (or location) : L. o'7 / a 3 Sir" -d Gro A A, co, /dC�l � ChM>5
Contractor: S/s, >7 a C, �c J C o H rrci7crs
T�
Depth of Cleanout at Flow Line
Cleanout 36 V� From
Layed at 2 ")-6/0
A/ Basement Service
C►1g/a3
f
v
MH
M H # SPIS 11 z s
Amounts pertaining to work completed this period, reviewed and approved.
BY W F� 1 14
WCSD INSPECTOR CONTRACTORS REPRESENTATIVE
WASHINGTON COUNTY SANITARY DISTRICT
AUGUST 13, 1984
S-2
MH srnl- -i/z/
TO MH sc�>--iizt
Date Installed
8-3 �— `I
Wye Sta. On Main dt�4 s— cT
WYE
SIZE -
TYPE
DEPTH
TYPE
EXCAVATION
TYPE PIPE
C.O.
C. 0.
LATERAL
LENGTH
LAYING LENGTH
Pvy
4"
PS L
Ces>
Horiz. • Total
Svie-55
1 XK'
ST ' D.
(/x 4,� �,
ywss
4 3 c
3 k C.
Slope + Horiz. = Total
NOTES:
DROP
Depth of Cleanout at Flow Line
Cleanout 36 V� From
Layed at 2 ")-6/0
A/ Basement Service
C►1g/a3
f
v
MH
M H # SPIS 11 z s
Amounts pertaining to work completed this period, reviewed and approved.
BY W F� 1 14
WCSD INSPECTOR CONTRACTORS REPRESENTATIVE
WASHINGTON COUNTY SANITARY DISTRICT
AUGUST 13, 1984
S-2