Loading...
HomeMy WebLinkAboutLat_13413ChadsTerraceC, 'TON c 02 3 � M�Rr�rN� Type of Permit Subdistrict Name _ Mainline Contract No. Building Permit No. _ WASHINGTON COUNTY WATER & SEWER DEPARTMENT 16232 Elliott Parkway f I ra Williamsport, MD 21795 V (301) 791-3083 1r^� Permit to Connect to Public Water/Sewer System Permission is hereby given to: Property Owner: -N rIt MEO of address: -r Permit No. 1`^-1401 �, N Issue Date Void Date Subdistrict No. Fj For property located at: " } Street Address Lot No. Subdiv. Phase Sec. Owner's Agent: Agent's Address: ` Previous Owner: Fees Paid in Full? Date Fees Paid WCWSD Alloc./Conn. WCWSD/Other City of Hagerstown_ Remarks Fee Fee Fee Fee Total Fee Lateral with Mainline? Residential EDU's _ Commercial EDLI's _ Gal/Day Allocation Building Number Misc. Number When connecting to a public water/sewer system, the installation of the connection and the abandonment of the previous private system shall conform with the provisions of Maryland State laws and County policy. This permit does not supercede any local ordinance that is in effect with regard to road excavations, plumbing permits, etc. ALL OTHER PERMITS, STATE AND LOCAL, MUST BE OBTAINED BY THE PROPERTY OWNER AND ALL RESPONSIBILITY CONNECTED THEREWITH RE- MAINS WITH THE PROPERTY OWNER. Date: I% .57 0 , INSPECTION: At least 48 hours notice prior to requested date is required. ON SITE INSPECTION will be made by: Washington County Plumbing Board 100 W. Washington Street, Room 304 Hagerstown, MD 217404727 Phone: (301) 791-3070 Inspection Date:�Z 0-7- g8 Plumbing Inspector: RECEIVED DEC Z 1 1994 WASHINGTON COUNTy' WATER & SEWER DEPT 8 WASHINGTON COUNTY SANITARY DISTRICT WASHINGTON COUNTY, MD. ^ Project: Street (or location): /' �c✓s i � -e 1 Contractor: '�a Date Installed 7- /-7' 94 SANITARY SEWER LATEF A*4 CONSTRUCTION REPORT ,c T 4'�.r 7 MH ///CJ TO MH Wye Sta. On Main WYE SIZE - TYPE PIPE TYPE C. 0. DEPTH C.O. TYPE LATERAL EXCAVATION LENGTH LAYING LENGTF sDe-2G = Total Q�!/C .�U/.4 DHoriz. STPD. ��•� Slope t Horiz. = To NOTES: DROP � /� // 4J11 .(A . .U Depth of Cleanout D Tem at Flow Line Cleanout From C4 oc M Layed at AJI,9- Basement Service MH #/)/O Amounts ain' to work completed this BY- WCSD INSPECTOR period. reviewed and approved. MHt# ///i / . Va�- CONTRACTORS REPRESENTATIVE WASHINGTON COUNTY SANITARY DISTRICT FS AUGUST 13, 1984 -